Loading...
HomeMy WebLinkAboutDSHW-2018-005917 - 0901a0688085c8d6SOLID WASTE PROGRAM FACILITY INSPECTION REPORT CHECKLIST WA5TE MANAGEMENT & RADIATION CONTROL Facility Name Georgia Pacific Mill Site Class IIIb Landfill County Sevier Location 200 South State Srreer, Sigurd, Utah 84657 Inspection Date 6/6118 Time In Routine Oversight X Follow up ! Time Out 9:40 am Monitorine Evaluation ! Announced X Unannounced ! Weather Conditions Inspection Goal Annual Landfi ll Inspection Facility Status tr Construction Review 9:20 am tr Facility Contact Dave Jolley, GP Plant Supervisor Participants Dave Jolley, GP Pland Supervisor; Pat Sheehan and Doug Taylor, DWMRC FOLLOW UP INSPECTION NEEDED Yes n No tr Recommended Follow Up Date 1.1 Permit Review 1.2 Annual Reoort Review 1.4 Facility Contacts Confirmed 1.5 Facilitv Contacted (if announced i 1.6 Local Heath Contacted (X - indicates items reviewed)I. PRE.INSPECTION REVIEW 2. FACILITY / OPERATIONAL CONTROLS U | 2.13 LeachateCollection Svstem Ll I 2.14 Other 4. OPERATOR / REPRESENTATIVE / EMPLOYEES 5. MONITORING RED/ PROPERLY POSTED 3.2 Directions & Procedure 3.4 List of Unacceptable Materials 4.1 On-site while 2.7 Fueitive Dust Control 2.8 Waste Inspection Area 2.ll Fences, Gates, Locks, Access Control 2.12 Workine Face 5.2 Random I 5.4 Ground Water SOLID WASTE FACILITY INSPECTION REPORT Date: 6/6/18 Facility Name: Georgia Pacific Mill Site Class IIIb Landfill 6. DRAINAGE/EROSION 7. PROPER STORAGE / ISOLATION / DISPOSAL 6.1 Water Run-on 6.2 Water Run-off 9.6 Intermediate Cover 9.8 Self I 9.9 Deviation from Plans 9.10 Permit, Permit Application and Rules Available 10. MONITORING / SAMPLING / ANALYSIS RECORDS l0.l Explosive Gas Monitorin 10.2 Leachate Sampling & Treatment 10.3 Ground Water Samolins Results 7.4 Infectious Waste 7.6 Dead Animals 7.8 Bulky Waste 7.9 Contaminated Soil 7.12 Other 11. SPECIAL WASTE RECORDS I Ll Lab Analysis Results I 1.2 Manifests I L3 Treatment Certification I 1.4 Paint Filter Test Results I 1.5 Onsite Treatment Documentation 8.1 Daily - Soil 8.2 Dailv - Alternative 12. SPECIAL PERMIT 13. OTHER ITEMS l3.l Notice of Inspections Form Completed and 9. INSPECTIONRECORDS 9.3 Surface Drainase Control 9.5 Weisht or Volumes Page 2 of 9 SOLID WASTE FACILITY INSPECTION REFORT Date: 616118 Facility Name: Georgia Pacific Mill Site Class IIIb Landfill GENERALCOMMENTS DWMRC Inspector DWMRC Inspector Name (type or print):Doue Tavlor June ll.20l8 Page 3 of9 Georgia Pacific Landfill Inspection Photos June 6. 2018 East view of Pile 3 from the Office Page 4 of 9 Illilffi . ,t-._. Sor"rth view of the Off-icc fbundation and lloor of the former mill burilding l)egc -5 ol t) r w , 't6 Pile 3 workins wall Page 6 of 9 Working wall of Pile 3 Loader sifting material through the grizzly Page 7 of 9 .*t:l ."j,S ..i .alJ,^,KJ :t" .-J ;! '"{-' .ir , - ...$- j,L: o..-.. .'"_ Front end loader Pile 3 working wall Page 8 of 9 .,'.jF, .,,h.. $..$, q:: Wall of Pile 3 Page 9 of 9