HomeMy WebLinkAboutDSHW-2018-003356 - 0901a068807f00ebSolid Waste Program Inspection Report
WASTE MANAGEMENT
& PAOIATION CONTROL
FACILITY:
DATE OF INSPECTION:
F'ACILITY ADDRESS:
F'ACILITY CONTACT:
TYPE OF INSPECTION:
PARTICIPANTS:
WEATHER COITIDITIONS:
ARRIVAL TIME:
DEPARTURE TIME:
REPORT PREPARED BY:
Wasatch Resource Recovery
22March2018
Wasatch Resource Recovery
1380 W. Center Street, North Salt Lake, Utah 84054
Latitude/Longitude: 40.843007
Latitude/Lon gitude: - | | | .9 47 209
Morgan Bowerman, Wasatch Resource Recovery (801) 380-5696
Brad Rasmussen, Principal, Aqua Engineering (801) 450-2150
Eric Alder, Alder Construction (801) 266-8856
Plan of Operation Pre-Approval Inspection
Patrick Sheehan, Utah DEQ, DWMRC
Morgan Bowerman, Wasatch Resource Recovery
Eric Alder, Alder Construction
Cloudy, south winds, approximately 58 oF at 9:30 am
9:55 am
l0:50 am
Patrick Sheehan
FACILITY DESCRIPTION:
Wasatch Resource Recovery (WRR) is a public-private partnership located at the South Plant of the South Davis (County)
Sewer District (POTW or Publicly-Owned Treatment Works). The partnership is building an anaerobic digester facility
on the north end of the Sewer Treatment Facility. The project entails converting organic wastes into biogas that will be
injected into a natural gas pipeline system. In addition, fertilizer product will also be produced.
CREDENTIALS, PT]RPOSE AND SCOPE:
Patrick Sheehan met with and presented credentials to Morgan Bowerman (Wasatch Resource Recovery), and Eric Alder
(Alder Construction). The purpose of the inspection was to conduct a pre-permitting (Plan of Operation) site visit. The
facility has progressed in construction and is scheduled to operate beginning in August 2018.
MANAGEMENT ACTIVITIES AND OBSERVATIONS:
The WRR project is a public-private partnership located at the South Davis Sewer District south plant. The Sewer District
Superintendent will act as the facility manager, and will have supervisory responsibility over the facility and personnel.
Based on the facility's submitted Plan of Operation application and drawings, as well as a walk-through of the site, the
following observations were made:
The WRR project is still in the construction phase. The project consists of converting or recycling organic wastes into
biogas via anaerobic digestion. The facility is being built in two major phases and will include reception areas, a
digestion process, and a dewatering process. Incoming wastes will enter the facility via truck and be handled and
contained in one building - the reception building. At the reception building, liquid and bottled wastes and FOG (Fats,
Oils, and Greases) will be handled separately from solid food wastes. In general, the various incoming streams will be
processed as follows:
Liquid wastes will be received and pumped into a reception tank, where it will then be sent to the anaerobic
digesters;
Bottled wastes will be crushed to remove packaging. The liquid will then be sent to the reception tank, and then
into the anaerobic digestion process;
FOG will be screened and then sent to a storage tank, where it will be fed into the anaerobic digestion process;
and
Food waste will be deposited onto the concrete floor of the building, where it will be fed by front-end loader into
the Re:Sep process to remove packaging in the separation process phase. After the Re:Sep stage, the material will
be sent to the hydrolysis process prior to feeding into the anaerobic digester process.
After anaerobic digestion, various materials will be handled as follows:
Biogas, consisting predominantly of methane, will be produced by the anaerobic digestion process. This gaseous
end-product will be sent to a gas-conditioning process prior to being fed into the natural gas pipeline system at the
site.
Solid by-products will be dewatered and packaged into dry fertilizer.
The water or pressate from the dewatering processed will be sent to an ammonia recovery process, where
ammonia will be removed; and
The water or pressate will then be re-introduced into the South Davis Sewer District headworks for processing.
o
a
SUMMARY:
Although the facility is under construction, progress on the site is proceeding, and Phase I of construction is scheduled to
be complete in July 201 8. The facility is scheduled to begin accepting waste in September 201 S.begin operations. WRR
has submitted a Plan of Operation and updated facility drawings for the process.
SIGNATI]RE:
Patrick Sheehan
Attachments:
3 April20l8
Date
Wasatch Resource Recovery Google Earth Image Map
Photographs
Wasatch Resource Recovery Google Image
Aerial View
Photographs
Wasatch Resource Recovery
1380 West Center Street, North Salt Lake, Utah
22March2018
rI'lr I WASATCH
0tF:gvls;
cG ffi
t@l +-rer.no ArF oAqu.A\g/
mffih.tfu ffircsffi@N F&ffi
Fisure 1. Photograph of signage and front area of the facility, looking northwest.
')
:'r
Photograph of facility from nearby street, looking northwest.Figure 2.
Photographs
Wasatch Resource Recovery
1380 West Center Street. North Salt Lake. Utah
22March2018
Fieure 3. Photograph of hydrolysis and digester tanks, with receiving building in background, looking west.(\
';+1,
! q-:''*u
*r .t1,
\.
\*r\
Figure 4. Photograph of site construction activities, looking north.
22 March 2018
Photographs
Wasatch Resource Recovery
1380 West Ccnter Strect, North Salt Lake, Utah
!;x:-
!r?';,i;u'
Figure6. Photographofahydrolysistankunderconstruction. Sectionsareinstalledandthentheunitis
jacked upward so that another section can be installed at ground level.
"ri