Loading...
HomeMy WebLinkAboutDAQ-2024-008591rrHot.cllt UTAH DEPARruENT OF ENVIRONMENTAL OUALTTY [{AY 25 NN DIVISION OF AIR QUAUTY April14,2A23 Utah Division of AirQuality Director of Air Quality 4701W. RussdlRoad 2d Floor Salt Lake City, UT 84'114-4,820 RE: Holctm StiJ& tnc.-utelltg Permlt #4,i1{Xtfi}100i}, Semi-Annual CAM segost';olSl.l2022 through oil3,tl2023 Dear Director: Holcim SWR, lnc.-Utellte is submitting the Semi-Annual CAM Report in accordance with Operating Permlt provision 1t.8.2.a.3, il.8.3.a.3 and il.8.4.a.3 and Utah Administratlve code {uAC} R307415-6a (3) ci. This certification covers operations from t0lo1.l2022 ta O3Btl2O23. Should you have questions or requlre additional information please do not hesitate to contact me at aaron. I und &. h olcim. com or 7 02-27 44299. Aaron J. Lund C.E.M. Environment & Land Manager Holcim US. 1687 Cole Blnd., Suite 300, GoHen, CO 8o'101 Phone 30&9ES1 070, www.holcim.com REVIEWEDInitials: Date: June 12, 2024Compliance Status: OKFile #: 10676 (B2)Comment: Should have been reviewedat of the July 21, 2023, inspection. To: Executive Secretary, Utah Air Quality Board From: Holcim SWR,Inc. - Utelite RE: CAM Summary Report for Permit # 4300001003 Date: April 14,2023 In accordance with Operating Permit provision 11.8.2.a.3,II.B.3.a.3, and II.B.4.a.3 the attached summary report is submitted. This report covers the period from l0/0112022 to 0313112023. In accordance with Operating Permit provisions I.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certifr that the statements and information in this document are true, accurate, and complete. c/- t3 - ?at-/ - Date Jeffery M. Barrick, General Manager a Responsible Official for the Source DIVISION OFAIR OUALITY Summary of Excursions & Monitoring Report Facility: Holcim - US, Utelite Plant Reporting Period: October 1,2022 through March 31,2023 Unit: Baghouse No. L Excursions utAH DEPARTI\IIENT oF ENVIRONMENTAL QUAUTY [,lAY 25 20n DIUSION OF AtR QUALITY Presence of Visible Emissions Number:0 Duration: N/A Cause: N/A Corrective Action: N/A Instances of visible emissions exceeding l0% opacity: 0 Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: MAY Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes ant=other 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 o/". A full Method 9 observation is conducted within 24 hours of observing visible emissions. Summary of Excursions & Monitoring Report Facility: Holcim - US, Utelite Plant Reporting Period: October 112022 through March 31,2023 Unit: Baghouse No.3 Excursions Presence of Visible Emissions Number: 2 Duration: Less than 24 hours (see notes below) Cause: Loss of pressure in the compressed air system caused bag house to bypass Corrective Action: Restored air pressure, identified and corrected cause Instances of visible emissions exceeding llYo opacity: 2 (see attached deviation reports) Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes ant:other 1.5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 o . A full Method 9 observation is conducted within 24 hours of observing visible emissions. HOLCIM To: Executive Secretary, Utah Air Quality Board From: Ilolcim -US, Utelite Plant RE: Deviation Report For Permit No' 4300001003 Date: lll29AL22 In accordance with operating permit provision I.s.2.b, utah Administrative code (uAc) R307-4 1 5-6a(3Xc)(iij the following report is submiued: l.Listthedatethedeviationoccurred:1112512022 2. Permit conditions for which deviation occurred: II.B.3.b 3. Describe the deviation that occurred: At 9:58am emissions greatgr than 10 percent opacity were emitted from the Number 3 stack' This condition existed for approximatelY 6 minutes- 4. Describe the probable cause of the deviation: A sudden loss of pressure in the compressed air system caused a bypass of the baghouse' 5. Describe any corrective actions or preventive measures taken: The kiln was shut down until ;r prrrr*, could be restored. The cause was determined to be moisture freezing in an air line. Because of the frozen line, air pressure- t9dJ9.bt routed to the bag house from a different air line. Once air pressure was restored the kiln was restarted' In accordance with Operating Permit provision I.K and UAC R307-415-5d' and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true,'accurate, and complete' ,. -/ df a Responsible Official Date Jeffery Barrick, General Manager REVIEWEDInitials: Date: June 12, 2024Complaince Status: OKFile #: 10676 (B2)Comment: Was reviewed already onJune 12, 2024. 0 HolctM To: Executive Secretary, Utah Air Quality Board From: Holcim - US, Utelite Plant RE: Deviation Report For Permit No' 4300001003 Date: nrclA022 In accordance with Operating Permit Provision I.S.2.b, Utah Adminisfrative Code (JAC) R307-415-6a(3XcXiii the following report is submitted: 1. List the date the deviation occurred: 1113012022 2. Permit conditions for which deviation occurred: II.B.3.b 3. Describe the deviation that occurred: At approximately 11:00am emissions greater than 10 percent opacity were emitted hom the Number 3 stack' This condition existed for approximately 5 minutes' 4. Describe the probable cause of the deviation: As a result of extreme low temperatures and high humidity, there was excessive moisfl[e buitt up in the compressed air system' It froze in the air lines and the loss of air pressure to the bypass gates caused them to activate. 5. Describe any corrective actions or preventive measures taken: The kiln was shut down untif tfre problem could be identified. The cause was determined to be frozen air lines. The air lines were heated to clear the blockage. The kiln was then restarted and returaed to normal operation. The kiln operators have been instructed to open air valves periodicaliy ut airr"r.* points in the system to purge moisture from^the air lines to ir.r.nt u UoitO up of moisttge that may freeze and cause a repeat of the problem' In accordance with operating Permit provision I.K and uAc R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document aro true, 'of a Responsible Official ' 7D - 7021L- Itiffery Barrick, General Manager Date REVIEWEDInitials: Date: June 12, 2024Compliance Status: OKFile #: 10676 (B2) Comment: Should have been reviewed at time of the July 21, 2023, inspection. Summary of Excursions & Monitoring Report Facility: Holcim - US, Utelite Plant Reporting Period: October 1,2022 through March 31,2023 Unit: Baghouse No. 4 Excursions Presence of Visible Emissions Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Instances of visible emissions exceeding llYo opacity: 2 (see attached deviation reports) Baghouse D.P. (outside the range of 3 to 6 inches of water column in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Baghouse Inlet Temp. (outside the range of 250 to 500 degrees Fahrenheit in a one hour period) Number: 0 Duration: N/A Cause: N/A Corrective Action: N/A Monitor Downtime Incidents Baghouse Pressure Monitor Number: 0 Duration: N/A Cause: N/A Baghouse Temperature Monitor Number: 0 Duration: N/A Cause: N/A Notes: Anytime visible emissions are detected, the damaged bags are replaced within 24 hours. The kiln is shut down approximately 1.5 - 2.0 hours before replacing the bags. It takes approximately 45 minutes for the existing feed to run through the kiln and another 45 minutes for the kiln to cool. Startup takes ant:other f .5 - 2.0 hours. Feed is not reintroduced to the kiln until after the baghouse has been brought back online. Because the opacity is monitored daily and because the baghouse is always repaired within 24 hours of observing any visible emissions, the opacity does not approach l0 Vo. A full Method 9 observation is conducted within 24 hours of observing visible emissions.