HomeMy WebLinkAboutDDW-2024-008445June 24, 2024
Utah Department Of Environmental Quality
Division Of Drinking Water
Admin Contacts
Inventory Report
Service Connections
Treatment Plants
Storage
Sources
BLACK DESERT RESORT
WATER SYSTEM
PWS ID: UTAH27114 Rating:Active
Legal Contact
BLACK DESERT RESORT WATER SYSTEM
SCOTT NIELSEN
1500 E BLACK DESERT DR
IVINS, UT 84738
Phone: 801-669-0464
County: WASHINGTON COUNTY
System Type: Community
Population: 2,500
Site Updates
Last Inventory Update: 05/16/2024
Last Surveyor Update:
Surveyor:
Operating Period: 1/1 - 12/31
Last IPS Update: 06/24/2024 14:10:00
Consumptive Use Zone
Irrigation Zone: null
Date:
Name Title Office Emergency Email
NIELSEN, SCOTT scottn@blackdesertresort.com
Type Meter Type Meter Size # Of Connections
Combined Unknown 0.000 1201
Total Service Connections: 1201
ID Plant Name Bin Status Date Design Cap Status
TP001 BLACK DESERT RESORT TREATMENT PLANT Active
Treatment Purposes
ION EXCHANGE
ID Name Type Effective Volume Material Status Status Reason
ST001 BLACK DESERT RESORT
STORAGE
Unknown Active
Total Effective Volume: 0 null
ID Source Name OP Date Status Reason Source
Type Water Type Period Of
Op
WS001 UTAH27008 IVINS Active Consecutiv
e
Connection
Surfacewater 1/1 - 12/31
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 1 of 6
Site Visit History
Date Visited Survey Type Surveyor Notified Date Next Inspection
06/24/2024 Needs Survey 06/24/2024
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 2 of 6
Bacterial Summary Report
Routine Bacteriological Sampling Requirements
Total Coliform Sample History
05/01/2023 - 06/30/2024
Sample Reuired Schedule Begin Schedule End Operation Begin Operation End
2/Monthly/Routine 07/01/2024 1/1 12/31
Routine Sampling Repeat Sampling Triggered Sampling Assessment Sampling
Month #Sample
s TC+Ecoli+#Sample
s TC+Ecoli
+
#Sample
s TC+Ecoli
+
#Sample
s TC+Ecoli
+
May-23 0 0 0 0 0 0 0 0 0 0 0 0
Jun-23 0 0 0 0 0 0 0 0 0 0 0 0
Jul-23 0 0 0 0 0 0 0 0 0 0 0 0
Aug-23 0 0 0 0 0 0 0 0 0 0 0 0
Sep-23 0 0 0 0 0 0 0 0 0 0 0 0
Oct-23 0 0 0 0 0 0 0 0 0 0 0 0
Nov-23 0 0 0 0 0 0 0 0 0 0 0 0
Dec-23 0 0 0 0 0 0 0 0 0 0 0 0
Jan-24 0 0 0 0 0 0 0 0 0 0 0 0
Feb-24 0 0 0 0 0 0 0 0 0 0 0 0
Mar-24 0 0 0 0 0 0 0 0 0 0 0 0
Apr-24 0 0 0 0 0 0 0 0 0 0 0 0
May-24 0 0 0 0 0 0 0 0 0 0 0 0
Jun-24 0 0 0 0 0 0 0 0 0 0 0 0
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 3 of 6
Water Monitoring Report
BACTERIOLOGICAL MONITORING
Disinfection ByProduct Stage 2 Monitoring
Other Distribution Monitoring
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
2 Routine Monthly 07/01/2024 COLIFORM (TCR)
Sample Count Type Frequency Sample Label
2 Routine Quarterly UTAH27114 DS001 Sample ID
below
ID Site Last Sample Next Sample Due
04/01/2024-06/30/2024
Sample during the following months: December, March, June, September
Analyte Name ID Sample
Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 20 Routine 6 Months 07/01/2024 - 12/31/2024
Open Compliance Schedule
Type Required Activities Severity Created Due
Disinfection Byproduct Sample Site Plan SUBMIT DBP SAMPLE SITE PLAN 05/13/2024 06/30/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 06/24/2024 06/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 06/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 06/24/2024 12/18/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 06/24/2024 07/01/2024
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 4 of 6
IPS 2020 Report
IPS Report
IPS Summary Total IPS Pts: 0
Admin & Physical Facilities Quality & Monitoring Significant Deficiency
0 0 0
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 5 of 6
Physical Facility Points 2020 Total Pts: 0
Facility Facility Name Status Points Effective
DS001 UTAH27114 DISTRIBUTION SYSTEM A 0.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
G001 UNAPPROVED
FACILITY IN SERVICE
SIG SYSTEM MUST OBTAIN AN
OPERATING PERMITS FOR
ALL WATER SYSTEM
FACILITIES BY 12/18/2025.
FILE #13570
06/24/2024 50 0
C001 SYSTEM DIRECT
RESPONSIBLE
CHARGE OPERATORS
NOT CERTIFIED AT
THE REQUIRED LEVEL
SIG SYSTEM MUST OBTAIN A
DIRECT RESPONSIBLE
CHARGE OPERATOR
CERTIFIED AT A
DISTRIBUTION GRADE 2
AND A TREATMENT GRADE
2 OR HIGHER BY 6/24/2025
06/24/2024 50 0
WS001 UTAH27008 IVINS A 0.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
S001 UNAPPROVED
SOURCE IN SERVICE
SIG SYSTEM MUST OBTAIN AN
OPERATING PERMIT BY
12/18/2025. FILE #13570
06/24/2024 200 0
Operator Certification
Type Level Required Highest Certificate
Distribution
Treatment
Open Compliance Schedule
Type Required Activities Severity Created Due
Disinfection Byproduct Sample Site Plan SUBMIT DBP SAMPLE SITE PLAN 05/13/2024 06/30/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 06/24/2024 06/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 12/18/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 06/24/2024 06/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 06/24/2024 12/18/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 06/24/2024 07/01/2024
DEQ | Drinking Water
Run Date: 06/24/2024 14:25:51 | Rating: UTAH27114 BLACK DESERT RESORT WATER SYSTEM page 6 of 6