Loading...
HomeMy WebLinkAboutDAQ-2024-0085471 DAQC-565-24 Site ID 10423 (B4) MEMORANDUM TO: STACK TEST FILE – INTERSTATE BRICK COMPANY – Kiln #4 Scrubber THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Paul Morris, Environmental Scientist DATE: June 10, 2024 SUBJECT: Source: Kiln #4 Scrubber Contact: Joe Eck – 801-280-5215 Location: 9780 South 5200 West, West Jordan, Salt Lake County, UT Tester: Montrose Air Quality Services FRS ID: UT0000004903500200 Permit: Title V Operating Permit 3500200002 dated August 22, 2023; revised February 19, 2024 Subject: Review of Pretest Protocol received June 6, 2024 On June 6, 2024, the DAQ received a protocol for testing of the Interstate Brick Company Kiln #4 Scrubber located in West Jordan, UT. Testing will be performed on July 23, 2024, to determine compliance with Condition II.B.3.b for SO2 and NOx emissions. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3A used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 6C used to determine SO2 emissions: OK 6. RM 7E used to determine NOx emissions: OK DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send protocol review and test date confirmation notice. ATTACHMENT: Pretest protocol received June 6, 2024. 6 , 3 I,TAH DEPAHruENT OF ENVIRONMENTAL OI.iAI.JIY JUN - 6 2024 DIVTSION OF AIR QUALTTY M*}gNT+R[H ..COMPLIANCE TEST PLAN FOR INTERSTATE BRICK COMPANY'S LINE #4 KILN SCRUBBER LOCATED AT THEIR FACILITY IN WEST JORDAN, UTAH" Test Date: July 23,2O24 June ,2ll24 Subject: 2lD24 Compliance Test PIan, Line #4 Kiln Scrubber Facility Name: Interstate Brick Company Facility Location: 97aO South 52OO West West lordan, UT 84081-5625 Title V Operating Permit No. 35OO2OOOOO1 Montrose Document No.: GPOS1AS-O27245-PP-716 Enclosed please find the compliance test plan for the above-referenced facility and source. The test plan documents the details of the testing that will be performed by Montrose Air Quality Services, LLC (Montrose) at the Interstate Brick Company Plant on July 23,2024. The following distribution was provided for this project. ***COPIES HAVE NOT BEEN SENT TO ANY REGULATORY AGENCIES**X Please do not hesitate to contact our office at 801-794-2950 if you have any questions. Sincerely, Montrose Air Quality Services, LLC a ,\ l)..tr .^ '\ \n .,-t-,* Beckie Hawkins District Manager BH/gm Interstate Brick Company 9780 south 5200 West West lordan, UT 84081 Emailed PDF June 3,2024 Source Test Plan for 2024 Compliance Testing Line #4 Kaln Scrubber Interstate Brick Company West Jordan, Utah Prepared For: Interstate Brick Company 9780 south 52OO West West Jordan, UT 84081 Prepared Byr Montrose Air Quality Services, LLC 5823 S. 3600 W. Spanish Forlg UT 84660 For Submission To: Utah Department of Environmental Quality 195 North 1950 West Salt Lake City UT 84114-4A2fJ Document Number: GPOS1AS-O27245-PP-7 16 Proposed Test Date: July 23,2024 Submittal Date: June 3,2024 I rl Review and Ceftification I certify that, to the best of my knowledge, the information contained in this document is complete and accurate and conforms to the requirements of the Montrose Quality Management System and ASTM D7O36-O4. Signature: Date:06l03l2024 Name: Cheyney Guymon Title: project Manager I have reviewed, technically and editorially, details and other appropriate written materials contained herein. I hereby certify that to the best of my knowledge the presented material is authentic and accurate and conforms to the requirements of the Montrose Quality Management System and ASTM D7O36-O4. signaturet 'Y:r-..u"-^ {o-rt,-.^, Date:06/0312024 Name: Beckie Hawkins Title:District Manager ro 1.0 Paqe Introduction............. ................ 6 1.1 Summary of Test Program ................ 6 L.2 Applicable Regulations and Emission Limits ........ I 1.3 Key Personnel .......... ........9 Plant and Sampling Location Descriptions............. ....11 2.L Process Description, Operation, and Control Equipment.......... ..........11 2.2 FIue Gas Sampling Location .............11 2.3 Operating Conditions and Process Data ,...........11 2.4 Plant Safety ............. ....... 11 2.4.1 Safety Responsibilities ............L2 2.4.2 Safety Program and Requirements ..........13 Sampling and Analytical Procedures......... ................14 3.1 Test Methods ........... .........:..... .......L4 3.1.1 EPA Method 1............. ...........L4 3.1.2 EPA Method 2............. ...........L4 3.1.3 EPA Method 4............. ...........16 3.L.4 EPA Method 3A, 6C and 7E........... ..........L7 Quality Assurance and Reporting .......... ....19 4.L QA Audits ........19 4.2 Quality Control Procedures ...............19 4.2.L Equipment Inspection and Maintenance ..............,...19 4.2.2 Audit Samples ........19 4.3 Data Analysis and Validation ............19 4.4 Sample Identification and Custody ....2O 4.5 Quality Statement ............20 4.6 Reporting. ........2O 4.6.1 Example Report Format ..........20 4.6.2 Example Presentation of Test Results ......2L Table of Contents Section 2.O 3.0 4.O List of Appendices *s" Supporting Information............. .............23 A.1 Units and Abbreviations........... .......24 A.2 Accreditation Information/Certifications ...,...,...28 A.3 Air Quality Operating Permit...... ......28 A.4 Calibration Data........ ......7O Field Work Safety Plan ........ ....90 t,t' ')i/ \ ,i I List of Tables 1-1 Summary of Test Program and Proposed Schedule ..................,7 1-2 Reportlng Units and Emission Limlts ......... 8 1-3 Test Personnel and Responsibllltles........ ......,..........10 2-L Sampling Location(s)............. ................11 4-L Example Emisslons Results ,.....22 List of Figures 3-1 US EpA METHOD 2 SAMPUNG TRAIN ......r.!..r..........15 3.1 US EPA METHOD 3A, 6C, AND 7E SAMPLING TRAIN ......,..........18 4-L Typlcal Report Format..... ........21 I ntersfiete Bnielt C*rnpany [202r].1 [Camplianee Testing] *Qcunee Test Filotseol l : i I I l.O Introduction l.l SummarT of Test Program Interstate Brlck Company contracted Montrose Air Quallty Servlces, LLC (Montrose) to perform a compliance emissions test program on the Llne #4 Klln Scrubber at the Interstate Brlck faclllty located ln West Jordan, Utah The tests are conducted to determine compllance wlth the emlssion limlts llsted ln permit number-35002000001 issued by Utah Department of Envlronmental Quality (UDEQ). The specific objectlves are to: r Measure emlssions of SOz and NOx at the outlet of the Line #4 Kiln Scrubber . Conduct the test program with a focus on safety Montrose wlll provide the test personnel and the necessary equipment to measure emissions as outllned in this test plan. Faclllty personnel will provlde the process and production data to be included in the final report. A summary of the test program and proposed schedule is presented in Table 1-1. lllersteie Irrck Crmpany I [ZOZ,{] [Crmplrence Testrrrg] Srurce Test Fmt.r.l l I L l I Table 1-1 Summary of Test Program and Proposed Schedule To simplify this test plan, a list of Units and Abbreviations is included in Appendix A. Throughout this test plan, chemical nomenclature, acronyms, and reporting units are not defined. Please refer to the list for specific details. EPA 1, 2,3A, rf 1.2 Applicable Regulations and Emission Limits The results from this test program are presented in units consistent with those listed in the applicable regulations or requirements. The reporting units and emission limits are presented ln Table 1-2. Table 1-2 Repoftlng Units and Emlssion Limits Permit Page #26 Ir.B.s.b Permit Page #26 rr.B.3.b tl il rl I ,' t.' i'ir I' ,r"'i"t-,0:j ,i l, [ "]i' '.r' :i; [: 1,1,'i,/ { 'rl | :; A llst of project participants is included below: Faclllty Informatlon Source Location: Interstate Brlck Company 9780 South 5200 West West Jordan, UT 84081-5625 1.3 Key Pensonnel ProJect Contact: Role: Company: Telephone: Email: Joseph Eck EHS Manager - Tech & CAD Support Interstate Brick Company P: 801-280-5215 C: 801-301-6840 Joe. Eck@ i nterstatebrlck. com Ageney Informatlon Regulatory Agenry: Utah Department of Environmental Quality Agenry Contact: Harold Burge Telephone: (385)306-6509 Email: hburge@utah.gov Testlng Company Information Testing Firm: Montrose Air Quallty Services, LLC Contact: BeckieHawklns Title: District Manager Telephone: 8OL-794-2950 Email: behawklns@montrose-env.com i n)terstate Briek CompaLry [2024] fGomplianee Testinig] Source Test ipre'iqaol ' ll r,.. ' ',,r,1: i irl Table 1-3 details the roles and responsibilities of the test team. Table 1-3 Test Personnel and ResPonslbillties Preparation, testing supportField Technician Execute stack platform responsibilities I lri.ei.ltate El"rc[.: lftn-raar=r'y [;?ti,l.] le ri'rtpi;a,ii:e , *;,ting] ,irurce -f er,'r ,Drorie{rol I 2.O Plant and Sampling Location Descriptions 2.1 Process Description, Operation, and Control Equipment Interstate Brick Company operates a brick and tile manufacturing plant located at 9780 South 5200 West, in West Jordan City, Salt Lake County, Utah. All exhaust air from the Kiln #3 process streams are routed through the Kiln #3 wet scrubber before being vented to the atmosphere. All exhaust air from the Kiln #4 process streams are routed through the Kiln #4 wet scrubber before being vented to the atmosphere. All exhaust air from the Primary Crusher Building is routed through the Primary Crusher Baghouse before being vented to the atmosphere. 2.2 Flue Gas Sampling Location Actual stack measurements, number of traverse points, and location of traverse points will be evaluated ln the field as part of the test program. Table 2-1 presents the anticipated stack measurements and traverse points for the sampling locations listed. Table 2-1 Sampling Location 2.3 Operating Conditions and Process Data Emission tests are performed while the source/units and air pollution control devices are operating at the conditions required by the permit. The unit(s) are tested when operating at greater than 90o/o capacity/at maximum load. Plant personnel are responsible for establishing the test conditions and collecting all applicable unit-operating data. Data collected includes the following parameters: . Kiln Scrubber #4 production (Car Weight in lbs.), Differential Pressure (H20) and Flow Rate (GPM). 2.4 Plant Safety Montrose will comply with all safety requirements at the facility. The facility Client Sponsor, or designated point of contact, is responsible for ensuring routine compliance with plant entry, health, and safety requirements. The Client Sponsor has the authority to impose or 'ia .:.ri';rii: liii;; ,- r,l'r,,:,;',.,',1,1:.'. a,irrial:-if a ri-i al :'.t ;:;:t Lt;::il -'rolro:,tl I rl waive facility restrictions. The Montrose test team leader has the authority to negotiate any deviations from the facility restrictions with the Client Sponsor. Any deviations must be documented. 2.4.L Safety Responsibilities Planning . Montrose must complete a field review with the Client Sponsor prior to the project date. The purpose of the review is to develop a scope of work that identifies the conditions, equipment, methods, and physical locations that will be utilized along with any policies or procedures that will affect our work . We must reach an agreement on the proper use of client emergency services and ensure that proper response personnel are available, as needed . The potential for chemical exposure and actions to be taken in case of exposure must be communicated to Montrose. This information must include expected concentrations of the chemicals and the equipment used to identify the substances. . Montrose will provide a list of equipment being brought to the site, if required by the client Project Day . Montrose personnel will arrive with the appropriate training and credentials for the activities they will be performing and the equipment that they will operate . Our team will meet daily to review the Project Scope, Job Hazard Assessment, and Work Permits. The Client Sponsor and Operations Team are invited to participate. . Montrose will provide equipment that can interface with the client utilities previously identified in the planning phase and only work with equipment that our client has made ready and prepared for connection . We will follow client direction regarding driving safety, safe work permitting, staging of equipment, and other crafts or work in the area . As per 40 CFR Part 60 Subpart A, Section 60.8, the facility must provide the following provisions at each sample location: o Sampling ports, which meet EPA minimum requirements for testing. The caps should be removed or be hand-tight. o Safe sampling platforms o Safe access to the platforms and test ports, including any scaffolding or man lifts o Sufficient utilities to perform all necessary testing I ra . Montrose will use the client communication system, as directed, in case of plant or project emergency . Any adverse conditions, unplanned shutdowns or other deviations to the agreed scope and project plan must be reviewed with the Client Sponsor prior to continuing work. This will include any safe work permit and hazard assessment updates, Completion . Montrose personnel will report any process concerns, incidents or near misses to the Client Sponsor prior to leaving the site . Montrose will clean up our work area to the same condition as it was prior to our arrival . We will ensure that all utilities, connection points or equipment have been returned to the pre-project condition or as stated in the safe work permit. In addition, we will walk out the job completion with Operations and the Client Sponsor if required by the facility. 2.4.2 Safety Program and Requirements Montrose has a comprehensive health and safety program that satisfies State and Federal OSHA requirements. The program includes an Illness and Injury Prevention Program, site- specific safety meetings, and training in safety awareness and procedures. The basic elements include: . All regulatory required policies/procedures and training for OSHA, EPA and FMCSA . Medical monitoring, as necessary . Use of Personal Protective Equipment (PPE) and chemical detection equipment . Hazard communication . Pre-test and daily toolbox meetings . Continued evaluation of work and potential hazards . Near-miss and incident reporting procedures as required by Montrose and the CIient Montrose will provide standard PPE to employees. The PPE will include but is not limited to; hard hats, safety shoes, glasses with side shields or goggles, hearing protection, hand protections, and fall protection. In addition, our trailers are equipped with four gas detectors to ensure that workspace has no unexpected equipment leaks or other ambient hazards. The detailed Site Safety Plan for this project is attached to this test plan in Appendix "S". o rl 3.O Sampling and Analytical Procedures 3.1 Test Methods The test methods for this test program have been presented in Table 1-1. Additional information regarding specific applications or modifications to standard procedures is presented below. 3.1.1 EPA Method l, Sample and Velocity Traverses for Stationary Sources EPA Method 1 is used to assure that representative samples or measurements of volumetric flow rate are obtained by dividing the cross-section of the stack or duct into equal areas, and then locating a traverse point within each of the equal areas. Acceptable sample locations must be located at least two stack or duct equivalent diameters downstream from a flow disturbance and one-half equivalent diameter upstream from a flow disturbance. 3.1.2 EPA Method 2, Determination of Gas Velocity and Volumetric Flow Rate (Type S Pitot Tube) EPA Method 2 is used to measure the gas velocity using an S-type pitot tube connected to a pressure measurement device, and to measure the gas temperature using a calibrated thermocouple connected to a thermocouple indicator. Typically, Type S (Stausscheibe) pitot tubes conforming to the geometric specifications in the test method are used, along with an inclined manometer. The measurements are made at traverse points specified by EPA Method 1. The molecular weight of the gas stream is determined from independent measurements of Oz, COz, and moisture. The stack gas volumetric flow rate is calculated using the measured average velocity head, the area of the duct at the measurement plane, the measured average temperature, the measured duct static pressure, the molecular weight of the gas stream, and the measured moisture. Pertinent information regarding the performance of the method is presented below: . Method Options: o S-type pitot tube coefficient is 0.84 . Method Exceptions: o None The typical sampling system is detailed in Figure 3-1. FIGURE 3-1 1 TY?E'$ HTOT US EPA Irlterstete Briek ecnnpany I I [?0?4] lCcrnpliaRee Testing] Sruree -[.est Frrtcerl I Dl 3.1.3 EPA Method 4 Determination of Moisture Content in Stack Gas EPA Method 4 is a manual, non-isokinetic method used to measure the moisture content of gas streams. Gas is sampled at a constant sampling rate through a probe and impinger train. Moisture is removed using a series of pre-weighed impingers containing methodology- specific liquids and silica gel immersed in an ice water bath. The impingers are weighed after each run to determine the percent moisture. The typical sampling system is detailed in Figure 3-2, Figure 3-2 EPA Method 4 Samolinq Train SAMPLE LINE VACUUM LIN E ADAPTOR n ,.i i":' (standard tp) THERMOCOUPLESft BY-PASS VALVE (tinerurud) VACUUMGAUGE I MAIN VALVE (@trse adlusl) MANOMETER:#ORIFICE GAS EXIT DRYGAS METER I rf 3.1.4 EPA Methods 3A, 6C and 7E Determination of Oxygen, Carbon Dioxide, Sulfur Dioxide and Niutrogen Oxides Concentrations in Emissions from Stationary Sources (Instrumental Analyzer Procedures) Concentrations of O,, SO. and NOx are measured simultaneously using EPA Methods 3A, 6C andTE which are instrumental test methods. Conditioned gas is sent to a series of analyzers to measure the gaseous emission concentrations. The performance requirements of the method must be met to validate the data. Pertinent information regarding the performance of the method is presented below: . Method Options: r A dry extractive sampling system is used to report emissions on a dry basis o A paramagnetic analyzer is used to measure Oz o A nondispersive infrared analyzer is used to measure COz o An ultraviolet absorption analyzer is used to measure SOz o A chemiluminescent analyzer is used to measure NO* r Target and/or Minimum Required Sample Duration: 60 minutes . Target Analytes: O., SO, and NOx The typical sampling system is detailed in Figure 3-3. - - 13 I r: a .' a a - t_ _ a a ' l a e ! t1 I l L Flgurc 3-3 US EPA METIIOD 3A, 6C snd 7E SAMPLING TRAIN #il .xlYlli' MXfin3nfl,L(tVCorlurf\aatl'.:.*n .ap[?m''YrE' iourallisfimi ntvdttd.El:s HEATE' 3AI'PLE UNE I lnterstete Enck CrmpanV i [2124] [Crrnplrence Testtrrgl Sruree Test Fncttesl ra 4.O Quality Assurance and Repofting 4.1 QA Audits Montrose has instituted a rigorous QA/QC program for its air quality testing. Quality assurance audits are performed as part of the test program to ensure that the results are calculated using the highest quality data available. This program ensures that the emissions data we report are as accurate as possible. The procedures included in the cited reference methods are followed during preparation, sampling, calibration, and analysis. Montrose is responsible for preparation, calibration, and cleaning of the sampling apparatus. Montrose will also perform the sampling, sample recovery, storage, and shipping. Approved contract laboratories may perform some of the preparation and sample analyses, as needed. 4.2 Quality Control Procedures Montrose calibrates and maintains equipment as required by the methods performed and applicable regulatory guidance. Montrose follows internal procedures to prevent the use of malfunctioning or inoperable equipment in test programs. All equipment is operated by trained personnel. Any incidence of nonconforming work encountered during testing is reported and addressed through the correctlve actlon system. 4.2.1 Equipment Inspection and Maintenance Each piece of field equipment that requires calibration is assigned a unique identification number to allow tracking of its calibration history. All field equipment is visually inspected prior to testing and includes pre-test calibration checks as required by the test method or regulatory agency. 4.2.2 Audit Samples When required by the test method and available, Montrose obtains EPA TNI SSAS audit samples from an accredited provider for analysis along with the samples. Currently, the SSAS program has been suspended pending the availability of a second accredited audit sample provider. If the program is reinstated, the audit samples will be ordered. If required as part of the test program, the audit samples are stored, shipped, and analyzed along with the emissions samples collected during the test program. The audit sample results are reported along with the emissions sample results. 4,3 Data Analysis and Validation Montrose converts the raw field, laboratory, and process data to reporting units consistent with the permit or subpart. Calculations are made using proprietary computer spreadsheets or data acquisition systems. One run of each test method is also verified using a separate example calculation. The example calculations are checked against the spreadsheet results and are included in the final report. The "Standard Conditions" for this project are 29.92 inches of mercury and 58 oF. rl 4.4 Sample ldentification and Custody No samples are required to be recovered for this test program. 4.5 Quality Statement Montrose is qualified to conduct this test program and has established a quality management system that led to accreditation with ASTM Standard D7036-04 (Standard Practice for Competence of Air Emission Testing Bodies). Montrose participates in annual functional assessments for conformance with D7036-O4 which are conducted by the American Association for Laboratory Accreditation (A2LA). All testing performed by Montrose is supervised on site by at least one Qualified Individual (QI) as defined in D7036-04 Section 8.3.2. Data quality objectives for estimating measurement uncertainty within the documented limits in the test methods are met by using approved test protocols for each project as defined in D7036-04 Sections 7.2.1 and 12.10. Additional quality assurance information is included in the appendices. The content of this test plan is modeled after the EPA Emission Measurement Center Guideline Document (GD-042). 4.6 Reporting Montrose will prepare a final report to present the test data, calculations/equations, descriptions, and results. Prior to release by Montrose, each report is reviewed and certified by the project manager and their supervisor, or a peer. Source test reports will be submitted to the facility or appropriate regulatory agency (upon customer approval) within 45 days of the completion of the field work. The report will include a series of appendices to present copies of the intermediate calculations and example calculations, raw field data, laboratory analysis data, process data, and equipment calibration data. 4.6.L Example Report Format The report is divided into various sections describing the different aspects of the source testing program. Figure 4-1 presents a typical Table of Contents for the final report. I rl Figure 4-1 Typical Repoft Format 4.6.2 Example Presentation of Test Results Table 4-1 presents the typical tabular format that is used to summarize the results in the final source test report. Separate tables will outline the results for each target analyte and compare them to their respective emissions limits. Cover Page Certification of Report Table of Contents n 1.0 Introduction Plant and Sampling Location Descriptions Sampling and Analytical Procedures Test Discussion and Results Internal QA/QC Activities 0 0 .0 5.0 ices D E Field Data and Calculations Facility Process Data Laboratory Analysis Data Quality Assu rance/Qua lity Control Regulatory Information rl Table 4-2 Example Emissions Results - -3 . aa- Date xx xx xx xx Time XX XX xx xx Process Data parameter 1, units xx XX xx xx Sampling & Flue Gas Parameters sample duration, minutes xx XX XX xx 02, o/o volume dry xx xx xx xx COz, o/o volume dry xx xx XX xx flue gas temperature, oF xx xx xx xx moisture content, o/o volume xx xx xx xx volumetric flow rate, dscfm xx xx xx xx NOr ppmvd xx XX XX xx lb/hr xx xx xx XX co ppmvd xx xx xx xx lblhr XX xx XX xx Appendix A Supporting Information rr. - r:1 3i','l .Ta;t,,. | .-. a a.. '- .,'.! a.. - - t'a..r'r' I Dt Appendix A.1 Units and Abbreviations )l UNITS AND ABBREVIATIONS @ Xolo Oz corrected to Xolo oxygen (corrected for dilution air) lCCl absolute value of the confidence coelficient ldl absolute value of the mean differencesoC degrees Celsius (centrigade)oF degrees FahrenheitoR degrees Rankine " HzO inches of water column 13.6 specific gravity of mercury AH pressure drop across orifice meter, inches HzO AP velocity head of stack gas, inches HzO e total sampling time, minutes Ug microgrampa density of acetone, mg/mlpw density of water, 0.9982 g/ml or 0.002201 lblml acfm actual cubic feet of gas per minute at stack conditions An cross-sectional area of nozzle, ftz As cross-sectional area of stack, square feet (ft2) Btu British thermal unit B*. proportion by volume of water vapor in gas stream Ca particulate matter concentration in stack gas, gr/acf ce,s average unadjusted gas concentration, ppmv Cor, measured concentration of calibration gas, ppmv cf or ft3 cubic feet cfm cubic feet per minute Cc", average gas concentration adjusted for bias, ppmv Cu average of initial and final system bias check responses from upscale calibration gas, ppmv cm or m3 cubic meters Cur actual concentration of the upscale calibration gas, ppmv Co average of initial and final system bias check responses from low-level calibration gas, ppmv Cp pitot tube coefficient Cs particulate matter concentration in stack gas, gr/dscf CS calibration span, 7o or ppmv Cs measured concentration of calibration gas, ppmv Cv manufactured certified concentration of calibration gas, ppmv D drift assessment, o/o of span dcf dry cubic feet dcm dry cubic meters Dn diameter of nozzle, inches Ds diameter of stack, inches dscf dry standard cubic feet dscfm dry standard cubic feet per minute dscm dry standard cubic meters , Fa F-factor, dscf/MMBtu of heat input fpm feet per minute, fps feet per second ft feet ft2 square feet g gram gal gallons I - - - 3 . a- I . . . - a a - - r'a r o a rf gr grains (7000 grains Per Pound)gr/dscf grains per dry standard cubic feet hr hour I percent of isokinetic samPling in inch k kilo or thousand (metric units, multiply by 103) K kelvin (temperature) K: conversion factor 0.0154 Y/mgK4 conversion factor 0.002658 ((in. Hg)(ft3))/((mlXoR)) kg kilogram Kp pitot tube constant (85.49 ftlsec) kwscfh thousand wet standard cubic feet per hour I liters lblhr pounds Per hour lblMMBtu pounds Per million Btu lpm liters per minute m meter or milli M thousand (English units) or mega (million, metric units) m3 cubic meters 1113 mass of residue of acetone after evaporation, mg Ma molecular weight of stack gas; dry basis, lbllb-mole meq milliequivalent mg milligram Mg megagram (106 grams) min minute ml or mL milliliter mm millimeter MM million (English units) MMBtu/hr million Btu per hour rnn total amount of particulate matter collected, mg mol mole mol. wt. or MW molecular weight Ms molecular weight of stack gas; wet basis, lbllb-mole MW molecular weight or megawatt n number of data Pointsng nanogram nm nanometer Pbu. barometric pressure, inches Hg pg PicogramPs stack static pressure, inches HzO Pm barometric pressure of dry gas meter, inches Hg ppb parts per billionppbv parts per billion, by volume ppbvd parts per billion by volume, dry basis ppm parts per million ppmv parts per million, by volume ppmvd parts per million by volume, dry basis Ps absolute stack gas pressure, inches Hg psi pounds per square inch psia pounds per square inch absolute psig pounds per square inch gauge Psto standard absolute pressure, 29.92 inches Hg ' -'i . .. | , a a. a I 'ta a o rl Qu volumetric flow rate, actual conditions, acfm Q, volumetric flow rate, standard conditions, scfm Q"ta volumetric flow rate, dry standard conditions, dscfm R ideal gas constant 21.85 ((in. Hg) (ft3))/((oR) (lbmole)) SBRnar post-run system bias check, o/o of span SBr pre-run system bias check, %o of span scf standard cubic feet scfh standard cubic feet per hour scfm standard cubic feet per minute scm standard cubic meters scmh standard cubic meters per hour sec second sf, sq. ft., or ft2 square feet std standard t metric ton (1000 kg) T o.szs t-value Ta absolute average ambient temperatur€, oR (+459.67 for English) Tm absolute average dry gas meter temperature, oR (+459.67 for English) ton or t ton = 2000 pounds tph or tons/hr tons per hour tpy or tons/yr tons per year T, absolute average stack gas meter temperatur€, oR (+459.67 for English) Trta absolute temperature at standard conditions V volt Va volume of acetone blank, ml V". volume of acetone used in wash, ml V6 total volume HzO collected in impingers and silica gel, grams Vm volume of gas sampled through dry gas meter, ft3 Vm(std) I:Hrr" of gas measured by the dry gas meter, corrected to standard conditions, Vr. stack gas volume sampled, acf Vn volume collected at stack conditions through nozzle, acf Vs average stack gas velocity, feet per second Vwc(std) volume of water vapor condensed, corrected to standard conditions, scf Vwt(std) volume of water vapor in gas sampled from impingers, scf Vwss(std) volume of water vapor in gas sampled from silica gel, scf W watt Wa weight of residue in acetone wash, mg Wrmp total weight of impingers, grams Wss total weight of silica gel, grams Y dry gas meter calibration factor, dimensionless I Dl Appendix A.2 Accred itation Information I Certifications )l ic n IH EG G'tG A" Fl r F}G A.bGl . -t F{ -\tG) Fl o o)e) Sa r oY Q) tl(t ' (h(\ l Sl e \i)Oq Bo ,$ N) r 5o ooo oo =(Do 3oz F{Fca rn lr {F Dt1 r{ l-h{a E]F lr {oEa 5 6o o, 8 <Y oi . " t- ' { @= ' ;s q ^s E d. HU E H: H i 1E ^ 6a = oH o fY 3 o ci ; o =g o. J 5 P o' 9 88 s . BQ + oq 6 q dg . oo + I dB TE I !I Q T 61 0 o1 9 aO O Y. g o >3 r =' ( o = so ll E_ <' ( o o => fg 6 g 36 =o o d9 a 8q a o" o r o' ? O ri d p i3:' - q o <o r < oo H 6 F' ' a * a t ;r 6 ' o * vO r O $9 B H F- - o 5 d i s. * { 6' 6 - } $q 6' i l b$ e & NS E E -E g o 3.os {E.a. di a- l.tgi.>!fi !. ,e 3o oo J 6 6oo o o o r*o cIo o o oo o o-a 6- .i - . t* J, M T 5b . .1 ); . ' . i i : I' l :t6'+5oo o doaoaIr. J l\ ) : : - : - a a : . a. , :a i a a : , - -. a :. t - _ -. !' r r' a I rf Appendix A,3 Approval Order State of Utah GARYR. IIERBERT Govemor SPENCBRJ, COX Lieutenant Goven ol Department of Environmental Quality Alaa Matheson Exeantive Director DTVISION OFAIRQUALITY Brycc C. Bird Director 10423 Title V Operating Permit PERMIT IIUMBER: 350020000 1 DATE OX'PERMIT: October 10,2018 Date of Last Revision: October 10, 2018 This Operating Permit is issued to, and applies to the following: Name of Permittee: Interstate Brick Company 9780 South 5200 West West Jordan, UT 84081-5625 Permitted Location: Interstate Brick Company Plant 9780 South 5200 West West Jordan, UT 84081-5625 UTM coordinates: 413,500 mEasting, 4,491,500 mNorthing SIC code: 3251 (Brick & Stnrctural Clay Tile) By'Prepared By: Robert Grandy 195 North 1950 West. Salt kke City, UT Mailing Arklress: P.O. Box 144820 . Salt lakc City, UT 841144820 Tclcphone (801) 536-a000 . Fax (801) 53il099 . T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% myclcd pepa Bryce C. Bird, Director ENFORCEABLE DATES AND TIMELINES The following dates or timeframes are referenced in Section I: General Provisions of this permit. Annual Certification Due: October 10, and on that date of every calendar year that this permit is in force. Renewal application due: April 10, 2023 Permit expiration date: October L0,2023 Definition of "prompf': written notification within 14 days. ABSTRACT Interstate Brick Company (ISB) operates a manufacturing plant in West Jordan City, Utah. Emissions are primarily assooiated with the hauling and processing of raw clay to produce brick and tile products. ISB is iocated in Salt Lake County, a non-attainment area for PM1s, PM 2.5, SO2, and a maintenance area for Ozone. ISB is a major source of CO. ISB is subject to 40 CFR Part 63 Subpart A- General Provisions, and Subpafi CCCCCC- Gasoline Dispensing Facilities. Project OPP0104230003 Page2 Title V Operating Permit #3500200001 ,l rf I tl l OPERATING PERMIT HISTORY PermiUActivitv I)ate fssued Recorded Changes Title V initial applioation (Proi ect #OPP0 1 04230003) October 10, 20L8 Initial permit issued. Project OPP0104230003 Page 3 fitle Y Opcreting Permit #3500200001 Table of Contents ENFORCEABLE DATES A}[D TIMELINES ......2 ABSTRACT ..........2 OPERATING PERMIT HISTORY .............3 SECTION I: GEIIIERAL PROVISIONS............... Title tV and Other, More Stringent Requirements ..'''.....' l I SECTION tr: SPECIAL PROVISIONS........................12 Emission Unit(s) Permitted to Discharge Air Contaminants. ................. .............t2 Gasoline Storage Tank- 40 CFR 63 Subpart CCCCCC .........................35 Alternative Operating Scenarios ..............37 SECTION III: PERMIT SHrr,.LD..... SECTION IV: ACID RAIN PROVISIONS ...............................37 This source is not subject to Title IV. This section is not applicable. ...'............. .........37 REVIEWER COMMENTS .................... 38 37 Project OPP0104230003 Prge4 Title V Operating Permit #3500200001 Issued under authority of Utah Code Ann. Section 19-2-104 and 19-2-109.1, and in accordance with Utah Administrative Code 111t07-415 Operating Permit Requirements. i aU definitions, terms and abbreviations used in this permit conforrn to those used in Utah ArtministrafiveI Code R307-101 and R307415 (Rules), and 40 Code of Federal Regulations (CFR), except as otherwise defured in this permit. Unless noted otherwise, references cited in the permit conditions refer to the Rules. Where a permit condition in Section I, General Provisions, partially recites or summarizes an applicable rule, the fulItext of the applicable portion of the rule shall govem interpretations of the requirements of the rule. , In the case of a conflict between the Rules and the permit terms and conditions of Section tr, Special Provisions, the permit terrns and conditions of Section tr shall govem except as noted in Provision LM, Permit Shield. SECTION I: GEIIIERAL PROYISIONS I.A Federal Enforcement All terms and conditions in this permit, including those provisions designed to limit the potential to emit, are enforceable by the EPA and citizens under the Clean Air Act of 1990 (CAA) except those terms and conditions that are specifically desipated as "State Requirements". (R307-41 5-6b) I.B Permitted Activitv(ies). Except as provided in R307415-7b(1), the permittee may not operate except in compliance with this permit. (See also Provision I.E, Application Shield) LC Dutv to Comnly. LC.1 The permittee must comply with all conditions of the operating permit. Any permit noncompliance constitutes a violation of the Air Conservation Act and is grounds for any of the following: enforcement action; permit termination; revocation and reissuance; modification; or denial of a permit renewal application. (R307415-6a(6)(a) I.C.2 It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. (R307415-6a(6)O) I.C.3 The penrrittee shall furnish to the Director, within a reasonable time, any infonnation that the Director may request in writing to deterrnine whether cause exists for modiffing, revoking and reissuing, or terminating this permit or to determine compliance with this pennit. Upon request, the permittee shall also furnish to the Director copies of records required to be kept by this permit or, for information claimed to be confidential, the permittee may firnish such records directly to the EPA along with a claim of confidentiality. (R3074 1 5-6a(6)(e)) 1.C.4 This permit may be modified, revoked, reopened, and reissued, or tenninated for cause. fls filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance shall not stay any permit condition, except as provided under R307415- 7f(1) for minor permit modifications. (R307415-6a(6)(c)) Project OPP0104230003 Page 5 Tifle V Operatiug Permit #3500200001 I.E I.D I.D.1 t.D.2 I.D.3 I.D.4 I.G I.G.1 t.G.2 I.H Permit Exniration and Renewal. This permit is issued for a fixed term of five years and expires on the date shown urder "Enforceable Dates and Timelines" at the front of this permit. (R307415-6a(2) Application for renewal of this permit is due on or before the date shown under "Enforceable Dates and Timelines" at the front of this permit. An application may be submitted early for any reason. (R307415-5a(1)(c) An application for renewal submitted after the due date listed in I.D.2 above shall be accepted for processing, but shall not be considered a timely application and shall not relieve the permittee of any enforcement actions resulting from submitting a late application. (807a1 5-5a(5) Permit expiration terminates the pemriuee's right to operate unless a timely and complete renewal application is submitted consistent with R307415-7b (see also Provision I.E, Application Shield) and R307-415-5a(1)(c) (see also Provision I.D.2). (F307at5-7c(2)) Anplication Shield. If the permittee submits a timely snd ssmplete application for renewal, the permittee's failure to have an operating permit will not be a violation of R307415, until the Director takes final action on the permit renewal application. In such case, the tenns and conditions of this permit shall remain in force unfil permit renewal or denial. This protection shall cease to apply if subsequent to the completeness determination required pursuant to R307- 415-7a(3), and as required by R307415-5a(2),the applicant fails to submit by the deadline specified in writing by the Director any additional information identified as being needed to process the application. @307-4 15 -7b(2)) Severabilitv. In the event of a challenge to any portion of this permit, or if any portion of this permit is held invalid, the remaining permit conditions remain valid and in force. (R307415-6a(5)) Permit Fee. The permittee shall pay an annual emission fee to the Director consistent with R307415-9. @307a1s-6a(7)) The emission fee shall be due on October 1 of each calendar year or 45 days after the sowce receives notice of the amount of the fee, whichever is later. (R307415-9(4Xu)) No Pronerty Riehts. This permit does not convey any properly rights of any sort, or any exclusive privilege. (R307415-6a(6)(d) Revision Excention. No permit revision shall be required under any approved economic ince'ntives, marketable permits, emissions tading and other similsr plegzuns or processes fs1 sfoanges that are provided for in this permit. (R307a15-6a(8)) Insoection and Entry. Upon presentation of credentials and other documents as may be required by law, the I.F I.I I.J I.J.1 Project OPP0104230003 Page 6 Tifle Y Operating Permit #3500200001 I.J.1.a I.J.1.b I.J.1.c r.J.l.d I.J.2 I.K I.L I I.r.t permiuee shall allow the Director or an authorized representative to perform any of the following: Enter upon the permittee's premises where the source is located or emissions related activity is conducted, or where records are kept under the conditions of this permit. (R30741s-6c(2)(a) Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit. (R307415-6c(2Xb) Inspeot at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practice, or operation regulated or requiredunder this permit. (R307415-6c(2)(c) Sample or monitor at reasonable times substances or parameters for the purpose of asswing compliance with this permit or applicable requirements. (R307415- 6c(2)(d)) Any claims of confidentiality made on the inforrnation obtained during an inspection shall be made pursuant to Utah Code Ann. Section 19-1-306. (R307415-6c(2)(e)) Certification. Any application form, report, or compliance certification submitted pursuant to this permit shall contain certification as to its tnrth, accuracy and completeness, by a responsible official as defined in R307415-3. This certification shall state that, based on information and belief formed after reasonable inquiry the statements and information in the document are true, accurate, and complete. (R307415-5d) Compliance Certifi cation. Permittee shall submit to the Director an annual compliance certification, certiffing compliance with the terms and conditions contained in this permit, including emission limitations, standards, or work practices. Th:is certification shall be submitted no later than the date shown under "Enforceable Dates and Timelines" at the front of this permit, and that date each year following until this permit expires. The certification shall include all the following (permittee rnay cross-reference this permit or previous reports): G.307415- 6c(s)) The identification of each term or condition of this perrnit that is the basis of the certification; The identification of the metlods or other means used by the permittee for determining the compliance status with each term and condition during the certification period. Such methods and other means shall include, at a minimum, the monitoring and related recordkeeping and reporting requirements in this permit. If necessary, the pennittee also shall identi$ any other material information that must be included in the certification to co*ply with section 113(c)(2) of the Act, which prohibits knowingly making a false certification or omitting material information; The status sf ssmpliance with the terms and conditions of the perrrit for the period covered by the certification, including whether compliance during the period was continuous or intermittent. The certification shall be based on the method or means designated in Provision I.L.l.b. The certification shall identiff each deviation and take it into account in the compliance certification. The certification shall also identiff as possible exceptions to compliance any periods during which compliance I.L.1.a I.L.1.b I.L.l.c Project OPP0104230003 PageT Tifle V Operating Permit #3500200001 is required and in which an excursion or exceedance as defined under 40 CFR Part 64 occurred; and I.L.l.d Such other facts as the Director may require to determine the compliance status. 11L-z The permittee shall also submit all compliance certifications to the EPA, Region VIII, at the following address or to such other address as may be required by the Director: (R307415- 6c(s)(d)) Environmental Protection Agency, Region VIII Office of Enforcement, Compliance and Envfuonmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver, CO 80202-1129 I.M Permit Shield. IM l ;,ffi:lTlJ:,fr11*:f,"'xHH"".-*'""",ffiJ:l#,1;,*n"f;:r',riancewithanv I.M.l.a Such applicable requirements are included and are specifically identified in this permit, or (R307415-6f(1Xa) I.M.l.b Those requirements not applicable to the source are specifically identified and listed in this permit. (R30741 5-6f(1xb) 1.M.2 Nothing inthis permit shall alter or affect any of the following: I.M.2.a The emergencyprovisions of Utah Code Ann. Section l9-l-202 and Section 19-2- 112, and the provisions of the CAA Section 303. (R307415-6f(3)(a) LM.2.b The liability of the owner or operator of the source for any violation of applicable requirements underutah code Am. section 1.9a-rc7Q)(g) and Section 1.92-ll0 prior to or at the time of issuance of this permit. (R307415-6f(3Xb) I.M.2.c The applicable requirements of the Acid Rain Program, consistent with the CAA Section 408(a). (R30741 s-6f(3)(c)) I.M.2.d The ability of the Director to obtain information from the source under Utah Code Ann. Section L9-2-120, and the ability of the EPA to obtain information from the source under the CAA Section 114. (R307415-6f(3Xd) I.N EmergencY Provision. I.N.l An "emergency" is any situation arising from sudden and reasonably unforeseeable events beyond the contol of the source, including acts of God, which situation requires immediate corrective action to restore normal operation, and that causes the source to exceed a technology-based emission limitation under this permit, due to unavoidable increases in emissions attributable to the emergency. An emergency shall not include noncompliance to the extent caused by improperly designed equipment, lack of preventive maintenance, careless or improper operation, or operator error. (R307a15-6g(1) I.N.2 An emergency constitutes an affirmative defense to an action brought for noncompliance with such technolory-based emission limitations if the affirmative defense is demonstrated through properly sigued, contemporaneous operating logs, or other relevant evidence that: Project OPP0104230003 Page 8 Title Y Operating Permit #3500200001 LN.2.a An emergency occured and the permittee can identiff the causes of the emergency. (R307415-6s(3xa) I.N.2.b The permitted facility was at the time being properly operated. (R307415- 6e(3Xb) I.N.2.c During the period of the emergency the perrnittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards, or other requirements in this permit. (R3074 1 5-6g(3Xc)) I.N.2.d The permittee submitted notice of the emergency to tle Director within trro working days of the time when emission limitations were exceeded due to the emergency. This notice must contain a description of the emergency, any steps taken to mitigate emissions, and corrective actions taken. This notice fulfills the requirement of Provision I. S.2.c below. (R3 074 I 5-6 g(3 Xd) I.N.3 In any enforcement proceeding, the permittee seeking to establish the occurrence of an emergency has the burden of proof. (807a15-6g(a)) I.N.4 ffi'":ilffffI"r,'H''ffi t$1ilr"_fi#riff*"cv or upset provision contained in I.O Onerational Flexibilitv. Operational flexibility is govemed by R307-415-7d(1). I.P 0ff-nermit Chanees. Off-permit changes are governed by R307415 -7 dQ). I.Q Administrative Permit Amendments. Administrative permit amendments are govemed by R307415-7e. i I.n Permit Modifications. Permit modifications are govemed by R307415-7f. i l.s Records and Reportins. I.S.1 Records. I.S.l.a The records of all required monitoring data and support inforrnation shall be retained by the permittee for a period of at least five years from the date of the, il:il[r,fr#,[]hT,ixi,THill;iilr;::"1'.:::fiT+#'#liffil* appropriate recordings for continuous monitoring instrumentation, and copies of all reports required by this permit. (R307415-6a(3)(b)(ii)) I.S.l.b For all monitoring requirements described in Section II, Special Provisions, the source shall record the following information, where applicable: (R307415- 6r(3XbXr) I.S.1.b.1 The date, place as defined in this permit, and time of sampling or measurement. , ProiectOPP0104230003 Page 9 Tifle Y Operating Permit #3500200001 I.S.1.b.2 The date analyses were performed. I.S.1.b.3 The company or entity that performed the analyses. I.S.l.b.4 The analytical techniques or methods used. I.S.1.b.5 The results of such analyses. I.S.1.b.6 The operating conditions as existing at the time of sampling or measurement. I.S.l.c Additional record keeping requirements, if any, are described in Section II, Special Provisions. I.S.2 Reports. LS.2.a Monitoring reports shall be submitted to the Director every six months, or more frequently if specified in Section tr. Al1 instances of deviation from permit requirements shall be clearly identified in the reports. (R307415-6a(3)(c)(i)) I.S.2.b A11 reports submitted pursuant to Provision I.S.2.a shall be certified by a responsible official in accordance with Provision I.K of this permit. (R307415- 6a(3Xc)(i) I.S.2.c The Director shall be notified promptly of any deviations from permit requirements including those attributable to upset conditions as defined in this permit, the probable cause ofsuch deviations, and any corrective actions or preventative measures taken. Prompt, as used in this condition, shall be defined as written notification within the number of days shown under "Enforceable Dates and Timelines" at the front of this permit. Deviations from permit requirements due to breakdowns shall be reported in accordance with the provisions of R307-107. (R3074 1 s-6a(3)(c)(ii)) I.S.3 Notification Addresses. I.S.3.a All reports, notifications, or other submissions required by this permit to be submitted to the Director are to be sent to the following address or to such other address as may be required by the Director: Utah Division of Air Quality P.O. Box 1M820 Saltlake ciry, uT 8411,44820 Phone: 801-5364000 I.S.3.b All reports, notifications or other submissions required by this permit to be submitted to the EPA should be serrt to one of the following addresses or to such other address as may be required by the Director: For annual compliance certifications: Environmental Protection Agency, Region VItr Office of Enforcement, Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Sheet Denver, CO 80202-1L29 Project OPP0104230003 Page 10 Tifle V Operating Permit #3500200001 For reports, notifications, or other correspondence related to permit modifications, applications, etc.: Environmental Protection Agency, Region VItr Office of Partnerships and Regulatory Assistance Air and Radiation Program (mail code 8P-AR) 1595 Wynkoop Street Denver, CO 80202-1129 Phone: 303-312-6114 I.T Reonening for Cause. I I.T.1 I.T.1.a I.T.1.b I.T.1.c r.T.1.d t.T.2 I.T.3 A permit shall be reopened and revised under any of the following circumstances: New applicable requirernents become applicable to the permittee and there is a lsmaining permit tenn of three or more years. No such reopening is required if the effective date of the requirement is later than the date on which this permit is due to expire, unless the terms and conditions of this permit have been extended pursuant to R3074 I 5 -7 c(3), application shield. (R3074 1 5-7g( 1 )(a) The Director or EPA determines that this permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of this permit. (R307415-7g(1Xc)) EPA or the Director determines that this permit must be revised or revoked to assure compliance with applicable requirements. (R3074 1 5-7g( I )(d)) Additional applicable requirements are to become effective before the renewal date of this permit and are in conflict with existing permit conditions. (R307415- 79(1)(e)) Additional requirements, including excess emissions requirements, become applicable to a Title IV affected source under the Acid Rain Program. Upon approval by EPA, excess emissions offset plans shall be deemed to be incorporated into this penrrit. (R307415- ze(tXb) Proceedings to reopen and issue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of this permit for which cause to reopen exists. @307a15-7gQ)) I.U fnventorv Reouirements. An emission inventory shall be submitted in accordance with the procedures of R307-150, Emission Inventories. (R307-1 50) I.V Tifle fV and Other, More Strinsent Requirements Where an applicable requirement is more stringent than an applicable requirement of regulations promulgated under Title [V of the Act, Acid Deposition Control, both provisions shall be incorporated into this permit. (R307-415-6a(1xb) Project OPP0104230003 Page 11 Tifle V Operating Permit #3500200001 SECTION II: SPECIAL PROYISIONS tr.A Emission Unit(s) Permitted to Discharge Air Contaminants. (R30741 s4(3Xa) and R3 07 41s 4(4)) tr.A.1 Permitted Source Source-wide n.A.z Line#l Tunnel Kiln #1. Listed for identification pulposes only. Not approved for operation. tr.A.3 Line#3 Includes: Line #3 kiln, packed tower scrubber (60,000 ACFM) with mist eliminator, and baghouse (MilroPul). tr.A.4 Linetl4 Includes: Line f4 kiln Wet scrubber (89,800 ACFM) with mist eliminator, vacuum cleaner, shapes dryer, and baghouse (MilaoPul). tr.A.5 GrizdyHopper Pre- August 31, 1983. II.A.6 Primary and Secondary Crushers Pre40 CFRPart 60, Subpart OOO facilities: (e) primary crusher (100 tonlhr) with pulse jet baghouse. Primaxy crusher replaced after the NSPS effective date with equipment of equal or smaller size. Exempted from Subpart OOO by provision 40 CFR 60.670(dX1). @) Secondary crusher/grinding. Pre-August 3 1,1983. (C) Screens. Pre-August 31,1983. tr.A.7 Silos Two lime silos. tr.A.8 Clay Storage Piles Storage for raw materials. tr.A.9 Gasoline Storage Tank- 40 CFR 63 Subpart CCCCCC Above ground gasoline storage tank for fueling vehicles. Capasity approximately 1,000 gallons. Throughput less than 10,000 gallons per month. tr.A.10 Diesel Storage Tanks Above-ground diesel storage tank for fueling vehicles. Capacity approximately 2,000 gallons. tr.A.ll Degreasers Four parts washers. Project OPP0104230003 Page12 Tifle Y Operating Permit #3500200001 I I II.B Requirements and Limitations The following emission limitations, standmds, and operational limitations apply to the permitted facility as indicated: II.B.1 Permitted Source (Source wide) II.B.1.a Condition: Plant wide production/consumption shall not exceed: 1) 2,880 tons raw clay consumption per rolling 24-hour period. 2) 393,236 tons of brick produced in Line #3 and Lne tt4 combined per rolling 1 2-month period. 3) 512,582 tons of brickproducedplant-wide perrolling I2-month period. [Authority granted under R307401-8(1Xa)[BACT]; condition originated in DAQE-AN104230017-L61. I II.B.l.a.l Monitoring: Recordkeeping requirements for this permit condition shall ssrve as monitoring. n.B.l.a.Z Recordkeeping: To demonstrate compliance with a rolling 12-month total, a new l2-month total shall be calculated by tle twentieth day of each month u5ing data from the previous 12 months. To demonstrate compliance with a rolling 24-hour total, a new 24-hour total shall be calculated after each hour ofoperation using data from the previous 24 hours. Production/consumption records shall be kept on a daily basis and maintained in accordance with provision I.S.1 of his pennit. tr.B.l.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.8.1.b Condition: Visible emissions from the following emission points shall not exceed the following values: (1) All screens - l0%o opaclty. (2) Nl conveyor tansfer points - l0%o opacity. (3) All baghouses - l0o/o opacity. (4) All buildings enclosing crushers - 10% opacity. (5) All crushers - l5o/o opacity. (6) All other points onsite- 20Yo opacity. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. ProjectOPP0104230003 Page 13 TifleVOperatingPermit#350020000l II.B.1.b.1 tr.B.1.b.2 tr.B.1.b.3 tr.B.1.c II.B.1.c.1 tr.B.1.c.2 tr.B.1.c.3 Monitoring: If an affected emission unit is operated dwing a calendar quarter, an opacrty observation of the emission unit shall be performed in the calendar quarter that the emission unit was operated. The opacity observation can be conducted at any time during the quarter. The opacity observation shall be conducted by an individual trained on the obsewation procedures of 40 CFR 60, Appendix A, Method 9, while the emission unit is operating. If visible emissions other than condensed water vapor are observed from the emission unit, an opacrty determination of that emission unit shall be performed by a certified observer within 24 hours of the initial visual emission observation. The opacity determination shall be performed in accordance with 40 CFR 60, Appendix A, Method 9. Recordkeeping: The permittee shall keep a log which includes the location and description of each affected emission unit. For each calendar quarter for each affected emission unit, the log shall include either the date of the opaclty observation and if visual emission other than condensed water vapor were observed or a note that the emission unit was not operated. For each observed visual emission other than condensed water vapor the pemrittee shall record: date and time of visual emission observation, emission unit location and description, time and date of opacity determination, and percent opacrty. The records required by this provision and all data required by 40 CFR 60, Appendix A, Method 9 shall be maintained in accordance with Provision I.S.1 of this permit. Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Condition: The moisture content of the clay shall be maintained at an average of no less +han 4.0%oby weight. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE- ANI04230017-161. Monitoring: Clay moisture content shall be monitored using a moisture meter. The moisture meter shall be calibrated biannually according to manufacturer specifications and procedures. Recordkeeping: Clay moisture content shall be recorded once a calendar week. Records of moisture meter calibrations shall be maintained. A copy of manufacturer specifications for moisture meter operation, maintenance, and calibration shall be kept on site. Records shall be maintained in accordance with Provision I.S.1 of this permit. Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Project OPP0104230003 Page14 Title V Operating Permit #3500200001 tr.B.l.d Condition: The plant-wide emissions of VOCs from the brick manufacturing plant and associated operations shall not exceed 14.87 tons per rolling l2-month period for VOCs. [Authority granted under R307401- 8(1)(a)[BACT]; condition originated in DAQE-AN104230017 -161. II.B.l.d.l Monitoring: Compliance with the limitation shall be demonshated on a lqlling l2-month total. Based on the twentieth day of each month, a new 12-month total shall be calculated using data from the previous 12 months. The VOC emissions shall be determined by maintaining a record of VOC-emitting materials used each month. The record shall include the following data for each material used: A. Name of the VOC-emitting material, such as: paint, adhesive, solvent, thinner, reducers, chemical compounds, toxics, isocyanates, etc. B. Density of each material used (pounds per gallon). C. Percent by weight of all VOC in each material used. D. Gallons of each VOC-emitting material used. E. The amount of VOC emitted monthly by each material used shall be calculated by the following procedure : VoC:% VoCbyWeiehtx I Density (lb )] x Gal Consumed x L ton(100) (eaD 2000 lb F. The amount of VOC emitted monthly from all materials used. G. The amount of VOCs reclaimed for the month shall be similarly quantified and subfracted from the quantities calculated above to provide the monthly total i VOC emissions. tr.8.1.d.2 Recordkeeping: Results of monitoring shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.l.d.3 Reporting: There are no reporting requirements for this provision except those speoified in Section I of this permit. tr.B.l.e Condition: I The plant-wide emissions of IIAPs from the brick manufacturing plant and associated operations shall not exceed: 7.2tans per rolling l2-month period for HCI 6.7 tons per rolling l2-month period for IIF 7.0 tons per rolling l2-month period for miscellaneous IIAPs Project OPP0104230003 Page 15 Title V Operating Permit #3500200001 18.2 tons per rolling l2-month period for all HAPs combined. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. tr.8.1.e.1 Monitoring: Compliance with the limitation shall be demonsfated on a rolling l2-month total. Based on the twentieth day of each month, a new l2-month total shall be calculated using data from the previous 12 months. Compliance with IIF and HCI limitations listed above shall be demonsfrated using the mass balance plan approved by the Director, submitted by ISB on October 22,2009 (See AO DAQE- AIiTl 042300 17 -l 6, Appendices A-C) . If ISB submits any additional revised mass balance methods for determining annual emissions to the Director for ap,proval, the plan shall include, at a minimum, the following: A. Proposed test methods and test frequency for determining the weight of the elemental fluorine contained in the clays used to manufacture brick. B. Proposed test methods and test frequency for determining the weight of the elemental fluorine contained in the finished product. C. Calculation method of determining emissions of HCL and IIF which will demonstrate compliance with the HCI and I{F emission limitations listed above. The miscellaneous IIAP emissions shall be determined by maintaining a record of llAP-emitting materials used each month. The record shall include the followingMta for each material used: 1. Na:ne of the llAP-emitting material, such as: paint, adhesive, solvent, thinner, reducers, chemical compounds, toxics, isocyanates, etc. 2. Density of each material used (pounds per gallon). 3. Percent by weight of all HAP in each material used. 4. Gallons of each HAP-emitting material used. 5. The amount of HAP emitted monthly by each material used shall be calculatedby the following procedure: HAP : % HAP bf, Weight x l-Deusiryllb ) I x Gal Consumed x 1 ton (100) (eal) 2000 lb 6. The amount of IIAPs emitted monthly from all materials used. 7.T\e amount of IIAPs reclaimed for the month shall be similarly quantified and subtracted from the quantities calculated above to provide the monthly total VOC emissions. tr.B.l.e.2 Recordkeeping: Results of monitoring shall be maintained in accordance with Provision I.S.1 of this permit. Project OPP0104230003 Page 16 Title V Operating Permit #3500200001 tr.B.l.e.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.l.f Condition: Fugitive Dust: (1) The permittee shall zubmit and abide by a fugitive dust control plan acceptable to the Director for contol of dust. [Orign: DAQE-ANI04230017-16]. The fugitive dust control plan must include contact information, site address, total arca of disturbance, expected start and completion dates, identification ofdust suppressant and plan certification by signature of a responsible person. [Origrn: R307-309-6(5)] (2) Opacity caused by fugitive dust shall not exceed Ll%o at the property boundary, and20% on site. lOrigrn: R307-309-5(1)l (3) State Only Requirements: The above opacity requirements shall not apply when ttre wind speed exceeds 25 miles per hour if the owner or operator has implemented, and continues to implement, the accepted fugitive dust control plan and administers one or more of the following contingency measures: (a) Pre-event watering; (b) Hourlywatering; (c) Additional chemical stabilization; (d) Cease or reduce fugitive dust producing operations to the extent practicable. [origin: R307-309-5(3)] (a) The penrrittee shall limit vehicle speeds on haul roads as follows: (a) 15 mph within the plant and in the vicinity of the crusher; and (b) 25 mph between the plant and the paved highway. Speed limit signs shall be posted at the entrance to the active haul road area. [Origrn: DAQE-AN I 04230017 -1 6). (5) All roads and other operational areas that are used by mobile equipment shall be sprayed with water to control fugitive dust. Treatuent shall be applied of sufficient frequency and quantity to maintain the surface material in a condition such that fugitive emissions are minimi26d unless the ambient temperature could result in freezing condifions. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-ANT04230017-16). (6) The storage piles shall be watered to minimize generation of fugifive dusts as dry conditions warrant or as determined necessary by the Director. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. Project OPP0104230003 PagelT Title V Operating Permit #3500200001 tr.8.1.f.1 Monitoring: (1) For paragraph (1) of the above condition: recordkeeping shall serye as monitoring for the most recently approved fugitive dust control plan. (2) For parugraph(2) of the above condition: adherence to the most recently approved fugitive dust contol plan shall be monitored to demonstrate that appropriate measures are being implemented to control fugitive dust in lieu of monitoring via visible emissions observations. (3) For paragraph(3) of the above condition: wind speed shall be measuredby an anemometer to identiff periods when velocity exceeds 25 mph. [origin: R307-309-5(4); State Only Requirement] (4) For paragraph (4) of the above condition: vehicle/equipment speed shall be observed at a -loimrrm of once each year. Additionally, at least once each year, all speed limit signs shall be inspected to assure they are still present. (5) For paragraph (5) of the above condition: recordkeeping shall serve as monitoring (fugitive dust control requirements that apply to roads). (6) For paragraph (6) of the above condition: recordkeeping shatl serve as monitoring (fugitive dust contol requirements that apply to storage piles). tr.B.l.f.2 Recordkeeping: The following records shall be maintained in accordance with Provision I.S.1 of this permit: (1) The most recently approved fugitive dust control p1an. Records required by the most recently approved fugitive dust control plan shall be maintained in accordance with the plan. (2) Measures taken to contol fugitive dust. (3) If wind speeds are measured to establish an exception from the visible emissions limits, records of the administered contingency measures and the wind speed measurements shall be maintained. [State Only Requirement] (4) Observations of the vehicle/equipment speed, and inspections of speed limit sips. (5) Records of water treatuent to suppress fugitive dust from roads. In addition to the requirements of Provision I.S.1 of this permiq records shall include the following items: A. Number of treatments made; B. Dilution ratio of treatments; C. Quantity applied; D. Rainfall received, if any, approximate amount; and E. Time of day treatments were made. [Origin: DAQE-ANI 04230017 -16] (6) Records of water treatrrent to suppress fugitive dust from storage piles. In addition to the requirements of Provision I.S.1 of this permit, records shall include the following items: Project OPP0104230003 Page 18 Tifle V Operating Permit #3500200001 A. Number of teatments made; B. Dilution ratio of treahents; C. Quantity applied; D. Rainfall received, if any, approximate amount; and E. Time of day treatments were made. [origin: DAQE-ANI 04230017 -161. (7) Records shall be maintained in accordance with section I.S.1 of this permit. tr.8.1.f.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. n.8.2 Line#3 n.B.2.a Condition: All exhaust air from Kitn #3 process streams shall be routed through the wet scrubber before fsing vented to the atnosphere. [Authority grantedunder R307401-8(1)(a)[BACT]; condition originated in DAQE- ANl04230017-t61. n.B.2.a.l Monitoring: Records required for this permit condition will serve as monitoring. n.8.2.a.2 Recordkeeping: Records shall be kept for all periods when the scrubber is not in use during line #3 operation. Records shall be maintained in accordance with Provision I.S.1 of this permit. fr..8.2.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.8.2.b Condition: Emissions from the Kiln #3 Scrubber Tunnel shall not exceed: Total PM2.5* .....8.66 lblhr (l-hr average). PMrg ......8.66 lb/hr (1 -hr average). NO*...... 5.07 lbltu (l-hr average). SOz ...... 8.09 lb/hr (1-hr average). Total Fluorid es...... 1.7 7 lb/hr ( 1 -hr average). Project OPP0104230003 Page 19 Tifle V Operating Permit #3500200001 * Including front half and back half condensables. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-A][104230017-L6). tr.8.2.b.1 Monitoring: Stacktesting shall be performed as specified below: (1) Frequency Kiln #3 Scrubber Tunnel emissions shall be tested as follows: PMro and PM 2.5......every three calendar years. NO*...................... every three calendar years *. SO2...................... every calendar year. Total Fluorides........ every five years based on the date of the last test. Additional tests may also be required at the direction of the Director. * If production exceeds 294,927 tons of brick produced per rolling l2-month period then testing will be conducted each calendar year and within 90 days of exceeding the294,927 ton limit. (2) Notification At least 30 days before the test, the source shall noti$ the Director of the date, time, and place of testing and provide a copy ofthe test protocol. The source shall attend a pretest conference if determined necessary by the Director. (3) Methods (a) Sample Location The emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Occupational Safety and Health Administration (OSHA) or Mine Safety and Health Administration (MSIIA) approved access shall be provided to the test location. (b) Emissions tests: (1) PMloandPM2.5: (i) 40 CFR 51, Appendix M, Method Z}laandMethod 202, or (i, 40 CFR 60, Appendix A, Method 5 and 40 CFR 51, Appendix M, Method 202. (2) NO*: 40 CFR 60, Appendix A, Method 7E. (3) SO2: 40 CFR 60, Appendix A, Method 6C. (4) Total Fluorides: 40 CFR 60, Appendix A, Method 13B. (c) 0 CFR 60, Appendix A, Method 2 shall be used to determine the volumetric flow ratp. Project OPP0104230003 Page20 Title V Operating Permit #3500200001 (d) Or other EPA approved testing methods acceptable to the Director. (4) Calculations To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determinedby the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. (5) Production Rate During Testing For a source/emission point, the production rate during compliance testing shall be no less than 90% of the maximum allowable production rate (L7.92 tons of product per hour). If the maximum allowable production rate cannot be achieved at the time of the test, the following procedure shall be followed: (a) Testing shall be at no less thqn9Oyo of the anticipated annual production rate. (b) If the test demonsfrates compliance with the limits listed above, the murimum allowable production rate shall be ll0% of the rate achieved during the latest test. (c) If a higher production rate is necessary, upon notification to the Director, ISB may increase production to 110%o of the highest tested rate that demonstrates compliance with the limits limited in this condition. TI.8.2.b.2 Recordkeeping: Results of monitoring shall be maintained in accordance with Provision I.S.1 of this permit. II.8.2.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. ll.B.2.c Condition: Emissions from the Line #3 Baghouse shall not exceed: (1) Total PM2.5* ..........0.18 lb/hr and 0.016 grains/dscf (1-hr average); and (2) PM10*t. ..... 0.18 lb/hr and 0.016 grains/dscf (l-hr average). *(dry filterable particulate only), including front half and back half condensables. **(dry filterable particulate only) [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-ANl042300ll-16). tr.B.2.c.l Monitoring: Stack testing shall be per{ormed as specified below: (1) Frequency: every three calendar years. Additional tests may also be required at the direction of tle Director. Project OPP0104230003 Page2l Tifle V Operating Permit #3500200001 (2) Notification At least 30 days before the test, the source shall notif the Director of the date, time, and place of testing and provide a copy ofthe test protocol. The source shall attend a pretest conference if determined necessary by the Director. (3) Methods (a) Sample Location The emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Occupational Safety and Health Administration (OSHA) or Mine Safety and Health Administation (MSHA) approved access shall be provided to the test location. (b) Emissions tests for PMro and PM 2.5: (1) 40 CFR 51, Appendix M, Method 201a (Method.z0z, dry impinger not required), or (2) 4OCFR 60, Appendix A, Method 5 (40 CFR 51, Appendix M, Method 202, dry imJringer not required). (c) 40 CFR 60, Appendix A, Method 2 shall be used to determine the volumetric flow tate. (d) or other EPA approved testing methods acceptable to the Director. (4) Calculations To determine rrass emission rates (lblhr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. (5) ProductionRate During Testing For a source/emission point, the production rate during compliance testing shall be no less than 90Yo of the ma:rimum allowable production rate (17.92 tons of product per hour). If the maximum allowable production rate cannot be achieved at the time of tle test, the following procedrue shall be followed: (a) Testing shall be at no less than90% of the anticipated annual production rate. (b) If the test demonshates compliance with the limits listed above, the maximum allowable production rate shall be 110% of the rate achieved during the latest test. (c) If a higher production rate is necessary, upon notification to the Director, ISB may increase production to ll0%o of the highest tested rate that demonshates compliance with the limits limited in this condition. tr.8.2.c.2 Recordkeeping: Records shall be maintained in accordance with Provision I.S.1 of this permit. Project OPP0104230003 Page22 Tifle V Operating Permit #3500200001 tr.B.2.c.3 Reporting: There are no reporting requirements for this provision excep those specified in Section I of this permit. IJ'B.2.d Condition: Line #3 tunnel kiln production shall not exceed 17 .92 tons ofproduct per hour. [Authority granted under R307a01-8(1)(a)[BACT]; condition originated in DAQE-AN1042300L7-161. tr.8.2.d.1 Monitoring: Production oalculations shall be based on tons ofproduct per hour averaged over a rolling 24- hour period. A new 24-how average shall be calculated after each hour of operatisn using data from the previous 24 hours. n.8.2.d.2 Recordkeeping: Production/consumption records shall be kept on a daily basis and kept for all periods when the plant is in operation. Records shall be maintained in accordance with provision I.S. 1 of his permit. tr.8.2.d.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.2.e Condition: Clay Prep for Line #3 shall not exceed 6,240 hours of operation per rolling l2-month period (does not Include Kiln # 3 operating hours) [Authority granted under R307a01-8(1)(a)[BACT]; condition originated in DAQE-AN 104230017 -16). tr.8.2.e.1 Monitoring: Hours of operation shall be calculated based on a rolling l2-month period, a new l2-month total shall be calculated by the twentieth day of each month using data from the previous 12 months. tr.8.2.e.2 Recordkeeping: Records shall be kep on a daily basis and kept for all periods when the plant is in operation. Records shall be maintained in accordance with provision I.S.1 of his perrnit. n.8.2.e.3 Reporting: There are no reporting requirernents for this provision except those specified in Section I of this permit. tr.B.2.f Condition: Natural gas shall be used for fuel in Kiln #3 with propane as a backup. [Authority granted under R307- a0 1-8(1)(a)[BACT]; condition originated in DAQE-AN1042300L7 -161. Project OPP0104230003 Prge23 Title V Operating Permit #3500200001 n.B.z.f.L Monitoring: Records required for this permit condition will serve as monitoring. tr.8.2.f.2 Recordkeeping: To demonstrate compliance, fuel records shall be kept for all periods when the facility is in operation indicating purchase ofnatural gas or propane. tr.8.2.f.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. n.B.Z.g Condition: The minimum pressure drop for the Line #3 scrubber shall be 0.1 inches/w.g. The above limit does not apply during start-up and shut-down of the scrubber. Pressure gauges shall be located such that an inspector/operator can safely read the indicator at any time. I [Authority granted under R307a01-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. tr.B.2.g.l Monitoringt i Pressure drop shall be measured once per operating day to demonstate compliance with the I limitation. Pressure gauges must be certified by the manufacturer to be accurate within plus or minus five percent of the w.g. design. Pressure gauges must be calibrated on an annual basis in accordance with the manufacturer's instructions. A..8.2.g.2 Recordkeeping: Pressure drop monitoring results shall be recorded on a daily basis. Records shall be kept onsite for pressure gauges and shall include: manufacturer certifications, calibrations, and operating instructions. Records shall be maintained in accordance with Provision LS.1 of this permit. tr.B.2.g.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of tlis permit. tr.B.2.h Condition: Lne#3 scrubber fluid shall be maintained between 5-9 pH. When the scrubber is in operation, the pH shall be within the range specified above, except during start- up and shutdown of the scrubber. [Authority granted under R307401-8(I)(a)[BACT]; condition originated in DAQE-AN104230017-161. Project OPP0104230003 Page24 Title V Operatiug Permit #3500200001 tr.8.2.h.1 Monitoring: A monitoring device for the continuous measurement of scrubbing solution pH shall be installed, calibrated, maintained and operated. The monitoring device shall be certified by the manufacturer to be accurate within plus or minus five percent of the design pH and must be calibrated on an annual basis in accordance with the manufacturer's instructions. The pH monitoring device shall be located such that an inspector/operator can safely read the indicator at any time. f.8.2.h2 Recordkeeping: The pH shall be recorded once per operating day. Continuous 1e661ding is not required. Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.8.2.h.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. II.B.2.i Condition: The minimum flow rate of Line #3 ssrubber fluid shall be 200 gallons per minute. When the scrubber is in operation, the minimum flow rate shall be as specified above, excep during start-up and shutdown of the scrubber. [Authority grantedunder R307401-8(1)(a)[BACT]; condition originated in DAQE-AN 104230017 -L 6). tr.B.2.i.l Monitoring: A monitoring device for the continuous measurement of flow rate shall be installed calibrated, maintained, and operated. The monitoring device shall be certified by the manufacturer to be accurate within plus or minus five percent of the design flow rate and must be calibrated on an annual basis in accordance with the manufacturer's instnrctions. The flow rate monitoring device shall be located such that an inspector/operator can safely read the indicator at any time. 11.8.2i.2 Recordkeeping: The scrubber flow rate shall be recorded once per operating day. Continuous recording is not required. I tr.B.2.i.3 Reporting: ' There are no reporting requirements for this provision except those specified in Section I of this permit. Project OPP0104230003 Page 25 Title V Operating Permit #3500200001 tr.B.3 Line #4 tr.B.3.a Condition: A11 exhaust air from Kiln #4 process steams shall be routed through th" wet scrubber before being vented to the atmosphere. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE- A1I104230017-161. tr.B.3.a.l Monitoring: Records required for this permit condition will serve as monitoring. tr.B.3.a.2 Recordkeeping: Records shall be kept for all periods when the scrubber is not in use during line #4 operation. Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.3.a.3 Reporting: There are no reporting requirements for this provision excep those specified in Section I of this permit. tr.B.3.b Condition: Emissions from the Kiln #4 Scrubber Tunnel shall not exceed: TotalPM2.5* .....3.97 lblh (l-hr average). PMro ......3.97 lblhr (l-hr average). NO* ..... 10.52 lblhr (1 -hr average). SO2 .......5.87 hlhr (1-hr average). Total Fluorides ......3.25 lb/h (l-hr average). *including front half and back half condensables. [Authority granted r:nder R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-L6). tr.B.3.b.l Monitoring: Stack testrng shall be performed as specified below: (1) Frequency Kiln #4 Scrubber Tunnel emissions shall be tested as follows: PMro and PM 2.5......every three calendar years. NO*...................... every three calendar years*. SO2...................... every calendar year. Total Fluorides........ every five years based on the date of the last stack test. Additional tests may also be required at the direction of the Director. Project OPP0104230003 Page26 Tifle V Operating Permit #3500200001 * If production exceeds 294,927 tons of brick produced per rolling l2-month period then testrng will be conducted each calendar year and within 90 days of exceeding the 294,927 ton limit. (2) Notification At least 30 days before the test, the source shall notiff the Director of the date, time, and place of testing and provide a copy ofthe test protocol. The source shall attend a pretest conference if determined necessary by the Director. (3) Methods (a) Sample Location The emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Occupational Safety and Health Administration (OSIIA) or Mine Safety and Health Adminishation (MSIIA) approved access shall be provided to the test location. (b) Emissions tests: (1) PMlo and PM 2.5: (r) 40 CFR 51, Appendix M, Method 201a and Method 202, or (ii) 40 CFR 60, Appendix A, Method 5 and 40 CFR 51, Appendix M, Method 202. (2) NO,.: 40 CFR 60, Appendix A, Method 7E. (3) SO2: 40 CFR 60, Appendix A, Method 6C. (4) Total Fluorides: 40 CFR 60, Appendix A, Method 138. (c) 40 CFR 60, Appendix A, Method 2 shall be used to determine the volumetric flow rate. (d) Or other EPA approved testing methods acceptable to the Director. (4) Calculations To determine mass emission rates (lb/br, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary oonversion factors determined by the Director to give the results in the specifiedrmits of the emission limitation. (5) Production Rate During Testing For a source/emission point, the production rate during compliance testing shall be no less than 90%o of the maximum allowable production rate Q6.97 tons ofproduct per hour). If the maximum allowable production rate cannot be achieved at the time of tle test, the following procedure shall be followed: (a) Testing shall be at no less thang}% of the anticipated annual production rate. (b) If the test demonshates compliance with the limits listed above, the maximum allowable production rate shall be 110%o of the rate achieved during the latest test. Project OPP0104230003 Page27 Title V Operating Permit #3500200001 (c) If a higher production rate is necessary, upon notification to the Director, ISB may increase production to ll}Yo of the highest tested rate that demonsfiates compliance with the limits limited inthis condition. tr.8.3.b.2 Recordkeeping: Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.3.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.3.c Condition: Emissions from the Lnett4 Baghouse shall not exceed: Total PM2.5* ... 0.34lblhr and 0.016 grains/dscf (l-hr average). PMro ........... ....0.341b1hr (dry filterable particulate only), and 0.016 grains/dscf (l-hr average). *(dry filterable particulate only), including front half and back half condensables [Authority grantedunder R307401-S(1Xa)[BACT]; condition originated in DAQE-AN104230017-1'61. tr.B.3.c.l Monitoring: Stack testing shall be performed as specified below: (1) Frequency: every tlree calendar years. Additional tests may also be required at the direction of the Director. (2) Notification At least 30 days before the test, the source shall notifr the Director of the date, time, and place of testing and provide a copy ofthe test protocol. The source shall attend a pretest conference if determined necessary by the Director. (3) Methods (a) Sample Location The emission point shall conform to the requirements of 40 CER 60, Appendix A, Method 1, and Occupational Safety and Health Administration (OSHA) or Mine Safety and Heatth Administation (MSHA) approved access shall be provided to the test location. (b) Emissions tests for PMro and PM 2.5: (l) 40 CFR 51, Appendix M, Method 20la (Method 202, dry impinger not required), or (2) 40 CFR 60, Appendix A, Mettrod 5 (40 CFR 51, Appendix M, Method 202, dry impinger not required). Project OPP0104230003 Page28 Title V Operating Permit #3500200001 (c) a0 CFR 60, Appendix A, Method 2 shall be used to determine the volumetric flow rute. (d) or other EPA approved testing methods acceptable to the Director. (4) Calculations To determine mass emission rates (lb/br, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. (5) Production Rate During Testing For a source/emission point, the production rate during compliance testing shall be no less than 90Yo of the maximum allowable production rate Q.6.97 tons of product per hour). If the maximum i ullowable production 13fs sannsf [e achieved at the time of the test, the following procedure shall be followed: (a) Testing shall be at no less than90% of the anticipated annual production rate. (b) If the test demonstrates compliance with the limits listed above, the maximum allowable production rate shall be LI}/o of the rate achieved during the latest test. (c) If a higher production rate is necessary, upon notification to the Director, ISB may increase production to ll0%o ofthe highest tested rate that demonstrates compliance with the limits limited inthis condition. n.8.3.c.2 Recordkeeping: Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.3.c.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.3.d Condition: Lne tA tunnel kiln production shall not exceed 26.97 tons of product per hour averaged over a rolling 24- hour period. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE- AN104230017-t6). tr.8.3.d.1 Monitoring: Production calculations shall be based on tons ofproduct per hour averaged 6ys1 I lslling 24- hour period. A new 24-hour average shall be calculated after each hour of operation u5ing data from the previous 24 hours. tr.8.3.d.2 Recordkeeping: Production/consumption records shall be kept on a daily basis and kept for all periods when the plant is in operation. Records shall be maintained in accordance with provision I.S.1 of his permit. Project OPP0104230003 Page29 Tifle V Operating Permit #3500200001 tr.B.3.d.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.8.3.e Condition: Clay Prep for Line # 4 shall not exceed 6,240 hours of operation per rolling l2-month period (does not Include Kiln # 4 operating hours) [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN1,04230017 -161. tr.B.3.e.l Monitoring: Hours of operation shall be calculated based on a rolling I2-month period, a new l2-month total shall be calculated by the twentieth day of each month using data from the previous 12 months. tr.B.3.e.2 Recordkeeping: Records shall be kept on a daily basis and kept for all periods whe,n the plant is in operafion. Records shall be maintained in accordance with provision I.S.1 of his permit. tr.B.3.e.3 Reporting: There are no reporting requirements for this provision excep those specified in Section I of this permit. tr.B.3.f Condition: Natural gas shall be used for fuel in Kiln #4 with propane as a backup. [Authority granted under R307- a0 1-8(1)(a)[BACT]; condition originated in DAQE-ANL042300I7 -161. tr.B.3.f.l Monitoring: Records required for this permit condition will serve as monitoring. tr.8.3.f.2 Recordkeeping: To demonstrate compliance, fuel records shall be kept for all periods when the facility is in operation indicating purchase ofnatural gas or propane. II.B.3.f.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. II.B.3.g Condition: The minimum pressure drop for the Line #4 scrubber shall be 2.0 incheVw.g. The above limit does not apply during start-up and shut-down of the scrubber. Pressure gauges shall be located such ttrat an inspector/operator can safely read the indicator at any time. [Authority grantedunder R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. Project OPP0104230003 Page 30 Tifle V Operating Permit #3500200001 tr.B.3.g.l Monitoring: Pressure drop shall be measured once per operating day to demonstate compliance with the ,imitation. Pressure gauges must be certified by the manufacturer to be accurate within plus or minus five $ffi?: #ril;t##:T;#"HH:sauses mustbe calibrated on an annualbasis in accordance tr.8.3.9.2 Recordkeeping: Pressure drop monitoring results shall be recorded on a daily basis. i ffi*jff,# }ffi#llfi;'"Tssure sauses and shall include: manufacturer certifications, Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.3.g.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.3.h Condition: Lnet4 scrubber fluid shall be maintainedbetween 5-9 pH. When the scrubber is in operation, the pH shall be within the range specified above, excspt dwing start-up and shutdown of the squbber. [Authority grantedunder R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017 -161. tr.B.3.h.l Monitoring: A monitoring device for the continuous measurement of scrubbing solution pH shall be installed, calibrated, maintained and operated. The monitoring device shall be certified by the manufacturer to be accurats within plus or minus five percent of the design pH and must be calibrated on an annual basis in accordance with the manufacturer's instructions. The pH monitoring device shall be located such that an inspector/operator can safely read the indicator at any time. tr.8.3.h.2 Recordkeeping: The pH shall be recorded once per operating day. Continuous recording is not required. , tr.B.3.h.3 Reporting: I There are no reporting requirements for this provision except those specified in Section I of this permit. Project OPP0104230003 Page 31 Tifle V Operating Permit #3500200001 II.B.3.i Condition: The minimum flow rate of Line #4 scrubber fluid shall be 600 gallons per minute. When the scrubber is in operation, the minimum flow rate shall be as specified above, except during start-up and shutdown of the scrubber. [Authority grantedunder R307401-8(1)(a)[BACT]; condition originated in DAQE-AN 104230017 -161. tr.8.3.i.1 Monitoring: A monitoring device for the continuous measurement of flow rate shall be installe{ calibrated, maintained, and operated. The monitoring device shall be certified by the manufacturer to be accurate within plus or minus five percent of the design flow rate and must be calibrated on an annual basis in accordance with the manufacturer's i:rstructions. The flow rate mouitoring device shall be located such that an inspector/operator can safely read the indicator at any time. U.B.3.i.2 Recordkeeping: The scrubber flow rate shall be recorded once per operating day. Continuous recording is not required. tr.B.3.i.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.8.4 Primarv and Secondarv Crushers tr.B.4.a Condition: All exhaust air from the Primary Crusher Building shall be routed tlrough the Primary Crusher Baghouse before being vented to the ahosphere. [Authority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN 104230017 -16). tr.B.4.a.l Monitoring: Records required for this permit condition will serve as monitoring. 1I.8.4.a.2 Recordkeeping: Records shall be kept for all periods when the Primax'/ Crusher Baghouse is not in use during crusher operation. Records shall be maintained in accordance with Provision I.S.1 of this permit. n.8.4.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Project OPP0104230003 Page32 Titte V Operating Permit #3500200001 tr.8.4.b Condition: Emissions from the Prinary Crusher Baghouse Vent shall not exceed: Total PM2.5 0.56lb/h and 0.010 grains/dscf (l-hr average). PMr0........................0.56 lb/hr (dry filterable particulate only), and 0.010 grains/dscf (1-hr averagQ. *(dry filterable particulate only), including front half and back half condensables. [Authority granted under R307401-8(1Xa)[BACT]; condition originated in DAQE-AN104230017-161. tr.8.4.b.1 Monitoring: Stack testing shall be perfonned as specified below: (l) Frequency: every three calendar years. Additional tests may also be required at the direction of the Director. (2) Notification At least 30 days before the test, the source shall noti$ the Director of the date, time, and place of testing and provide a copy ofthe test protocol. The source shall attend a pretest conference if determined necessary by the Director. (3) Methods (a) Sample Location The emission point shall conform to the requirements of 40 CER 60, Appendix A, Method 1, and Occupational Safety and Health Administration (OSIIA) or Mine Safety and Health Administation (MSIIA) approved access shall be provided to the test location. (b) Emissions tests for PMro and PM 2.5: (l) 40 CFR 51, Appendix M, Method 201a (Methodz02, dry impinger not required), or (2) 40 CFR 60, Appendix A, Method 5 (40 CFR 51, Appendix M, Method 202, dry impinger not required). (c) 40 CFR 60, Appendix A, Method 2 shall be used to determine the volumetric flow rate. (d) Or other EPA approved testing methods acceptable to the Director. (4) Calculations To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specifiedunits of tle emission limitation. Project OPP0104230003 Page 33 Tifle V Operating Permit #3500200001 (5) Production Rate During Testing For a source/emission point, the production rate during compliance testing shall be no less than 90% of the maximum allowable production rate (crusher rating 100 tonslhr). If the maximum allowable production rate cannot be achieved at the time of the test, the following procedure shall be followed: (a) Testing shall be at no less than 90o/o of the anticipated annual production rate. (b) If the test demonsfrates compliance with the limits listed above, the maximum allowable production rate shall be ll0% of the rate achieved during the latest test. (c) If a higher production rate is necessary, upon notification to the Director, ISB may increase production to 11,0%o of the highest testedrate ttrat demonstrates compliance with the limits limited in this condition. n.B.4.b.2 Recordkeeping: Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.B.4.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.4.c Condition: The minimum pressure drop for the Pdmary Crusher Baghouse shall be: (A) 2.0 in inches/w.g. when using polyester felt; or (B) 0.4 in inchesiw.g. when using PTFE membrane The above limits do not apply during a period of ten crusher operating days following filter media replacement. Pressure gauges shall be located such that an inspector/operator can safely read them at any time. fAuthority granted under R307401-8(1)(a)[BACT]; condition originated in DAQE-AN104230017-161. tr.B.4.c.I Monitoring: Pressure drop shall be measured once per operating day to demonstate compliance with the above limitation. Pressure gauges must be certified by the manufacturer to be accurate within plus or minus five perceut of the w.g. design. Pressure gauges must be calibrated on an annual basis in accordance with the manufacturer's instructions. n.8.4.c.2 Recordkeeping: Pressure drop monitoring results shall be recorded on a daily basis. Records shall be kept onsite for pressure gauges and shall include: manufacturer certifications, calibrations, and operating instructions. Project OPP0104230003 Page 34 Tifle Y Operating Permit #3500200001 Records shall be maintained in accordance with Provision I.S.1 of this permit. tr.8.4.c.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. tr.B.s Gasoline Storaee Tank- 40 CFR 63 Subnart CCCCCC tr.B.S.a Condition: ' For each gasoline storage tankwith a throughput less than 10,000 gallons per month the permittee shall allow gasoline to be handled in a rnanner that would not result in vapor releases to the abnosphere for extended periods of time. Measures to be taken include, but are not limited to, the following: (1) Minimize gasoline spills; (2) Clean up spills as expeditiously as practicable; (3) Cover all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal when not in use; (4) Minimize gasoline sent to open waste collection systeins that collect and transport gasoline to reclamation and recycling devices, such as oiVwater separators. The permiuee shall also, at all times, operate and maintain any affected source, including associated air pollution contol equipment and monitoring equipment, in a manner consistent with safety and good air pollution confrol practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Adminisfator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. [Authority granted under: 40 CFR63 SubpartCCCCCC40I;conditionoriginatedin40CFR63.1l116and63.1lll5l. tr.B.5.a.l Monitoring: The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identifred in Table 3 of 40 CFR 63 Subpart CCCCCC. [40 CFR 63.11130] Records required for this permit condition will serve as monitoring. n.8.5.a.2 Recordkeeping: The permittee shall, upon request of the Director, demonstrate their monthly throughput is less than 10,000 gallons within 24 hours of the request. Records shall be maintained in accordance with Provision LS.1 of this permit. A log shall fs maintained to document records in accordance with 40 CFR 63.11125. [40 CFR 63.1 1 1 1 1(e) and 63.1 1 1 16(b)l The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in Table 3 of 40 CFR 63 Subpart CCCCCC. [40 CFR 63. 1 1 1 30]. Project OPP0104230003 Page 35 Title Y Operating Permit #3500200001 tr.B.5.a.3 Reporting: There are no reporting requirements for this provision except those specifred in Section I of this permit. tr.B.6 l)esreasers tr.B.6.a Condition: The permittee shall ensure that the following conditions are met: (1) Each solvent degreaser is equipped with a cover which shall remain closed except during actual loading, unloading or handling of parts in cleaner. The cover shall be desigued so that it can be easily operated with one hand if: (a) the volatility of the solvent is greater than? kfa (15 mm Hg or 0.3 psi) measured at 38 degrees C (100 degrees F), (b) the solvent is agitated or (c) the solvent is heated. (2) An intenral draining rack for cleaned parts shall be installed on which parts shall be drained until all drippiog ceases. If the volatility of the solvent is greater than 4.3 kPa (32 mrn Hg at 38 degrees C (100 degrees F)), the drainage facility must be intemal, so that parts are enclosed under the cover while draining. The drainage facility may be extemal for applications where an internal tSpe cannot fit into the cleaning system. (3) Waste or used solvent shall be stored in covered containers. (4) Tanks, containers and all associated equipment shall be maintained in good operating condition and leaks shall be repaired immediately or the degreaser shall be shutdown. (5) Written procedures for the operation and maintenance of the degreasing or solvent sleaning equipment shall be permanently posted in an accessible and conspicuous location near the equipment. (6) If the solvent volatility is greater than 4.3 kPa (33 mm Hg or 0.6 psi) measured at 38 degrees C (100 degrees F), or ifsolvent is heated above 50 degrees C (120 degrees F), then one oftle following control devices shall be used: (a) freeboard that gives a freeboard ratio greater than 0.7; (b) water cover if the solvent is insoluble in and heavier than water; (c) other systems ofequivalent control, such as a refrigerated chiller or carbon absorption. (7) If used the solvent spray shall be a solid fluid sheam at a pressure which does not cause excessive splashing and may not be a fine, atomized or shower tlpe spray. [Authority granted under R307-3354; condition originated in R307-3354]. Project OPP0104230003 Page 36 Title V Operating Permit #3500200001 tr.c tr.D tr.B.6.a.1 11.8.6.a.2 tr.B.6.a.3 tr.E IV.A Monitoring: A visual observation shall be conducted each calendar month for all equipment and applicable workpractices. Recordkeeping: Results of monthly inqpections and the volatility of the solvent(s) being used shall be recorded and maintained as described in Provision I.S.1 of this permit. Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Emissions Trading (R30741s-6a(10)) Not applicable to this source. Alternative Operating Scenarios. @307a1s-6a(e)) Not applicable to this source. Source-specifi c Definitions. There are no source,specific definitions for this permit. SECTION ITI: PERMIT SIIIELI) A permit shield was not granted for any specific requirements. This source is not subiect to Title IV. This section is not annlicable. Project OPP0104230003 Pege37 Tifle V Operating Permit #3500200001 This operating permit incorporates all applicable requirements contained in the following documents: 1 . Commelrt on the ourrent approval order @AQE-A1I104230017-L6): does not allow the operation ofKiln#1. As statedinDAQE-A}ILM2300L7-16, UISB shallnot qperateKiln#l untilthe replaceme, rt sorubber for Kiln #1 has been approved in aocordanoe with R307401-8." past updated March 22,20187 Project OPP011M230003 Page 38 Tifle V Opereting Penmit #3500200001 Project OPP0104230003 Page 39 Title V Operating Permit #3500200001 Appendix A.4 Calibration Data Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 794-2950 (801 ) 266-7 11 1 Meter Box Calibration Data Form (English Units) Date Barometric Pressure Meter Box Number 11512024 25.78 APEX XC-522 DGM No. 20227130 , Average Yi Average AH Calibrated By Std Meter YiI 1.006 1.695 JA 0.99497 Orfice Manometer Std Test Meter Dry Gas Meter Std Test Meter AH/13.6 Std Test Meter Setting AH (Vs) Ft3 (Vd) Ft3 (Ts)'F Average Temp. 0.50 5.002 4.938 62 0.04 62.00 62 1.00 5.001 4.928 62 0.07 63.00 64 1 .50 1 0.005 9.903 64 0.1 1 65.00 66 2.OO 10.004 9.959 66 0.15 67.00 6B3.OO 10.004 9.933 68 0.22 69.00 704.00 10.009 9.924 70 0.29 70.50 71 Dry Gas Meter lnlet Outlet Average Time@ Gd i) "F (Td o)'F (Td)'F Minutes Yi AH ; 59 58 60.50 '1 1.53 1.004 1.711 65 60 66 61 65.00 8.15 1.011 1-701 71 6271 62 69.50 13.53 1.010 1.757 78 67 : 77 67 74.00 11.58 1'007 1.715 14171 76 71 74.75 9.22 1.004 1.639 79 73 78 72 76.75 8.00 1.004 1.648,8275 Average Yi Average AH 1.006 1.695 Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 7 e4-2e50 (801 ) 266-7 1 1 1 Meter Box Calibration Data Form (English Units) Date 11212024 Average Yi 1.006 Orfice Manometer Setting AH 0.50 1.00 1.50 2.O0 3.00 4.00 lnlet (Td i)'F 77 84 76 87 B4 93 8B oE 91 94 91 99 Barometric Pressure 2s.56 Average AH Calibrated By Std Meter Yi 1.718 JA 0.99497 Meter Box Number APEX XC-522-10 DGM No.351501 Std Test Meter (Vs) Ft3 5 5.004 10.001 10.o03 10.04 10.001 Dry Gas Meter Outlet (Td o)'F 75 76 B1 77 77 80 80 82 82 B3 84 85 Dry Gas Meter (vd)Ft3 4.876 4.987 9.979 10.121 10.053 10.022 Std Test Meter (Ts)"F 74 75 76 76 76 76 76 77 77 7B 78 7B Time A Minutes 11.10 8.23 13.40 11.65 9.30 8.02 AH/13.6 0.04 0.07 0.11 o.1s 0.22 0.29 Yi 1.025 1.003 1.007 0.996 1.004 1.003 Average Yi 1.006 Std Test Meter Average TemP. 74.50 76.00 76.00 76.50 77.50 78.00 AH 1.623 1.784 1.765 1.773 1.685 1.678 Average AH 1.718 Average (Td) "F 78.00 80.25 83.50 86.25 87.50 89.75 Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 7e4-2e50 (801 ) 266-7 1 1 1 Meter Box Calibration Data Form (English Units) Date 1t2t2024 Average V 0.990 Orfice Manometer Setting AH 0.50 1.00 1.50 2.OO 3.00 4.00 lnlet frd i)'F 75 75 72 80 78 89 85 91 90 95 95 97 Barometric Pressure 25.61 Meter Box Number APEX XC-522-14 DGM No. 1017791 Average AH Calibrated By Std Meter Yi 1.682 ATTIJA 0.99497 Std Test Meter (Vs) Ft3 5.001 5.004 10.002 10 10 10.001 Dry Gas Meter Outlet (Td o) "F 62 63 64 66 66 70 70 73 73 76 76 78 Dry Gas Meter (vd) Ft3 5.1 5.096 10.195 10.194 10.175 10.136 Average (Td)'F 68.75 70.50 75.75 79.75 83.50 86.50 StO fest fUeter (Ts) "F 60 65 65 65 65 68 68 70 70 70 70 72 Time @ Minutes 11.97 8.3 13.25 11.22 9.12 7.9 AH/13.6 0.04 0.07 0.11 0.15 0.22 o.29 Yi 0.986 0.984 0.989 0.990 0.994 0.999 AverageY 0.990 Std Test Meter Average Temp. 62.50 65.00 66.50 69.00 70.00 71.00 AH 1.831 1.769 1.686 1.616 1.596 1.594 Average AH 1.682 Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 794-2e50 (801 ) 266-7 11 1 Meter Box Galibration Data Form (English Units) Date 1t10t2024 Average Yi 1.O29 Orfice Manometer Setting AH 0.50 1.00 1.50 2.OO 3_00 4.00 Barometric Pressure 25.8 Average AH Calibrated By Std MeterYi 1.632 AlT 0.99497 Meter Box Number ES C-5000 DGM No.8219557 lnlet (Td i) "F 58 61 61 64 64 68 68 71 71 74 74 76 Average od)'F 58.75 61.00 63.75 67.00 69.50 71.50 AH 1.616 1.638 1.667 1.631 1.610 1.633 Average AH 1.632 Std Test Meter Us) Fm 5.001 5.001 9.999 10-oo2 10.003 10.oo2 Dry Gas Meter Outlet fl'd o) "F 57 59 59 60 60 63 63 66 66 67 67 69 Dry Gas Meter (vd) Ft3 4.75 4.786 9.584 9.584 9.58 9.567 Std Test Meter (Ts) "F 63 65 65 68 68 68 6E 70 70 71 71 73 Time @ Minutes 11.15 7.92 13.03 11.18 9.O7 7.90 AH/13.6 0.04 0.07 0.11 o.15 0.22 o.29 Yi 1.036 1.026 1.025 1.O29 1.028 1.O28 Average Yi 1.O29 Std Test Meter Average TemP. 64.00 66.50 68.00 69.OO 70.50 72.00 Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 7e4-2950 (801 ) 266-7 1 11 ample Box Temperature Sensor Calibration Form Sample Box Number lmpinger Boxes (Cal) Date:11812O24 Calibrated By: CG Barometric Pressure: 25.55 Reference: D ig i-Sense 20250-92 SN:210429562 APEX #1A(XC522) APEX fzA(XC522-10) APEX #3A(XC522-14) ES #1A (C-5000) Reference Point Number 1 1 3 4 4 5 5 1 1 3 4 4 5 5 1 1 3 4 4 5 5 Source a (specify) Temperature Difference b o/o -o.14 0.00 0.19 -0.19 -0.14 0.00 -0.19 0.14 -0.19 0.00 0.19 0.00 0.00 -0.19 -0.14 0.19 0.19 0.19 0.00 0.20 0.00 0.00 0.19 0.00 -0.19 -o.28 -0.20 -0.'19 1 Probeon 241 242 1 Probe off 71 71 3 CPM 72 71 4 Oven on 244 245 4 Oven off 70 71 5 lmpinger ice 33 33 5 lmpinger amb. 71 72 Reference ThermocouPle Thermometer Potentiometer Temperature oF Temperature'F Probeon 238 237 Probe off 70 71 cPM 72 72 Oven on 248 248 Oven off 72 71 lmpinger ice 34 34 lmpinger amb. 71 72 Probe on 245 Probe off 73 CPM 71 Oven on 245 Oven off 72 lmpinger ice 34 lmpinger amb. 72 Probe on 251 Probe off 72 CPM 72 Oven on 242 Oven off 72 lmpinger ice 33 lmpinger amb. 71 246 72 70 245 71 33 72 251 71 72 244 73 34 72 a Type of calibration system used. b (reference temp. oF + 460) - (test thermometer temp. 'F + 460) reference temPerature 'F + 460 * 100< 1.5o/o Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 794-2e50 (801 ) 266-7 111 Sample Box Temperature Sensor Calibration Form Sample Box Numben Probes (Gal) Dale:11812024 Calibrated BY: CG Barometric Pressure: 25.55 Reference: Digi-Sense 2O25O-92 SN:210429562 ,a)z'.-A b) c) d) e) 0 a)z'.-B b) c) d) e) 0 a) 3'-C b) c) d) e) D 4'-A lce Water HotWater Boiling Water Warm Oil Hot Oil Boiling Oil lce Water Hot Water Boiling Water Warm Oil Hot Oil Boiling Oil lce Water HotWater Boiling Water Warm Oil Hot Oil Boiling Oil lce Water Hot Water Boiling Water Warm Oil Hot Oil Boiling Oil Temperature Difference b o/o 0.00 -0.16 -0.15 o.14 -0.25 0.11 -o.20 0.00 0.15 -o.14 -o.25 0.11 -0.20 0.00 -0.15 o.28 o.12 o.22 -o.20 0.00 -o.29 -0.28 -0.12 -0.11 Reference Point Source a Number (specifi7) Reference ThermocouPle Thermometer Potentiometer Temperature'F TemPerature'F 35 160 220 250 350 461 35 161 221 249 352 460 36 162 221 249 352 463 35 159 225 250 350 461 36 161 222 251 350 462 35 162 222 248 350 464 34 159 224 252 351 463 35 161 220 249 349 461 a) b) c) d) e) D a Type of calibration system used. b (reference temp. oF + 460) - (test thermometer temp. 'F + 460) * 1OO< 1.5o/o reference temperature oF + 460 Montrose Air Quality Services 6823 South 3600 West Spanish Fork, Utah 84660 (801) 7e4-2e50 (801 ) 266:7 111 Sample Box Temperature Sensor Calibration Form Sample Box Number Probes (Gal) Dale:11912024 Calibrated By: CG - ATT Barometric Pressure: 25.5 Reference: Digi-Sense 20250-92 SN:210429562 a) 6'-A b) c) d) e) D a) 7'.-C b) c) d) e) D 7'.-D lce Water HotWater Boiling Water Warm Oil Hot Oil Boiling Oil lce Water HotWater Boiling Water Warm Oil Hot Oil Boiling Oil lce Water HotWater Boiling Water Warm Oil Hot Oil Boiling Oil Temperature Difference b o/o -0.20 -o.17 0.15 -0.28 -o.25 -0.11 -0.20 -o-17 -0.15 -0.14 -0.25 0.11 0.00 -0.17 0.15 0.00 0.12 -o.22 -o.20 -o.17 0.14 -o.14 -o.12 -o.22 Reference Point Source a Number (specify) Reference ThermocouPle Thermometer Potentiometer Temperature'F Temperature'F 41 135 224 253 341 449 42 136 223 255 343 450 a) lce Water 6'- B b) HotWater c) Boiling Water d) Warm Oil e) Hot Oil D Boiling Oil 42 138 227 260 346 450 42 '140 226 260 345 455 41 145 232 260 353 463 41 137 226 259 3M 451 42 139 227 260 346 453 40 144 233 259 352 461 a) b) c) d) e) D a Type of calibration system used. b (reference temp. oF + 460) - (test thermometer temp- "F + 460) * 100< 1-5% reference temPerature oF + 460 Montrose Air Quality Services Certificate of Balance Calabration Address: 6823 South 3600 West City/State/Zip: Spanish Fork, Utah 84660 Manufacturer: Model: SerialNumber: ldentification: Location: Sartarius Analytical 8a110530706871 AET#1. SmallTrailer lndication L 19.9999 49.9999 99.9998 199.9998 71412024 Error 0.0000 -0.0001 -0.0001 -0.0002 -0.0002 Nominal Mass L 20 50 100 200 CertificateNo.: Ll4-2il2ry1 Calib. Date: Ll4l2O24 Technician: CheYneY GuYmon Next Calibration: Reference Weights Cal Id: Nominal Mass t 20 50 100 200 Comments: lndication Error 1 0.0000 19.9999 -LE-04 49.9999 -0.0001 99.9998 -0.0002 199.9998 -0.0002 Pertinent lnformation: The artifact described herein has been calibrated using standards traceble to NIST' This is to certify the data reported herein is true and correct as the date calibrated. The procedure used to calibrate the artifact meets the requirements to meet MAQS Standards. Authorized Signature: Montrose Air Quality Services Certificate of Balance Calabration Address: 6823 South 3500 West City/State/Zip: Spanish For( Utah 84660 Manufacturer: Model: SerialNumber: ldentification: Location: Shimadzu Top Loader DM67L1.AET #2439 AET#2 SmallTrailer Certificate No.: t l4-2o24#2 Calib. Date: t l4l2il24 Technician: CheYneY GuYmon Next Calibration: Reference Weights Cal ld: lndication 1.OO 20 49.98 99.97 L99-97 71412024 Error 0.oo 0 -o.o2 -0.03 -0.03 lndication 1.00 19.99 49.98 99.98 L99.97 Error 0 -0.01 -o.o2 -o.o2 -0.03 Nominal Mass L 20 50 100 200 Comments: Nominal Mass 7 20 50 100 200 Pertinent lnformation: The artifact described herein has been calibrated using standards traceble to Nl5T. This is to certify the data reported herein is true and correct as the date calibrated. The procedure used to catibrate the artifact meets the requirements to meet MAQS Standards. Authorized Signature: Montrose Air Quality Services Certificate of Balance Calabration Address: 6823 South 3600 West City/5tate/Zip: Spanish Fork, Utah 84660 Manufacturer: Model: SerialNumber: ldentification: Location: OHAUS Top Loader 8350103094 AET #5 Gooseneck lndication 1, 20 50 99.9 199.9 71412024 Certificate No.: 1.14'2024#5 Calib. Date: Ll4l2O24 Technician: CheYneY GuYmon lndication Error 10 200 49.9 -0.L 100 0 199.9 -0.1 Next Calibration: Reference Weights Cal ld: Nominal Mass t 20 50 100 200 Comments: Error 0 0 0 -0.1 -0.1 Nominal Mass 7 20 50 100 zoo Pertinent lnformation: The artifact described herein has been calibrated using standards traceble to NIST. This is to certify the data reported herein is true and correct as the date calibrated. The procedure used to catibrate the artifact meets the requirements to meet MAQS Standards. Authorized Signature: Montrose Air Quality Services Certificate of Balance Calabration Address: 6823 South 3600 West City/State/Zip: Spanish Fork, Utah 84660 Manufacturer: Model: SerialNumber: ldentification: Location: OHAUS Analytical 8329582368 AET #6 Gooseneck lndication I 20 49.9998 99.9998 L99.9998 71412024 Error 0.0000 0 -0.0002 -0.0002 -0.0002 Certificate No.: I.14'2024#6 Calib. Date: Ll4l2O24 Technician: CheYneY GuYmon lndication Error 0.9999 -0.0001 2A0 49.9998 -0.0002 99.9997 -0.0003 199.9998 -0.0002 Next Calibration: Reference Weights Cal ld: Nominal Mass 1, 20 50 100 200 Comments: Nominal Mass 1 20 50 100 200 Pertinent lnformation: The artifact described herein has been calibrated using standards traceble to NIST. This is to certify the data reported herein is true and correct as the date calibrated. The procedure used to calibrate the artifact meets the requirements to meet MAQS Standards. Authorized Signature: Montrose Air Quality Services Certificate of Balance Calabration Address: 6823 South 3600 West City/State/Zip: Spanish Fork, Utah 84660 Firstaden HC21404N 94L MAqS-1 LaboratorY lndication L 20 49.9999 100 199.9999 Pertinent lnformation: The artifact described herein has been calibrated using standards traceble to NIST. This is to certify the data reported herein is true and correct as the date calibrated. The procedure used to calibrate the artifact meets the require to meet MAQS Standards. Authorized Signature: Certificate No.: Ll4'2o24#8 Calib. Date: 1.1412024 Technician: CheYneY GuYmon lndication Error 1 0.0000 20 0.0000 s00 99.9999 -0.000L zoo 0 Manufacturer: Model: SerialNumber: ldentification: Location: Next Calibration: Reference Weights Cal ld: Nominal Mass t 20 50 100 200 Comments: 71412024 Error 0.0000 0.0000 -0.0001 0 -0.0001 Nominal Mass L 20 50 100 zoo I I Pltot Tube Galibration Data Sheet callbrdld Prtot Tubr: $Type ProbelPltot lD No: 2t A-TP-?' No ProtEcbror Dlgltd Angla Flndsr lD: U@rlngTapelD: Gs[p6r lD: OsIA$REFPRGI OSlEREFRUL.I O81.RErcPR-I Csllbrallon pedbnn6d uslng lha pordu]€s o! EPA Msfhod 2, Sacfion 10,'l Allgnment and Tublng Dlmonslonsfi;W E P*s Pasg PasE Pass t lgE lrflrfi! hYd pqlllon td dlftr=: r@,ffi DGOm Indlcriln! lml losl[on lor ddrmltrlng 0. Pass PasE Pas Pas Pass Pass DGg6 ln.tlcdltrI bEt Do.l06rloid.t Eltrltrg,lhrn G.lcullllnEZ Assembly lntor-Gomponent Spaclng Requlrements OffsetTC only SelbackTc mly Pass Pass Pss Ofis€tTC only SIgnalur6: Signature: 0110824 olnBli2l a, (-10'<d,< +I0")2.O c (-loe<4,< +I0")2.O 8. a-50 < Il, < +)"1 o-2 R- t-5"<tt <+J'l o.2 I 0.3 I o.9 o.I ,FAtsr? {t o.0. FAian0 (*0.01 Di (0.1875" < q< 0.375")o_3740 Pe (1.05Q < P^< 1.5q)0.4830 PE (1.05q < PE < 1.5q)0.4970 I P^- PB I s 0.0625 -0.0140 A B rv (> 3.0,) n 725 )r 0.376 / Dr (> 1.5)1.e28 r (> 3.o\3.125 | > n75tr 1.530 Prof8Ebr or lrlgltsl Angls Fhdar lD: Ms8suhgT8pa ltX CaIperlD: Calhra0on pElromBd uslng th3 pl@durB ot EPA Matrod 2, Scc{on 1oI 08I-RErcPR.1 Allgnment and Tublng Dlmenslons fi"H Pas Pas Pass Psg Irlgrr.lrdlcdlng hld potl$ott torddmlnlng 14 8nd qi. i'MH,,%_*d4-'ffi DogrE hdfcdrg LEl posluor rordGlrrmlnhg 0. Pass Pass Pass Pasg Pas Pass IrlgB lndlerlng l.Et podum lot.bGnrlnlnq t lltrn Gdculllng e PsB Otrsot TC only Setbad<Tc only Pass Pass PaBs OffcetTC only Performed Bf, Approved BF Slgnaturo: Slgnaturo: Dats: DEts: 0lr08r2t olnuzl a, (-10"<a'< +l(F)3.O 6 (-10"<4,< +101 5.O B. '-50 < B, < +5n 4.O R^ /-50<B-<+5c)o.2 t 0.7 0 o.7 A 0.9650 FAtanr (* 0.125'1 0.0118 w=Alan0 (* 0.m125')0.0118 Dr (0.1875" < q< 0.37e)0.3740 Pr (1.05Q <Pr<1.SDr)0.4830 PE (1.O5Dt < Pr <'l'sDr)o.497() I Pa- PE I s 0.0625 -{!.0140 A B A /v (> 3.0'1 6.0(x, or- AA l> 2-O'l 0.800 )n o.25',l, (, D" (> 1.5)3.187 I (> 3.0',t 3-350 a > o.7g 1.220 efl pttot rube Gatlbratton Data sheet [9tllqtf 'u l' _- _- [lJlllqlf Pltot rube Galrbratlon Data sheet Callbrrtlon Dsto: January 8, 2024 Portomed byr ATT{A Explratlon Drte: July 8, 2024 "r""- l PmbrD.lcrlFton: TRiNrEtsE-Fh&Tmp(IP) EfiEctlvslsngth(ffI: 3' LsvllrnalPlrplndlcultr lEs Themocouplo cdlbrrson parlbrmrd? ThBmocoupli pssed callbrallon? Pmtacbror Ognrl Angla Flndsr lD: OSIAS-REFPRo-I CallMlon Pdlomsd uslng l,lo pE@duE ot EPA Msthod 2, Sacdon 10.1 MffidngTEpBlD: 06i.REF-RU[1 cslperlD: o8i-REFCPR-1 Allgnment and Tublng Dlmenslons I u\aJ- Pass lF"' M- Pass X U I B' (-:"F'' *sl l o'l I Pass lll * n I p, es".u.+srl o.r I P* 'I DrgE! tndtcrthl tmt poslllotr lor rtGtrrmltrlrr di md q. I g I f .A I ^ ' Pr -.. Pass \)'----"-->s- F. E rffX] I lFAlEne (i 0.0312s,) | 0.0306 I Passd4; HIlffi :I rrlgEsrndrc{tnghEtpoltflotrro]drrlrmlnlnc0. I lp^-prl:o.oszsl +.ooto I Pass j_ _Tr__r_li- {^ 1r^lffi ffil:L---r- _ IrcgB ltrllcd|n! lrEl pdum lor dd.mlnltl! ? lhln elcubilnf z Assembly lntercomponent SPaclng Requlrcments f-mmrrJ I ffit ffi Pass ofis'rrconrv m ffi t-M lxlo"1>t.s1 ls.saol Pass ffim>zorn__r ffi :H oftsrrconryI I ,--==- |rffi n t', , a,' . , ** Iffiry",,,"-lpertormedBy q sisnarurg: %i -- o1tt&t21 cr (-10'<o,< +lop)2.3 e (-10'<k+l(r)1.8 B, a-5o < B. < +5o)o.4 B- a-5"<B-<+5n o.4 v 2.4 0 1.8 A 0.9730 z= Alanr a* 0.125'l 0.0408 FAlEnO (i 0.03125'l 0.m06 q (0.1875', < q< 0.375)0.3600 P^ (.1.05Dr < P^ < 1.EDr)o_3990 P! (1.Osq <PE<1.5Dr)o-4000 I P^- PB | :0.0625 {.0010 /v (> 3.0'l 6.tno .r- AA l> , Orrl o.stlo l"o.251 / D" (> 1.5)3.586 r (> 3.0')3-400 z > 0.75'{..t50 A B l I, Pllol TUDE Ucs[.m @Ildion sn€d Rwlslao: 2 cEalod: u18r15 by lE s Fvtscq: {t ar1, oy rE Pitot Tuhe Calibration Data Sheet callbratsd PltolTubo: S-Type ProboJPltotlD No; Profscbr u tlglbl Angl8 Flnd$ lD: Moaarlng TaFo lD: C8[pEr lD: OO,IA$REFPRGI Csllbrstlon podomod BIng ths pmcadulEs ot EPA Mothod e sedlon '10'1 ' f-10' < a.< +10')3.2 (-10'<c< +lo")3.1 n. (-5. < B. < +5")o.4 n- {-5" < u"<+r'l 1.8 ? ,1.1 0,5 0_8850 FAEN' (I FAtano (t 0.O31i 0.0077 Dr (0.1875" < q< 0.375i)0.3740 P^ (1.OsDr <P^<1.5q)o.4!100 P! (l.05Dr < Pg < 1.5Dr)a.42fi I Pe- Ps I < 0.0625 o.ff 50 Pass Pass Ps PEs Pass Pass Pass Pais Pass P65 DGgE ltrdltdlrq l@l podtlotdd.t mlnlnlTlDq qtdLlloez Assembly tnter-component spaclng Requlrcments w(>3.0)6.100 or-AA l> 2.0") ,t zDO Dn o.376 , Di (> 1.5)3.1S1 r (> 3.o'I 3.200 z > o.75'1.500 Pss Pass Pas PaBs OffsetTC only SatbskTC only OftotTC only Psrtunn€d BS AppmvBd By ,4d ,,n*'*, Z *:- oln'ta slsnatrra: / ;; ol/os':!{,4Tr A E A Pitot Tube Gallbration Data Sheet cafbrafEd Fltot Tubc: gType ProbE Pltol lD No: 4'B- PEfsdoror DlgltEl Angla Flndsr ID: Maasudng Tapo lD: CdhsrlD: CEllbratlon pe]formad uslng lha pmEdurB of EPA ir€thod 2, Secilon 10.1 Allgnment and Tublng Dlmenslons F', MV*H Dogru lndlcdltrg llEt potiloon h1d.Emlnltr0 ur ud oa. Pas Fass Pass Pss re; % d4o DogE tndlBtlng l.Y!l pclllotr lor dlllmlrltrg 8. Pass Psss Pass Pass PBa Pess DlgH lnrttcdln! lGEl pdUon tor dcEmldng , lhrn crlflldtng ]1 Assembly lnter-Component Spaclng Requlrements Pass Ofis€tTC only S6lbackTc only Pass Pass Pass OfrselTC only Parrorm€dBs (E ApprovgdBy '(fr Signature: Slgnaturo: a, (-10'<d,< +10')2.6 G (-10o<d-< +l0o)3.1 B, a-5" < B. < +5o)2.6 B" (-5"<8,<+5')1.8 o.7 s 1.'.1 A o.8000 FAianr (* 0.125')0.0098 lFAtano (* 0.03125')0.0154 Dr (0.1875'< Dt< 0.375")0.36{X) P^ (1.05D, <P^<1.5Dr)o.3900 (1.OsD' <PE<1.6q)o-4000 I PA- PE I S 0.0625 -0.0100 A B A ,v E 3.0i)5.700 aa ,> 2 n'l o 6EO Jn o.261 , D, G 1.5)2.749 r (> 3.0tr1 3.320 t- > o.75n ? 550 I f Pitot Tube Galibratlon Data Sheet carlbnta.r PIbtTub!: S-Ttps PrcbsrPltot lD No; S'A-TP{'-tlo PmiEcbr tr Dlgltd Anglo Ft[dsr lD: M@dnqTapslD: CallpsrlD: OEIA$REFPRO.I CsIbE0on performad u8lng iha pmcadur of EPA Mathod 2. Sodlon 10'1 Allgnment and Tublng Dlmenslons ffi;W Pasg Pasg Pass Pass Dlgm lr.ltcdttrg l6El pclllon ,or dlt!trrlrlnl ar ud qz.F=:H4.ffi Pas Pass Pes Pass Pgss Pg DGgB lnttlcdfry E$t PosIlotr fol d.t mlnlng 0. Assembly lnter-ComPonent Spaclng REqulrcments Pas Pss Pass Pas OffBatTC mly sslbad(Tc only OtrBBtTC only Parformed B}l: Approv€d BS /4 Slgnature: SlgnalurB: DatE: Date 01N&tz4 oTlltEt2l,4n c, (-t0o<a'< +I0")4.,| G (-l0o<4,< +10")5.0 0, (-5'<8,< +5")3.9 0, (-5'<pr<+so)3.6 'l o.3 o.s500 FAtanY (* o.12b FAIANU q (0.1675',< Dr< 0.075')o.3740 P^ (1.05Dr <P^<l.EDt)o.4:i50 Pi (1.05Dr <Ps<1.5Q)o.4400 I P^- PB I s Om25 {.0050 '''NT'.'S[ itot Tube Callbration Data Sheet Protsacbr or DlgltEl Angla Flnder lD: Maasudng Tapa lD: CalpcrlD: O8IA$REFPR(}I OsIBREFRUL.I OEI{EFCPR.I Callbr8tion perfom8d rslng lhs plocBdurEs of EPA Msthod 2, Sacdon 10.1 Allgnment and Tublng Dlmenslons ffi.H Pass Pss Pas Pass Dlgru lndlcdlng lqEl pcl[on to] Itdlmililn! ct Dd dr. -'M ,%ffi DigB lr'dlc.llng lrE, ,*r- "t.;,tn " Pass Pass Pass Pasg Ps6 Pass DlgE lndlr0l! llEl pd{on for d&mlnlrg ? lh$ qlEldltrE z Assembly lntercomponent Spaclng RoqutEments OfrselTC wily SelbekTc only Pas Ps P*s OfrsetTC only Pedormsd BS ApptEvEd B!': /1. ffi Signatura: Slgmlure: Date: Dete: oilaElzl 0ln,8r2l a, (-10"<a,< +10')o.7 c (-10'<d"< +10')0.1 0. (-5' < B, < +5o)0.4 B. (-5. < B"<+5')1.7 ?2.2 0 0.6 A o.s550 FAlenl (* 0.125")0.0367 FAlBn0 (+ 0.03125")0.0{00 q (0.1875- < Dr< 0.375')0.3700 P^ (1.O5Dr < P^ < 1-5DJ o.4900 Pa (1.OSDI < Pe < 1,5D1)o.4950 P^-PBls0.0625 -{t.0050 1 B B /v (> 3.0,1 5_goo or-AA l} 2.t)"'l o 650 Jtr o.251 (, Dtr (> 1.5)2.590 r (> 3.0',t 3.440 7, > 0.751 LzAO reYtt $9,ryI1\9,S,! Pitot rube calibration Data sheet caubratlon Dato: January 8, 2024 PottoEnod by: ATT-JA Explratlon Dala: July 8! 2024 PmbsDEscrlpllon: TR vERsE-Flow&Temp(tP) EfiEcuvolenglh(ltl: 5 Llwl lndPuplndlcttlon I'Es Thsmocoupla cqllbrrflon p€rfomcd? Thomocoupl! pr$8d ctllbratlon? P,otaoloror Dlgllsl Angls Flndor lD: -!9lH=ERGt - CdlbEdon partomsd ushg lhB Pl!€duras ol EPA Mahod 2, Ssc{on 'to'l MoEulng Tspa lO: 0S1EREFRUL-i CdffilD: o81-RErcPR'l Allgnment and Tubhg Dlmenslons r ---4* ]TFa! \.Ny/ I q (-ro..c,<+10.)l t.e I Ps y{ H Pass ll).--* H I o. (-s'.p,.+s)l z.r I Pss u I ., I iB I DcsEltrdlcdlnsEEtpdllloniordctrmlrlngarudda. I gl t.l Ih tMI F el o.ztro IL--< hEI I Faran, r+ o.l2s5 I 0.0251 I Psss u-=ye, H -E{) I !\FArano (i 0.03125") I 9.919! | :"*@ Hffi ;= DcgElndtctilr[tlctpo6uotrrord.icrrltrltr!0. I lp^-frlso.oezs | +.otto I Pass {i-,! ,-o z ml [8 N q DBgB lldlcclrg tlEl pGluon tor dctrriltrln8 r lir.tr Elculrfing ,L Assembly lnter-Component Spaclng Requlrements f-ma.omJ:I fffi Ee*I I s'ooo I P*s onsatrcolY -J/' lz:or6:L ffi se'bad(rco{vI ql-Tt' tx lr.zsor ffi.ffii::: onse,rc.ny FM>zotn1 t,ffi m , r,rWDab:- o1natz1 Approvsd Bs Zf* slsnatur€: t A- ' A olnsnl t-l0o < d.< +l0o)3.5 r-Ioc < c< +10"1 1.6 0, (-5' < Bt < +5')1.1 R- /-50 < B-<+5.1 2.4 1.8 0 1.4 A 0.7880 FAlanY (* 0.125')0.0251 w=Alan0 (t 0.03'125")0.019s D (0.1875" < q< 0.375')0.3700 P. (1.05Dr <Pe<1.5Dr)0.3975 PE (l.o6Dr < PE < 1.5Dr)o-4085 I PA- Ps l:0.0625 {.0110 /v (> 3.0")6.000 {r- AA l> 2-t)il 1.250 l"o.25,1 , D. (> 1.5)4.S80 / (> 3.O.'l 3.370 I > O_75s o.985 Pltot Tube Callbratlon Data Sheet crtlbr&d Pltot Tubq S-Type ProbrrPttot lD No: 6A-TP-6' r" PrDffactr or DlglE Angh Rnder III Ms8slng Tap6lD: Cdptrlt} OBIASAEFPRGI Calbratlon p$hrmsd uslng lha ProcsdulEs of EPA Msthod 2, Sedlon 10.1 . Allgnment and Tublng DlmenslonsE-W F Pass Pass Pass Pas Pas Pass Ps Pass Pms PEss IrigE! lndtcdttrg tcEl pcl0or iordatamlnlog dr .nd a.' %ffi ItGgm lndlEdhg l3El Pallor ,ot dctcmlnlry 0. Irr!@ Itr.tlcdr! lGrrd po.nlon lor d&mlnl.g ? u.tr GdouLlltrg Z Assembly lntBr-Component Spaclng Requlrements Pas Pms Pffi Psss OfratTC only Setbad(TG only OtrsetTC only Performed Bf Approrrd Bs Slgnatura:Dat€: - 0tro&a 01n8n1srsnarura: tA# - Dare - I-l0o <d.< +loo't 1.0 do (-l0o<q4< +10o)2.4 B, (-5" < E, < +5-l 0.9 8' (-r'< Ur<+J'l 1.8 0.8 o FAtanY (*o, FAtane (i o.[0.011 Dt (0.1875" < q< O.375J 0.3700 P^ (1.05Dr <P^<1.sDr)0.4'100 PE (1.05Dr < PB < 1,5Dr)o.4400 I Pr- Pa | < 0.0625 {r.0300 A E (> 3.0")6.250 aal>2ol,l o_76() JT 0.251 , D" (> 1.5)s.o2a / (> 3.0")3.500 a z o.75"1.650 Pitot Tube Calibratlon Data Sheet Pmf8cbrd Dlglbl ArEls Flndor ID: M€asling TspB lI} CallperlD: OEtA$REtrRG,I callbratlon pertonnsd uslng lho prDcaduffi ol EPA Msthod 2. secflon 10'1 OEI EREFRUL.' O8I-RErcPR.I P H-"'"ntandrubrng'''*'*[ Pass Ps Pes Pass Dogtu lndlfliltrg lord poslUon td dcllmlnlng dr afil cz.%w Pass Pass Pass Psss Pa$ PassD![m lndlcdhg lml DmUm tor d.t mlnlnl 0. Dcg@ hdldlno l.sl pdud br6mtdtrg 7th.n olcqldln! Z Assembly lnter-Component Spaclng Requlrcments OfhetTC only Salbad(Tc mly Pas Pass PasB OlIsetTG mly Yz tro tn. Dala - 0tr0!r2a o1na//21 c, (-10o<a'< +10')3.0 6 (-l0o<co< +IU")1.9 B, G5"<8,<+5')0.0 B- a-5e < B-<+J-t 1.3 o.7 0 1.6 A FAEN? IT u=Alan8 (* O.o312c 23 q (0.1875i < Dr< 0.375")o.37m P^ (1.05q < Pe < 1.58)o.39S8 P" (1.05q < P8 < 1.5q)0.4000 I P^- Pu | < 0.0625 {.(xm | \ Pitot Tube Calibratlon Data Sheet Gatlbratcd Pltot Tuho: $Type ProberPltot ID No: TtCJP-7' No ProlrEcbr s qgftd Angla Flndsr lD: MwringTapGlD: Callpor lD: OEIA$REFPRO-'CEllbEtlor pedomd uslng lhs prDcsdurB of EPA Msthod 2, Sscilm 10.1 Allgnment and Tublng Dlmenslons E-W Pass Pass Pass Pms Pas Pas Pffi Pss Pass Pass DCgE! ltrdlcd|Ig llsl podllq ror daLmlnltrg d, ud &>-ffi DIIE liltlcr[ng hEl DGlllon lor dGtlrmlnlng 0. ,l IL I I I a D.gB ltrdldlr! l.El po.luoD ,or dGlimlnh! 7 lhln alcultunl z. lntercomponent Spaclng Requlrcmonts Pas Pass P8s Pass OfistTC only Selbad<TC only OfrstTC only Performed Bs AppDv€d Byr DatE: DBts: 0tr08 z,l 0rmE/21 d, a-l0o<a,< +10")1.1 % (-l0o <6< +l0o)3.5 B, (-5" < B, < +5')2.7 9" (-5"<D,<+5')2.7 .t 1.8 0 1.O A 0.8300 z=AtEnY (* 0.125'o.(1261 FAiano (* 0.03125'o.ot45 Dr (0.'t875" < q< 0.376r)0.3700 P^ (1.05D1 <P1<1,5Ds)0.4100 PE (1.05Dr < PB < 1.5q)0.4000 I P^- P8 | 5 0.0625 0.0100 A E A I a ,v (> 3_o")6.1 UU or- AA l:2-oq O.EsU )n 0.376 (, D, (> 1.5)2.Xi1 r'l> 3.0')3.410 L > o-75t 1.510 Pitot Tube Gallbratlon Data Sheet Pltot Tubc: S-Tvpe DsrPltot lD No: 7'D-TP-7' o damaga: PEsg Pass Pas Pass Pss Pass Fall Pass Pass Pasg ,l il- iih^ a\iXB \!i ntwngtnrFoa@gz Assembly Inter-Component Spaclng Reqult€ments trsatTC only tbad(Tc only Pffi Psss PaBs lTsatTC only Dalai - 1frt?,,| Dadl€x. - ilal&ll -l0o <a,< +lm (-l0o <G< +l0o)0 R. 1-5.<0,< +5')o D, (-5'<02<+5)o 'l 1 e o A o.833 pAlanr (i 0.125")0.0,l4s10069 w=Alane (* 0.8125")0 Dr (0.1875" < Dr< 0.375")0.375 P^ (1.05q <Pr<1'5Dr)o.41 P" (1.05Dl <Pa<1.5Q)0.4 I Pe- Pa l5 o.{]626 0.01 w (> 3.0")6.1 or-AA (> 2.0") x o.a D,o.376 x/ D. {> 1.5)2.Qn Y (> 3.0't 3.4 z > o-75l 0.76 Afl T9IIIIi9II Crllbntlon Dtle: PltotTube Callbratlon Data Sheet PcI,0rmGd lD No-: Drie: I'A No obstructlon3: CrllbrrlGd PltotTubr: S-Typa Ptob6rFnot lD No:8'A-No Pmb; Dsslrtlon: TRAVER9E a PEtador otDlg$rl Anglr Fhdrr lD UeuingT8Fo lD: Csfipsr lD; Csllbn0on pE lormod uslng th! pm6duru ot EPA Mothod 2, Sac0on 10., Allgnmont rnd Tublng Dlmenslono E: H Pass Pass PEss Pass D.fE hdl€0trl H F.toiltudrlorlrlog dr Ed ar wffi Pass Pass Pass Pas Pasg r .) hgEHHq H-lkbdffihlo. D.gE ldlqlh! lNt pcE6tordtrdtt{ Tltto alanutng Z Asembly lnter-Gomponont Spaclng Requlrsmsnts otrsEtTC only Setbad(Tc only PaEs Pass Pass olsEtTC only Perfomad BS Appmved By:slgnatur€: 01to8t21 olnEDa a, (-10ocar< +l0o)2.1 q (-10'<cr< +10')2.O B, t-5"<0,< +501 0.3 6" (-5. < B,<+50)o.2 0.3 6 0.9 A o.8550 FAhn? (* 0.125'l 0.0050 !,!FAtan0 (t 0.03125")0.0150 Dr (0.1875' < q< 0.375')o.3740 PA {1.05q <P^<1.6q)0.4Bil0 Pr (1.05D <Pe<1.5Dr)0.4s70 I P^- P! | S O.O62s -o-o140 A E l II /v (> 3.o')6.e00 AA {> 2 0.! n noo )i 0.376 (, D, (> 1.5)2.12A r (> 3.0'l 3.200 | > 0.76 1.530 cro8tEd: 3,1 6,1 5 hY lE L!8t rwlad: !L,17 DY lE MONTROSI l r'i.o..f:'i'. Pitot Tube Galibration Data Sheet 2024 Perlormcd IDNo-: BFG Gallbritcd Pll,ot TuDc:S-TypB Probs/Pltot lD No:No Noffirll Pmb.Lrval lnd PEtscbr or Dlgital Angls Flnds lO Ms8sudng Tspo ID: CalipslD. OITA$REFPRO,I callbra{on pErtotmsd uslng lha ptDeduras ot EPA Mshod e sBdlon 10.1 oEIEREHUL-i 001-RExncPR-l Allgnment and Tublng Dlmenslons ffi.H Ps PEs Pass Pasg D.gE! lndlam! bEl ) fr Fl Pass Psss Pass PaEs Pe PassDGgE lllilcrilng loEt pod0on totdntrmldo! 0. Assembly lntor-Component Spaclng Requlrcments OfisatTC mlY Sslbsd(Tc mly #I/ALUEI Pass Pass OfrstToonly Perftmad Bf Approv€d BS SlgnatuE: Signaturs: 0'lr08 2,l ot,lttr 2a a-l0o <a,< +Itr)2.',| ,-10'<c< +10')2.2 R. ,-5o < B. < +5o't 0.3 B" (-5o < B,<+5")0.3 v 0.3 0 0.8 A 0-9550 FAlany (* 0.'125")0.o055 w=Atan0 (t 0.03125)0.0133 Dr (0.1875r< D1< 0.375)0.3740 Pe (J.05Dr <P^<1.5Dt)0.4830 P. (1.O5n <P.<1.sq)o.497() I P^- PB ls 0.$2s 4.0140 A B A /v (> 3.o,) or- AA l> 2.0irl N'A N/A Jn N'4. , Di (> 1.5) r (> 3.0.)N/A L > 0.76'N/A /fr ffi Rcvlslon:z oEtod:3rlor'lsbylE H EVISS: Ul rr1' Oll lE 6fl {9Iit9tl . Crllbratlon DatE; Pltot Tube Galibration Data Sheet STyp€ ProbsrPltot ID No3 t rotactor or DigltEl Angl8 Fbdor lD Masurlng Tapo lD: CallpsrlD: 08'A$REIAPROI Csllbratlon perfotmsd u3ln0 lh8 promduras ot EPA Mahod 2. Sscdon 10.1 oslEEFRuL-i Allgnment and Tublng Dlmenslons F-Mv-H lragm ldlqutrJ lml !8lllon tbtddrmlthe ar ud E . Pass Pasg Pas Pas t'fNry M [--\-nE {4- Dlgm lml6tln! lclEl Pdilon tor dllmlilr! O \i PEss Pass Pass Pasg Pas Pas lrrgEr ltrdtcdlng tlEl pdllloa hl d.tuilrlnl ? fiu aloLlln0 z. Assembly lntEr-Component Spaclng Roqulr€ments OftetTC only Sstbad(Tc only #I/ALUEI Pass Pas OtrsstTConly Pelrormed Bt[ ApproredBS '4:E-O7 Signature: Signatura: DatE: - Datsi - 01naal otnatu d, (-l0o<a,< +I0")1.9 G (-10'<d,< +10')2.O B, (-5. < B, < +5')0.1 B. (-5. < B,<+5.)o.2 I 0.5 0.5 A o.s650 z=Atan? (1 0.12S)0,0084 EAlan0 (* 0.O3125'l 0.0084 Dr (0.1875" < Dr< 0.375")0.3740 Pr (1,05Dr'< Pe < 1.5Dr)0.4910 P. (.t-o6D, < Pr < 1.5Dr)o-498O I Pe- Pa | < 0.0625 -0.0070 A B I II l, l> 3_0n'l N/A 'or-AA a> 2.or'l N/A N'A lr N/A ( / D. (> 1.5)ffi r l> 3-0tr1 N?A z >, o.75i N/A Appendix"S" Field Work Safety Plan ffi ffit)tr-J. ',ffi ru /- I [t {i}, /-t L fi -tr-'r' Ii ii fil U I {". r" ii SITE SAFETY PLAN BOOKLET Project: Customer: Location: Units: Glient Project Manager: Revision Date: January 21,2022 r&, , ,. i-vri i,:irtr I i';d-l,lll. Page 1 of2 site safety Plan and JHA Purpose and lnstructions Purpose Employee safety is the top priority of Montrose Environmental Group. All employees must be trained to assess and mitigate hazards. The District Manager and Project Manager are responsible to ensure all lrazards have been property identified and managed. All employees have Stop Work Authority in all situations where an employee feels they or their co-worker cannot perform a job safely or if there is a task for which they have not been adequately trained. The Site Safety Plan (SSP) has been developed to help assist Montrose test crews with identifying phyiicat and health hazards and determining how the hazards will be managed. Additionaily, the SSP will help each crew manage the safety of the employees by providing em"rgency procedures and information. The booklet contains a several safety forms that may be required in the field. lnstructions The SSP consists of the following: 1. A Pre-Mobilization Test Plan - To be completed in it's entirety by the client project Manager prior to the test. 2. A Job HazardAnatysis is a standardized, two-page, fillable form that is used to evaluated the task/site's particular hazards and controls. The form also includes a daily toolbox topic and daity hazard review with sign off by the team. The client Project Manager is responsible to complete the JHA form through section 8. Upon arrival at the test site, the team will review the form for accuracy, making any corrections required and complete the remainder of the JHA. Section 9 will require at least three tasks, hazards and controls be identified for the project. Each team member has the option to discuss making changes or adding to the JHA and must sign on the Job HazardAnalysis form in agreement and sign in Section 10. The JHA is to be modified when conditions chinge. A toolbox meeting with a daity topic in addition to a review of the hazard analysis is required daily for the duration of the test. An additional sheet of paper with the toolbox topic and signatures can be added to the SSP packet. 3. Hazard Contro! Matrix - contains usefut information on both engineering and administrative controls that a crew can use to reduce or eliminate the hazards they have observed plus applicable PPE that may be required. 4. Emergency Action Ptan - The Job Supervisor/ Client Project Manager (CPM) will complete the Emergency Action plan form and ensure that all employees are familiar with the facility "*"rg"niy and evacuation procedures, assembly/ rally points, alert systems, and signals prior to woik commencing. ln the event of an emergency situation/ evacuation, the Job Supervisor/ CpM will maintain Jroster and be responsible for accounting for all employees' The Job Supervisor/ CPM will ensure that this Emergency Action Plan Form is completed, communicated to allemployees, signed, and posted' 5. Additional Forms, as aPPlicable a. MEWP Lift lnsPection Form b. Heat Stress Prevention Form Based on Heat lndex c. Extended Hours Form AQS.FRM-1.13R1 tgi,,t ivt\,jl"{ I ltt--r;1i Page2 ot2 Site Safety Plan and JHA Purpose and lnstructions The SSP is a living document. The Project Manager should continually update their SSPs as new information and conditions change or if new hazards are presented. Each completed SSP should be maintained with the Test Plan in the office for a period of 3 years. There will be an audit process developed for the Site Safety Plans. AOS-FRM.1.13R1 f{&,,* itri\,1'[\ h $t't' 1;5i.. Page 1 of2 PRE.MOBILIZATION TEST IN FORMATION Source Tvpe: New Source: - Revisit: - Pri#lDateffech: Coal Fired Electric Utility: - Ethanol Plant - ChemicalMfg. of CemenULime Kiln Plant: - Specialty Mfg. of: Anticipated Effluent Composition - check allthat apply and fill in expected concentration in ppm/% n voc lf other, explain: Flammable: - Toxic: Corrosive: Dust: Engineering Controls to be lmplemented: n co u NOx tr SOz tr other PROJECT NAMHLOCATION: TEST DATE: PROJECT #: PROJECT MANAGER: TEST SCOPE: SITE CONTACT: Name:Contact Phone: Additional Safety Equipment Required: Personal gas monitors: _ Respiratory Protection : Half Face- Full Face- HEPA Filters- Supplied Air: - (Safety Dept. Approval) Approximate Flue Gas Temperatures, (F) trtr below 210 210 to 450 450 to 950 above 950 other lf other, explain: Approximate Duct Fressure, (iwg): trutrtr below -3 -3 to +3 +3 to +7 above +7 tr other lf other, explain: AQS.FRM-1.17 r&" , , irii l-"rl'* I $i["Jll b Page2of 2 PRE-MOBI LIZATION TEST IN FORMATI ON Sampling Location: Stack Port - Duct Port -Approximate Sampling Platform Height, (ft) below 6 lf other, explain: ntrtrn 6 to 50 50 to 100 above 100 other Access and Protection: Elevators: _ Ladders: _ MEWP Lift: _ Scaffold: - Equipment Hois[ -Guardrails: _ Toe plate: _ Engineered Tie Off Points: _ Heat Shield: - Other: Describe how equipment will be mobilized to the sampling Iocation: Additional lnformation : Effluent Chemical Regulatory Limits Gas Name Ghemical Formula Gal OSHA PELI (ppm) Cal OSHA STEL2 (oom) NIOSH REL TWA3 (ppm) Cal OSHA Ceiling {ooml IDLHl (ppm) Carbon Monoxide co 25 200 35 200 1,200 Nitric Oxide NO,25 ND5 25 ND 100 Sulfur Dioxide SOz 2 5 2 ND 100 Hvdroqen Chloride HCt 0.3 2 ND 2 50 Hydrogen Sulfide HzS 10 15 10 (10 min.)c 50 100 )alifomia Occupational Safety and Heafth Admtnistntion (OSHA) Permissible Exposure Limit (PEL) based on an $'hour shift; 2: Cal OSHA Short-term Exposure Limlt (STEL) based on a 1S-minute period; 3: National tnstitute for Occipational Safety and Heafth (NTOSH) Recommended Exposure Limit (REL) Time-weighted Average (TWA) based on an $-hour shift; 4: lmmediately Dangerous to Lffe or Heafth (IDLH); 5: Not Defined (ND); C: Ceiling Limit'- Maximum allowable human exposure limit for an airbome or gaseous subsfance, which is not to be exceeded, even momentarily. Prepared by: Reviewed by: Date: Date: AQS.FRM-1.17 3lient Contact Name Date =acility SSP Writer PM Slient Rep I lob Preparation fl .toU Site Walk Through Completed E] ! Safe Work Permit Received from Client Site Specific Training Complete lf the heat index is expected to be above 91", fill out the Heat Stress Prevention Form' Job Hazard Analysis 1o rS.,'q ii.r'i i'- J i\l lrr lt rt-,t ;l i Risk E time pressure E Remote Work Location tl > 12 hr shift tr Working > I consecutive days E Lack of procedures E Extreme temps, wind >30mph E Personal illness/fatigue EI Vague work guidance E Monotonous Activity [J First Oay back afier time off E tr,tuttipte loU locations EI Other: tyGlassesESafetytoeShoe/BootEHearingProtectionESafetySpotter E Hi-Vis Vests E Harness/Lanyard* E Goggles E Personal Monitor Type: E Metatarsal Guards f] Uot Gloves E Face Shield I RespiratorType: EINomex/FRC E Other PPE: 1. 2. 3. lnformition/Emergency Preparedness lf non-emergency medical attention is needed, call: AXIOM #: 877'502'9466' Plant Emergency# EMS Location Certified First Aid Person: Evacuation Routes Rally Point Severe Weather Shelter Location Eye Wash & Safety Shower Location Operational: ElYes flNo lnformation: (list type): Stack Gas Temp. (.F) Stack Gas Press. ("H2O) Stack Gas Components: Stack Gas lnhalation Potential? EYes E tto lf ves. see List of Hazard Chemicals. Dust Hazards Thermal Bum Electrical Hazards lnadequate Lighting Slip and Tdp Hand Protection E Hot Gloves E Heat Shields E Other Protective Clothlng: El Connections Protected from Elements ! Extemal GFCI trlottrer: E Xp nafing Requirement E lntrinsically Safe Requirement E lnstalt Temporary Lighting flHeadlamps fl Housekeeping E Barricade Area E other: E cut Resistant Gloves E Pinch Pts. E General El ebctrical E lmpact Resistant E other: Secondary Permits Working from Heights See also Sect.7 Electrical Lifting Respiratory See also Sect. I E Hot wort El Confined Space ! Excavation E f"Uing objects E Fatl protection Ef Drop zone protection E Phtform load ratings E] Scaffold inspection E taooe, inspection EI Banlcades for equipment E Exposed wire/connector I Verify equipment grounding E] Arc Flash E crane lift plan fl Rigging inspection E fag lines used E] Hoists in place LJ Unexpected exposure E Chemicat E Dust (combustible) E pel provided AQS-FRM-I.18 /&" r ivi t.,r i\i i lt \-i ::'l i Additional Work Place Hazards Job Hazard Analysis 2 of3 7. Gritical Procedures - check all that apply - *indicates additional form must be completed or collected from client El Heat Stress Prevention* El Confined Space* El MEWP. E Roof Work EI Scaffold E Coto Weather Work I Hazardous Energy ControF EI Exposure Monitoring El other: From Helghts Fall Protection Falling Objects Protection F all Hazard Communication !! fixea Guardrails/Toe boards E fatt Prevention PPE Waming Line System i E Barricading tr Netting E House Keeping I Tethered Tools E Catctr Blanket or Tarp El AdjacenUOvefiead Workers I Contractor Contact E Client Contact Other Gonslderations Environmental Hazards - Weather Forecast E HeaUCotd Eugnming E Rain fl Snow I lce E Tomado E wina Speed Steps for Mitigation: actrical Safety Planning PlantHookup: Elttov f zzotz+ov EI +sov EI cenerator EHardwiredintopanel Electrical Classified Area: EYes f] No Trailer Grounded: E yes E ruo Plug Type Electrical Hook Up Responsibility: Ist of Hazardous Chemicals EI Acetone E NitricRcio E Hydrogen Peroxide E compressed Gases El Hexane E Sufuric Rcio fllsopropyl Alcohol I Fhmmable Gas E Toluene E Hydrochloric Acid E Uquia Nitrogen I Non-Flammable Gas other Ghemlcals: tl nzs E Carbon Monoxide Steps for Mifigation: lildlife/Fauna in Area I Poison lvy ! Poison oak fllnsects:!Wildlife: Personnel w/ known allergies to bees stings or other allergens? f] yes E t'to 8. Hazards and Mitigation Steps 1 2 3 1 2 3 1 2 3 1 2 3 AQS-FRM-1.18 r&".o lr"it.,ri\ 1 Iil-i'lii Job Hazard Analysis 3c.-l ffies&signatures Printed Name Signature Date Prlnted Name Slqnature Date JHA Meetinq & Review to review: o Change in conditions o Extended work hours o Daily SafetyTopic o New workers or contractors r Occurrence of near misses or injuries demonstrates that site conditions and hazards have not changed from the original SSP. lf changes dld occur, make the updates to this JHA and add notes as applicable in Section 9. Day Discussion Topic lnitials 2 3 4 5 6 7 8 9 10 11 AOS-FRM.1.18 /&,"r i1"l t.r l''! i irl-i 3 l Poge 7 of 2 EMERGENCY ACTION PLAN FORM The Job Supervisor/ Gllent project Manager (CPM) will ensure that atl employees are famlliar wlth the facllity emergency and evacuation procedures, assembly/ rally polnG, alert systems, and slgnals prior to work commencing, ln the event of an emergency situation/ evacua6on, the Job Supervisor/ CPM will malntaln a roster and be responsible for accountlng for all employees. The Job Supervisor/ CPM wlll ensune that thls EmergencyActlon Plan Form ls completed, communlcated to all employees, and posted. .Mou must follow the client's emergency action plan flrst, and notify your Supervisor immediately' .lf incident is life threatenlng, CALL 911 IMMEDIATELLY .E non-emergency medical attention is needed, call AXIOM Medical number: 877.502'9466. 1 MEG Job Supervisor/ GPM's Name: 2 MEG Job Supervisor/ CPM's Telephone Number: 3 MEG Job Safety Supervisor (if applicable): 4 MEG Job Safety Supervisor's Telephone Number: 5 Plant's Emergency Telephone Number: 6 Loca! Hospital/ Clinic Telephone Number: 7 Emergency Ops Radio Channel: 8 Planfs #1 Gontact Person's Name: I Plant's #1 Contact Person's Telephone Number: 10 Plant's #2 Gontact Person's Name: 11 Plant's #2 Contact Person's Telephone Number: 12 Designated Assembly Point Location: 13 Evacuation Routes: 14 Severe Weather Shelter Location: 15 Eye Wash and Safety Shower Location: t6 The First Aid Kit is Located: 17 The Fire Extinguisher is Located: ans-EPt\I-1 11 ffi, ',, iuit,r)\ I ltt j:i I Poge 2 of 2 1 Facility Name: 2 Facility Alarm (Circle):YES or NO 3 Alarm Tones: cHEMtCAL/ SHELTER-IN.PLACE: ; EVACUATE: OTHER: 4 Designated Shelter(sl Description: 5 Designated Assembly Point(s) Description: N*+, s Draw the evacuatlon and assemblv map here EN1ERCTENCy ACTtOn BLY MAP REVIEW: Crew Names an{Sisnatures Printed Nome:Siqnature:Date:Printed Name:Signature:Date: AQS-FRM.1.11 r$v , ii'i{,-,lu'd i ilt't r':i Page 1 of 1 Daily MEWP Lift Inspection Form All checks must be completed prior to each work shift, before operation of the MEWP lift. This checklist must be used afthe beginning of each shift or following 6 to 8 hours of use. MEWP Lift Model #:Serial Number: Make:Rented or Owned: . Check'Yes" if an item is adequate, operational, and safe.. Check'No" to indicate that a repair or other conective action is required prior to use. . Check'N//t''to indicate "Not Applicable." Items to be lnspected 1. All MEWP lift components are in working condition (i.e. no loose or missing parts, torn or loose hoses, etc.) - if something can be easily loosened by hand then it is not sufficient. 2. Hydraulic fluid level is sufficient, with the platform fully lowered 3. Hydraulic system pressure (see manufacturer specs) is acceptable. lf the pressure is low, determine cause and repair in accordance with accepted procedures as outlined in service manual. 4. Tires and wheel lug nuts (for tightness) 5. Hoses and cables (i.e. worn areas or chafing) 6. Platform rails and safety gate (no damage present) 7. Pivot pins secure 8. Welds are not cracked and structural members are not bent or broken 9. Waming and instructional labets are legible and secure, and load capacity is clearly marked. 10. Manufacture/s lnstruction Manual is present inside the bucket 11. Base controls (switches and push buttons) can be properly operated 12. Platform conditions are safe (i.e. not slippery) 13. Fire extinguisher is present, mounted and fully charged, located inside the bucket 14. Headlights, safety strobe light and back-up alarm are functional 15. Workplace is free of hazards (overhead powerlines, obstructions, level surface, high winds, etc.) *Do not operate if winds are 20 mph, unless otherwise specified by manufacturer recommendations. Yes No N/A nEn trtrtr n tr tr tr tr tr tr u tr tr tr tr tr tru trtr trtr trtr utr tr! trtr trtr !tr trtr tru !tr trtr Operator Name & Signature Location Date Ground Control Name & Signature Location Date Hamess Inspections: Printed Name Signature Date Printed Name Signature Date Printed Name Signature Date AQS-FRM.1.16 r6vr\ lvl?,lYI+p_[5 Page 1 of 1 Extended Hours Safety Audit Project Number:Date:Time: When a project is expected to extend past a 14-hour work day, this form must be completed to evaluate the condition of the crew, and the safetf of the work environment. Permission to proceed into extended work hours must come from a District Manager (DM) or RegionalVice President (RVP). Technicat RVPs can authorize moving forward, if they are in the field or if they are managing the project. 1. Hold test crew meetino Test crew initials: The test leader should look for signs of the following in their crews: . lrritabilityo Lack of motivationr Headaches. Giddiness o.Fatigue . Depression o Reduced alertness, lack of concentration and memory The test leader should assess the environmental and hazardous concerns: a a a Temperature and weather Lighting Working from Heights Hoisting PPE (i.e. respirators, etc.) Pollutant concentration in ambient air (SOz, HzS, ect.) a a a Notifv DM or RVP The PM must contact either the DM or RVP to discusp the safety issues that may arise due to the extended work period. During this time, they can come to an agreement on how to proceed. ltems to discuss include: a a t a Reason for extended hours Reason for delay Production limitations lmpending Weather Gontact the client The PM, DM or RVP must discuss with client any identified safety concerns, the client's needs and mutually agree on how to proceed. Discussion should also include the appropriate rest period needed before the next day's work shift can begin. The DM and/or a RVP must be informed on the finaldecision. Final Outcome: Approver; 3. OO1AS.SAFEW.FM.3 1. 2. ,,6' i i+itruri I iit ,',)i Page 1 of 1 Heat Stress Prevention Form This form is to be used when the Expected Heat lndex is above 91' F, and is to be kept with project documentation. Proiect Manaqer (PM):Expected Hiqh Temp: Date(s):Expected Heat lndex: Review the signs of Heat Exhaustion and Heat Stroke lf Heat lndex is above 91' F:o Provide cold water and/or sports drinks to allfield staff (avoid caffeinated drinks and energy drinks which can increase core temperature). o Bring no less than one gallon of water per employee. lf employee(s) are dehydrated, on blood pressure medication or not acclimated to heat, ensure they are aware of the heightened risk for heat illness. Provide cool head bands/vests/etc.. Have ice available to employees. lmplement work shift rotations and breaks, particularly for employees working in direct sunlight.o Provide as much shade at the jobsite as possible, including tarps, tents or other acceptable temporary structures.r PM should interview each fleld staff periodically to evaluate for signs of heat illness lf Heat lndex is above 103' F:. Employees must stop for drinks and breaks every hour (about 4 cups/hour). Employees are not permitted to work alone for more than one hour at a time without a break offering shade and drinks. Employees should wear cool bands and vests if working outside more than one hour at a timeo PM should interview each field staff every 2 hours to evaluate for signs of heat illness 3. Nausa orwmldng ffi Nausea ot wmitlng Rapid,weakpulso -88*ffi{ m Rapld,strongpulse Musctecramps ffiI r'taytose (D OOlAS-SAFEry-FM.5 This is the Last Page of This Document If you have any questions, please contact one of the following individuals by email or phone. Name: Beckie Hawkins Title: District Manager Region: Great PIains, Utah Office Email : behawkins@montrose-env.com Phone: B0 t-794-2950 0raH orPeRr NT OF ,Ltw JUN - 6 2024 DIVISION OF AIR OUALITY Name: Title: Region: Email; Phone: Cheyney Guymon Field Project Manager Great Plains, Utah Office chg uymon @montrose-env. com 80L-794-2950