Loading...
HomeMy WebLinkAboutDDW-2024-008445June 24, 2024 Utah Department Of Environmental Quality Division Of Drinking Water Admin Contacts Inventory Report Service Connections Treatment Plants Storage Sources BLACK DESERT RESORT WATER SYSTEM PWS ID: UTAH27114 Rating:Active Legal Contact BLACK DESERT RESORT WATER SYSTEM SCOTT NIELSEN 1500 E BLACK DESERT DR IVINS, UT 84738 Phone: 801-669-0464 County: WASHINGTON COUNTY System Type: Community Population: 2,500 Site Updates Last Inventory Update: 05/16/2024 Last Surveyor Update: Surveyor: Operating Period: 1/1 - 12/31 Last IPS Update: 06/24/2024 14:10:00 Consumptive Use Zone Irrigation Zone: null Date: Name Title Office Emergency Email NIELSEN, SCOTT scottn@blackdesertresort.com Type Meter Type Meter Size # Of Connections Combined Unknown 0.000 1201 Total Service Connections: 1201 ID Plant Name Bin Status Date Design Cap Status TP001 BLACK DESERT RESORT TREATMENT PLANT Active Treatment Purposes ION EXCHANGE ID Name Type Effective Volume Material Status Status Reason ST001 BLACK DESERT RESORT STORAGE Unknown Active Total Effective Volume: 0 null ID Source Name OP Date Status Reason Source Type Water Type Period Of Op WS001 UTAH27008 IVINS Active Consecutiv e Connection Surfacewater 1/1 - 12/31 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 1 of 6 Site Visit History Date Visited Survey Type Surveyor Notified Date Next Inspection 06/24/2024 Needs Survey 06/24/2024 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 2 of 6 Bacterial Summary Report Routine Bacteriological Sampling Requirements Total Coliform Sample History 05/01/2023 - 06/30/2024 Sample Reuired Schedule Begin Schedule End Operation Begin Operation End 2/Monthly/Routine 07/01/2024 1/1 12/31 Routine Sampling Repeat Sampling Triggered Sampling Assessment Sampling Month #Sample s TC+Ecoli+#Sample s TC+Ecoli + #Sample s TC+Ecoli + #Sample s TC+Ecoli + May-23 0 0 0 0 0 0 0 0 0 0 0 0 Jun-23 0 0 0 0 0 0 0 0 0 0 0 0 Jul-23 0 0 0 0 0 0 0 0 0 0 0 0 Aug-23 0 0 0 0 0 0 0 0 0 0 0 0 Sep-23 0 0 0 0 0 0 0 0 0 0 0 0 Oct-23 0 0 0 0 0 0 0 0 0 0 0 0 Nov-23 0 0 0 0 0 0 0 0 0 0 0 0 Dec-23 0 0 0 0 0 0 0 0 0 0 0 0 Jan-24 0 0 0 0 0 0 0 0 0 0 0 0 Feb-24 0 0 0 0 0 0 0 0 0 0 0 0 Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 May-24 0 0 0 0 0 0 0 0 0 0 0 0 Jun-24 0 0 0 0 0 0 0 0 0 0 0 0 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 3 of 6 Water Monitoring Report BACTERIOLOGICAL MONITORING Disinfection ByProduct Stage 2 Monitoring Other Distribution Monitoring Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 2 Routine Monthly 07/01/2024 COLIFORM (TCR) Sample Count Type Frequency Sample Label 2 Routine Quarterly UTAH27114 DS001 Sample ID below ID Site Last Sample Next Sample Due 04/01/2024-06/30/2024 Sample during the following months: December, March, June, September Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 20 Routine 6 Months 07/01/2024 - 12/31/2024 Open Compliance Schedule Type Required Activities Severity Created Due Disinfection Byproduct Sample Site Plan SUBMIT DBP SAMPLE SITE PLAN 05/13/2024 06/30/2024 WELCOME TO THE CLUB LETTER SCHEDULE ONSITE INSPECTION/SANITARY SURVEY 06/24/2024 06/24/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 06/24/2025 WELCOME TO THE CLUB LETTER SCHEDULE CAPACITY DEVELOPMENT EVALUATION 06/24/2024 12/18/2025 Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 06/24/2024 07/01/2024 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 4 of 6 IPS 2020 Report IPS Report IPS Summary Total IPS Pts: 0 Admin & Physical Facilities Quality & Monitoring Significant Deficiency 0 0 0 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 5 of 6 Physical Facility Points 2020 Total Pts: 0 Facility Facility Name Status Points Effective DS001 UTAH27114 DISTRIBUTION SYSTEM A 0.0 Code Description Severity Comments Determined Date Not Assessed Assessed G001 UNAPPROVED FACILITY IN SERVICE SIG SYSTEM MUST OBTAIN AN OPERATING PERMITS FOR ALL WATER SYSTEM FACILITIES BY 12/18/2025. FILE #13570 06/24/2024 50 0 C001 SYSTEM DIRECT RESPONSIBLE CHARGE OPERATORS NOT CERTIFIED AT THE REQUIRED LEVEL SIG SYSTEM MUST OBTAIN A DIRECT RESPONSIBLE CHARGE OPERATOR CERTIFIED AT A DISTRIBUTION GRADE 2 AND A TREATMENT GRADE 2 OR HIGHER BY 6/24/2025 06/24/2024 50 0 WS001 UTAH27008 IVINS A 0.0 Code Description Severity Comments Determined Date Not Assessed Assessed S001 UNAPPROVED SOURCE IN SERVICE SIG SYSTEM MUST OBTAIN AN OPERATING PERMIT BY 12/18/2025. FILE #13570 06/24/2024 200 0 Operator Certification Type Level Required Highest Certificate Distribution Treatment Open Compliance Schedule Type Required Activities Severity Created Due Disinfection Byproduct Sample Site Plan SUBMIT DBP SAMPLE SITE PLAN 05/13/2024 06/30/2024 WELCOME TO THE CLUB LETTER SCHEDULE ONSITE INSPECTION/SANITARY SURVEY 06/24/2024 06/24/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 06/24/2025 WELCOME TO THE CLUB LETTER SCHEDULE CAPACITY DEVELOPMENT EVALUATION 06/24/2024 12/18/2025 Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 06/24/2024 07/01/2024 DEQ | Drinking Water Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 6 of 6