HomeMy WebLinkAboutDSHW-2018-005182 - 0901a0688083e870SOLID WASTB PROGRAM
FACILITY INSPECTION REPORT CHECKLIST
WASTE MANAGEMENT
& RAOIATION CONTROL
Facility Name Salt Lake Valley Solid Waste Management Facility - Compost
Location 6030 West Califomia Avenue
County Salt lake
Inspection Date O5l23ll8 Time In
Routine Oversight X Follow up f
Time Out 1230
Monitoring Evaluation tr Facility Status n Construction Review
I 045
tr
Announced X Unannounced n Weather Conditions Clear, Sunny, 75F
Inspection Goal Annual inspection of a solid waste facility
Facility Contact Ashley Yodder
Participants Ashley Yodder, Leon Ford, Tom Bumrp, Roy Van Os, pat Sheehan
FOLLOW UP INSPECTION NEEDED Yes tr No X Recommended Follow Up Date
1. PRE-INSPECTION REYIEW
X | 1.1 Permit Review
The Plan of Operation is incorporated in the SLVSWMF operating
permit. The recommendation was to update the Plan of Operation
into a stand alone document and update the document for the
current operating conditions
X | 1.2 Annual Report Review
The Annual Report was reivewed
X | 1.3 Previous Inspection Review
na
X | 1.4 Facility Conracts Confirmed
Ashee is the contact
X | 1.5 Facility Contacted (ifannounced inspection)
This inspection was announced.
X | 1.6 Local Heath Contacted
The local health department was informed. They did not
participate in this inspection
U | 1.7 Other
(X - indicates items reviewed)
2. FACILITY/ OPERATIONAL CONTROLS
na
X | 2.1 | Fences. Gates, Locks, Access Control
Thre are two areas used for composting. The public drop-off
occurs within the landfill. Grinding opeations take place within this
area. The access to this area is controlled. Also, composting is
performed on the west end of the landfill where Module 8 will
eventualy be. This area is surrounded by fencing for access control.X | 2.12 Workine Face
na
X | 2. l3 Leachate Collection System
Leachate (run-off control) from the actual composting is collected
from the asphalt pad.
Ll | 2.14 Other
X | 2.1Litter
There was no litter near the composting operationX | 2.2 Roads
The roads and the pad were well maintained
X | 2.3 Gate House Operations
The facility has a sate houseX | 2.4 Vectors
No vectors in the composting area was observed
X | 2.5 Communications
All personnel have radios or cell ohones
X | 2.6 Recycling Area
na
X | 2.7 Fueitive Dust Control
The compost is watered to encourage the bioloeical desradation
X | 2.8 Waste InsDection Area
na
X | 2.9 Scavenging Control
na
X | 2.10 Open Bumine
J. SIGNS ruJQUIRI,D / PROPERLY POSTED
X | 3. I Operating Days / Hrs.
Same as the landfill
X | 3.2 Directions & Procedure
Customers are directed to the finished comDost
X | 3.3 Emergency Numbers
Same as the landfill
X | 3.4 List of Unacceptable Materials
Inappropriate materials are removed from the material before
shreddins.
U | 3.5 Other
4. OPERATOR / REPRESENTATIVE / EMPLOYEES
X | 4. I On-site while open
On site operations are monitored bv a comoostins exoertX | 4.2 Trainins
Operators are trained for manufacturing compost. In fact, this
facility has achieved a very difficult composting certification for
oualitv.
U | 4.3 Other
5. MONITORING
SOLID WASTE FACILITY INSPECTION REPORT
Date: O5l23ll8 Facility Name: Salt Lake Valley Solid Waste Management Facility - Compost
X | 5.IMethane
na
X | 5.2 Random InsDections
Materials placed on the east pad are inspected prior to shredding to
remove inappropriate materials such as MSW, concrete and metals
X | 5.3 L,eachate
Composting is performed on a impervious pad in accordance with
the solid waste rulesX | 5.4 Ground Water
naX | 5.5 Other
Temperatures of the compost are monitored to achieve the
appropriate biological destruction temperature, seed destruction
temDerature. and to trigser the comDost tuming events
8.6 Other
9. INSPECTION RECORDS
6. DRAINAGE/ EROSIONX | 6.1 water Run-on
Run-on is restricted but not prevented by the grade of the
comnostins nad
X | 6.2 Water Run-ofl
Run-off is collected and manased
E I 6.3 Other
X | 9.1 RandomlnspectionReport
naX | 9.2 Gas Monitorins Svstem
na
X | 9.3 Surface Drainase Control
Surface drainaee is controlled
X | 9.4 Dailv Records
Daily composting records are maintained to track composting sales
and volumes
X | 9.5 Weieht or Volumes
Weiehts and volumes are keptX | 9.6 Intermediate Cover
na
X I 9.7 Final Cover
na
X | 9.8 Selflnspection (Quarterly) Reports
na
X | 9.9 Deviation from Plans
na
X | 9.10 Permit. Permit Application and Rules Available
Discussed with Ashlee about pulling the section from the Permit
Application that covers composting and updating the composting
Plan of Operation
I 9.ll Other
PROPER STORAGE / ISOLATION / DISPOSAL
X | 7.1 Special Waste
naX | 7.2 Batteries
na
X | 7.3 Hazardous Waste
na
X | 7.4 Infectious Waste
naX | 7.5 Tires
na
X | 7.6 Dead Animals
naX | 7.7 Asbestos
naX | 7.8 Bulky Waste
na
X | 7.9 Contaminated Soil
na
X | 7.10 Ash
na
X | 7.ll Sludse
Sludse is not composted at this facilitv
X | 7.12 Other
Pre-consumer food scraps (vegetable and fruits) are composted
10.
X I l0.l Explosive Gas Monitorins
na
X | 10.2 t eachate Samoline & Treatment
na
X | 10.3 Ground Water Samplins Results
nafl | 10.4 Other
8.COYER
U. SPECIAL WASTE RECORDSXllI Lab Analvsis Results
Samples to achieve certification are available.X lll.2Manifests
na
X I I 1.3 Treatment Certification
na
X I I 1.4 Paint Filter Test Results
na
X I l 1.5 Onsite Treatment Documentation
na
11.6 Other
X | 8.1 Dailv- Soil
na
X | 8.2 Dailv - Alternative
na
X | 8.3 Intermediate
naX | 8.4 Final
naX | 8.5 Veeetation
na
Page 2 of 5
SOLID WASTE FACILITY INSPBCTION REPORT
Date: 05123/78 Facility Name: Salt Lake Valley Solid Waste Management Facility - Compost
l3.l Notice of Inspections Form Completed and Si
COMMENTS
DWMRC Inspector Signature:
DWMRC Inspector Name (type or print):5t3U2018
Wateringofthecompostfacilityisperformedbyanoverheadirrigationsystemthatspraysw
work well for the facility. The facility purchased a compost tuming machine (with the additional watering option) but the delivery of thijiompost
tumer has been delayed until the end of June 2018. Ashlee indicated that the compost piles would be higher and would no longer require
additional space between piles to perform the tuming by a front end loader. The entire facility could be tumed in four hours once the composr
turner is in operation. Ashlee also requested to use as much of the asphalt pad for composting operation and move non-composting operations off
the pad to create additional processing space. These operations would include the final screening and the storage of non-conforming compost
waste destined for the landfill. I requested that she submit the request by letterhead to formalize this request
'/.vr
Page 3 of 5
Initial shredding of the compost is
performed on the east pad of the
landfill. This pad is not covered by
asphalt. There is no active
composting performed on this pad.
Waste is screened prior to shredding.
1,t
fl
Trucks and public drop-off is
directed to the east pad for
shredding. Once the waste is placed
on the pad, the waste is inspected for
MSW, rocks, concrete and metals
which could damage the shredder.
Shredded waste is placed in
windrows on the west pad where the
composting is performed.
Composting takes approximately 12-
14 weeks and the windrows are
turned weekly to prevent
overheating of the compost,
distribute and mix the waste and
distribute the moisture.
Page 4 of 5
$$$sir{,SSs
The finished product is placed in the
trammel screen to screen out the
large pieces of waste as well as the
waste that does not compost. The
screen size is Vz" and regular
compost is sorted through the screen.
!t
I
J
If.l-s i6 ._*da
Waste that is rejected by the trammel
screen is piled and will eventually be
used inside the landfill.
The composting process shrinks the
sized of the windrows. Windrows
are currently turned weekly by a
front end loader. A windrow turner
is expected at the end of June and
will speed the turning process.
Page -5 of 5