HomeMy WebLinkAboutDDW-2024-008366Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Exception Granted: R309-510-8 | The basis for your request for an exception is that you do not have sufficient equalization storage as stated
previously. According to your calculations, the water system would require 2,750 gallons of equalization storage. However, guidance in Rule R309-
510-8(2) allows for transient non-community water systems to meet the intent of having equalization storage. The configuration of the system is one
of those items that meets the intent of equalization storage.
Site Visit Date Surveyor Name
05/23/2024 Ryan Dearing
SLOT CANYONS INN PWS ID: UTAH09104 Rating:Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: JOETTE MARIE
*Last Name: REX
*Organization:
*Address: Redacted
*City: ESCALANTE
*State: UT
*Zip: 84726
*Email: info@slotcanyonsinn.com
*Phone: 435-826-4901
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: SLOT CANYONS INN
*Address: 3680 W STATE HWY 12
*City: ESCALANTE
*State: UT
*Zip: 84726
*Email: info@slotcanyonsinn.com
*Phone: 435-826-4901
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 1 of 13
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Joette Marie
*Last Name: Rex
*Organization:
*Address: 3680 W State Hwy 12
*City: Escalante
*State: UT
*Zip: 84726
*Email: info@slotcanyonsinn.com
*Phone: 435-826-4901
Emergency Phone: 435-826-4901
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Joette
*Last Name: Rex
*Organization:
*Address: 3680 W State Hwy 12
*City: Escalante
*State: UT
*Zip: 84726
*Email: info@slotcanyonsinn.com
*Phone: 435-826-4901
Emergency Phone: 435-826-4901
5 Does the system serve a Residential population?Y
5A Population - Residential 6
5B Operating Period (Start Date) - Residential 01/01
5C Operating Period (End Date) - Residential 12/31
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
Y
6A Population - Transient 40
6B Operating Period (Start Date) - Transient 01/01
6C Operating Period (End Date) - Transient 12/31
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
Y (Notes: One worker at the Inn.)
7A Population - Non-Transient 1
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 2 of 13
Site Visit Info
Management and Operations
7B Operating Period (Start Date) - Non-Transient 04/01
7C Operating Period (End Date) - Non-Transient 10/31
8 Population - Wholesale :0
9 Residential Connections:2
10 Commercial Connections:4
11 Industrial Connections:0
12 Agricultural Connections:0
13 Date of Survey (First Day of Field Work)05/23/2024
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
05/23/2024
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
05/23/2024
16 Water system representative present during the survey:Adam Rex
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
1
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
2
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
8
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
2
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
NA (Notes: Non community)
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 3 of 13
Cross Connection and Operator Certification
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
NA (Notes: Non community)
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
N
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
31A Does your Emergency Response Plan address cybersecurity? (required for systems
over 3,300 population)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
NA (Notes: Less than 3300.)
31B Does your water system use any computers, laptops, phones, tablets, or any other
computer systems to manage, operate, or maintain the PWS (SCADA or Industrial
Control Systems)? This includes any water sources, treatment, distribution or any
process related to operation function
N
31C Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 4 of 13
General Maintenance and Environment
32 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
D (Notes: No authority statement. Talked to
operator about how to resolve.)
33 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
D (Notes: Talked to operator about how to
resolve.)
34 Documentation of personnel trained to manage the program (COMMUNITY WATER
SYSTEMS POPULATION 500 AND ABOVE REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A
MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
D (Notes: Talked to operator about how to
resolve.)
35 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
D (Notes: Talked to operator about how to
resolve.)
36 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
D (Notes: Talked to operator about how to
resolve.)
37 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
38 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 5 of 13
Distribution
General Disinfection
39 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
40 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
41 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
N
42 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
NA (Notes: NO FIRE HYDRANTS)
43 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
44 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
45 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
46 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
47 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
N
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 6 of 13
WS001 - SLOT CANYONS WELL - Active
48 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
49 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
50 Is this facility Active or Inactive?A
51 Operating Period (Start Date)01/01
52 Operating Period (Ending Date)12/31
53 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
54 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
55 Wellhead is sealed to prevent contamination.
Exception Granted: R309-515-6(6)(i) | The basis for your request for an exception to
Rule R309-515-6(6)(i), Well Sealing Techniques and Requirements is to allow the
previously constructed grout seal to a depth of 30 feet, instead of to a depth of 100
feet. All other components of the well were drilled according to DDW rules.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
56 Is the well casing vented? ... if yes, answer the following question(s)N
57 Does the well have a pump to waste line? ... if yes, answer the following question(s)N
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 7 of 13
58 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
59 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
60 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
61 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
62 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
63 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
D (Notes: Need to add smooth nosed
sample tap on the line where it first enters
the building.)
64 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
65 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
66 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 8 of 13
HD001 - THREE PRESSURE TANKS -- Hydropneumatic Tanks - Active
PF001 - CLIFF HOUSE BOOSTER PUMP -- Pump Stations - Active
67 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
68 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
69 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
70 Does well require oil-lubrication?N
71 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
72 A tank located below ground allows for adequate drainage, ventilation, maintenance,
and flood protection.
MIN | 15pts | PU | PT14 | R309-540-6(2) | Rule requires diaphragm or air tanks and
appurtenances located below ground to have adequate provisions for drainage,
ventilation, maintenance, and flood protection.
C
73 Is there a means to measure pressure to verify the tank is pressurizing properly?
MIN | 15pts | PU | PT08 | R309-540-6(3) | A pressure gauge shall be installed on the
pressure tank inlet line.
C
74 Pump station/Hydropneumatic tank and controls not protected against hazard?
SIG | 25pts | PU | PT13 | R309-540-5(1)(a)(i) | The pump station site meets the
requirements for sanitary protection of water quality, hydraulics of the system, and
protection against interruption of service by fire, flood, or any other hazard. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
75 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 9 of 13
TP001 - IRON REMOVAL TREATMENT -- Treatment General - Active
76 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
77 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Centrifugal
78 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Only pressurizes Cliff House)
79 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
80 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
81 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
82 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
83 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
84 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 10 of 13
85 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
86 Operating Period (Start Date)01/01
87 Operating Period (Ending Date)12/31
88 What is the objective of the treatment process and how do you know it is working?
(e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.)
Iron Removal
89 Walk me through the different process steps of your treatment plant. What is the
purpose of each step? Show me how you determine you are meeting your Treatment
Requirements.
The treatment is basically 2 large water
softeners.
90 What Chemicals are used? Why?Salt
91 How is the chemical dose adjusted with flow and water quality? Prompts: What flow
rate is used for the adjustment (influent, effluent, CFE)? What water quality
parameters would make you change dose rate?
N/A
92 Does influent flow rate vary?N
93 Process control testing is consistent with the specific treatment process
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
94 There is a means to accurately measure the quantities of chemicals used.
SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for
measuring the quantities of chemicals used. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
95 Treatment plant properly secured to protect the quality of the treated water, R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
96 Are liquid chemicals used? ... if yes, answer the following question(s)N
97 Treatment chemicals meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 11 of 13
TP001 - IRON REMOVAL TREATMENT -- Filtration - General
98 Are all chemical feeders properly verified for accuracy?
SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the
necessary amounts of chemicals at an accurately controlled rate, throughout the
anticipated range of feed. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
99 Spare parts are available for all chemical feeders
MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states
that a means consistent with the nature of the chemical solution shall be provided in a
solution tank to maintain a uniform strength of solution. Continuous agitation shall be
provided to maintain slurries in suspension. 2 dem
C
100 Incompatible chemicals stored separately
SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are
incompatible from being fed, stored, or handled together. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
101 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
NA (Notes: N/A)
102 Raw water compliance samples are collected before any treatment. R309-215-4(4)
SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i)
Y
102A
If yes, was location shown?Yes
103 Where are finished water quality monitoring samples collected?At sample tab at the end of the treatment
process.
104 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the
proper disposal of treatment plant waste to land or water?
MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6
NA (Notes: N/A)
105 Which parameters are watched when running treatment plant?Finished water iron levels
106 What type of alarm system is used?None
107 Does treatment plant have a SCADA system?N
108 Proper lab equipment on site to support required operations & maintenance of the
plant?
SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be
provided to assure proper operation and monitoring of the water plant. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: N/A)
DEQ | Drinking Water
Run Date: 06/11/2024 13:52:40 | Rating: UTAH09104 SLOT CANYONS INN page 12 of 13
109 Instrumentation and controls for the process are operational, and in service
SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify
that treatment processes are sufficient shall be properly calibrated and maintained. At
a minimum, this shall include turbidimeters. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
110 Is turbidity monitoring required? ... if yes, answer the following question(s)N
111 What is the maximum filtration rate throughout the year (in gpm/sf)?N/A
112 What criteria are used to determine when a filter backwash is needed?H
113 What criteria are used to determine filtration is functioning properly? (PSI, Turbidity,
Headloss, Flow rate, water quality parameter)
Flow rate
114 Criteria is used to determine filter loading rate meets the manufacturers
recommendations? R309-525-15(2) Explain in comments...
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
115 What criteria are used to determine if filter media needs to be replaced?Iron breakthrough
116 Is backwash flow rate verified to determine it meets minimum requirements?
MIN | 15pts | TR | T076 | R309-525-15(7) | Rule requires that backwash systems be
designed and operated to
provide for adequate backwash with minimum media loss.
NA (Notes: N/A)
117 If system filters by Direct Filtration, the plant is configured to shut down automatically
when a source water exceeds 20 NTU for longer than 3 hours, or when the source
water turbidity exceeds 30 NTU at any time? R309-530-5(3)(g)
SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify
that treatment processes are sufficient shall be properly calibrated and maintained. At
a minimum, this shall include turbidimeters. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
NA (Notes: Does not use turbidity as an
indicator.)
DEQ | Drinking Water