Loading...
HomeMy WebLinkAboutDSHW-2018-006859 - 0901a0688087dae8SOLID WASTE PROGRAM FACILITY INSPBCTION REPORT CHECKLIST WASTE MANAGEMENT & RADIATION CONTROL Facility Name Wasatch Regional landfill County Tooele Location lnspection Date 6121118 Time In Time Out Routine Oversight X Follow up n Monitoring Evaluation tr Facility Status tr Construction Review tr Announced tr Unannounced X Weather Conditions Sunny and warm Inspection Goal To check on the progress ofthe construction ofthe new waste cell and to do a landfill inspection Facility Contact Les Lemmon Participants RobPowers FOLLOW UP INSPECTION NEEDED Yes ! No tr Recommended Follow Up Date 1. PR.E-INSPECTION REVIEW 1.2 Annual Report Review 1.3 Previous Inspection Review 1.4 Facilitv Contacts Confirmed 1.5 Facilitv Contacted (if announced i 1.6 Local Heath Contacted (X - indicates items reviewed) In compliance X | 2.13 Leachate Collection Svstem NAtI |2.14other MONITORING IRED/ PROPERLY POSTED 3.2 Directions & Procedure 3.4 List of Unacceptable Materials 4. OPERATOR / REPRESENTATIVE / EMPLOYEES X | 4.1 On-sitewhileopen In compliance X | 4.2 Trainine Not reviewed I 4.3 Other 2.7 Fusitive Dust Control 2.8 Waste Inspection Area 2.11 Fences. Gates 2.12 Workins Face X | 5.1 Methane In complianceD( | 5.2 Random Insoections Not reviewed X | 5.3 Leachate In compliance X | 5.4 Ground Water In comoliance | 5.5 Other SOLID WASTE FACILITY INSPECTION RBPORT Date: 6121118 Facility Name: Wasatch Regional landfill 6. DRAINAGE/ EROSIONX | 6.1 WaterRun-on In compliance X | 6.2 Water Run-off rn compttance U | 6.3 Other 9.7 Final Cover 9.9 Deviation from Plans 9.10 Permit, Permit and Rules Available 7. PROPERSTORAGE / ISOLATION / DISPOSAT 7.1 Special Waste 7.2 Batteries 7.3 Hazardous Waste NA 7.4 Infectious Waste 7.5 Tires In compliance 7.6 Dead Animals In compliance 7.7 Asbestos 7.8 Bulky Waste 7.9 Contaminated Soil NA 7.10 Ash 7.11 Sludge 7.12 Other Liquid waste in compliance rO. MONITORING /IX I l0.l ExplosiveGasMonitoring In compliance X | 10.2 l,eachate Sampling & Treatment NA X | 10.3 Ground Water Sampling Results In compliance U J 10.4 Other 8.1 Dailv - Soil I 1 .1 Lab Analysis Results l1.2 Manifests I 1.3 Treatment Certification I 1.4 Paint Filter Test Results I 1.5 Onsite Treatment Documentation 12. SPECIAL PERMIT 13.1 Notice of Inspections Form Completed and9. TNSPD,CI-ION RECORDSD3 | 9.1 RandomlnspectionReport Not reviewed X | 9.2 Gas Monitoring System In compliance X | 9.3 Surface Drainage Control In compliance X | 9.a Daily Records Not reviewed X | 9.5 Weight or Volumes Not reviewed Page 2 of 14 SOLID WASTE FACITITY'INSPECTION REPORT Date: 6121118 Facility Name: Wasatch Regional landfill DWMRC Inspector Name (type or print): Rob Powers Date: 6127ll8 Page 3 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 612l/18 Facility Name: Wasarch Regional landfill .-Y .,. ,':P lail : "; .:i *".'!Ijt r? [f,;.t'" W$ Looking northwest at the new cell beine lined Page 4 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 6121118 Facility Name: Wasatch Regional landfill i,:in''i'l','( '|}11..'r F !> '19 -'a''i'- ''4 -"' -i t{*' " -- "-',i"1.,ffia, *,,r{1'9ffi.j1 .i: 'r\l ' ' -11'-. .':" ",i"l'r't,':lft" ' . .,f Lookine west at the south end of the new waste cell Page 5 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 6/21/18 Facility Name: Wasatch Regional landfill "fr Looking north Page 6 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 6121118 Facility Name: Wasatch Regional landfill Wi:ilRls" -i*ll : Yf Looking north at the workers placing liner Page7 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 6/21/18 Facility Name: Wasatch Regional landfill Looking southeast at the liquid waste cell #3 Page 8 of 14 SOI,ID WASTE FACILITY INSPECTION REPORT Drtc: 6/2 1/ I lt Facilitl' Name : \\'asatch Rcgionrl landfrll It ,.**..i*-&*A"A*&a&- **b*&*g*S***SeA*a*4*a<Asa..&-J}_:A* u a:1r,:.:..r , ' g.:;r'*il a- -. .J,."".'" .. wn- . - ,,,*:*;q1,i.-,,, ,_?:,-1-: , . ...t 14' .-'-:. .'.i'.'. * r*;;l;:'!l' 'tt..* -.: _':d-F 6, .rilj'.,.&. SiJT"Y' Liquid waste cell #l Pagc 9 of 1.1 SOLID WASTE FACILITY INSPECTION REPORT Date: 6/2ll18 Facility Name: Wasatch Regional landfill Liquid waste cell #2 Page l0 of 14 SOLID WASTE FACILITY INSPECTION REPORT Date: 6121118 Facilitv Name: Wasatch Resional landfill riffi Waste solidification cell Page ll of14 SOI,ID WASTE FACILITY INSPECTION REPORT I)ate: 6/21l18 Flcilit,r Nantc. \\'asatch Rcuional landtlll tf Looking west at the working lace at the southeast end of the randfiU k- .,:),1,, .;o '.1 t roi I)age l2 of l:1 SOLID WASTE FACILITY INSPECTION REPORT Date: 6121118 Facility Name: Wasatch Regional landfill Page l3 of 14