Loading...
HomeMy WebLinkAboutDERR-2024-006887 __________________________________________________________________________________________ Palmer Tire MLS-22 Atlas 358 South 700 East, B518 Salt Lake City, Utah 84102 www.oneatlas.com Office: 801-935-4917 May 6, 2024 Mr. Mark Crim Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, Utah 84114-4840 SUBJECT: Proposed Work Plan and Price for Quarterly Groundwater Monitoring and Reporting Palmer Tire 395 South 200 East Roosevelt, Utah Facility ID #9000371 UST Release Site MLS Work Assignment MLS-22 UDEQ Technical Services Contract #216364 Dear Mr. Crim: Please find attached a copy of the Proposed Work Plan and Price to conduct quarterly groundwater monitoring and reporting at the above referenced site. Our services consist of professional opinions and recommendations made in accordance with generally accepted geotechnical and environmental engineering principles and practices. This warranty is in lieu of all other warranties either expressed or implied. Should you have any questions, please do not hesitate to call me at 801-971-1064. Sincerely, Atlas Jim Coletta, P.G. Branch Manager Utah Certified UST Consultant Palmer Tire MLS-22 Atlas PROPOSED WORK PLAN QUARTERLY GROUNDWATER MONITORING AND REPORTING PALMER TIRE 395 SOUTH 200 EAST ROOSEVELT, UTAH FACILITY ID #9000371 UST RELEASE SITE MLS WORK ASSIGNMENT MLS-22 UDEQ TECHNICAL SERVICES CONTRACT #216364 May 6, 2024 Prepared for: Mr. Mark Crim State of Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, Utah 84114 Prepared by: Atlas 358 South 700 East, B518 Salt Lake City, Utah 84102 Palmer Tire MLS-22 Atlas TABLE OF CONTENTS Letter of Transmittal Title Page Table of Contents 1. INTRODUCTION ................................................................................................................................... 1 2. SCOPE OF SERVICES ........................................................................................................................ 1 2.1 Task 1 – June 2024 Groundwater Monitoring and Reporting .................................................... 1 2.2 Task 2 – September 2024 Groundwater Monitoring and Reporting ......................................... 2 2.3 Task 3 – December 2024 Groundwater Monitoring and Reporting ........................................... 2 2.4 Task 4 – March 2025 Groundwater Monitoring and Reporting ................................................. 2 2.5 Task 5 – June 2025 Groundwater Monitoring and Reporting .................................................... 2 2.6 Task 6 – September 2025 Groundwater Monitoring and Reporting ......................................... 2 3. DELIVERABLES .................................................................................................................................. 3 4. PROPOSED PROJECT SCHEDULE ................................................................................................... 3 5. PERSONNEL ........................................................................................................................................ 3 6. SUBCONTRACTORS ........................................................................................................................... 3 7. EXCEPTIONS, ANTICIPATED PROBLEMS, OR SPECIAL REQUIREMENTS ................................. 3 8. CONFLICT OF INTEREST ................................................................................................................... 3 9. COST ESTIMATE ................................................................................................................................. 4 Figure 1 – Site Map Table 1 - Proposed Project Schedule Table 2 - Cost Estimate Appendix A – Contract Required Paperwork and Bid Documentation Palmer Tire MLS-22 Atlas 1 PROPOSED WORK PLAN QUARTERLY GROUNDWATER MONITORING AND REPORTING PALMER TIRE 395 SOUTH 200 EAST ROOSEVELT, UTAH FACILITY ID #9000371 UST RELEASE SITE MLS WORK ASSIGNMENT MLS-22 UDEQ TECHNICAL SERVICES CONTRACT #216364 1. INTRODUCTION Under Work Assignments MLS-22, the Utah Department of Environmental Quality, Division of Environmental Response and Remediation (UDEQ) requested Atlas Technical Consultants (Atlas) prepare a Work Plan and price to conduct quarterly groundwater monitoring and reporting for a one year period at the above referenced site. A site map showing well locations is presented as Figure 1. This following proposed Work Plan presents a brief description of the tasks to be performed including a schedule (Table 1) for completing the activities described herein and a detailed cost breakdown (Table 2). 2. SCOPE OF SERVICES The objective of this proposed Work Plan is to conduct four quarterly rounds of groundwater sampling and to prepare summary reports for each groundwater sampling event. Each task is described in greater detail in the following sections. Utah Certified Soil and Groundwater Samplers would perform the groundwater sampling activities described below under the direction of a Utah Certified UST Consultant. 2.1 Task 1 – June 2024 Groundwater Monitoring and Reporting The procedures described in the following paragraphs would be used to sample monitoring wells MW -11, MW -14, MW -15, MW -17, MW -18, MW -19, MW -21, and MW -22. In addition, free product and groundwater elevation data will be collected from MW -10. Initially, the groundwater depth and free product thickness (if present) would be measured at each well location. These measurements would be taken with a down-hole water level/free product interface probe. The water level/free product probe would be decontaminated between each well with an Alconox detergent wash and tap water rinse. The wells to be sampled would then be developed/purged of a minimum of three well casing volumes or until dry using new disposable bailers. The water interface probe would be decontaminated between each well using an Alconox detergent wash and tap water rinse. If free product is measured in a well, that well would not be sampled. The purge and decontamination water would be poured on the asphalt surface and allowed to evaporate. The groundwater sampling event would include the wells listed above. A field blank and trip blank would also be submitted for quality assurance purposes. The wells that do not contain free product would be analyzed for MBTEXN and TPH-GRO sing USEPA Method 8260; and for TPH-DRO using USEPA Method 8015. A groundwater monitoring report would be prepared under Task 1. The report will include: • Data tables for historic and newly obtained analytic data; • Measurements for depth to water and free product; Palmer Tire MLS-22 Atlas 2 • A site location map showing the monitoring wells • A groundwater gradient map; • Iso-concentration contours maps for dissolved phase benzene, TPH-GRO, and TPH- DRO; • QA/QC for sample collection; • Actual laboratory reports and chain of custody forms; and • Field observations including standard operating procedures for well purging and sampling. One copy of the report will be provided to the UDEQ. 2.2 Task 2 – September 2024 Groundwater Monitoring and Reporting A groundwater sampling event would be conducted in September 2024 and would follow the sample protocols and included the sample locations as described in Section 2.1 above with the exception of the collection of the free product samples. Upon completion of the sampling event a Groundwater Monitoring Report would be prepared and will include the components listed above under Section 2.1. 2.3 Task 3 – December 2024 Groundwater Monitoring and Reporting A groundwater sampling event would be conducted in December 2024 and would follow the sample protocols and included the sample locations as described in Section 2.1 above with the exception of the collection of the free product samples. Upon completion of the sampling event a Groundwater Monitoring Report would be prepared and will include the components listed above under Section 2.1. 2.4 Task 4 – March 2025 Groundwater Monitoring and Reporting A groundwater sampling event would be conducted in March 2025 and would follow the sample protocols and included the sample locations as described in Section 2.1 above with the exception of the collection of the free product samples. Upon completion of the sampling event a Groundwater Monitoring Report would be prepared and will include the components listed above under Section 2.1. 2.5 Task 5 – June 2025 Groundwater Monitoring and Reporting A groundwater sampling event would be conducted in June 2025 and would follow the sample protocols and included the sample locations as described in Section 2.1 above with the exception of the collection of the free product samples. Upon completion of the sampling event a Groundwater Monitoring Report would be prepared and will include the components listed above under Section 2.1. 2.6 Task 6 – September 2025 Groundwater Monitoring and Reporting A groundwater sampling event would be conducted in September 2025 and would follow the sample protocols and included the sample locations as described in Section 2.1 above with the exception of the collection of the free product samples. Upon completion of the sampling event a Groundwater Monitoring Report would be prepared and will include the components listed above under Section 2.1. Palmer Tire MLS-22 Atlas 3 3. DELIVERABLES The anticipated deliverables for the work identified in this proposed Work Plan include the following: • June, September, and December, 2024; and March, June, and September 2025 Groundwater Monitoring Reports; • Contract required forms. 4. PROPOSED PROJECT SCHEDULE The proposed schedule for the activities described herein is presented in Table 1. 5. PERSONNEL The key personnel for the proposed activities are as follows: • Atlas Senior Project Manager: Jim Coletta (P101) • Atlas Professional Geologist: Jim Coletta (P102) • Atlas Project Manager: Jim Coletta (P103) • Atlas Senior Technician: Olaf Questereit (P105) 6. SUBCONTRACTORS The following subcontractors would be used in the performance of the above scope of work: • PACE Laboratory - would provide state certified laboratory services. Based on information provided by each selected subcontractor, the following contract requirements have been met: • The selected subcontractor is not currently debarred pursuant to Utah Code Section 63-56- 48 or EPA’s most recent “Master List of Debarred or Suspended Facilities”; • The selected subcontractor has no apparent conflict of interest; and • The selected subcontractor is not a minority or women owned business enterprises. 7. EXCEPTIONS, ANTICIPATED PROBLEMS, OR SPECIAL REQUIREMENTS At this time, no exceptions or special requirements to the proposed Work Plan are anticipated with the exception of the grant of access agreement. In the event exceptions or special conditions arise, Atlas would amend this proposed Work Plan or submit a new Work Plan for UDEQ approval before initiating any work outside the scope of services described herein. 8. CONFLICT OF INTEREST Based on Atlas’s present knowledge of the site location and conditions, no personal or corporate conflict of interest has been identified for the performance of the scope of services described in this proposed Work Plan. Atlas would contact UDEQ immediately if a potential conflict of interest is identified during the performance of this proposed Work Plan. Palmer Tire MLS-22 Atlas 4 9. COST ESTIMATE The estimated cost for implementation of this proposed Work Plan is presented in Table 2. The estimated budget would require adjustment if the scope of services identified herein is modified or any assumptions are incorrect. Exhibit 3 from the UDEQ Technical Services contract is presented in Appendix A. 20 0 E A S T MOVIE GALLERY (LCL OIL) PALMER TIRE ELECTRICAL SEEP RESIDENTIAL RESIDENTIAL RESIDENTIAL DISPENSOR ISLANDS ELECTRICAL LINE SEEP AREA FENCE G G G G G G G G G G G G G NATURAL GAS ST E E P S L O P E STEEP SLOPE TP TP TELEPHONE POLE W W W W W W W S WATER LINE (Approximate Depth = 5') SEWER LINE (Approximate Depth = 8') US H W Y 4 0 INSTALLED JANUARY 2008 MONITORING WELL LOCATION INSTALLED OCTOBER 2008 IRRIGATION WATER LINE 271EM00757PROJECT NUMBER:DATE:10-26-21 1 FIGURE DRAWN BY:JCAPPROVED BY:BIX W W W W W W W W W S S W W W W WESTERN PETROLEUM W W W W W W W W W W S S S S S S MONITORING WELL LOCATION (02-14) W W W W W W G G G G G G G G G NEW MONITORING WELL LOCATION (05-17) W W W W W W ABANDONED OR DESTROYED WELL 358 South 700 East, B518 Salt Lake City, Utah 84102 801-935-4917 Palmer Tire MLS-22 Atlas TABLE 1 PROPOSED PROJECT SCHEDULE TASK MONTH June 2024 July 2024 Sept. 2024 Oct. 2024 Dec. 2024 Jan. 2025 March 2025 April 2025 June 2025 July 2025 Sept. 2025 Oct. 2025 Task 1 – June 2024 Groundwater Monitoring and Reporting (July 2024) X X Task 2 – Sept. 2024 Groundwater Monitoring and Reporting (Oct. 2024) X X Task 3 – Dec. 2024 Groundwater Monitoring and Reporting (Jan. 2024) X X Task 4 – March 2025 Groundwater Monitoring and Reporting (April 2025) X X Task 5 – June 2025 Groundwater Monitoring and Reporting (July 2025) X X Task 6 – Sept. 2025 Groundwater Monitoring and Reporting (Oct. 2025) X X Work Assignment MLS-22 1 of 6 Task 1 - Groundwater Monitoring - June 2024 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Setup new project and project coordination 3 152.00$ 456.00$ 456.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,430.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation, and payment request submittal 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 1 Total:7,663.05$ Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Disposal of Absorbent Socks TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Work Assignment MLS-22 2 of 6 TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Task 2 - Groundwater Monitoring - September 2024 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Project coordination 2 152.00$ 304.00$ 304.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,278.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation, and payment request submittal 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 2 Total:7,511.05$ Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Disposal of Absorbent Socks Work Assignment MLS-22 3 of 6 TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Task 3 - Groundwater Monitoring - December 2024 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Project coordination 2 152.00$ 304.00$ 304.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,278.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation, and payment request submittal 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 3 Total:7,511.05$ Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Disposal of Absorbent Socks Work Assignment MLS-22 4 of 6 TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Task 4 - Groundwater Monitoring - March 2025 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Project coordination 2 152.00$ 304.00$ 304.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,278.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation of the groundwater gradient and isoconcentration maps 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 4 Total:7,511.05$ Disposal of Absorbent Socks Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Work Assignment MLS-22 5 of 6 TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Task 5 - Groundwater Monitoring - June 2025 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Project coordination 2 152.00$ 304.00$ 304.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,278.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation of the groundwater gradient and isoconcentration maps 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 5 Total:7,511.05$ Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Disposal of Absorbent Socks Work Assignment MLS-22 6 of 6 TABLE 2 Palmer Tire 395 South 200 East Roosevelt, Utah Quarterly Groundwater Sampling Work Assignment MLS-22 Task 6 - Groundwater Monitoring - September 2025 (Sample MW-11, 14 , 15, 17, 18, 19, 21, and 22 - Free Product and WT Ele.) Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Project coordination 2 152.00$ 304.00$ 304.00$ P103 Project Manager - Coordinate with laboratory and coordination of sampling effort, and preparation of payment request 4 118.00$ 472.00$ 472.00$ P105 Senior Technician - Preparation and coordination 1.5 90.00$ 135.00$ 135.00$ P105 Senior Technician - Travel (round trip)5 90.00$ 450.00$ 450.00$ P105 Senior Technician - Collect groundwater elevation (includes MW-10) and free product data, and sample wells 9.5 90.00$ 855.00$ 855.00$ P108 Administrative Assistant - Amendment processing 1 62.00$ 62.00$ 62.00$ Labor Subtotal 2,278.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 2 55.00$ 110.00$ 110.00$ Sampling Supplies 2 25.00$ 50.00$ 50.00$ Traffic Safety Equipment 2 15.00$ 30.00$ 30.00$ Submersible Pump 0 30.00$ -$ -$ Flexible Tubing 0 0.50$ -$ -$ Free Product Absorbent Sock (MW-17 & MW-18)0 15.00$ -$ -$ Disposable Bailers 8 9.00$ 72.00$ 72.00$ Outside Services 10 94.00$ 940.00$ 940.00$ 0 50.00$ -$ -$ Per Diem Mileage 310 0.655$ 203.05$ 203.05$ Lodging 1 120.00$ 120.00$ 120.00$ Meals 2 40.00$ 80.00$ 80.00$ Direct Costs Subtotal 1,605.05$ Groundwater Monitoring Report Labor Category Staff Quantity Hourly Rate Subtotal Subtotal Totals P101 Senior Project Manager - Coordination, review, invoicing 2 152.00$ 304.00$ 304.00$ P102 Professional Geologist - Preparation of the groundwater gradient map and three isoconcentration maps 8 147.00$ 1,176.00$ 1,176.00$ P103 Project Manager - Report review and preparation of the groundwater gradient and isoconcentration maps 3 118.00$ 354.00$ 354.00$ P105 Senior Technician - Data entry and report preparation 11 90.00$ 990.00$ 990.00$ P107 Drafter - Prepare gradient map and three isoconcentration maps 8 85.00$ 680.00$ 680.00$ P108 Administrative Assistant - Clerical and invoicing 2 62.00$ 124.00$ 124.00$ Labor Subtotal 3,628.00$ #REF! Task 6 Total:7,511.05$ 45,218.30$ PROJECT TOTAL: Laboratory - MBTEXN/TPH-GRO & DRO, Field Blank and Trip Blank - includes 10% markup Disposal of Absorbent Socks APPENDIX A CONTRACT REQUIRED PAPER EXHIBIT “3” DELIVERABLE AND PAYMENT SCHEDULE Date May 6, 2024 Work Assignment No. MLS-22 Deliverable/Task Number Description Due Date Price Task 1 June 2024 Groundwater Monitoring and Reporting Sampling – June 31, 2024 Reporting – July 31, 2024 $7,663.05 Task 2 September 2024 Groundwater Monitoring and Reporting Sampling – September 30, 2024 Reporting – October 31, 2024 $7,511.05 Task 3 December 2024 Groundwater Monitoring and Reporting Sampling – December 31, 2024 Reporting – January 30, 2025 $7,511.05 Task 4 March 2025 Groundwater Monitoring and Reporting Sampling – March 31, 2025 Reporting – April 30, 2025 $7,511.05 Task 5 June 2025 Groundwater Monitoring and Reporting Sampling – June 31, 2025 Reporting – July 31, 2025 $7,511.05 Task 6 September 2025 Groundwater Monitoring and Reporting Sampling – September 30, 2025 Reporting – October 31, 2025 $7,511.05 Work Assignment Total $45,218.30