HomeMy WebLinkAboutDDW-2024-008515June 20, 2024
Paul Garvey
Junction Town
P.O. Box 26
Junction, UT 84740
Subject:Operating Permit, 350K Gallon Storage Tank (ST003);
Junction Town, System #16001, File #13150, SRF #3S1915
Dear Paul Garvey:
The Division of Drinking Water (the Division) received a request for an Operating Permit for the
350K Gallon Storage Tank project from your consultant, Tyson Jewkes with Ensign Engineering
on June 18, 2024. The Division issued Plan Approval for this project on October 17, 2022. DEQ
Central District Engineer, John Chartier, conducted an onsite final inspection of this project on
February 20, 2024.
Our understanding of the project is that a new 350,000-gallon concrete tank (ST003) has been
constructed adjacent to the two existing tanks, the East Tank (ST001) and the West Tank (ST002).
The new 350K Gallon Tank has been constructed at the same elevation as the existing tanks and
all three tanks share a common discharge point for their respective drain and overflow pipelines.
This project also included the installation of approximately 585 feet of 8-inch diameter PVC pipe
in the distribution system near 100 South and Main Street. This section of pipe included
reconnecting existing service connections and fire hydrants as well as new 8-inch gate valves. The
new 350K Gallon Tank is identified as ST003 in the Division’s database.
We have received the following information for the 350K Gallon Storage Tank(ST003) Project:
1. Certification of Rule Conformance with plan approval conditions by a professional
engineer.
2. Satisfactory bacteriological results as evidence of proper disinfection and flushing.
3. Evidence of O&M manual delivery.
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801-536-4211 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper.
State of Utah
SPENCER J. COX
Gover nor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF DRINKING WATER
Nathan Lunstad, P.E.
Director
Paul Garvey
Page 2 of 2
June 20, 2024
We have determined that all conditions for operating permit issuance have been met. On this basis,
an Operating Permit for the 350K Gallon Tank Project is hereby issued as constituted by
this letter. You may now place the 350K Gallon Tank in service in your water system.
Please maintain a copy of this letter with your permanent records for future reference.
If you have any questions regarding this Operating Permit, please contact John Chartier, P.E.,
DEQ Central District Engineer, at (435) 559-1969, or Michael Newberry, P.E., Permitting and
Engineering Manager, at (385) 515-1464.
Sincerely,
Russell Seeley, P.E.
Assistant Director
cc: Eric Larsen, Central Utah Public Health, elarsen@centralutahhealth.org
Tyson Jewkes, P.E., Ensign Engineering, tjewkes@ensignutah.com
Paul Garvey, Junction Town, junction.town@yahoo.com
John Chartier, P.E., Department of Environmental Quality, jchartier@utah.gov
Kjori Shelley, Division of Drinking Water, kashelley@utah.gov