Loading...
HomeMy WebLinkAboutDSHW-2018-006858 - 0901a0688087dae7SOLID WASTE FACILITY INSPECTION REPORT Date: 7/9/18 Facility Name: Wasatch Integrated Waste landfill SOLID WASTE PROGRAM FACILITY INSPBCTION REPORT CHECKLIST WASTE MAilAGEMENT & RADIATIOT{ CONTROL Facility Name Wasatch Integrated Waste landfill County Davis Location Layton, Utah Inspection Date 7l9ll8 Time In Routine Oversight X Follow uP Announced tr Unannounced Inspection Goal Time Out n Monitoring Evaluation tr Facility Status tr X Weather Conditions Sunny and warm Construction Review E Facility Contact Preston Lee and Nathan Rich Participants Rob Powers, Preston Lee and Brett Michelson FOLLOW UP INSPECTION NEEDED Yes tr No tr Recommended Follow Up Date 1.2 Annual Report Review 1.4 Facility Contacts Confirmed L5 Facility Contacted (if announced 1.6 Local Heath Contacted (X - indicates items reviewed) RATIONAL CONTROLS In complianceF-] 2.13 Leachate Collection Svstem In compliancetr| 2.14 Other 3. SIGNS REOUIRED / PROPERLY POS'I'EI) tr | 3.1 operating Days / Hrs. In complianceF | 3.2 Directions & Procedure In complianceR | 3.3 Emergency Numbers In compliance X | 3.4 List of Unacceptable Materials In compliancen | 3.5 other /EMPLOYEES F | 4.1 On-site while open In complianceX | 4.2 Training Not reviewedn | 4.3 Other Fl l 5.1Methane In comoliance X I 5.2 Random Inspections Not reviewed X | 5.3 Leachate In complianceX| 5.4 Ground Water Monitoring assessementn | 5.5 other x | 2.Il-iuer In complianceX I 2.2 Roads In compliancex| 2.3 Gate House OPerations In complianceX I 2.4 vectors In complianceX | 2.5 communications In comolianceX | 2.6 Recvclins Area In complianceX | 2.7 Fueitive Dust Control ln compliancex| 2.8 Waste Inspection Area In compliance X | 2.9 Scavensing Control NA X l2.l0openBuming NAXl | 2.1 I Fences, Gates, Locks, Access Control In complianceX| 2.12 Working Face 5. MONMORING SOLID WASTE FACILITY INSPECTION REPORT Date:7l9l18 Facility Name: Wasatch Inte-erated Waste landfill t,i'.: a: ' ; ',.,, ill' .,.tl Looking northwest at the next area that will be landfilled. Moving the waste away from the outer slopes of the landfill in hopes it will reduce the odors. 14r Page6ofll SOLID WASTE FACILI'I'Y INSPECI'ION REPORT Datc: 7lL)ll8 Facilitr' \amc: \\'asatch Intesrated \\'astc landfill P j$ii:' ' ... '- : ..(..rc\s Looking northwest at the working face PagcTofll SOLID WASTE FACILITY INSPECTION REPORT Date: 7/9/18 Facility Name: Wasatch Integrated Waste landfill r'if :\:x r:,;-i::; Stti Looking northeast at the outer slope of the phase v waste cell and waste cell. Page 8 of ll SOLID WASTE FACILITY INSPECTION REPORT Date:7/9/18 Facility Name: Wasatch Integrated Waste landfill t:iittrw.twiii!,^: ',ii,'ll i::' ;"1 ' 'i!;)iii: 1 ,,/t1f1 ry I I Looking north at the composting area Page9ofll SOLID WASTI' FACILITY INSPECTION REPORT 7 /9/18 Facilit,r Narnc: \\'asltch Inrogratcd Wastc lancllill Looking south at the largc composting winclrows on the composting pacl Page I0olII