Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2018-004503 - 0901a06880811d8f
. Div of Waste Management and Radiation Control CLIVE SITE MAY - 8 2018 LETTER OF TRANSMITTAL -20/ 0-004503 DATE: 05/07/2018 ATTN: Don Verbica — DWMRC CC; Treesa Parker Karen Kirkwood RE: Transmittal 18017 Description of Documents Transmitted Qty See attached for an update to State-issued Part B Permit; Attachment 11-7-1 dated 4/25/2018 1 List of Revision Dates 4/25/2018 1 Please replace your current procedure revisions with the documents with in this Transmittal. You are not required to sign any documents to verify receipt of this distribution. However, you should make every effort to ensure that your copy of the License is current. FROM: EnergySolutions Document Control Clive Facility EnergySolutions Clive Facility Surety Summary Section Item lle.(2) LLRW MW lle.(2) 1 FACILITY DECOMMISSIONING $ 71,212.79 $ 59,931.73 $ 1,711,625.22 $ 424,962.54 $ 4,126,138.17 $ (197,004.91) $ 329,275.31 2 PLACEMENT OF MATERIAL 3 LINER/PROTECTIVE LINER COVER 100 RESTORATION OF GRADE 101 SETI-LEMENT MONITORING 200 COVER CONSTRUCTION 201 STOCKPILES OF CLOSURE ASSETS 203 GROUNDWATER RESTORATION & WELL PLUGGING SUBTOTALS $ 6,526,140.85 2 ADMINISTRATION BUILDING $ 1,482.18 $ 139,754.35 $ 447.10 $ 13,830.87 $ 427,583.52 $ 32,377.75 $ 365,661.29 $ 4,363.72 $ 22,985.00 $ 8,683.04 $ 22,850.93 $ 16,125.27 $ 169,595.13 $ 10,529.40 $ 3,602.32 $ 54,336.85 $ 1,794.61 $ 4,344.71 $ 6,605.77 3 OPERATIONS BUILDING 5 ROLLOVER AREA 6 ROLLOVER ENCLOSURE 7 CONTAINER STORAGE PAD AND EVAPORATION PONDS 8 EQUIPMENT PAD NORTH OF 1997 EVAPORATION POND 9 EAST TRUCK UNLOADING FACILITY 10 LLRW MAINTENANCE BAY (Inside Restricted Area) 11 LLRW MAINTENANCE SHOP 12 RAIL WASH FACILITY ON TRACK NO. 2 13 RAIL WASH FACILITY ON TRACK NO. 4 14 SECONDARY UNLOADING FACILITY 16 INTERMODAL UNLOADING FACILITY 17 CLEAN TRANSFER FACILITY 18 CONTAINERIZED CLASS A TRAILER 26 MOBILE BATCH PLANT 27 WIRELESS TOWER SUPPORT SURFACE 28 GUARD SHACKS (5) 29 TRANSPORTATION CASKS Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 1 PLACEMENT OF STORED WASTE DECONTAMINATION ACCESS CONTROL BUILDING INTERMODAL CONTAINER WASH BUILDING SHREDDER FACILITY ROTARY DUMP FACILITY EAST SIDE DRAINAGE SYSTEM AIR MONITORING STATION SURFACE UPGRADES NEW LLRW OPERATIONS BUILDING SRS DU STORAGE BUILDING HAUL ROADS FROM THE CLASS A EMBANKMENT TO THE AREA AROUND THE LLRW MAINTENANCE SHOP AND BAY ROADS FROM ROLLOVER TO SOUTH SIDE OF THE 1997 EVAPORATION POND, AREA BETWEEN TRACKS 2 AND 3, AND AREA AROUND IUF 100 101 31 32 33 34 35 36 37 38 39 $ 3,106,072.25 $ 28,143.72 $ 97,609.25 $ 526,254.83 $ 500,588.29 $ 49,757.53 $ 432.75 $ 78,864.42 $ 72,534.06 $ 229,876.64 $ 371,537.76 ROADS SOUTH OF THE 1997 POND, SITE ACCESS ROADS ALONG THE SOUTH AND NORTH BORDERS OF SECTION 32, HAUL ROAD ALONG THE WEST SIDE OF THE 11E42) EMBANKMENT RAIL TRACK AND RAILROAD BEDS WITHIN THE RESTRICTED AREA 102 103 $ 194,861.98 $ 557,453.87 105 106 200 201 202 203 204 205 207 208 209 211 215 HAUL ROADS (LARGE COMPONENT AND CWF) AROUND CLASS A AND CLASS A NORTH EMBANKMENTS CLOSURE PERIOD STORMWATER MANAGEMENT TEMPORARY STORAGE TANKS DISPOSAL OF EQUIPMENT ON SITE OPEN AREA HEALTH PHYSICS STAFF AND RAD SURVEY EQUIPMENT DISPOSAL VOLUMES AND LINER CONSTRUCTION SETMEMENT MONITORING COVER CONSTRUCTION GENERAL CLOSURE OF SECTION GENERAL CLEANUP COST CATEGORIES (not in any previously-defined areas) INITIAL MOBILIZATION FOR SECURITY, SURVEY, AND SETTLEMENT MONITORING POTENTIAL GROUNDWATER REMEDIATION SYSTEM (IF NEEDED) SUBTOTALS $ 90,995.26 $ 26,181.54 $ 9,532.11 $ 564,487.02 $ 260,371.97 $ 1,177,670.86 $ 295,633.54 $ 2,742,227.01 $ 15,513,703.50 $ 1,433,729.88 $ 625,120.16 $ 429,617.14 $ 329,275.31 $ 30,619,486.46 Section Item lle.(2) LLRW WM Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 2 Section Item lle.(2) LLRW MW I IIWIEIMIIIIIIIIIPMOF Treatment of Stored Waste $ 2,425,037.65 $ 311,851.27 $ 2,634.57 $ 94,880.40 $ 85,459.64 $ 116,578.26 $ 3,706.30 $ 52,601.97 $ 99,541.44 $ 10,258.82 $ 74,255.70 $ 10,087.18 $ 46,986.70 $ 1,177,670.86 $ 4,771,726.33 $ 186,506.12 $ 187,465.04 $ 329,275.31 III Storage Pads and MW Truck Unloading Facility IV Pump House and Water Tank V Mixed Waste Storage Building VI Mixed Waste Treatment Building VII Mixed Waste Operations Building VIII Rail Car Unloading Facility IX Railroads Inside Restricted Area X Roads Inside Restricted Area Xl Reagent Delivery Silos XII Evaporation Pond and Mixed Waste Surface Impoundment XIII Evaporation Tanks XIV On Site Open Area XV Health Physics Staff and Radiation Survey Equipment XVI Cell Closure XVII General Closure of Section XVIII VTD Condensate Costs XVIV POTENTIAL GROUNDWATER REMEDIATION SYSTEM (IF NEEDED) SUBTOTALS $ 9,986,523.56 Indirect Multipliers lle.(2) LLRW MW , Working Conditions (5.5%) $ 358,937.75 $ 1,684,071.76 $ 549,258.80 Included in MTE of each line item $ 652,614.09 $ 3,061,948.65 $ 998,652.36 $ 146,838.17 $ 688,938.45 $ 224,696.78 $ 978,921.13 $ 4,592,922.97 $ 1,497,978.53 $ 261,045.63 $ 1,224,779.46 $ 399,460.94 $ 261,045.63 $ 1,224,779.46 $ 399,460.94 Mobilization Contingency (10%) Engineering and Redesign (2.25%) Profit and Overhead (15%) Management Fee and Legal Expense (4%) DEQ Oversight of Project (4%) SUBTOTALS $ 2,659,402.40 $ 12,477,440.73 $ 4,069,508.35 Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 3 Section item 11e.(2) 1.1.12W MW Environmental Monitoring During Closure 401 Post Operational Monitoring and Maintenance NA NA NA NA NA NA $ 13,771.00 $ 189,246.29 NA $ 165,222.36 $ 3,647.36 $ 3,834.26 $ 18,609.63 $ 31,541.53 $ 43,173.36 $ 16,288.94 $ 583.58 $ 989.49 XX VI 401 WATER SAMPLES - Radiological XXVII XXVIII WATER SAMPLES - RCRA 403 AIRBORNE PARTICULATE MONITORING XXX 403 GAMMA EXPOSURE MONITORING XXXIII 407 RADON EXPOSURE MONITORING XXXIV SUBTOTALS $ 375,721.27 $ 111,186.53 Post-Closure Monitoring lle.(2) $ 965,728.00 $ 6,885.50 $ 94,623.59 $ 4,153.93 $ 82,611.18 $ 27,616.60 NA $ 1,823.68 $ 1,917.13 $ 9,304.81 $ 15,770.77 $ 21,586.68 $ 4,153.93 $ 8,144.47 $ 3,692.18 NA $ 291.79 $ 494.74 400 LONG TERM SURVEILLANCE (10 CFR 40, Criterion 10: $250,000 in 1978 dollars - CPI Calculator used) LLRW 400 Post Operational Monitoring and Maintenance (Year 1-100) 401 WATER SAMPLES - Radiological (Year 1-100) 402 EMBANKMENT SURVEY (Year 1-5) 403 AIRBORNE PARTICULATE MONITORING (Year 1) 404 SOIL SAMPLING (Year 1) 405 VEGETATION SAMPLING (YEAR 1) 406 GAMMA EXPOSURE MONITORING (YEAR 1) 407 RADON EXPOSURE MONITORING (Year 1) MW XXVI Post Operational Monitoring and Maintenance (Year 1-100) XXVII Water Samples -- Radiological (Year 1-100) XXVIII Water Samples -- RCRA (Year 1-30) XXIX Embankment Survey (Year 1-5) XXX Airborne Particulate Monitoring (Year 1) XXXI Soil Sampling (Year 1) XXXII Vegetation Sampling (Year 1) XXXII! Gamma Exposure Monitoring (Year 1) XXXIV Radon Exposure Monitoring (Year 1) Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 4 Section Item lle.(2) LLRW MW Year 1 $ 219,631.61 $ 63,439.37 Year 2-5 $ 105,663.02 $ 50,816.19 Year 6-30 $ 101,509.09 $ 46,662.26 Year 31-100 $ 101,509.09 $ 25,075.58 PRESENT VALUE versus FUTURE VALUE 1 Costs are in 2016 dollars, Year 2 -100 activities are converted into 2016 dollars using Future (F) to Present (P) factor. $ 219,631.61 $ 63,439.37 2 Real Return = 1.0% $ 103,581.04 $ 50,816.19 3 $ 102,555.49 $ 50,816.19 4 " The Mixed Waste Facility does not use PRESENT VALUE versus FUTURE VALUE $ 101,540.09 $ 50,816.19 5 calculations in the first 30 years of post-closure. These calculations are $ 100,534.74 $ 50,816.19 6 used for years 31-100 in the Mixed Waste Facility portion ** $ 95,626.15 $ 46,662.26 7 $ 94,679.36 $ 46,662.26 8 $ 93,741.94 $ 46,662.26 9 $ 92,813.80 $ 46,662.26 10 $ 91,894.85 $ 46,662.26 11 $ 90,985.00 $ 46,662.26 12 $ 90,084.16 $ 46,662.26 13 $ 89,192.24 $ 46,662.26 14 $ 88,309.15 $ 46,662.26 15 $ 87,434.80 $ 46,662.26 16 $ 86,569.11 $ 46,662.26 17 $ 85,711.99 $ 46,662.26 18 $ 84,863.36 $ 46,662.26 19 $ 84,023.13 $ 46,662.26 20 $ 83,191.21 $ 46,662.26 21 $ 82,367.54 $ 46,662.26 22 $ 81,552.02 $ 46,662.26 23 $ 80,744.57 $ 46,662.26 24 $ 79,945.12 $ 46,662.26 25 $ 79,153.59 $ 46,662.26 26 $ 78,369.89 $ 46,662.26 27 $ 77,593.95 $ 46,662.26 28 $ 76,825.69 $ 46,662.26 29 $ 76,065.04 $ 46,662.26 30 $ 75,311.92 $ 46,662.26 31 $ 74,566.26 $ 18,419.95 32 $ 73,827.98 $ 18,237.57 33 $ 73,097.01 $ 18,057.00 34 $ 72,373.28 $ 17,878.22 Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 5 Section Item 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 lle.(2) LLRW MW $ 71,656.71 $ 17,701.21 $ 70,947.24 $ 17,525.95 $ 70,244.79 $ 17,352.42 $ 69,549.29 $ 17,180.62 $ 68,860.69 $ 17,010.51 $ 68,178.90 $ 16,842.09 $ 67,503.86 $ 16,675.34 $ 66,835.51 $ 16,510.24 $ 66,173.77 $ 16,346.77 $ 65,518.58 $ 16,184.92 $ 64,869.88 $ 16,024.67 $ 64,227.61 $ 15,866.01 $ 63,591.69 $ 15,708.92 $ 62,962.07 $ 15,553.39 $ 62,338.68 $ 15,399.40 $ 61,721.47 $ 15,246.93 $ 61,110.36 $ 15,095.97 $ 60,505.31 $ 14,946.50 $ 59,906.25 $ 14,798.52 $ 59,313.12 $ 14,652.00 $ 58,725.86 $ 14,506.93 $ 58,144.41 $ 14,363.29 $ 57,568.73 $ 14,221.08 $ 56,998.74 $ 14,080.28 $ 56,434.40 $ 13,940.87 $ 55,875.64 $ 13,802.84 $ 55,322.42 $ 13,666.18 $ 54,774.67 $ 13,530.87 $ 54,232.35 $ 13,396.90 $ 53,695.39 $ 13,264.26 $ 53,163.75 $ 13,132.93 $ 52,637.38 $ 13,002.90 $ 52,116.22 $ 12,874.16 $ 51,600.22 $ 12,746.69 $ 51,089.32 $ 12,620.49 $ 50,583.49 $ 12,495.53 $ 50,082.66 $ 12,371.82 $ 49,586.79 $ 12,249.32 $ 49,095.83 $ 12,128.04 $ 48,609.74 $ 12,007.96 $ 48,128.45 $ 11,889.07 Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 6 Section Item lle.(2) LLRW MW 76 $ 47,651.93 $ 11,771.36 77 $ 47,180.13 $ 11,654.81 78 $ 46,713.00 $ 11,539.42 79 $ 46,250.50 $ 11,425.16 80 $ 45,792.57 $ 11,312.04 81 $ 45,339.18 $ 11,200.04 82 $ 44,890.28 $ 11,089.15 83 $ 44,445.82 $ 10,979.36 84 $ 44,005.76 $ 10,870.65 85 $ 43,570.06 $ 10,763.02 86 $ 43,138.67 $ 10,656.46 87 $ 42,711.56 $ 10,550.95 88 $ 42,288.67 $ 10,446.48 89 $ 41,869.97 $ 10,343.05 90 $ 41,455.42 $ 10,240.65 91 $ 41,044.97 $ 10,139.25 92 $ 40,638.58 $ 10,038.86 93 $ 40,236.22 $ 9,939.47 94 $ 39,837.84 $ 9,841.06 95 $ 39,443.41 $ 9.743.62 96 $ 39,052.88 $ 9,647.15 97 $ 38,666.22 $ 9,551.64 98 $ 38,283.38 $ 9,457.06 99 $ 37,904.34 $ 9,363.43 100 $ 37,529.05 $ 9,270.72 POST-CLOSURE SUBTOTALS $ 965,728.00 $ 6,533,179.70 $ 2,366,603.07 Grand Totals 11.e.(2) LLRW MW $ 10,151,271.25 $ 50,005,828.16 $ 16,533,821.51 Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 7 Closure of Unrestricted Areas (from MOU) Administration Building LLRW Employee Parking Area Southwest Storage Pond (Section 6) Water Storage Ponds and Associated Equipment (Section 29) Shredder Substation Rail Outside of Section 32 Excavated Land (borrow Pits) - Section 5 and 29 Truck Release Survey Building Container Maintenance Shop Purchasing Warehouse/Maintenance Building GW Laboratory/DEQ Office Building Water Tower Radio Tower and Support Building Concrete Pad Rail Repair Foundation Section 29 Cement Ramp Used for Off-Loading Smoking Hut Manhole ORA 013 and Surrounding Area Power and Manhole and Surrounding Area on Section 29 Diesel Fueling Area and tank Cement Foundation near Small Water Pond Underground Water Tank, Section 29 Old Batch Plant Foundation Abandon Wells not Needed during Post-Closure Other Areas Requiring only Radiological Survey SUBTOTAL 63,693.86 11,915.21 24,767.68 3,788.93 15,888.70 $ 273,235.76 $ 864,980.90 11,537.03 14,257.99 48,581.35 10,513.65 4,965.82 2,840.70 9,250.55 2,963.36 1,016.24 1,548.16 1,112.05 3,927.43 1,063.14 1,972.30 2,868.30 4,052.62 6,626.79 $ 1,387,368.52 Section Item lle.(2) LLRW MW Indirect Multiplier for Profit and Overhead (15%) $ 208,105.28 Overall Facility Closure Cost Summary Attachment 11-7-1 April 25, 2018 8 EnergySolutions LLC Issued — April 4, 2003 Revised — April 25, 2018 LIST OF REVISION DATES MODULE I STANDARD CONDITIONS Revised: August 7, 2014 Attachment I-1 REGULATIONS INCORPORATED BY REFERENCE Revised: August 7, 2014 MODULE II GENERAL FACILITY CONDITIONS Revised: August 2, 2017 Attachment II-1 WASTE ANALYSIS PLAN Revised: August 7, 2014 Attachment II-1-1 WASTE ANALYSIS PLAN AND FORMULA DEVELOPMENT FOR TREATMENT WASTES Revised: August 7, 2014 Attachment II-1-2 APPROVED TREATMENT REAGENTS Revised: May 27, 2016 Attachment 11-1-3 WASTE STABILIZATION PLAN Revised: February 26, 2015 Attachment 11-1-4 LIQUID WASTE MANAGEMENT PLAN Revised: August 7, 2014 Attachment II-1-4-1 ANALYTICAL PROCEDURES FOR FORMULA DEVELOPMENT LIQUID WASTE SOLIDIFICATION Revised: August 7, 2014 Attachment II-1-5 MACROENCAP SULATION PLAN Revised: August 7, 2014 Attachment 11-1-6 LEACHATE, EVAPORATION, AND DECONTAMINATION WASTE MANAGEMENT Revised: August 7, 2014 Attachment 11-1-7 SPRAY WASHING PLAN Revised: August 7, 2014 Attachment 11-1-8 MANAGEMENT OF WASTE FOR DISPOSAL AT THE LLRW FACILITY Revised: August 7, 2014 Attachment 11-1-9 MIXED WASTE OPERATIONS BUILDING OPERATING PLAN Revised: August 7, 2014 Attachment II-1-10 MANAGEMENT OF WASTES CONTAINING POLYCHLORINATED BIPHENYLS (PCBs) AT THE MIXED WASTE FACILITY Revised: August 7, 2014 Attachment II-1-10.1 PLAN FOR THE MANAGEMENT OF WASTE CONTAINING POLYCHLORINATED BIPHENYLS (PCBS AT THE LLRW FACILITY Revised: August 7, 2014 List of Revision Dates - Page 1 of 3 EnergySolutions LLC Issued — April 4, 2003 Revised — April 25, 2018 LIST OF REVISION DATES Attachment II-1-11 MIXED WASTE TREATMENT BUILDING OPERATING PLAN Revised: August 7, 2014 Attachment II-1-12 THERMAL DESORPTION SEPARATION PLAN Revised: August 7, 2014 Attachment II-1-12-1 THERMAL DESORPTION SHAKEDOWN OPERATIONS AND WASTE FAMILY DEMONSTRATION TESTING Revised: August 7, 2014 Attachment II-1-12-2 WASTE FAMILY OPERATIONAL PARAMETERS Revised: August 7, 2014 Attachment II-1-13 MIXED WASTE STORAGE BUILDING OPERATING PLAN Revised: August 7, 2014 Attachment II-1-14 PLAN FOR MANAGEMENT OF WASTECODES F020-F023 AND F026- F027 Revised: August 7, 2014 Attachment II-1-15 AEROSOL CAN PUNCTURING SYSTEM OPERATING PLAN Issued: October 30, 2014 Attachment II-1-16 OFF-LOADING WASTE USING THE ROTARY DUMP FACILITY Issued: December 15, 2016 Attachment 11-2 SITE SECURITY PLAN Revised: August 7, 2014 Attachment 11-3 SITE INSPECTION PLAN Revised: November 10, 2015 Attachment 11-4 PERSONNEL TRAINING PLAN Revised: August 7, 2014 Attachment 11-5 PREPAREDNESS AND PREVENTION PLAN Revised: April 25, 2017 Attachment 11-6 CONTINGENCY PLAN Revised: April 25, 2017 Attachment 11-6 EMERGENCY COORDINATOR LIST Revised: April 25, 2017 Attachment 11-7 CLOSURE PLAN Revised: March 22, 2017 Attachment II-7-1 OVERALL FACILITY CLOSURE COST SUMMARY Revised: April 25, 2018 Attachment 11-7-2 CLOSURE COST ESTIMATE-MIXED WASTE DETAILS Revised: August 2, 2017 Attachment 11-7-3 RESERVE CAPACITY CALCULATIONS Issued: March 22, 2017 List of Revision Dates - Page 2 of 3 EnergySolutions LLC Issued — April 4, 2003 Revised — April 25, 2018 LIST OF REVISION DATES Attachment 11-7-4 FINANCIAL ASSURANCE MECHANISM Issued: August 14, 2017 Attachment 11-7-5 CLOSURE AND POST-CLOSURE STANDBY TRUST AGREEMENT Revised: January 20, 2017 Attachment 11-8 POST CLOSURE PLAN Revised: August 7, 2014 Attachment 11-9 CONSTRUCTION QA/QC MANUAL Revised: August 7, 2014 Attachment II-10 PLAN FOR CONTROLLING WIND DISPERSAL Revised: August 7, 2014 Attachment II-11 FACILITY DRAWINGS Revised: November 30, 2017 MODULE III STORAGE AND TREATMENT IN CONTAINERS Revised: August 7, 2014 Attachment III-1 CONTAINER MANAGEMENT PLAN Revised: August 7, 2014 Attachment 111-2 WASTE IDENTIFICATION AND TRACKING PLAN Revised: August 7, 2014 MODULE IV STORAGE AND TREATMENT IN TANKS AND SURFACE IMPOUNDMENTS Revised: August 7, 2014 Attachment IV-1 TANK MANAGEMENT PLAN Revised: August 7, 2014 Attachment IV-2 MIXER EFFECTIVENESS PLAN Revised: August 7, 2014 Attachment IV-3 FIRE PROTECTION PLAN Revised: August 7, 2014 MODULE V DISPOSAL IN LANDFILLS Revised: January 20, 2015 Attachment V-1 DESIGN OF RUN-ON/RUN-OFF CONTROL BERMS Revised: August 7, 2014 MODULE VI GROUNDWATER MONITORING Revised: August 7, 2014 Attachment VI-1 GROUNDWATER FIELD SAMPLING PLAN Revised: April 25, 2017 Attachment VI-2 PERMANENT CLOSURE OF MONITORING WELLS Revised: August 7, 2014 MODULE VII CORRECTIVE ACTION PROGRAM Revised: August 7, 2014 List of Revision Dates - Page 3 of 3