HomeMy WebLinkAboutDAQ-2024-0075761
DAQC-359-24
Site ID 16140 (B4)
MEMORANDUM
TO: STACK TEST FILE – CRUSOE ENERGY SYSTEMS INC. – Mullins Tap Facility
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: April 19, 2024
SUBJECT: Source: Five (5) Waukesha 9394 GSI generator engines; Units: 1320, 1454,
2026-01, 1452, 1453 SN’s: 1632087, 1657645, 1641324, 1651044,
1651075
Location: 2 Miles North of Myton, Duchesne County, Utah
Contact: Kaitlin Meszaros: 631-245-0308
Tester: Great Plains Analytical Services, Inc.
Site ID #: 16140
Permit/AO #: DAQE-AN161400001-23 dated August 9, 2023
Subject: Review of Pretest Protocol dated April 19, 2024
On April 19, 2024, Utah Division of Air Quality (DAQ) received a test notification for the testing of five
(5) Waukesha 9394 GSI generator engines located at Crusoe Energy Systems, Incorporated Mullins Tap
Facility, Duchesne County, Utah. Testing will be performed during the week of June 3, 2024, to
determine compliance with the emission limits found in condition II.B.2.a of Approval Order
DAQE-AN161400001-23 and 40 CFR 60, Subpart JJJJ.
PROTOCOL CONDITIONS:
1. RM 1 used to determine sample velocity traverses: OK
2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK
3. RM 3A used to determine dry molecular weight of the gas stream: OK
4. ASTM D6348-03 used to determine H2O, NOx, CO, and VOC emissions: OK
DEVIATIONS: No deviations stated in the protocol.
CONCLUSION: The protocol appears to be acceptable.
RECOMMENDATION: Send protocol review and test date confirmation notice.
ATTACHMENTS: Crusoe Energy Systems’ pretest protocol and test notification.
2
3
4
5
6
7
8
9
10
11
12