HomeMy WebLinkAboutDSHW-2018-005243 - 0901a068808406b7SIGNED:
1 Div of Waste Management
and Radiation Control
JUN - 8 418 2702 South 1030 West, Suite 10
Salt Lake City, Utah 84119
Ph: 801.270.9400 Fax: 801.270.9401
TRANSMITTALpst4w_ 201 8 - 0 0 5z4.3
TO: Rob Powers
State of Utah
Department of Environmental Quality
Division of Waste Management and Radiation Control
195 North 1950 West
Salt Lake City, Utah 84114
DATE: 6/8/18
IGES JOB #: 00639-005
SENT VIA: Hand Delivered
We are delivering to you the following:
Copies Date Description
1 6/8/18 Phase II Final Cover Documentation (Beaver County Landfill)
X For approval Approved as
submitted
Resubmit Copies for approval
For your use Approved as noted Submit Copies for
distribution
As requested Returned for
corrections
Return Corrected prints
For your review and
comment
Other
Remarks:
Rob,
Here is one copy of the closure documentation report for the Phase II Final Cover for the Beaver County
Landfill. Update closure and post-closure care costs will be updated to reflect the Phase II Final Cover.
Please contact us if you have any questions
Beaver County Landfill
Phase II Municipal Solid Waste (MSW)
Final Cover Documentation
Section 1— General Requirements
The Beaver County Class I Landfill is located approximately three miles northwest of the City of Beaver in
Beaver County, Utah, and serves a population of approximately 6,600 city and county residents. The landfill is
owned and operated by the Beaver County Special Service District #5 (District).
This report documents the third in a series of final cover installations at the Beaver County Landfill (BCL). The
first closure operation was focused on the former construction and demolition (C&D) landfill area as indicated
on the Figure in Appendix A. The C&D final cover construction started in June of 2010 and ran through May of
2011. The second closure construction at the BCL was completed on the northern and eastern slopes of the
BCL over municipal solid waste (MSW). This closure, since it was the first closure over MSW, was called the
Phase I Municipal Solid Waste Final Cover (Phase I Closure). The Figure in Appendix A shows the location of
the Phase I Closure area with regard to the overall BCL boundary. The Phase I Closure was completed in 2016.
The third closure construction at the BCL, and the focus of this report, was completed on the northern top of
the BCL over municipal solid waste (MSW). This closure, since it was the second closure over MSW, was called
the Phase II Municipal Solid Waste Final Cover (Phase II Closure). The Phase II Closure shows two closure areas
based on the timing of final cover placement. This report documents the Phase II Cover construction. The
Figure in Appendix A shows the location of the Phase II Closure areas with regard to the overall BCL boundary.
Section 2 — Construction Quality Assurance
The Phase II Closure of the Beaver County Landfill was governed by the Class I Landfill Final Cover QA/QC Plan
dated May 8, 2017. The QA/QC Plan detailed the approach necessary to adequately construct and document
all closure activities.
Prior to the start of final cover construction, a brief site meeting was held to discuss the implementation of
the quality assurance plan and potential problems with the cover construction. Rob Powers with the State of
Utah Department of Environmental Quality, Division of Waste Management and Radiation Control, Mike
Neilsen (Beaver County Landfill Manager) and Brett Mickelson (IGES, Inc.) were present at the preconstruction
meeting.
Section 3 — Documentation
Construction of the Phase II Closure was conducted over an approximate 1 1/2 year period of time from mid-
November of 2017 through May 18 of 2018. Due to the length of time utilized for cover construction, the
construction was documented via 26 field logs (for the weeks that work was performed). Appendix B contains
copies of the weekly field logs.
The single most important aspect of the Phase II cover construction was the placement of the final cover soils
to the prescribed depth. The depth of soil was controlled by the use of plastic pipe and metal posts with spray
painted markings on them. Photographs 1 through 12 documents the landfill construction including initial
surface conditions, soil placement, rough grading, final grading, and final cover extents. The photographs
documenting the Phase II Closure are included as Appendix C. The description of the photographs are as
follows:
Photo 1 — shows the condition of the landfill prior to commencement of construction.
Photo 2 — shows the grade staking of the landfill.
Photo 3 — illustrates the initial placement of final cover soils. The grade posts were utilized to ensure
the depth of final cover.
Photo 4 — illustrates the initial placement of final cover soils. The grade posts were utilized to ensure
the depth of final cover.
Photo 5 — shows the placement of covers soils by truck and initial grading with dozer.
Photo 6 — shows the rough grading of the final cover soils by dozer.
Photo 7 — shows the thickness of final cover soils on top of the landfill.
Photo 8 — shows the final cover thickness and view of west slope.
Photo 9 — shows the north west view of the final cover.
Photo 10 — shows the north east view of the final cover.
Photo 11 — shows the north east view of the final cover.
Photo 12 — is an overview of the extent of the Phase II final cover.
Section 4 — Opinion
Based on the review of the weekly field logs, periodic site visits, photographs of the landfill closure activities
and a final field visit on May 16, 2018 it is IGES's opinion that the Phase II Closure of the Beaver County Landfill
was closed in general accordance with the Class I Landfill Final Cover QA/QC Plan prepared by IGES dated May
8, 2017.
APPENDIX A
(Closure Drawings)
OV
J
tOO
\
6
E
900
\
,
F Class I Landfill
I
s
Beaver County Landfill Beaver County, Utah i
Project Number 00639-005 FINAL COVER AREAS 1
c)'41 •IGES
Copyright IMES 2017
APPENDIX B
(Weekly Field Logs)
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: ...__LUILT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 0..) 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: - 7 REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNE
: SUPERVISORS
L fNymbiti /54,/
WI i k-t,
VISITORS (Name and Affiliation):
OPERATORS: ,S7A,,A4 5,44 ;44-, Ottn. domiA."44.
LABORERS: 1416,0-1,, TeAS C/A
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: 0 • 6 00 Lt.,- , 506( LaAkt-' i Pomp 11,14,4
MEETINGS:
WEEKLY MEETING HELD? CES)/ NO
WORK DEFICIENCY MEETING HELD? YES /
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEKENT:i Comments: MGL,a 6,1e464, si-4,fr...C,5 cA"et.e. it- fArea where work is being performed
.11-Z q " - /41)4;" Aktell 5 oL)ft, A.1- poifoo
placd1, 5bcir _co; /-D ?
" lit
cc)
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: 7/Z4,,j
REPORT DATE: i I REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: ZIE2a, LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 60 70 80 90 100
H.HIGH L=LOW
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number): i 1
SUPERVISORS: NI NCI (Se INI
VISITORS (Name and Affiliation):
OPERATORS: Z--u ct Som:t 4-1-. -"+- alr( Tt/A$.-t"
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: sqt-i k TO - Dumf -hrock - Gevieiv-
MEETINGS:
WEEKLY MEETING HELD?
WORK DEFICIENCY MEETING HELD?
cEg / NO
YES /e
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: D o LAsiO 01 54-6 tkp ta 5
v+
-0'1
0 004" polow) 0C ovv-c
+0 -L.L4 u G rodd siwoulk -
Arpov.. 300' oiv‘PIA-1-t-
Area where work is being performed
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: OLE4 PARTLY CLOUDY CLOUDY WIND: LIG MODERATE HIGH
VISITORS (Name and Affiliation): OWNER PERSONNEL (Ntii0er):
SUPERVISORS: ii..4, Ned
OPERATORS: '--)1A--Ci 5-"et ; IN st— 144,,v6 DR,,evr-evi
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: 5,14 k Dvey
REPORT DATE: / 7 REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PRECIPITATION: C•TE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 50 60 70 80 90 100
H=HIGH L=LOW
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT
Comments: p kivo 444. 51; Is 1-0 ht qrseAc
01,N.
hAst. cicts-vivt.
Area where work is being performed
COVER DEPTH 1 ESTING: Area where work is being performed
Comments;
LANDFILL MANAGER'S SIGNATURE: 7441
SUN: .CLE1.1.. PARTLY CLOUDY CLOUDY WIND: -LI. 1-CLIZ. MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 q2D 40 50 60 70 80 90 100
H=HIGH L=LOW
WEEKLY MEETING HELD?
WORK DEFICIENCY MEETING HELD?
MEETINGS:
OWNER PERSONNEL (Mirabelli
SUPERVISORS: C5—(")-‘4_ iov:i 4111
OPERATORS: 110-tileC, 0-61(4,1
LABORERS:
OTHERS:
EQUIPMENT (List): 5' EARTHMOVING/LINING/MISC. EQUIPMENT: D 14 I- umf-/ eta:
VISITORS (Name and Affiliation):
SOIL PLACEMENT: , Comments: p /14/..4ry 5d1 ;IJ 4:9 n do ,Acylet
poli4 g diASt 7:r
Area where work is being performed
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: 741-Y
REPORT DATE: a:t". I REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
WORK ACTIVITIES (If work is or has been perforrned during the week, describe the area of work):
SUN: CLEAR PARTLY CLOUDY WIND: LIGHT MODERATE HIG
PRECIPITAT ON: NONE LT. RAIN/SNOW MED. RAIN/SNO HEAVY RA N/SNOW
TEMPERATURE (Deg. F): (ZED
H=HIGH L=LOW
30 40 50 60 70 80 90 100
VISITORS (Name and Affiliation): OWNER PERSONNEL (Nrber4
,1 SUPERVISORS:
OPERATORS: Mi
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: O OD +- G cy,t
SOIL PLACEMENT:
Comments: ,D
+t 4U D-cpt-k
Area where work is being performed
I4Ð )4L tince
hgtst:1
REPORT DATE: I REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD?
WORK DEFICIENCY MEETING HELD?
YES /
YES /
tap,
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: 7/14'i ka-/
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
VISITORS (Name and Affiliation): OWNER PERSONNEL (Number):
SUPERVISORS:
OPERATORS:
LA.BORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
REPORT DATE: i - 19 - I -7 REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT:
Comments:
(A)
Area where work is being performed
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: )4411 //ALL'
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: 1 - - REPORT #: 7
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed
Comments:
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: 1/47/141
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAW/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: (3. REPORT #:
BEAVER COUNTY LANDHLL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed
Comments: 0 Work
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: -744,1
SUN: CLEAR (PARTO.15M7D CLOUDY -
PRECIP ATION: C.N22.IIE_ LT. RAIN/SNOW
IND: LIGHT MODERAT HIGH
MED. RAIN/SNOW HEAVY RA /SNOW
TEMPERATURE (Deg. F):
H=HIGH L=LOW
20 Orr) 40 50 60 70 80 90 100
REPORT DATE: I - REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Nupber): 1
SUPERVISORS:
1 VISITORS (Name and Affiliation):
OPERATORS: 1---..,t,,A s:,.;, 1--1,,, -4— 04.01/44(, 3eir4t„,")
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: 5 9 LH< LiAki.,/ 1- Dti.AAf truck
MEETINGS:
WEEKLY MEETING HELD? NO
WORK DEFICIENCY MEETING HELD? YES /
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: n
bt,
Lo&tS 0ç' SD;
zJ4" WirN
Area where work is being performed
NI 0 AL
pi.v..st,
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR _PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: 44010 LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
1EMPERATURE (Deg. F): 20 30 4)1 50 60 70 80 90 100
H=HIGH L=LOW
SOIL PLACEMENT: Comments: p
cyc. 50 5
CL(AL •
+k to(Ach b-t, rad -to "
Area where work is being performed
0P rr
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: Via
REPORT DATE: I . 3 REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number): i /
SUPERVISORS: 6.4 i\LA 4 I-014
VISITORS (Name and Affiliation):
OPERATORS: 7, cm i 144
LABORERS: MIA A,t _ TraVIS.f./1
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: sqqk 6.Cv.A.L.-
MEETINGS:
WEEKLY MEETING HELD? YES WORK DEFICIENCY MEETING HELD? YES /0
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW -7
TEMPERATURE (Deg. F): 20 30 6413)- 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: ls lc/ REPORT #: 11
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Nunalper):
SUPERVISORS: J ov-t.11 SL/1 iil-N
VISITORS (Name and Affiliation):
OPERATORS: Mot I-L. J
LABORERS:
OTHERS:
EQUIPMENT (List): EARTHMOVING/LINING/MISC. EQUIPMENT: 51/1 lic Loa-- v- j71.6,7/9-tv'uck
MEETINGS:
WEEKLY MEETING HELD? ACP NO
WORK DEFICIENCY MEETING HELD? YES /
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: n / ylacIn
-A)
ci4r/tN
(vas de
, 1-0 If/ 11 t
Area where work is being performed
emi 0-P
,heA
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: Yli4j
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
REPORT DATE: 2_ - 9 - i REPORT #: / 2—
BEAVER COUNTY LANDHLL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: Area where work is being performed
D WorL,
COVER DEPTH TESTING: Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: -04,z40.
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
SOIL PLACEMENT:
Comments:
Area where work is being perforrned
K.0 We-r1<-
COVER DEPTH TESTING:
Comments:
Area where work is being performed
LANDFILL MANAGER'S SIGNATURE: 744,41 1//A1
REPORT DATE: REPORT #: 3
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: 2 REPORT #: 11
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS: • •
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed
Comments:
NI
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: 14/Li
SUN: CLEAR PA. 1.1: Y CLOUDY CLOUDY WIND: LIGHT M01.__L_)El1.2A HIGH
PRECIPITATION: (No-I\-1) LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F):
H=HIGH L=LOW
20 30 qeS 50 60 70 80 90 100
REPORT DATE: 3 REPORT #: IS
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS: iN\ ‘ to, ILI I sit-A
VISITORS (Name and Affiliation):
OPERATORS: St.-4-(1 sAft.tAN
LABORERS: VAufl, SC ,v-4.1.-•
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: nuw,r l'y-v Lit( 44 4 k. (PIA/.
MEETINGS:
WEEKLY MEETING HELD? NO
WORK DEFICIENCY MEETING HELD? YES /
WORK ACTIVITIES (If work is or has been perforrned during the week, describe the area of work):
SOIL PLACEMENT:
Comments: <i4kci 11 515 +0
ko 1,4 44,
Area where work is being performed 0 01.5,-01 c‘A, \ 5.40k, Icp ',Li so
05.5 1 1- 45-t •, ±
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT —Ad Elf21ATE HIGH
PRECIPITATION: Ma LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 61 60 70 80 90 100
H=HIGH L=LOW
VISITORS (Name and Affiliation): OWNER PERSONNEL (Num ,ter): ,
SUPERVISORS:
OPERATORS:
LABORERS: VV1, -7:1-tANS-a" OTHERS:
EQUIPMENT (List):
EARTHMOVINGILINING/MISC EQUIPMENT: 0 ‘) f k k.A.PAS-Y- - tt fold
REPORT DATE: 3- °I - REPORT #: to
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD?
WORK DEFICIENCY MEETING HELD?
YES /CR)
YES /)
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: 0 ev_p jc to cAsLs
.6ks >lax. cio/A.A.
Area where work is being performed
ou40,-
kb f4441, ov-‘6S
tb Grclo,
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPUATION: NONE LT. RAIN/SNOW MED. RA1N/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: 3 - 1 to ' 1V REPORT #: l 1
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed
Comments:
NI 0 budyk
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: MI
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
L=LOW
VISITORS (Name and Affiliation): OWNER PERSONNEL (Number):
SUPERVISORS:
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
REPORT DATE: •3 - 2-3 • l REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT:
Comments:
Area where work is being performed
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 70 80 90 100
H=HIGH L=LOW
REPORT DATE: 3 - 3 0 - REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Nurnber):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed
Comments:
4ei t),Ja/1(
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR PARTLY CLOUDY .C,Latlay WIND: LIGHT MODERATE HIGH
PRECIPITATION: LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 CO 70 80 90 100
H=HIGH L=LOW
VISITORS (Name and Affiliation): OWNER PERSONNEL (Nur9ber):
SUPERVISORS: SPA li \141P-",
OPERATORS: kV\ -4- DA Gt.Art/
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: Ç 44L4 k. LciAL../ OUv p
SOIL PLACEMENT:
Comments: p.5.-‘„:‘," p J‘Ifv• p :rwy
- t.P:15 4,0
(kiv, 1t-Ft
XU: cAr-c.
Area where work is being performed
4-0•1/4.4) Ot,5 P‘S- SINt W vs. O
COVER DEPTH TESTING: Area where work is being performed Comments:
REPORT DATE: LI' to ) REPORT #: -
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? C!&/ NO
WORK DEFICIENCY MEETING HELD? YES /
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
LANDFILL MANAGER'S SIGNATURE: 1441
WIND: LIGHT MODERATE
PRECIPITATION: I:(1 LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
IEMPERATURE (Deg. F): 20 30 40 60 70 80 90 100
H=HIGH L=LOW
WEATHER COND
I
TONSL
SUN: CLEAR ARTLY CLOUpy CLOUDY
VISITORS (Name and Affiliation): OWNER PERSONNEL (Number):
SUPERVISORS:
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
REPORT DATE: REPORT #: I
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: 140 Wo•Ck
1 \ jk noeS
Area where work is being performed
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR 66i-RTLY CLOUD). CLOUDY WIND: MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 S, 80 90 100
H=HIGH L=LOW
REPORT DATE: I <3 REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number)i i i
SUPERVISORS: (A/1. l L. f\ttA ktml
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: D — (.7 00V
MEETINGS:
WEEKLY MEETING HELD? YES /Ca
WORK DEFICIENCY MEETING HELD? YES
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT:
Comments: Itsaq go:,U p
o-CC 1,0
rt.4\1 pus, GIN:I.
Area where work is being performed
c14,,
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: '.ÇJEÆ PARTLY CLOUDY CLOUDY WIND: LIGHT MODERATE
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 4r:3 70 80 90 100
H=HIGH L=LOW
REPORT DATE: REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES /
WORK DEFICIENCY MEETING HELD? YES /Ty
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Comments: Area where work is being performed
COVER DEPTH TESTING: Area where work is being perforrned
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR (15Z-12-TLY_CI-7,017517) CLOUDY WIND: CLQ..6 MODERATE HIGH
PRECIPITATION: NONE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 (61)) 70 80 90 100
H=HIGH L=LOW
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
SOIL PLACEMENT:
Comments:
Area where work is being performed
W6N-
COVER DEPTH TESTING:
Comments:
Area where work is being performed
REPORT DATE: 5 - t4- REPORT #: 2..14
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD? YES / NO
WORK DEFICIENCY MEETING HELD? YES / NO
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
LANDFILL MANAGER'S SIGNATURE: 7/14--4 11
SUN: CLEAR (PREM--7---. CL-6173, CLOUDY WIND: <LIGK) MODERATE HIGH
REPORT DATE: REPORT #:
BEAVER COUNTY LANDFILL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PRECIPITATION: NONE LT. RAIN/SNO MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 60 80 90 100
H=HIGH L=LOW
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
OWNER PERSONNEL (Number):
SUPERVISORS:
VISITORS (Name and Affiliation):
OPERATORS:
LABORERS:
OTHERS:
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT:
MEETINGS:
WEEKLY MEETING HELD? YES
WORK DEFICIENCY MEETING HELD? YES
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT: Area where work is being performed Comments:
NID 4)1( ic
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE:
SUN: CLEAR P ARTLY.....c.LOUDY CLOUDY WIND: LIGHT MODERATE HIGH
PRECIPITATION: IlaItE LT. RAIN/SNOW MED. RAIN/SNOW HEAVY RAIN/SNOW
TEMPERATURE (Deg. F): 20 30 40 50 0 80 90 100
H=HIGH L=LOW
OWNER PERSONNEL (Number):
SUPERVISORS: \Mt SLAII-4014-OPERATORS:
LABORERS:
OTHERS:
VISITORS (Name and Affiliation):
EQUIPMENT (List):
EARTHMOVING/LINING/MISC. EQUIPMENT: G
REPORT DATE: 5 - REPORT #: 2./6
BEAVER COUNTY LANDHLL
WEEKLY FIELD LOG - FINAL C&D COVER CONSTRUCTION
WEATHER CONDITIONS:
PERSONNEL, EQUIPMENT, AND VISITORS ON SITE:
MEETINGS:
WEEKLY MEETING HELD?
WORK DEFICIENCY MEETING HELD?
YES Ao
YES /OP
WORK ACTIVITIES (If work is or has been performed during the week, describe the area of work):
SOIL PLACEMENT:
Comments: I I(1.1. ptig-LS
us-t4 4-0 5.0,NotAL ov-t-
4
Area where work is being performed
COVER DEPTH TESTING: Area where work is being performed
Comments:
LANDFILL MANAGER'S SIGNATURE: -ma
APPENDIX C
(Photographs)
Photo 1
Photo 3
Photo 5
Photo 7 Photo 8
Photo 9 Photo 10
.....••••••••••"..""
,
, .
.61.1k;
,
e7_ ,
+
.„ , , •
, •
Photo 11
Photo 12