HomeMy WebLinkAboutDAQ-2024-008588rrHoLctM I,TAH DEPAFTMET.IT OF
Et IVIRONMENTAL OUALITY
ocl 1 1 2023
* an d \ali ,tuv.J
DIVISION OF AIH QUALITY
October 10,?0,23
Utah DMsion of Air Quality
Director of Air Quality
4701W. RussellRoad 2tto Floor
Salt Lake City, UT 84.1144820
RE: Holcfm SWR, lnc.-t telttc, Permh lf4!100001004, Semi-Annual Monltorlnt Report 04/0UD23 through
slrl3ol2o23
Dear Director:
Holcim SWR, lnc.-Utelite is submitting the Semi-Annual Monitoring Report in accordance with Operating Permit
provision 1.S.2.a, and Utah Administrative Code (UAC) R307415$a (3XcXil. This certification covers operatlons
f r o m M I Ot I 2023 to 09 I 30/ 2O23.
Please see the attached Deviation Report whlch occured on May 17,2023 and received by your ofEces on May 18,
2023.
Should you have questions or require additlonal information please do not hesitate to contact me at
aaron.lund holcim.com or 7O2-27 44299.
Aaron J. Lund C.E.M.
Environment & tand Manager, Mountain Re$on
Holcim SwR, lnc.
Sincerely,
Holcim uS, 1887 Cole Bhtd., SriE 300, Golden, CO E0,Ol
Phono g,3$&l 0N). w*w.hoHm.com 111
REVIEWEDInitials: Date: May 8, 2024Compliance Status: OK File #: 10676 (B2)
ffi
DIVISION OF AIR OUALITY-
tr
N
Semi-Annual Monitoring Report - RO Certification
Permit # 430000f003
Date: October 10,2023
This report covers the period from 0410112023 to 0913012023.
For the indicated reporting period:
tr There were no deviations from any permit requirements
Attached is a list of permit requirements for which there were deviations. The list
Includes the information required by Operating Permit provision I.S.2.a and UAC
R3 07-4 I s-6a(3)(c)(i).
In lieu of attaching the above list, deviation reports submitted in accordance with
permit provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below.
See attached copy of deviation report dated 0511712023
In accordance with Operating Permit provisions I.K and UAC R307-415-5d, and based
on information and belief formed after reasonable inquiry, I certiS that the statements
and information in this document are true, accurate, and complete.
Alex Judd, Operations Manager
Date
r,Holcm,t
ttf ari ClrfA+rThtr.]il ei
U",J,HONIT{[ \] AI Q$AIjtY
To: ErecuJive Socretrry, Utrh Air Quality Board
From: Holcim - US, Utelite Pl*ut
RE: Devietion Report For PermitNo. 43{Xffil&}3
l,ll,l 'i ', itLo':
DMSION OF AIH QUALTTY
Ilrte: 05tfin423
In accordance wittr Operatiag Permit Provision I.S.2.b, Utah Adrnhistrative Code (UAC)
R307-415-643XcXii) the following rcport is zubmitted:
I. List the date the deviation occurd: 05117n023
2. Permit conditiong forwhich dcvietion occurred: II.B.a.a.l(AXi)
3. Describe the devirtion that mcurred: The stack test for PMl0 emissions from
the number 4 kiln should have been done by 45rc3n023.
4. Deocribe lhe probable cauge of the deviation: The stack test was scheduled for
MlDnlB. On that day, the testing compafly was set up and ready but due to the cold
and wet winter weather conditions the raw shale was hangrng up in the feed tank and
would not {bed consistently into the kiln. Affer spending most of the day trying to get the
material to feed from the tank, the stack test was rcscheduled for slfin0B, Although
conditions had improved by 511712023 there were still some problems getting the raw
shale to feed to the kiln as consistently as neded for the stack test.
5. De*crlbe rny correclinte *cliow or preveative merlures takca: ThE kila operators
will continue to rnonitor the feed to tfu kiln and continue working to maintain a
consistent flow of material. The process should get back to normal as the weather gets
warmer. The stack test has been scheduled for the week of M10512023. The
representative from the Division ofAir Quality has been notified of the new date.
ln accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on
information and belief formed after reasonable inguiry, I certify that the staternents and
Jeffery Barrick, General Manager