HomeMy WebLinkAboutDDW-2024-008384Sanitary Survey - Deficiency Report
PWS Number:UTAH15008 Deficiency Points:365 Survey Date:05/14/2024
Survey Name:MORGAN CITY WATER
SYSTEM
Surveyor:Susan Riggs
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Management and Operations | DS001 | UTAH15008 DISTRIBUTION SYSTEM
22. For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power
option.
Rule: R309-515-6(2)(a)Rule requires a community water system without naturally flowing water sources, such
as springs or flowing wells, to have one or more of the system's sources equipped for
operation during power outages. To ensure continuous service when the primary power
has been interrupted, a redundant power supply is required. A redundant power
supply may include a transfer switch for auxiliary power such as a generator or a
power supply service with coverage from two independent substations. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:In process of getting standby power.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S033 COM SYSTEM WITHOUT NATURALLY FLOWING SOURCES LACKS BACKUP
POWER FOR AT LEAST ONE WATER SOURCE
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Management and Operations | DS001 | UTAH15008 DISTRIBUTION SYSTEM
28A. System lacks up to 20% of required source capacity
Rule: R309-510-7(1)Rule requires a water system's source capacity to legally and physically meet the peak
day demand and the average yearly demand.
Notes:Existing % of Total Req'd is 93.7%
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S091 SYSTEM LACKS UP TO 20% OF REQUIRED SOURCE CAPACITY
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH15008 DISTRIBUTION SYSTEM
33. Documentation of annual public awareness and/or employee training
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes providing public education or awareness material or presentations.
Notes:In process.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS
Sanitary Survey Category: DS
SDWIS Severity Code: Significant Deficiency
Distribution | DS001 | UTAH15008 DISTRIBUTION SYSTEM
40. No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe
the location in detail.)
Rule: R309-550-5(11)R309-550-5(11)
Notes:In a vault which drains to daylight.
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: D009 WATER MAINS SUSCEPTIBLE TO NEARBY CONTAMINATION SOURCES
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS004 | ROBINSON SPRING
76. No deep-rooted vegetation is within the 50 ft collection area.
Rule: R309-515-7(7)(f)All deep-rooted vegetation within the fenced collection area shall be removed by a
means not negatively affecting water quality. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:Less than 50ft
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS07 DEEP ROOTED VEGETATION IN SPRING COLLECTION AREA
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS004 | ROBINSON SPRING
77. No roots seen in collection boxes and junctions.
Rule: R309-105-10(4)(a), R309-515-8(1)(a)Spring collection areas shall be periodically (preferably annually) cleared of deep-
rooted vegetation to prevent root growth from clogging collection lines. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:Roots in well connected to spring.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS08 ROOTS IN SPRING COLLECTION PIPES
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS004 | ROBINSON SPRING
78B. Spring box lid is gasketed
Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished
with a gasket between the lid and frame. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:To be repaired.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS005 | N MORGAN SPRING
92. No roots seen in collection boxes and junctions.
Rule: R309-105-10(4)(a), R309-515-8(1)(a)Spring collection areas shall be periodically (preferably annually) cleared of deep-
rooted vegetation to prevent root growth from clogging collection lines. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:Roots in well connected to spring.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS08 ROOTS IN SPRING COLLECTION PIPES
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST002 | NORTH MORGAN SPRINGS STORAGE
227A. Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin?
Rule: R309-545-13 Rule requires all water storage tanks to be provided with an overflow that discharges at
an elevation between 12 and 24 inches above the ground surface or the rim of the
receiving basin.
Notes:Discharges below flood rim.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V011 END OF STORAGE TANK OVERFLOW LACKS A CLEARANCE OF BETWEEN 12
AND 24 INCHES FROM GROUND SURFACE
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST004 | ROBINSON SPRINGS STORAGE
255A. Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin?
Rule: R309-545-13 Rule requires all water storage tanks to be provided with an overflow that discharges at
an elevation between 12 and 24 inches above the ground surface or the rim of the
receiving basin.
Notes:Discharges below flood rim.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V011 END OF STORAGE TANK OVERFLOW LACKS A CLEARANCE OF BETWEEN 12
AND 24 INCHES FROM GROUND SURFACE
Sanitary Survey Category: PU
SDWIS Severity Code: Minor Deficiency
Pump Stations | PF001 | ROBINSON SPRINGS BOOSTER STATION
265. Pump station properly secured
Rule: R309-540-5(1)(a)(v)The pump station is protected to prevent vandalism and entrance by animals or
unauthorized persons.
Notes:In vault. Manhole to be secured.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: PS33 PUMP FACILITY NOT PROTECTED FROM VANDLISM OR UNAUTHORIZED
ENTRY
Sanitary Survey Category: PU
SDWIS Severity Code: Minor Deficiency
Pump Stations | PF002 | 700 EAST BOOSTER PUMP
274. Pump station properly secured
Rule: R309-540-5(1)(a)(v)The pump station is protected to prevent vandalism and entrance by animals or
unauthorized persons.
Notes:In vault. Manhole to be secured.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: PS33 PUMP FACILITY NOT PROTECTED FROM VANDLISM OR UNAUTHORIZED
ENTRY
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Treatment - Chlorination General | TP004 | ROBINSON SPRING CHLORINATOR
300. Is there a designated chlorine Point of Entry (POE) sample location?
Rule: R309-105-7, 8 & 18, R309-100 through
605
Trigger for regulatory followup to address concerns.
Notes:POE at first customer connection.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS
Sanitary Survey Category: TR
SDWIS Severity Code: Significant Deficiency
Treatment - Chlorination General | TP004 | ROBINSON SPRING CHLORINATOR
301. POE is before first connection/customer?
Rule: R309-215 R309-215 & R309-520-6(4)(d)
Notes:POE at first customer connection.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: T028 INCORRECT COMPLIANCE CHLORINE RESIDUAL SAMPLING LOCATION
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Treatment - Chlorination General | TP005 | N MORGAN SPRING CHLORINATOR
315. Is there a designated chlorine Point of Entry (POE) sample location?
Rule: R309-105-7, 8 & 18, R309-100 through
605
Trigger for regulatory followup to address concerns.
Notes:POE at first customer connection.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS
Sanitary Survey Category: TR
SDWIS Severity Code: Significant Deficiency
Treatment - Chlorination General | TP005 | N MORGAN SPRING CHLORINATOR
316. POE is before first connection/customer?
Rule: R309-215 R309-215 & R309-520-6(4)(d)
Notes:POE at first customer connection.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: T028 INCORRECT COMPLIANCE CHLORINE RESIDUAL SAMPLING LOCATION