Loading...
HomeMy WebLinkAboutDAQ-2024-0085780 HolcrM UTAH DEPARTMENT OF ENVIRONMENTAL OUAUTY DEC 1 2 2A)?- DIVISION OF AIR QUALTTY 2. aJ. To: Executive Secretary, Utah Air Quality Board From: Holcim - US, Utelite Plant RE: Deviation Report For Permit No. 4300001003 Date: 1210112022 In accordance with Operating Permit Provision I.S.2.b, Utah Administrative Code (UAC) R307-415-6a(3XcXii) the following report is submiued: 1. List the date the deviation occurred: 1113012022 Permit conditions for which deviation occurred: II.B.3.b Describe the deviation that occurred: At approximately 11:00am emissions greater than l0 percent opacity were emitted from the Number 3 stack. This condition existed for approximately 5 minutes. Describe the probable cause of the deviation: As a result of extreme low temperatures and high humidity, there was excessive moisture built up in the compressed air system. It froze in the air lines and the loss of air pressure to the bypass gates caused them to activate. Describe any corrective actions or preventive measures taken: The kiln was shut down until the problem could be identified. The cause was determined to be frozen air lines. The air lines were heated to clear the blockage. The kiln was then restarted and returned to normal operation. The kiln operators have been instructed to open air valves periodically at different points in the system to purge moisture from the air lines to prevent a build up of moisture that may freeze and cause a repeat of the problem. ln accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true,, and complete. - 7D - ZP?'tt'' 'of a Responsible Offrcial 4. 5. Jdffery Barrick, General Manager Date REVIEWEDInitials: Date: June 12, 2024Compliance Status: OK File #:10676 (B2) Comment: Should have been reviewedat time of the July 21, 2023, inspection.