HomeMy WebLinkAboutDDW-2024-008387Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Exception Granted: R309-550-7(1) | The sewer main and waterline are both existing and the elevations cannot effectively be changed.
Exception Granted: R309-550-7(1) | The basis for your request for an exception to R309-550-7(1) is that adequate vertical separation requirements
cannot be met at two water line crossings due to the shallow depth of the existing sewer system.
Exception Granted: R309-550-7(1) | The Como Springs Resort will consist of a total of 96 RV and tent sites. The sewer main in this part of the city's
service area is very shallow and cannot be lowered below the proposed new waterlines. The new sewer mains must cross over the new water
mains. There will be a total of 51 8” DIP waterline crossing, and 9 4” PVC C900 waterline crossings.
Site Visit Date Surveyor Name
05/14/2024 Susan Riggs
MORGAN CITY WATER
SYSTEM
PWS ID: UTAH15008 Rating: Approved 04/08/1980 Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: KALE SHAYNE
*Last Name: WATKINS
*Organization:
*Address: Redacted
*City: MORGAN
*State: UT
*Zip: 84050
*Email: kwatkins@morgancityut.org
*Phone: 801-516-8112
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: MORGAN CITY WATER
SYSTEM
*Address: PO BOX 1085
*City: MORGAN
*State: UT
*Zip: 84050
*Email: kwatkins@morgancityut.org
*Phone: 801-829-4361
Emergency Phone: 801-516-8112
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 1 of 62
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: MORGAN CITY
*Address: PO BOX 1085
*City: MORGAN
*State: UT
*Zip: 84050
*Email: kwatkins@morgancityut.org
*Phone: 801-829-4361
Emergency Phone: 801-516-8112
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: KALE SHAYNE
*Last Name: WATKINS
*Organization:
*Address: 4025 W 3900 N
*City: MORGAN
*State: UT
*Zip: 84050
*Email: kwatkins@morgancityut.org
*Phone: 801-516-8112
5 Does the system serve a Residential population?Y
5A Population - Residential 4520
5B Operating Period (Start Date) - Residential 01/01
5C Operating Period (End Date) - Residential 12/31
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
N (Notes: N/A)
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
N (Notes: N/A)
8 Population - Wholesale :0
9 Residential Connections:1153
10 Commercial Connections:111
11 Industrial Connections:0
12 Agricultural Connections:0
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 2 of 62
Site Visit Info
Management and Operations
13 Date of Survey (First Day of Field Work)05/13/2024
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
05/14/2024
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
06/11/2024
16 Water system representative present during the survey:Kale Watkins
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
1
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
8.0
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
1.5
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
5.0
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
D (Notes: In process of getting standby
power.)
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 3 of 62
Cross Connection and Operator Certification
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
N
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
Y
28A System lacks up to 20% of required source capacity
MIN | 15pts | SO | S091 | R309-510-7(1) | Rule requires a water system's source
capacity to legally and physically meet the peak day demand and the average yearly
demand.
Y (Notes: Existing % of Total Req'd is
93.7%)
28B System lacks more than 20% of required source capacity
SIG | 50pts | SO | S094 | R309-510-7(1) | Rule requires a water system's source
capacity to legally and physically meet the peak day demand and the average yearly
demand. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
31A Does your Emergency Response Plan address cybersecurity? (required for systems
over 3,300 population)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
31B Does your water system use any computers, laptops, phones, tablets, or any other
computer systems to manage, operate, or maintain the PWS (SCADA or Industrial
Control Systems)? This includes any water sources, treatment, distribution or any
process related to operation function
Y
31C Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
32 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 4 of 62
General Maintenance and Environment
33 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
D (Notes: In process.)
34 Documentation of personnel trained to manage the program (COMMUNITY WATER
SYSTEMS POPULATION 500 AND ABOVE REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A
MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C
35 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C
36 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
37 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
38 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 5 of 62
Distribution
39 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
40 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
D (Notes: In a vault which drains to
daylight.)
41 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
Y
41A Open end of vent line covered with #14 mesh screen
SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: In a vault which drains to
daylight.)
41B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or
one foot above distribution line in a chamber that does not flood.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: In a vault which drains to
daylight.)
41C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or
sump pump.
SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be
provided with a drain to daylight, if possible. Where this is not possible, underground
gravel-filled absorption pits may be used if the site is not subject to flooding and
conditions will assure adequate drainage. Sump pumps may also be considered if a
drain to daylight or absorption pit is not feasible. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C (Notes: In a vault which drains to
daylight.)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 6 of 62
General Disinfection
41D Open end of vent line down-turned.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: In a vault which drains to
daylight.)
42 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C
43 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
44 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
45 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
46 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
47 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
Y
47A Distribution system capable of maintaining the following pressures at all service
connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b)
30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand.
SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless
otherwise specifically approved by the Director, public water systems constructed after
January 1, 2007, shall be designed and shall meet the following minimum water
pressures at points of connection: (a) 20 psi during conditions of fire flow and fire
demand experienced during peak day demand; (b) 30 psi during peak instantaneous
demand; and (c) 40 psi during peak day demand. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 7 of 62
TP009 - PARK WELL #3 CHLORINATOR - Proposed
WS003 - BRADT SPRING -
48 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
49 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
50 Is this facility in operation without an Operating Permit?
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
N (Notes: Proposed Park Well #3 unknown
to current operator.)
50A When is the anticipated date to request an Operating Permit? Explain in comments...N/A
51 Is this facility Active or Inactive? (Active status means used on a routine/seasonal
basis without long periods of inactivity and water quality samples are routinely
collected))
I (Notes: Bradt Spring is unknown to current
operator.)
51A Explain why this facility is Inactive (Is this facility in stand-by mode and not used
regularly, has not been used for multiple years, does it have known water quality
concerns?)
N/A
52 Operating Period (Start Date)01/01
53 Operating Period (End Date)12/31
54 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: Inactive)
55 Area of equal or higher elevation within 50 feet of spring collection devices is fenced.
MIN | 15pts | SO | SS02 | R309-515-7(7)(e) | Rule requires a stock-tight fence around
the spring collection area.
NA (Notes: Inactive)
56 Surface water runoff diverted away from spring by diversion channel or berm.
MIN | 15pts | SO | SS03 | R309-515-7(7)(g) | Rule requires a diversion channel or
berm, constructed immediately inside the fenced area, capable of diverting all
anticipated surface water runoff away from the spring collection area.
NA (Notes: Inactive)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 8 of 62
57 Spring box has a means to release overflow?
MIN | 15pts | SO | SS23 | R309-515-7(7)(d), R309-545-13(1) | All junction boxes and
collection boxes, must comply with R309-545 with respect to access openings,
venting, and tank overflow. Lids for these spring boxes shall be gasketed and the box
adequately vented.
NA (Notes: Inactive)
58 Drain has minimum of 12 inch clearance above flood rim of receiving basin
SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction
and collection boxes shall comply with R309-545 and discharge a minimum of 12
inches above the ground surface or rim of the receiving basin. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Inactive)
59 Spring collection area graded and no evidence of water ponding or flow on surface?
SIG | 25pts | SO | SS06 | R309-515-7(7)(i) | Rule requires the spring to be developed
as thoroughly as possible to minimize the possibility of excess water ponding within
the collection area. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
NA (Notes: Inactive)
60 If a liner is present, spring liner integrity is maintained.
SIG | 50pts | SO | SS19 | R309-515-7(7)(b)(iv) | If a liner is present, it shall be installed
to assure its integrity. No sharp-edged stones or stones two inches or larger shall be
located within two inches of the liner. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
NA (Notes: Inactive)
61 No deep-rooted vegetation is within the 50 ft collection area.
SIG | 25pts | SO | SS07 | R309-515-7(7)(f) | All deep-rooted vegetation within the
fenced collection area shall be removed by a means not negatively affecting water
quality. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
NA (Notes: Inactive)
62 No roots seen in collection boxes and junctions.
SIG | 25pts | SO | SS08 | R309-105-10(4)(a), R309-515-8(1)(a) | Spring collection
areas shall be periodically (preferably annually) cleared of deep-rooted vegetation to
prevent root growth from clogging collection lines. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
NA (Notes: Inactive)
63 Is a spring collection box present? ... if yes, answer the following question(s)
MIN | 5pts | SO | L014 | R309-515-7(7)(c) | Rule requires each spring collection area
to be provided with at least one collection box to permit spring inspection and testing.
Y (Notes: Inactive)
63A Spring box has shoe box type lid with 2 inch overlap around frame
SIG | 25pts | SO | SS09 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a close-fitting, solid shoebox-type cover
that extends down around the frame at least 2 inches. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C (Notes: Inactive)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 9 of 62
63B Spring box lid is gasketed
SIG | 25pts | SO | SS10 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a cover furnished with a gasket between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: Inactive)
63C Spring box lid does not show evidence of a vacuum.
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
C (Notes: Inactive)
63D Spring box opening is at least 4 inches above the surface of the box or 18 inches
above an earthen cover if the box is buried.
MIN | 15pts | SO | SS12 | R309-515-7(7)(d), R309-545-14 (1), | Access openings shall
comply with R309-545 and be framed at least 4 inches above the surface of the spring
box roof at the opening or 18 inches above the ground surface on a buried spring box.
C (Notes: Inactive)
63E Spring box lid is locked
SIG | 25pts | SO | SS13 | R309-515-7(7)(d), R309-545-14 (3) | Access openings shall
comply with R309-545 and the lids to the openings shall be locked. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C (Notes: Inactive)
63F All openings/penetrations in the spring collection box are sealed.
SIG | 50pts | SO | SS20 | R309-515-7(7)(d), R309-545-9(1) and (2) | All junction and
collection boxes shall comply with R309-545 and shall have suitable watertight roofs
and sidewalls that exclude birds, animals, insects, and excessive dust. All openings
shall be kept to a minimum and be watertight. Pipes that may contain water of lesser
quality than drinking water shall not penetrate the spring box. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C (Notes: Inactive)
64 Is a spring box vent present? ... if yes, answer the following question(s)
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
NA (Notes: Inactive)
65 Spring has a permanent flow-measuring device.
MIN | 5pts | SO | SS01 | R309-515-7(7)(h) | Rule requires a spring to have a
permanent flow measuring device.
NA (Notes: Inactive)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 10 of 62
WS004 - ROBINSON SPRING - Active
66 Is this facility Active or Inactive? (Active status means used on a routine/seasonal
basis without long periods of inactivity and water quality samples are routinely
collected))
A
67 Operating Period (Start Date)01/01
68 Operating Period (End Date)12/31
69 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
70 Area of equal or higher elevation within 50 feet of spring collection devices is fenced.
MIN | 15pts | SO | SS02 | R309-515-7(7)(e) | Rule requires a stock-tight fence around
the spring collection area.
C
71 Surface water runoff diverted away from spring by diversion channel or berm.
MIN | 15pts | SO | SS03 | R309-515-7(7)(g) | Rule requires a diversion channel or
berm, constructed immediately inside the fenced area, capable of diverting all
anticipated surface water runoff away from the spring collection area.
C
72 Spring box has a means to release overflow?
MIN | 15pts | SO | SS23 | R309-515-7(7)(d), R309-545-13(1) | All junction boxes and
collection boxes, must comply with R309-545 with respect to access openings,
venting, and tank overflow. Lids for these spring boxes shall be gasketed and the box
adequately vented.
Y
72A Overflow screened with #4 mesh screen
SIG | 25pts | SO | SS04 | R309-515-7(7)(d), R309-545-13(3) | Overflow pipes on
junction and collection boxes shall comply with R309-545 and be screened with No. 4
mesh non-corrodible screens. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
72B Overflow has a minimum of 12 inch clearance above flood rim of receiving basin
SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction
and collection boxes shall comply with R309-545 and discharge a minimum of 12
inches above the ground surface or rim of the receiving basin. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
73 Drain has minimum of 12 inch clearance above flood rim of receiving basin
SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction
and collection boxes shall comply with R309-545 and discharge a minimum of 12
inches above the ground surface or rim of the receiving basin. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 11 of 62
74 Spring collection area graded and no evidence of water ponding or flow on surface?
SIG | 25pts | SO | SS06 | R309-515-7(7)(i) | Rule requires the spring to be developed
as thoroughly as possible to minimize the possibility of excess water ponding within
the collection area. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
75 If a liner is present, spring liner integrity is maintained.
SIG | 50pts | SO | SS19 | R309-515-7(7)(b)(iv) | If a liner is present, it shall be installed
to assure its integrity. No sharp-edged stones or stones two inches or larger shall be
located within two inches of the liner. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
76 No deep-rooted vegetation is within the 50 ft collection area.
SIG | 25pts | SO | SS07 | R309-515-7(7)(f) | All deep-rooted vegetation within the
fenced collection area shall be removed by a means not negatively affecting water
quality. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
D (Notes: Less than 50ft)
77 No roots seen in collection boxes and junctions.
SIG | 25pts | SO | SS08 | R309-105-10(4)(a), R309-515-8(1)(a) | Spring collection
areas shall be periodically (preferably annually) cleared of deep-rooted vegetation to
prevent root growth from clogging collection lines. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
D (Notes: Roots in well connected to
spring.)
78 Is a spring collection box present? ... if yes, answer the following question(s)
MIN | 5pts | SO | L014 | R309-515-7(7)(c) | Rule requires each spring collection area
to be provided with at least one collection box to permit spring inspection and testing.
Y
78A Spring box has shoe box type lid with 2 inch overlap around frame
SIG | 25pts | SO | SS09 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a close-fitting, solid shoebox-type cover
that extends down around the frame at least 2 inches. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
78B Spring box lid is gasketed
SIG | 25pts | SO | SS10 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a cover furnished with a gasket between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
D (Notes: To be repaired.)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 12 of 62
78C Spring box lid does not show evidence of a vacuum.
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
C
78D Spring box opening is at least 4 inches above the surface of the box or 18 inches
above an earthen cover if the box is buried.
MIN | 15pts | SO | SS12 | R309-515-7(7)(d), R309-545-14 (1), | Access openings shall
comply with R309-545 and be framed at least 4 inches above the surface of the spring
box roof at the opening or 18 inches above the ground surface on a buried spring box.
C
78E Spring box lid is locked
SIG | 25pts | SO | SS13 | R309-515-7(7)(d), R309-545-14 (3) | Access openings shall
comply with R309-545 and the lids to the openings shall be locked. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
78F All openings/penetrations in the spring collection box are sealed.
SIG | 50pts | SO | SS20 | R309-515-7(7)(d), R309-545-9(1) and (2) | All junction and
collection boxes shall comply with R309-545 and shall have suitable watertight roofs
and sidewalls that exclude birds, animals, insects, and excessive dust. All openings
shall be kept to a minimum and be watertight. Pipes that may contain water of lesser
quality than drinking water shall not penetrate the spring box. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
79 Is a spring box vent present? ... if yes, answer the following question(s)
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Y
79A Vent is down-turned.
SIG | 25pts | SO | SS16 | R309-515-7(7)(d), R309-545-15(1) | All vents on junction
and collection boxes shall comply with R309-545 and be downturned a minimum of 2
inches below any opening and shielded to prevent the entrance of contaminants. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 13 of 62
WS005 - N MORGAN SPRING - Active
79B Vent has #14 or finer non-corrodible mesh screen and a protective screen/covering if
6-inch diameter or greater.
SIG | 25pts | SO | SS17 | R309-515-7(7)(d), R309-545-15(4) and (5) | All vents on
junction and collection boxes shall comply with R309-545 and be fitted with No. 14 or
finer non-corrodible mesh screen. Vents 6-inch diameter or larger shall be fitted with
additional heavy gage screen or substantial covering to protect the No. 14 mesh
screen. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
79C End of vent has sufficient clearance to prevent ice/snow blockage or is at least 24
inches above the earthen cover
SIG | 25pts | SO | SS18 | R309-515-7(7)(d), R309-545-15(2) and (3) | All vents on
junction and collection boxes shall comply with R309-545 and shall be located and
sized to avoid blockage during winter. The end of a vent on a buried spring box shall
discharge a minimum of 24 inches above the ground. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
80 Spring has a permanent flow-measuring device.
MIN | 5pts | SO | SS01 | R309-515-7(7)(h) | Rule requires a spring to have a
permanent flow measuring device.
C
81 Is this facility Active or Inactive? (Active status means used on a routine/seasonal
basis without long periods of inactivity and water quality samples are routinely
collected))
A
82 Operating Period (Start Date)01/01
83 Operating Period (End Date)12/31
84 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
85 Area of equal or higher elevation within 50 feet of spring collection devices is fenced.
MIN | 15pts | SO | SS02 | R309-515-7(7)(e) | Rule requires a stock-tight fence around
the spring collection area.
C
86 Surface water runoff diverted away from spring by diversion channel or berm.
MIN | 15pts | SO | SS03 | R309-515-7(7)(g) | Rule requires a diversion channel or
berm, constructed immediately inside the fenced area, capable of diverting all
anticipated surface water runoff away from the spring collection area.
C
87 Spring box has a means to release overflow?
MIN | 15pts | SO | SS23 | R309-515-7(7)(d), R309-545-13(1) | All junction boxes and
collection boxes, must comply with R309-545 with respect to access openings,
venting, and tank overflow. Lids for these spring boxes shall be gasketed and the box
adequately vented.
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 14 of 62
87A Overflow screened with #4 mesh screen
SIG | 25pts | SO | SS04 | R309-515-7(7)(d), R309-545-13(3) | Overflow pipes on
junction and collection boxes shall comply with R309-545 and be screened with No. 4
mesh non-corrodible screens. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
87B Overflow has a minimum of 12 inch clearance above flood rim of receiving basin
SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction
and collection boxes shall comply with R309-545 and discharge a minimum of 12
inches above the ground surface or rim of the receiving basin. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
88 Drain has minimum of 12 inch clearance above flood rim of receiving basin
SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction
and collection boxes shall comply with R309-545 and discharge a minimum of 12
inches above the ground surface or rim of the receiving basin. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
89 Spring collection area graded and no evidence of water ponding or flow on surface?
SIG | 25pts | SO | SS06 | R309-515-7(7)(i) | Rule requires the spring to be developed
as thoroughly as possible to minimize the possibility of excess water ponding within
the collection area. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
90 If a liner is present, spring liner integrity is maintained.
SIG | 50pts | SO | SS19 | R309-515-7(7)(b)(iv) | If a liner is present, it shall be installed
to assure its integrity. No sharp-edged stones or stones two inches or larger shall be
located within two inches of the liner. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
91 No deep-rooted vegetation is within the 50 ft collection area.
SIG | 25pts | SO | SS07 | R309-515-7(7)(f) | All deep-rooted vegetation within the
fenced collection area shall be removed by a means not negatively affecting water
quality. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
92 No roots seen in collection boxes and junctions.
SIG | 25pts | SO | SS08 | R309-105-10(4)(a), R309-515-8(1)(a) | Spring collection
areas shall be periodically (preferably annually) cleared of deep-rooted vegetation to
prevent root growth from clogging collection lines. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
D (Notes: Roots in well connected to
spring.)
93 Is a spring collection box present? ... if yes, answer the following question(s)
MIN | 5pts | SO | L014 | R309-515-7(7)(c) | Rule requires each spring collection area
to be provided with at least one collection box to permit spring inspection and testing.
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 15 of 62
93A Spring box has shoe box type lid with 2 inch overlap around frame
SIG | 25pts | SO | SS09 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a close-fitting, solid shoebox-type cover
that extends down around the frame at least 2 inches. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
93B Spring box lid is gasketed
SIG | 25pts | SO | SS10 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall
comply with R309-545 and be provided with a cover furnished with a gasket between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
93C Spring box lid does not show evidence of a vacuum.
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
C
93D Spring box opening is at least 4 inches above the surface of the box or 18 inches
above an earthen cover if the box is buried.
MIN | 15pts | SO | SS12 | R309-515-7(7)(d), R309-545-14 (1), | Access openings shall
comply with R309-545 and be framed at least 4 inches above the surface of the spring
box roof at the opening or 18 inches above the ground surface on a buried spring box.
C
93E Spring box lid is locked
SIG | 25pts | SO | SS13 | R309-515-7(7)(d), R309-545-14 (3) | Access openings shall
comply with R309-545 and the lids to the openings shall be locked. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
93F All openings/penetrations in the spring collection box are sealed.
SIG | 50pts | SO | SS20 | R309-515-7(7)(d), R309-545-9(1) and (2) | All junction and
collection boxes shall comply with R309-545 and shall have suitable watertight roofs
and sidewalls that exclude birds, animals, insects, and excessive dust. All openings
shall be kept to a minimum and be watertight. Pipes that may contain water of lesser
quality than drinking water shall not penetrate the spring box. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 16 of 62
WS001 - WELL #1 DISCONNECTED -
94 Is a spring box vent present? ... if yes, answer the following question(s)
MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction
boxes and collection boxes to comply with R309-545 with respect to venting.
Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or
finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering
if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Y
94A Vent is down-turned.
SIG | 25pts | SO | SS16 | R309-515-7(7)(d), R309-545-15(1) | All vents on junction
and collection boxes shall comply with R309-545 and be downturned a minimum of 2
inches below any opening and shielded to prevent the entrance of contaminants. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
94B Vent has #14 or finer non-corrodible mesh screen and a protective screen/covering if
6-inch diameter or greater.
SIG | 25pts | SO | SS17 | R309-515-7(7)(d), R309-545-15(4) and (5) | All vents on
junction and collection boxes shall comply with R309-545 and be fitted with No. 14 or
finer non-corrodible mesh screen. Vents 6-inch diameter or larger shall be fitted with
additional heavy gage screen or substantial covering to protect the No. 14 mesh
screen. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
94C End of vent has sufficient clearance to prevent ice/snow blockage or is at least 24
inches above the earthen cover
SIG | 25pts | SO | SS18 | R309-515-7(7)(d), R309-545-15(2) and (3) | All vents on
junction and collection boxes shall comply with R309-545 and shall be located and
sized to avoid blockage during winter. The end of a vent on a buried spring box shall
discharge a minimum of 24 inches above the ground. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
95 Spring has a permanent flow-measuring device.
MIN | 5pts | SO | SS01 | R309-515-7(7)(h) | Rule requires a spring to have a
permanent flow measuring device.
C
96 Is this facility Active or Inactive?I (Notes: Inactive)
96A Explain why this facility is Inactive (Is this facility in stand-by mode?)Disconnected.
97 Operating Period (Start Date)05/01
98 Operating Period (Ending Date)11/30
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 17 of 62
99 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Disconnected.)
100 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C (Notes: Disconnected)
101 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C (Notes: Disconnected)
102 Is the well casing vented? ... if yes, answer the following question(s)N (Notes: Disconnected)
103 Does the well have a pump to waste line? ... if yes, answer the following question(s)N (Notes: Disconnected)
104 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C (Notes: Disconnected)
105 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Disconnected)
106 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 18 of 62
WS002 - WELL #2 -
107 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Disconnected)
108 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
109 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C (Notes: Disconnected)
110 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Disconnected)
111 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Disconnected)
112 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Disconnected)
113 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Disconnected)
114 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N (Notes: Disconnected)
115 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C (Notes: Disconnected)
116 Does well require oil-lubrication?N (Notes: Disconnected.)
117 Is this facility Active or Inactive?I (Notes: Operator has no knowledge of well
#2. Does not exist.)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 19 of 62
117A
Explain why this facility is Inactive (Is this facility in stand-by mode?)Operator has no knowledge of well #2. Does
not exist.
118 Operating Period (Start Date)05/01
119 Operating Period (Ending Date)11/30
120 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Inactive)
121 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C (Notes: Inactive)
122 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C (Notes: Inactive)
123 Is the well casing vented? ... if yes, answer the following question(s)N (Notes: Inactive)
124 Does the well have a pump to waste line? ... if yes, answer the following question(s)N (Notes: Inactive)
125 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C (Notes: Inactive)
126 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Inactive)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 20 of 62
127 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C (Notes: Inactive)
128 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Inactive)
129 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
NA (Notes: Inactive)
130 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C (Notes: Inactive)
131 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Inactive)
132 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Inactive)
133 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Inactive)
134 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Inactive)
135 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N (Notes: Inactive)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 21 of 62
WS006 - PARK WELL # 3 - Active
136 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C (Notes: Inactive)
137 Does well require oil-lubrication?N (Notes: Inactive)
138 Is this facility Active or Inactive?A (Notes: Active)
139 Operating Period (Start Date)05/01
140 Operating Period (Ending Date)11/30
141 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
142 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
143 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
144 Is the well casing vented? ... if yes, answer the following question(s)Y (Notes: Compliant)
144A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C (Notes: N/A)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 22 of 62
144B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C (Notes: N/A)
144C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C (Notes: N/A)
145 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y (Notes: Compliant)
145A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C (Notes: N/A)
145B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
145C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
146 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
147 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
148 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 23 of 62
149 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
150 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
151 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
152 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
153 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
154 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
155 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
156 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y (Notes: Compliant)
156A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
156B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 24 of 62
WS007 - MAHOGANY RIDGE WELL #4 - Active
156C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
157 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
158 Does well require oil-lubrication?Y (Notes: Compliant)
158A
Well shaft lubricants ANSI/NSF 60 certified
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C (Notes: N/A)
159 Is this facility Active or Inactive?A (Notes: Active)
160 Operating Period (Start Date)05/01
161 Operating Period (Ending Date)11/30
162 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
163 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 25 of 62
164 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
165 Is the well casing vented? ... if yes, answer the following question(s)Y (Notes: Compliant)
165A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C (Notes: N/A)
165B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C (Notes: N/A)
165C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C (Notes: N/A)
166 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y (Notes: Compliant)
166A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C (Notes: N/A)
166B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
166C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
167 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
168 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 26 of 62
169 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
170 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
171 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
172 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
173 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
174 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
175 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
176 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
177 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y (Notes: Compliant)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 27 of 62
WS008 - ISLAND ROAD WELL #5 - Active
177A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
177B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
177C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
178 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
179 Does well require oil-lubrication?N (Notes: Submersible)
180 Is this facility Active or Inactive?A (Notes: Active)
181 Operating Period (Start Date)05/01
182 Operating Period (Ending Date)11/30
183 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 28 of 62
184 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
185 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
186 Is the well casing vented? ... if yes, answer the following question(s)Y (Notes: Compliant)
186A
Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C (Notes: N/A)
186B
Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C (Notes: N/A)
186C
Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C (Notes: N/A)
187 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y (Notes: Compliant)
187A
Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C (Notes: N/A)
187B
Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 29 of 62
187C
Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
188 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
189 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
190 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
191 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
192 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
193 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
194 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 30 of 62
ST001 - LANDMARK STORAGE - Active
195 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
196 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
197 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
198 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y (Notes: Compliant)
198A
Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: N/A)
198B
Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
198C
Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C (Notes: N/A)
199 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
200 Does well require oil-lubrication?N (Notes: N/A)
201 Is this facility Active or Inactive?A
202 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
2000000
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 31 of 62
203 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
204 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
205 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
206 Are air vents present? ... if yes, answer the following question(s)Y
206A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
206B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
206C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
206D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 32 of 62
207 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
207A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
207B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
207C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
208 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
209 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
210 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
211 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
212 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 33 of 62
ST002 - NORTH MORGAN SPRINGS STORAGE - Active
213 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
213A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
213B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
213C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
214 Are the drain line and overflow combined?N
214A
Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
215 Is this facility Active or Inactive?A
216 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
100000
217 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 34 of 62
218 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
219 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
220 Are air vents present? ... if yes, answer the following question(s)Y
220A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
220B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
220C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
220D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
221 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
221A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 35 of 62
221B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
221C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
222 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
223 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
224 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
225 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
226 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
227 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
227A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
D (Notes: Discharges below flood rim.)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 36 of 62
ST003 - MAHOGANY RIDGE STORAGE - Active
227B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
227C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
228 Are the drain line and overflow combined?Y
229 Is this facility Active or Inactive?A
230 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
750000
231 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
232 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
233 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
234 Are air vents present? ... if yes, answer the following question(s)Y
234A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 37 of 62
234B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
234C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
234D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
235 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
235A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
235B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
235C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
236 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 38 of 62
ST004 - ROBINSON SPRINGS STORAGE - Active
237 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
238 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
239 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
240 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
241 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
241A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
241B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
241C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
242 Are the drain line and overflow combined?Y
243 Is this facility Active or Inactive?A
244 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
500000
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 39 of 62
245 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
246 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
247 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
248 Are air vents present? ... if yes, answer the following question(s)Y
248A
Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
248B
End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
248C
Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
248D
Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 40 of 62
249 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
249A
Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
249B
Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
249C
Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
250 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
251 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
252 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
253 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
254 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 41 of 62
PF001 - ROBINSON SPRINGS BOOSTER STATION -- Pump Stations - Active
255 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
255A
Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
D (Notes: Discharges below flood rim.)
255B
Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
255C
Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
256 Are the drain line and overflow combined?Y
257 Is this facility Active or Inactive?A
258 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
259 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Centrifugal
260 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 42 of 62
PF002 - 700 EAST BOOSTER PUMP -- Pump Stations - Active
260A
Demand is met by remaining pump(s) when largest pumping unit out of service
SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two
pumping units (such that with any one pump out of service, the remaining pump or
pumps shall be capable of providing the peak day demand of the specific portion of
the system serviced). This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
261 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
262 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
263 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
264 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
265 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
D (Notes: In vault. Manhole to be secured.)
266 Is this facility Active or Inactive?A
267 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
268 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Centrifugal
269 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 43 of 62
TP001 - WELL #1 CHLOR DISCONNECTED -- Treatment - Chlorination General -
269A
Demand is met by remaining pump(s) when largest pumping unit out of service
SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two
pumping units (such that with any one pump out of service, the remaining pump or
pumps shall be capable of providing the peak day demand of the specific portion of
the system serviced). This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
270 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
271 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
272 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
273 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
274 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
D (Notes: In vault. Manhole to be secured.)
275 Is this facility Active or Inactive?I
275A
Explain why this facility is Inactive (Is this facility in stand-by mode?)Disconnected
276 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
N (Notes: Disconnected)
277 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
278 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 44 of 62
279 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Disconnected)
280 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
281 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C (Notes: Disconnected)
282 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C (Notes: Disconnected)
283 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C (Notes: Disconnected)
284 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
N (Notes: Disconnected)
285 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
286 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C (Notes: Disconnected)
287 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y (Notes: Disconnected)
287A
System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
287B
Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C (Notes: Disconnected)
287C
"What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 45 of 62
TP004 - ROBINSON SPRING CHLORINATOR -- Treatment - Chlorination General - Active
287D
System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
287E
System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C (Notes: Disconnected)
288 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C (Notes: Disconnected)
289 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
290 Is this facility Active or Inactive?A
291 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
291A
If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
292 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
293 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 46 of 62
294 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: Gas Chlorinator)
295 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
296 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
297 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
298 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
299 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
299A
If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent
300 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
D (Notes: POE at first customer connection.)
301 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
D (Notes: POE at first customer connection.)
302 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
302A
System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
302B
Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
302C
"What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 47 of 62
TP005 - N MORGAN SPRING CHLORINATOR -- Treatment - Chlorination General - Active
302D
System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
302E
System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
303 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
304 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
305 Is this facility Active or Inactive?A
306 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
306A
If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
307 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
308 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 48 of 62
309 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: Gas Chlorinator)
310 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
311 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
312 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
313 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
314 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
314A
If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent
315 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
D (Notes: POE at first customer connection.)
316 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
D (Notes: POE at first customer connection.)
317 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
317A
System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
317B
Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
317C
"What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 49 of 62
TP007 - MAHOGANY RIDGE CHLORINATOR -- Treatment - Chlorination General - Active
317D
System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
317E
System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
318 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
319 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
320 Is this facility Active or Inactive?A
321 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
321A
If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
322 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
323 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 50 of 62
324 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: Gas Chlorinator)
325 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
326 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
327 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
328 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
329 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
329A
If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent
330 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
331 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
332 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
332A
System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
332B
Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
332C
"What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 51 of 62
TP008 - ISLAND ROAD #5 CHLORINATOR -- Treatment - Chlorination General - Active
332D
System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
332E
System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
333 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
334 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
335 Is this facility Active or Inactive?A
336 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
336A
If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
337 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
338 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 52 of 62
339 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
NA (Notes: Gas Chlorinator)
340 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
341 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
342 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
343 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
344 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
344A
If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent
345 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
346 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
347 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
347A
System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
347B
Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
347C
"What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 53 of 62
TP001 - WELL #1 CHLOR DISCONNECTED -- Gaseous Chlorination -
347D
System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
347E
System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
348 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
349 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
350 Is this facility Active or Inactive?I
350A
Explain why this facility is Inactive (Is this facility in stand-by mode?)Disconnected
351 If disinfection is required, standby chlorination equipment of sufficient capacity is
available to replace the largest unit.
SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for
disinfection of the water supply, the rule requires standby equipment of sufficient
capacity to be available to replace the largest unit in the event of its failure. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: Disconnected)
352 Is the chlorinator room heated and has the ability to be protected from excessive heat?
MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be
heated, lighted, and ventilated as necessary to assure proper operation of the
equipment and safety of the operators.
C (Notes: Disconnected)
353 If continuous disinfection is needed, automatic switch over of chlorine cylinders is
provided.
MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic
switch over of chlorine cylinders be provided if continuous disinfection is required.
C (Notes: Disconnected)
354 Exhaust fan takes suction near the floor as far as practical from the door and air inlet,
and discharges outside away from air inlets.
MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust
fan to take suction inside the chlorine room near the floor, as far as practical from the
door and air inlet, and discharge air outside of the building away from air inlets.
C (Notes: Disconnected)
355 Air inlets are located near the ceiling and fitted with louvers.
MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets
to be through wall louvers near the ceiling.
C (Notes: Disconnected)
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 54 of 62
TP004 - ROBINSON SPRING CHLORINATOR -- Gaseous Chlorination - Active
356 Chlorine vent line discharges outside and above grade and is screened with #14 mesh
screen.
SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to
discharge outside, above grade, at a point least susceptible to vandalism, and to have
the end covered with a #14 mesh non-corrodible screen. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C (Notes: Disconnected)
357 Separate switches for chlorine room fans and lights are located near the entrance to
the room (or are located outside the chlorine room if housed in a water treatment
plant).
MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for
the chlorine room fans and lights to be located near the entrance to the room and to
be protected from vandalism. The switches are required to be located outside the
chlorine room if housed in a water treatment plant.
C (Notes: Disconnected)
358 Chlorine cylinder is restrained in position to prevent upset.
SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be
restrained in position to prevent upset. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
359 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat.
SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from
being stored in direct sunlight or exposed to excessive heat. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C (Notes: Disconnected)
360 Weight scale is provided for weighing chlorine gas cylinders/containers.
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
361 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following
question(s)
N (Notes: Disconnected)
362 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N (Notes: Disconnected)
363 Is the (daily) scale weight or volume data recorded? Explain where in the comments...
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C (Notes: Disconnected)
364 Is this facility Active or Inactive?A
365 If disinfection is required, standby chlorination equipment of sufficient capacity is
available to replace the largest unit.
SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for
disinfection of the water supply, the rule requires standby equipment of sufficient
capacity to be available to replace the largest unit in the event of its failure. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 55 of 62
366 Is the chlorinator room heated and has the ability to be protected from excessive heat?
MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be
heated, lighted, and ventilated as necessary to assure proper operation of the
equipment and safety of the operators.
C
367 If continuous disinfection is needed, automatic switch over of chlorine cylinders is
provided.
MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic
switch over of chlorine cylinders be provided if continuous disinfection is required.
C
368 Exhaust fan takes suction near the floor as far as practical from the door and air inlet,
and discharges outside away from air inlets.
MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust
fan to take suction inside the chlorine room near the floor, as far as practical from the
door and air inlet, and discharge air outside of the building away from air inlets.
C
369 Air inlets are located near the ceiling and fitted with louvers.
MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets
to be through wall louvers near the ceiling.
C
370 Chlorine vent line discharges outside and above grade and is screened with #14 mesh
screen.
SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to
discharge outside, above grade, at a point least susceptible to vandalism, and to have
the end covered with a #14 mesh non-corrodible screen. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
371 Separate switches for chlorine room fans and lights are located near the entrance to
the room (or are located outside the chlorine room if housed in a water treatment
plant).
MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for
the chlorine room fans and lights to be located near the entrance to the room and to
be protected from vandalism. The switches are required to be located outside the
chlorine room if housed in a water treatment plant.
C
372 Chlorine cylinder is restrained in position to prevent upset.
SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be
restrained in position to prevent upset. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
373 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat.
SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from
being stored in direct sunlight or exposed to excessive heat. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
374 Weight scale is provided for weighing chlorine gas cylinders/containers.
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
375 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 56 of 62
TP005 - N MORGAN SPRING CHLORINATOR -- Gaseous Chlorination - Active
375A
Leak response/repair plan available
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
375B
Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak
detection
MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium
hydroxide (56% ammonia solution) to be available for leak detection.
C
375C
Immediate access to NIOSH respirator available
SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders
are used, a respirator recommended the National Institute of Occupational Safety and
Health must be available. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
376 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N
377 Is the (daily) scale weight or volume data recorded? Explain where in the comments...
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
378 Is this facility Active or Inactive?A
379 If disinfection is required, standby chlorination equipment of sufficient capacity is
available to replace the largest unit.
SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for
disinfection of the water supply, the rule requires standby equipment of sufficient
capacity to be available to replace the largest unit in the event of its failure. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
380 Is the chlorinator room heated and has the ability to be protected from excessive heat?
MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be
heated, lighted, and ventilated as necessary to assure proper operation of the
equipment and safety of the operators.
C
381 If continuous disinfection is needed, automatic switch over of chlorine cylinders is
provided.
MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic
switch over of chlorine cylinders be provided if continuous disinfection is required.
C
382 Exhaust fan takes suction near the floor as far as practical from the door and air inlet,
and discharges outside away from air inlets.
MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust
fan to take suction inside the chlorine room near the floor, as far as practical from the
door and air inlet, and discharge air outside of the building away from air inlets.
C
383 Air inlets are located near the ceiling and fitted with louvers.
MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets
to be through wall louvers near the ceiling.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 57 of 62
384 Chlorine vent line discharges outside and above grade and is screened with #14 mesh
screen.
SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to
discharge outside, above grade, at a point least susceptible to vandalism, and to have
the end covered with a #14 mesh non-corrodible screen. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
385 Separate switches for chlorine room fans and lights are located near the entrance to
the room (or are located outside the chlorine room if housed in a water treatment
plant).
MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for
the chlorine room fans and lights to be located near the entrance to the room and to
be protected from vandalism. The switches are required to be located outside the
chlorine room if housed in a water treatment plant.
C
386 Chlorine cylinder is restrained in position to prevent upset.
SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be
restrained in position to prevent upset. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
387 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat.
SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from
being stored in direct sunlight or exposed to excessive heat. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
388 Weight scale is provided for weighing chlorine gas cylinders/containers.
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
389 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following
question(s)
Y
389A
Leak response/repair plan available
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
389B
Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak
detection
MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium
hydroxide (56% ammonia solution) to be available for leak detection.
C
389C
Immediate access to NIOSH respirator available
SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders
are used, a respirator recommended the National Institute of Occupational Safety and
Health must be available. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
390 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 58 of 62
TP007 - MAHOGANY RIDGE CHLORINATOR -- Gaseous Chlorination - Active
391 Is the (daily) scale weight or volume data recorded? Explain where in the comments...
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
392 Is this facility Active or Inactive?A
393 If disinfection is required, standby chlorination equipment of sufficient capacity is
available to replace the largest unit.
SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for
disinfection of the water supply, the rule requires standby equipment of sufficient
capacity to be available to replace the largest unit in the event of its failure. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
394 Is the chlorinator room heated and has the ability to be protected from excessive heat?
MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be
heated, lighted, and ventilated as necessary to assure proper operation of the
equipment and safety of the operators.
C
395 If continuous disinfection is needed, automatic switch over of chlorine cylinders is
provided.
MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic
switch over of chlorine cylinders be provided if continuous disinfection is required.
C
396 Exhaust fan takes suction near the floor as far as practical from the door and air inlet,
and discharges outside away from air inlets.
MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust
fan to take suction inside the chlorine room near the floor, as far as practical from the
door and air inlet, and discharge air outside of the building away from air inlets.
C
397 Air inlets are located near the ceiling and fitted with louvers.
MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets
to be through wall louvers near the ceiling.
C
398 Chlorine vent line discharges outside and above grade and is screened with #14 mesh
screen.
SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to
discharge outside, above grade, at a point least susceptible to vandalism, and to have
the end covered with a #14 mesh non-corrodible screen. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
399 Separate switches for chlorine room fans and lights are located near the entrance to
the room (or are located outside the chlorine room if housed in a water treatment
plant).
MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for
the chlorine room fans and lights to be located near the entrance to the room and to
be protected from vandalism. The switches are required to be located outside the
chlorine room if housed in a water treatment plant.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 59 of 62
TP008 - ISLAND ROAD #5 CHLORINATOR -- Gaseous Chlorination - Active
400 Chlorine cylinder is restrained in position to prevent upset.
SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be
restrained in position to prevent upset. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
401 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat.
SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from
being stored in direct sunlight or exposed to excessive heat. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
402 Weight scale is provided for weighing chlorine gas cylinders/containers.
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
403 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following
question(s)
Y
403A
Leak response/repair plan available
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
403B
Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak
detection
MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium
hydroxide (56% ammonia solution) to be available for leak detection.
C
403C
Immediate access to NIOSH respirator available
SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders
are used, a respirator recommended the National Institute of Occupational Safety and
Health must be available. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
404 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N
405 Is the (daily) scale weight or volume data recorded? Explain where in the comments...
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
406 Is this facility Active or Inactive?A
407 If disinfection is required, standby chlorination equipment of sufficient capacity is
available to replace the largest unit.
SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for
disinfection of the water supply, the rule requires standby equipment of sufficient
capacity to be available to replace the largest unit in the event of its failure. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 60 of 62
408 Is the chlorinator room heated and has the ability to be protected from excessive heat?
MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be
heated, lighted, and ventilated as necessary to assure proper operation of the
equipment and safety of the operators.
C
409 If continuous disinfection is needed, automatic switch over of chlorine cylinders is
provided.
MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic
switch over of chlorine cylinders be provided if continuous disinfection is required.
C
410 Exhaust fan takes suction near the floor as far as practical from the door and air inlet,
and discharges outside away from air inlets.
MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust
fan to take suction inside the chlorine room near the floor, as far as practical from the
door and air inlet, and discharge air outside of the building away from air inlets.
C
411 Air inlets are located near the ceiling and fitted with louvers.
MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets
to be through wall louvers near the ceiling.
C
412 Chlorine vent line discharges outside and above grade and is screened with #14 mesh
screen.
SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to
discharge outside, above grade, at a point least susceptible to vandalism, and to have
the end covered with a #14 mesh non-corrodible screen. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
413 Separate switches for chlorine room fans and lights are located near the entrance to
the room (or are located outside the chlorine room if housed in a water treatment
plant).
MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for
the chlorine room fans and lights to be located near the entrance to the room and to
be protected from vandalism. The switches are required to be located outside the
chlorine room if housed in a water treatment plant.
C
414 Chlorine cylinder is restrained in position to prevent upset.
SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be
restrained in position to prevent upset. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
415 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat.
SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from
being stored in direct sunlight or exposed to excessive heat. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
416 Weight scale is provided for weighing chlorine gas cylinders/containers.
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
417 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 61 of 62
417A
Leak response/repair plan available
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
417B
Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak
detection
MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium
hydroxide (56% ammonia solution) to be available for leak detection.
C
417C
Immediate access to NIOSH respirator available
SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders
are used, a respirator recommended the National Institute of Occupational Safety and
Health must be available. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
418 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N
419 Is the (daily) scale weight or volume data recorded? Explain where in the comments...
SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for
determining chlorine cylinder weight. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 16:24:52 | Rating: Approved UTAH15008 MORGAN CITY WATER SYSTEM page 62 of 62