Loading...
HomeMy WebLinkAboutDSHW-2018-006838 - 0901a0688087d8e0SOLID WASTB PROGRAM FACILITY INSPBCTION REPORT CHECKLIST WASTE MANAGEMENT & RADIATION CONTROL Facility Name Dunn Five Mile Pass Class VI landfill County Location Inspection Date 6121118 Time In Time Out f] Monitoring Evaluation tr Facility Status X Weather Conditions Sunny and hot Routine Oversight Announced n Inspection Goal X Follow up Unannounced tr Construction Review tr Facility Contact Tom Burns and Mike Dunn Participants Rob Powers and Tom Bums FOLLOW UP INSPECTION NEEDED Yes tr No ! Recommended Follow Up Date l.l Permit Review 1.3 Previous Inspection Review 1.4 Facilitv Contacts Confirmed 1.5 Facility Contacted (if announced 1.6 Local Heath Contacted (X - indicates items reviewed) PRE.INSPECTION REVIEW ln compliance X | 2.l3 Leachate Collection System NAn | 2.14 other 5. MONITORING 2. FACILITY / OPERATIONAL CONTROLS 2.3 Gate House 2.7 Fueitive Dust Control 2.8 Waste InsDection Area 2. I I Fences, Gates, Locks, Access Control 3.1 Operatins Days / Hrs. 3.2 Directions & Procedure 3.3 Emereencv Numbers 3.4 List of Unacceptable Materials 4. OPERATOR / REPRESENTATIVE / EMPLOYEES X I 4.1 On-sitewhileopen In complianceX | 4.2 Trainine Not reviewed I 4.3 Other X | 5.1 Methane NAX | 5.2 Random Inspections Not reviewed X | 5.3 Leachate NA X | 5.4 Ground Water NA | 5.5 Other SOLID WASTE FACILITY INSPECTION REPORT Date: 6/2ll18 Facility Name: Dunn Five Mile pass Class VI landfill 6. DRAINAGE/EROSION X | 6.1 WaterRun-on In compliance X | 6.2 Water Run-off In compliance LJ | 6.3 Other 9.6 Intermediate Cover 9.7 Final Cover 9.9 Deviation from Plans 9. l0 Permit. Permit Application and Rules Auailable 7.1 Special Waste 7.2 Batteries 7.3 Hazardous Waste NA 7.4 Infectious Waste 7.5 Tires In compliance 7.6 Dead Animals NA 7.7 Asbestos 7.8 Bulky Waste 7.9 Contaminated Soil NA 7.10 Ash 7.11 Sludse 7.12 Other Construction and Demolition Waste only, in cornpliance 7. PROPER STORAGE / ISOLATION / DISPOSAL 9. INSPECTION RECORDS O. MONI|ORING / SAMPLING / ANAI,YSISX I l0.l Explosive Gas Monitoring NA X | 10.2 Leachate Sampling & Treatment NA X | 10.3 Ground Warer Sampling Results NA U | 10.4 Other 1I. SPECIAL WASTE RECORDS I l.l Lab Analysis Results 1 1.2 Manifests I 1.3 Treatment Certification I 1.4 Paint Filter Test Results I 1.5 Onsite Treatment Documentation8. COVER 8.1 Dailv - Soil 8.2 Daily - Alternative 12. SPECIAL PERMIT 13. OTHER ITEMS 13.1 Notice of Inspections Form Completed and S X | 9.1 Random Inspecrion Reporr Not reviewed X | 9.2Gas Monitorine Svstem NA X | 9.3 Surface Drainase Control In compliance X I 9.4 Daily Records Not reviewed X | 9.5 Weight or Volumes Not reviewed Page 2 of 8 SOLID WASTE FACILITY INSPECTION REPORT Date; 6121118 Facility Name: Dunn Five Mile Pass Class VI landfill GENERAL COMMENTS Tom and I discussed the possible expansion cell being built to the west of the present Phase II waste cell. I explained to him that we needed a plan we could approve and put out for the 30-day public comment period prior to any construction activity and that it would be a permit modification as well. DWMRC Inspector Signature: DWMRC Inspector Name (type or print): Rob Powers Date: 6128/18 Page 3 of 8 SOLID WASTE FACILITY INSPECTION REPORT Da.e: 6/21118 Facility Name: Dunn Five Mile Pass Class VI landfill Looking north at the working face Page 4 of 8 SOLID WASTE FACILITY INSPECTION REPORT Date: 6/2lll8 Facility Name: Dunn Five Mile Pass Class VI landfill l{:i*',{. Looking northeast at the working face Page 5 of 8 SOLID WASTE FACILITY INSPECTION REPORT Date: 6/21/18 Facility Name: Dunn Five Mile Pass Class VI landfill .,,,"!,,;j .s.l -j Working face Page 6 of 8 SOLID WASTE FACILITY INSPECTION REPORT Date'. 612ll18 Facility Name: Dunn Five Mile Pass Class VI landfill Working face Page 7 of 8