Loading...
HomeMy WebLinkAboutDSHW-2018-003265 - 0901a068807ea4c5Anderson Geneva Development, inc. United States Steel Corporation P.SRW _201e-0032 (05 April 3, 2018 Mr. Scott T. Anderson, Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality P.O. Box 144880 Salt Lake City, UT 84114-4880 RE: Notification Letter for Continued Site Management Plan (SMP) Groundwater Monitoring at the Former Geneva Steel Facility, Vineyard, Utah Dear Mr. Anderson: On behalf of United States Steel Corporation (USS) and Anderson Geneva, LLC/Ice Castle Retirement Fund L.L.C. (Anderson Geneva), this letter is to notify you that the Site Management Plan (SMP) groundwater monitoring event at the solid waste management units (SWMUs) shown in the attached table, which are located at the former Geneva Steel facility in Vineyard, Utah, is planned for the week of April 9, 2018. This sampling event responds to the requirements of the approved SMPs for each SWMU. AECOM, a contractor to USS/Anderson Geneva, will conduct the field work. Specific Planned Activities Samples will be collected at each of the SWMUs and from the monitoring wells or piezometers presented in the attached table. To help evaluate groundwater conditions, the following data will also be collected at each location, using field instrumentation: temperature, dissolved oxygen (DO), pH, conductivity, and oxidation/reduction potential (ORP). Procedures and Analytical Program Field methods, including sampling arld documentation, will be performed and documented in accordance with applicable standard operating procedures (SOPs) and requirements listed in the revised Verification Investigation Work Plan (VIWP). Quality assurance and quality control (QA/QC) protocols for the investigation, including the number and types of QC samples, are included in the revised Data Collection Quality Assurance Plan (DCQAP), which is Part 2 of the RCRA Facility Investigation (RFI) Work Plan. The groundwater samples will be collected in accordance with the revised DCQAP and will be submitted for the analytical program presented in the attached table. The samples will be analyzed by a Utah- certified laboratory and the analytical results will be validated in accordance with the DCQAP. Reporting Preliminary analytical data will be available approximately four (4) weeks after submittal of samples to the laboratory. USS/Anderson Geneva will document the sampling, review and validate analytical data, and submit separate SWMU-specific Letter Reports of Findings to UDEQ to summarize the results of the groundwater monitoring event approximately 60 days following receipt of all validated analytical results. Please contact us at your convenience if you have any questions on this matter. cc: B. Mustoe, AECOM T. Messersmith, AECOM File: AG, USS Anderson Geneva Development, inc. United States Steel Corporation Summary of Planned Semi-Annual SWMU SMP Groundwater Sam lin SWMU to be Sampled Planned Sample Dates Monitoring Wells/Piezometers to be Sampled Analytical Program1'2 SWMU GW-4.2 ORA Benzene Plume 4/9/2018 MW-142, MW-143, MW-144 Benzene, toluene, ethylbenzene, xylene, and naphthalene SWMU GW-4.5A Parish Geneva Area 4/12/2018 MW-124S / GPW-0180R, PC-213 VOCs and SVOCs3 SWMU GW-4.6 Maintenance Area Plume 4/11/2018 MW-136, MW-137, MW-138 Benzene, toluene, ethylbenzene, and xylene SWMU GW-4.7 Pipe Mill Area Plume 4/9/2018 MW-140, MW-141 TCE, DCE, and vinyl chloride SWMU GW-4.8 Nitrogen Plant Plume 4/12/2018 MW-118S / NPP-209 Benzene, toluene, ethylbenzene, xylene, and naphthalene SWMU GW-4.11 Front End Oil Tank Plumes - South 4/10/2018 MW-156, MW-157 / 3.20A-053 Benzene, toluene, ethylbenzene, and xylene SWMU GW-4.12 Front End Oil Tank Plumes - North 4/10/2018 MW-158, MW-159, MW-161 / 3.20A-094 TCE, DCE, and vinyl chloride SWMU GW-4.13 Highline Area 4/11/2018 MW-150, MW-151, MW-152 / MS29-006, M529-009R, MS29-011R Benzene, toluene, ethylbenzene, and xylene Notes: 1 - The proposed analytical program is based on the specifications in the approved SMP for each SWMU. For SWMU GW-4.5A, SVOCs are included in the sampling program, even though they are not specified in the SMP; this is to assess for bis-2-chloroethyl ether, which has been previously identified in this area. 2 - Analytical program to be conducted by EPA Method 5W846 8260B or equivalent method, unless otherwise noted. 3 — SVOC analysis to be conducted by EPA Method 5W846 8270C or equivalent method. DCE - dichloroethene TCE - trichloroethene SMP - Site Management Plan SVOC - Semi-volatile Organic Compound SWMU - Solid Waste Management Unit VOC - Volatile Organic Compound