HomeMy WebLinkAboutDDW-2024-008390Sanitary Survey - Deficiency Report
PWS Number:UTAH22013 Deficiency Points:220 Survey Date:06/19/2024
Survey Name:PEOA PIPELINE COMPANY Surveyor:Colt Smith
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Management and Operations | DS001 | UTAH22013 DISTRIBUTION SYSTEM
31A. Does your Emergency Response Plan include cybersecurity?
Rule: R309-105-7, 8 & 18, R309-100 through
605
Trigger for regulatory followup to address concerns.
Notes:System's emergency response plan did not have a cyber security component
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH22013 DISTRIBUTION SYSTEM
32. Legally adopted authority statement
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes a legally adopted and functional local authority to enforce the program
(i.e., ordinance, bylaw, or policy).
Notes:The system was unable to locate cross connection records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH22013 DISTRIBUTION SYSTEM
34. Documentation of personnel trained to manage the program (COMMUNITY WATER SYSTEMS POPULATION 500 AND ABOVE
REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM
BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes an operator with adequate training in the area of cross connection control
or backflow prevention.
Notes:The system was unable to locate cross connection records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH22013 DISTRIBUTION SYSTEM
35. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:The system was unable to locate cross connection records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH22013 DISTRIBUTION SYSTEM
36. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:The system was unable to locate cross connection records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: OC
SDWIS Severity Code: Significant Deficiency
Cross Connection and Operator Certification | DS001 | UTAH22013 DISTRIBUTION SYSTEM
37. Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT )
Rule: R309-105-11, R309-300-5(3)Rule requires every community and NTNC water system and public water systems that
utilize treatment/filtration to have at least one operator certified at the classified grade
of the water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
Notes:The system was unable to locate cross-connection records
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: C001 SYSTEM DIRECT RESPONSIBLE CHARGE OPERATORS NOT CERTIFIED AT THE
REQUIRED LEVEL
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | PEOA SPRING
62B. Spring box lid is gasketed
Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished
with a gasket between the lid and frame. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:The box had a gasket, but it needed repair to form a complete seal around the entrance
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | PEOA SPRING
63. Is a spring box vent present? ... if yes, answer the following question(s)
Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect
to venting. Therefore, a junction or collection box requires a vent to be fitted with #14
mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or
covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Notes:
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST001 | 1400 GALLON TANK
70C. Vent covered with #14 or finer non-corrodible mesh screen.
Rule: R309-545-15(4)Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-
corrodible screen and vents 6-inches or greater in diameter to be fitted with additional
heavy gauge screen or substantial covering to protect the #14 mesh screen from
vandalism or damage. This significant deficiency must be corrected within 120 days of
notification or have a compliance action plan approved by DDW.
Notes:The tank vent's screen fell off during inspection and needs to be replaced.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V007 STORAGE TANK VENT LACKS NO. 14 SCREEN
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST001 | 1400 GALLON TANK
77B. Overflow line covered with #4 mesh non-corrodible screen
Rule: R309-545-13(3)Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens
installed at a location least susceptible to damage by vandalism. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:The end point of the overflow was screened correctly, but there is a two-inch opening in the
pipe that is exposed without any screen.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V012 END OF STORAGE TANK OVERFLOW PIPE LACKS NO. 4 SCREEN
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Gaseous Chlorination | TP001 | PEOA SPRING CHLORINATOR
111. If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided.
Rule: R309-520-7(2)(a), R309-520-6(1)Rule requires automatic switch over of chlorine cylinders be provided if continuous
disinfection is required.
Notes:System does not have an automatic switch-over for chlorine cylinders
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TD01 CONTINUOUS DISINFECTION IS REQUIRED BUT CHLORINATOR LACKS
AUTOMATIC SWITCHOVER