Loading...
HomeMy WebLinkAboutDSHW-2018-005243 - 0901a068808406b7SIGNED: 1 Div of Waste Management and Radiation Control JUN - 8 418 2702 South 1030 West, Suite 10 Salt Lake City, Utah 84119 Ph: 801.270.9400 Fax: 801.270.9401 TRANSMITTALpst4w_ 201 8 - 0 0 5z4.3 TO: Rob Powers State of Utah Department of Environmental Quality Division of Waste Management and Radiation Control 195 North 1950 West Salt Lake City, Utah 84114 DATE: 6/8/18 IGES JOB #: 00639-005 SENT VIA: Hand Delivered We are delivering to you the following: Copies Date Description 1 6/8/18 Phase II Final Cover Documentation (Beaver County Landfill) X For approval Approved as submitted Resubmit Copies for approval For your use Approved as noted Submit Copies for distribution As requested Returned for corrections Return Corrected prints For your review and comment Other Remarks: Rob, Here is one copy of the closure documentation report for the Phase II Final Cover for the Beaver County Landfill. Update closure and post-closure care costs will be updated to reflect the Phase II Final Cover. Please contact us if you have any questions Beaver County Landfill Phase II Municipal Solid Waste (MSW) Final Cover Documentation Section 1— General Requirements The Beaver County Class I Landfill is located approximately three miles northwest of the City of Beaver in Beaver County, Utah, and serves a population of approximately 6,600 city and county residents. The landfill is owned and operated by the Beaver County Special Service District #5 (District). This report documents the third in a series of final cover installations at the Beaver County Landfill (BCL). The first closure operation was focused on the former construction and demolition (C&D) landfill area as indicated on the Figure in Appendix A. The C&D final cover construction started in June of 2010 and ran through May of 2011. The second closure construction at the BCL was completed on the northern and eastern slopes of the BCL over municipal solid waste (MSW). This closure, since it was the first closure over MSW, was called the Phase I Municipal Solid Waste Final Cover (Phase I Closure). The Figure in Appendix A shows the location of the Phase I Closure area with regard to the overall BCL boundary. The Phase I Closure was completed in 2016. The third closure construction at the BCL, and the focus of this report, was completed on the northern top of the BCL over municipal solid waste (MSW). This closure, since it was the second closure over MSW, was called the Phase II Municipal Solid Waste Final Cover (Phase II Closure). The Phase II Closure shows two closure areas based on the timing of final cover placement. This report documents the Phase II Cover construction. The Figure in Appendix A shows the location of the Phase II Closure areas with regard to the overall BCL boundary. Section 2 — Construction Quality Assurance The Phase II Closure of the Beaver County Landfill was governed by the Class I Landfill Final Cover QA/QC Plan dated May 8, 2017. The QA/QC Plan detailed the approach necessary to adequately construct and document all closure activities. Prior to the start of final cover construction, a brief site meeting was held to discuss the implementation of the quality assurance plan and potential problems with the cover construction. Rob Powers with the State of Utah Department of Environmental Quality, Division of Waste Management and Radiation Control, Mike Neilsen (Beaver County Landfill Manager) and Brett Mickelson (IGES, Inc.) were present at the preconstruction meeting. Section 3 — Documentation Construction of the Phase II Closure was conducted over an approximate 1 1/2 year period of time from mid- November of 2017 through May 18 of 2018. Due to the length of time utilized for cover construction, the construction was documented via 26 field logs (for the weeks that work was performed). Appendix B contains copies of the weekly field logs. The single most important aspect of the Phase II cover construction was the placement of the final cover soils to the prescribed depth. The depth of soil was controlled by the use of plastic pipe and metal posts with spray painted markings on them. Photographs 1 through 12 documents the landfill construction including initial surface conditions, soil placement, rough grading, final grading, and final cover extents. The photographs documenting the Phase II Closure are included as Appendix C. The description of the photographs are as follows: Photo 1 — shows the condition of the landfill prior to commencement of construction. Photo 2 — shows the grade staking of the landfill. Photo 3 — illustrates the initial placement of final cover soils. The grade posts were utilized to ensure the depth of final cover. Photo 4 — illustrates the initial placement of final cover soils. The grade posts were utilized to ensure the depth of final cover. Photo 5 — shows the placement of covers soils by truck and initial grading with dozer. Photo 6 — shows the rough grading of the final cover soils by dozer. Photo 7 — shows the thickness of final cover soils on top of the landfill. Photo 8 — shows the final cover thickness and view of west slope. Photo 9 — shows the north west view of the final cover. Photo 10 — shows the north east view of the final cover. Photo 11 — shows the north east view of the final cover. Photo 12 — is an overview of the extent of the Phase II final cover. Section 4 — Opinion Based on the review of the weekly field logs, periodic site visits, photographs of the landfill closure activities and a final field visit on May 16, 2018 it is IGES's opinion that the Phase II Closure of the Beaver County Landfill was closed in general accordance with the Class I Landfill Final Cover QA/QC Plan prepared by IGES dated May 8, 2017. APPENDIX A (Closure Drawings) OV J tOO \ 6 E 900 \ , F Class I Landfill I s Beaver County Landfill Beaver County, Utah i Project Number 00639-005 FINAL COVER AREAS 1 c)'41 •IGES Copyright IMES 2017 APPENDIX B (Weekly Field Logs) SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: ...__LUILT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 0..) 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: - 7 REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNE : SUPERVISORS L fNymbiti /54,/ WI i k-t, VISITORS (Name and Affiliation): OPERATORS: ,S7A,,A4 5,44 ;44-, Ottn. domiA."44. LABORERS: 1416,0-1,, TeAS C/A OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: 0 • 6 00 Lt.,- , 506( LaAkt-' i Pomp 11,14,4 MEETINGS: WEEKLY MEETING HELD? CES)/ NO WORK DEFICIENCY MEETING HELD? YES / WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEKENT:i Comments: MGL,a 6,1e464, si-4,fr...C,5 cA"et.e. it- fArea where work is being performed .11-Z q " - /41)4;" Aktell 5 oL)ft, A.1- poifoo placd1, 5bcir _co; /-D ? " lit cc) COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: 7/Z4,,j REPORT DATE: i I REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: ZIE2a, LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 60 70 80 90 100 H.HIGH L=LOW PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): i 1 SUPERVISORS: NI NCI (Se INI VISITORS (Name and Affiliation): OPERATORS: Z--u ct Som:t 4-1-. -"+- alr( Tt/A$.-t" LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: sqt-i k TO - Dumf -hrock - Gevieiv- MEETINGS: WEEKLY MEETING HELD? WORK DEFICIENCY MEETING HELD? cEg / NO YES /e WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: D o LAsiO 01 54-6 tkp ta 5 v+ -0'1 0 004" polow) 0C ovv-c +0 -L.L4 u G rodd siwoulk - Arpov.. 300' oiv‘PIA-1-t- Area where work is being performed COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: OLE4 PARTLY CLOUDY CLOUDY WIND: LIG MODERATE HIGH VISITORS (Name and Affiliation): OWNER PERSONNEL (Ntii0er): SUPERVISORS: ii..4, Ned OPERATORS: '--)1A--Ci 5-"et ; IN st— 144,,v6 DR,,evr-evi LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: 5,14 k Dvey REPORT DATE: / 7 REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PRECIPITATION: C•TE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 50 60 70 80 90 100 H=HIGH L=LOW PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT Comments: p kivo 444. 51; Is 1-0 ht qrseAc 01,N. hAst. cicts-vivt. Area where work is being performed COVER DEPTH 1 ESTING: Area where work is being performed Comments; LANDFILL MANAGER'S SIGNATURE: 7441 SUN: .CLE1.1.. PARTLY CLOUDY CLOUDY WIND: -LI. 1-CLIZ. MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 q2D 40 50 60 70 80 90 100 H=HIGH L=LOW WEEKLY MEETING HELD? WORK DEFICIENCY MEETING HELD? MEETINGS: OWNER PERSONNEL (Mirabelli SUPERVISORS: C5—(")-‘4_ iov:i 4111 OPERATORS: 110-tileC, 0-61(4,1 LABORERS: OTHERS: EQUIPMENT (List): 5' EARTHMOVING/LINING/MISC. EQUIPMENT: D 14 I- umf-/ eta: VISITORS (Name and Affiliation): SOIL PLACEMENT: , Comments: p /14/..4ry 5d1 ;IJ 4:9 n do ,Acylet poli4 g diASt 7:r Area where work is being performed COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: 741-Y REPORT DATE: a:t". I REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: WORK ACTIVITIES (If work is or has been perforrned during the week, describe the area of work): SUN: CLEAR PARTLY CLOUDY WIND: LIGHT MODERATE HIG PRECIPITAT ON: NONE LT. RAIN/SNOW MED. RAIN/SNO HEAVY RA N/SNOW TEMPERATURE (Deg. F): (ZED H=HIGH L=LOW 30 40 50 60 70 80 90 100 VISITORS (Name and Affiliation): OWNER PERSONNEL (Nrber4 ,1 SUPERVISORS: OPERATORS: Mi LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: O OD +- G cy,t SOIL PLACEMENT: Comments: ,D +t 4U D-cpt-k Area where work is being performed I4Ð )4L tince hgtst:1 REPORT DATE: I REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? WORK DEFICIENCY MEETING HELD? YES / YES / tap, WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: 7/14'i ka-/ SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW VISITORS (Name and Affiliation): OWNER PERSONNEL (Number): SUPERVISORS: OPERATORS: LA.BORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: REPORT DATE: i - 19 - I -7 REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: (A) Area where work is being performed COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: )4411 //ALL' SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: 1 - - REPORT #: 7 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: 1/47/141 SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAW/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: (3. REPORT #: BEAVER COUNTY LANDHLL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: 0 Work COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: -744,1 SUN: CLEAR (PARTO.15M7D CLOUDY - PRECIP ATION: C.N22.IIE_ LT. RAIN/SNOW IND: LIGHT MODERAT HIGH MED. RAIN/SNOW HEAVY RA /SNOW TEMPERATURE (Deg. F): H=HIGH L=LOW 20 Orr) 40 50 60 70 80 90 100 REPORT DATE: I - REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Nupber): 1 SUPERVISORS: 1 VISITORS (Name and Affiliation): OPERATORS: 1---..,t,,A s:,.;, 1--1,,, -4— 04.01/44(, 3eir4t„,") LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: 5 9 LH< LiAki.,/ 1- Dti.AAf truck MEETINGS: WEEKLY MEETING HELD? NO WORK DEFICIENCY MEETING HELD? YES / WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: n bt, Lo&tS 0ç' SD; zJ4" WirN Area where work is being performed NI 0 AL pi.v..st, COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR _PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: 44010 LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW 1EMPERATURE (Deg. F): 20 30 4)1 50 60 70 80 90 100 H=HIGH L=LOW SOIL PLACEMENT: Comments: p cyc. 50 5 CL(AL • +k to(Ach b-t, rad -to " Area where work is being performed 0P rr COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: Via REPORT DATE: I . 3 REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): i / SUPERVISORS: 6.4 i\LA 4 I-014 VISITORS (Name and Affiliation): OPERATORS: 7, cm i 144 LABORERS: MIA A,t _ TraVIS.f./1 OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: sqqk 6.Cv.A.L.- MEETINGS: WEEKLY MEETING HELD? YES WORK DEFICIENCY MEETING HELD? YES /0 WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW -7 TEMPERATURE (Deg. F): 20 30 6413)- 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: ls lc/ REPORT #: 11 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Nunalper): SUPERVISORS: J ov-t.11 SL/1 iil-N VISITORS (Name and Affiliation): OPERATORS: Mot I-L. J LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: 51/1 lic Loa-- v- j71.6,7/9-tv'uck MEETINGS: WEEKLY MEETING HELD? ACP NO WORK DEFICIENCY MEETING HELD? YES / WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: n / ylacIn -A) ci4r/tN (vas de , 1-0 If/ 11 t Area where work is being performed emi 0-P ,heA COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: Yli4j SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: REPORT DATE: 2_ - 9 - i REPORT #: / 2— BEAVER COUNTY LANDHLL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: Area where work is being performed D WorL, COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: -04,z40. SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW SOIL PLACEMENT: Comments: Area where work is being perforrned K.0 We-r1<- COVER DEPTH TESTING: Comments: Area where work is being performed LANDFILL MANAGER'S SIGNATURE: 744,41 1//A1 REPORT DATE: REPORT #: 3 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: 2 REPORT #: 11 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: • • OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: NI COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: 14/Li SUN: CLEAR PA. 1.1: Y CLOUDY CLOUDY WIND: LIGHT M01.__L_)El1.2A HIGH PRECIPITATION: (No-I\-1) LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): H=HIGH L=LOW 20 30 qeS 50 60 70 80 90 100 REPORT DATE: 3 REPORT #: IS BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: iN\ ‘ to, ILI I sit-A VISITORS (Name and Affiliation): OPERATORS: St.-4-(1 sAft.tAN LABORERS: VAufl, SC ,v-4.1.-• OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: nuw,r l'y-v Lit( 44 4 k. (PIA/. MEETINGS: WEEKLY MEETING HELD? NO WORK DEFICIENCY MEETING HELD? YES / WORK ACTIVITIES (If work is or has been perforrned during the week, describe the area of work): SOIL PLACEMENT: Comments: <i4kci 11 515 +0 ko 1,4 44, Area where work is being performed 0 01.5,-01 c‘A, \ 5.40k, Icp ',Li so 05.5 1 1- 45-t •, ± COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT —Ad Elf21ATE HIGH PRECIPITATION: Ma LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 61 60 70 80 90 100 H=HIGH L=LOW VISITORS (Name and Affiliation): OWNER PERSONNEL (Num ,ter): , SUPERVISORS: OPERATORS: LABORERS: VV1, -7:1-tANS-a" OTHERS: EQUIPMENT (List): EARTHMOVINGILINING/MISC EQUIPMENT: 0 ‘) f k k.A.PAS-Y- - tt fold REPORT DATE: 3- °I - REPORT #: to BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? WORK DEFICIENCY MEETING HELD? YES /CR) YES /) WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: 0 ev_p jc to cAsLs .6ks >lax. cio/A.A. Area where work is being performed ou40,- kb f4441, ov-‘6S tb Grclo, COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPUATION: NONE LT. RAIN/SNOW MED. RA1N/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: 3 - 1 to ' 1V REPORT #: l 1 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: NI 0 budyk COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: MI SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 L=LOW VISITORS (Name and Affiliation): OWNER PERSONNEL (Number): SUPERVISORS: OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: REPORT DATE: •3 - 2-3 • l REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: Area where work is being performed COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100 H=HIGH L=LOW REPORT DATE: 3 - 3 0 - REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Nurnber): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: 4ei t),Ja/1( COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR PARTLY CLOUDY .C,Latlay WIND: LIGHT MODERATE HIGH PRECIPITATION: LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 CO 70 80 90 100 H=HIGH L=LOW VISITORS (Name and Affiliation): OWNER PERSONNEL (Nur9ber): SUPERVISORS: SPA li \141P-", OPERATORS: kV\ -4- DA Gt.Art/ LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: Ç 44L4 k. LciAL../ OUv p SOIL PLACEMENT: Comments: p.5.-‘„:‘," p J‘Ifv• p :rwy - t.P:15 4,0 (kiv, 1t-Ft XU: cAr-c. Area where work is being performed 4-0•1/4.4) Ot,5 P‘S- SINt W vs. O COVER DEPTH TESTING: Area where work is being performed Comments: REPORT DATE: LI' to ) REPORT #: - BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? C!&/ NO WORK DEFICIENCY MEETING HELD? YES / WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): LANDFILL MANAGER'S SIGNATURE: 1441 WIND: LIGHT MODERATE PRECIPITATION: I:(1 LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW IEMPERATURE (Deg. F): 20 30 40 60 70 80 90 100 H=HIGH L=LOW WEATHER COND I TONSL SUN: CLEAR ARTLY CLOUpy CLOUDY VISITORS (Name and Affiliation): OWNER PERSONNEL (Number): SUPERVISORS: OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: REPORT DATE: REPORT #: I BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: 140 Wo•Ck 1 \ jk noeS Area where work is being performed COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR 66i-RTLY CLOUD). CLOUDY WIND: MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 S, 80 90 100 H=HIGH L=LOW REPORT DATE: I <3 REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number)i i i SUPERVISORS: (A/1. l L. f\ttA ktml VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: D — (.7 00V MEETINGS: WEEKLY MEETING HELD? YES /Ca WORK DEFICIENCY MEETING HELD? YES WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: Itsaq go:,U p o-CC 1,0 rt.4\1 pus, GIN:I. Area where work is being performed c14,, COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: '.ÇJEÆ PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 4r:3 70 80 90 100 H=HIGH L=LOW REPORT DATE: REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES / WORK DEFICIENCY MEETING HELD? YES /Ty WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: Area where work is being performed COVER DEPTH TESTING: Area where work is being perforrned Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR (15Z-12-TLY_CI-7,017517) CLOUDY WIND: CLQ..6 MODERATE HIGH PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 (61)) 70 80 90 100 H=HIGH L=LOW OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: SOIL PLACEMENT: Comments: Area where work is being performed W6N- COVER DEPTH TESTING: Comments: Area where work is being performed REPORT DATE: 5 - t4- REPORT #: 2..14 BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? YES / NO WORK DEFICIENCY MEETING HELD? YES / NO WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): LANDFILL MANAGER'S SIGNATURE: 7/14--4 11 SUN: CLEAR (PREM--7---. CL-6173, CLOUDY WIND: <LIGK) MODERATE HIGH REPORT DATE: REPORT #: BEAVER COUNTY LANDFILL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PRECIPITATION: NONE LT. RAIN/SNO MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 60 80 90 100 H=HIGH L=LOW PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: OWNER PERSONNEL (Number): SUPERVISORS: VISITORS (Name and Affiliation): OPERATORS: LABORERS: OTHERS: EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: MEETINGS: WEEKLY MEETING HELD? YES WORK DEFICIENCY MEETING HELD? YES WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Area where work is being performed Comments: NID 4)1( ic COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: SUN: CLEAR P ARTLY.....c.LOUDY CLOUDY WIND: LIGHT MODERATE HIGH PRECIPITATION: IlaItE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW TEMPERATURE (Deg. F): 20 30 40 50 0 80 90 100 H=HIGH L=LOW OWNER PERSONNEL (Number): SUPERVISORS: \Mt SLAII-4014-OPERATORS: LABORERS: OTHERS: VISITORS (Name and Affiliation): EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: G REPORT DATE: 5 - REPORT #: 2./6 BEAVER COUNTY LANDHLL WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION WEATHER CONDITIONS: PERSONNEL, EQUIPMENT, AND VISITORS ON SITE: MEETINGS: WEEKLY MEETING HELD? WORK DEFICIENCY MEETING HELD? YES Ao YES /OP WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work): SOIL PLACEMENT: Comments: I I(1.1. ptig-LS us-t4 4-0 5.0,NotAL ov-t- 4 Area where work is being performed COVER DEPTH TESTING: Area where work is being performed Comments: LANDFILL MANAGER'S SIGNATURE: -ma APPENDIX C (Photographs) Photo 1 Photo 3 Photo 5 Photo 7 Photo 8 Photo 9 Photo 10 .....••••••••••".."" , , . .61.1k; , e7_ , + .„ , , • , • Photo 11 Photo 12