MEMORANDUM
TO: FILE – CITATION OIL & GAS CORPORATION – Pineview Tank Battery and
Gas Plant
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: May 10, 2024
SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Summit County
INSPECTION DATE: April 17, 2024
SOURCE LOCATION: 3604 E Chalk Creek Road
Coalville, UT 84017
DIRECTIONS: The source is approximately 15 miles east of Coalville, UT on
East Chalk Creek Road.
SOURCE CONTACTS: Ron Schultz, Manager Regulatory Compliance
832-517-4821 RSchultz@cogc.com
OPERATING STATUS: Operating.
PROCESS DESCRIPTION: Citation Oil & Gas Corporation (Citation) operates a crude oil
and natural gas tank battery and gas plant at the Pineview
Facility location. At the tank battery, crude oil, natural gas, and
produced water are processed from an emulsion stream extracted
from wells using electric submersible pumps and pumping units.
Fluid from the wellheads enters a separator where the oil and
water are separated from gas. The separated gas is sent to the
adjoining gas plant. The liquids from the separators are routed to
crude oil and produced water storage tanks at the lower portion
of the tank battery. Emissions from the crude oil storage tanks
are controlled by a flare. The crude oil is sent off site via truck
loading while the produced water is piped for off-site injection
within the field. Gas is routed to the gas plant.
APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN155130002-22 dated August
15, 2022
MACT (Part 63) -HH : National Emission Standards for
Hazardous Air Pollutants From Oil and Natural Gas Production
Facilities,
MACT (Part 63) -ZZZZ: National Emissions Standards for
Hazardous Air Pollutants for Stationary Reciprocating Internal
Combustion Engines,
2
SOURCE EVALUATION:
Name of Permittee: Permitted Location:
Citation Oil & Gas Corp. - Pineview Tank
Battery and Gas Plant
14077 Cutten Road 3604 East Chalk Creek Road
Houston, TX 77069 Coalville, UT 84017
SIC Code: 1311: (Crude Petroleum & Natural Gas)
Section I: GENERAL PROVISIONS
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the
UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to
those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions
covered by this AO must be reviewed and approved. [R307-401-1]
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by
the owner/operator, shall be made available to the Director or Director's representative upon
request, and the records shall include the two-year period prior to the date of the request. Unless
otherwise specified in this AO or in other applicable state and federal rules, records shall be kept
for a minimum of two (2) years. [R307-401-8]
I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall,
to the extent practicable, maintain and operate any equipment approved under this AO, including
associated air pollution control equipment, in a manner consistent with good air pollution control
practice for minimizing emissions. Determination of whether acceptable operating and
maintenance procedures are being used will be based on information available to the Director
which may include, but is not limited to, monitoring results, opacity observations, review of
operating and maintenance procedures, and inspection of the source. All maintenance performed
on equipment authorized by this AO shall be recorded. [R307-401-4]
I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns.
[R307-107]
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150]
Status: In Compliance. No limits set forth in this AO appear to have been exceeded. All
requested records were made available after the inspection via email. No breakdowns that
would result in excess emissions were reported. The equipment appeared to be maintained
and operated in a manner consistent with good air pollution control practices. An emission
inventory was submitted for the Pineview Gas Plant in 2020.
Section II: SPECIAL PROVISIONS
II.A The approved installations shall consist of the following equipment:
II.A.1 Pineview Operations
Production Tank Battery and Gas Plant
3
II.A.2 Pineview Production Tank Battery
II.A.3 Two Separators
Free Water Knock Out
II.A.4 Two Crude Oil Storage Tanks
Capacity: 1,000 barrels (bbls) each
Control: Combustor (II.A.8)
II.A.5 One Wet Oil Tank
Capacity: 1,000 bbls
Control: Combustor (II.A.8)
II.A.6 One Crude Oil Tank
Capacity: 500 bbl
Control: Combustor (II.A.8)
II.A.7 One Combustor
II.A.8 Three Heater Treaters
Fuel: Field Gas
Capacity: 0.302 MMBtu/hr Each
II.A.9 Pineview Gas Plant
II.A.10 One Residue Gas Compressor Engine
Fuel: Natural Gas
Make and Manufacturer: White Superior, 8G825
Maximum Rating: 800 hp
Control: Non-selective catalytic Reduction
II.A.11 Two Wet Gas Compressor Engines
Fuel: Natural Gas
Make and Manufacturer: White Superior, 8G825
Maximum Rating: 800 hp Each
Control: Non-selective catalytic Reduction
II.A.12 One MRU Dehydration Unit
Fuel: Natural Gas
Capacity: 0.075 MMBtu/hr
Maximum Capacity: Less than 1.0 MMscf/day
II.A.13 One Dehydration Unit
Fuel: Natural Gas
Burner Capacity: 1.5 MMBtu/hr
Maximum Capacity: Less Than 1.0 MMscf/day
II.A.14 One Refrigeration Compressor Heater
Fuel: Natural Gas
Burner Capacity: 0.35 MMBtu/hr
Maximum Capacity: Less than 5 MMBtu/hr
II.A.15 One Flare Pit
for emergency use
II.A.16 Various Boilers
Includes: hot oil heaters
Fuel: Natural Gas
Maximum Capacity: Less than 5 MMBtu/hr Each
4
II.A.17 Four Bullet Tanks
Contents: Natural Gas
Capacity: 714.3 bbls Each
*include for informational purposes
II.A.18 One Slop Tank
Contents: Produced/Separator Water
Capacity: 400 bbl
II.A.19 Miscellaneous Storage Tanks
Storage of methanol, etc.
Maximum Tank Capacity: Less than or equal to 500 gallons Each
II.A.20 One H2S Sweetening Unit
Non-Emitting Unit Listed for informational purposes
II.A.21 Pineview Production Tank Battery
II.A.22 Produced Water Transfer at Production Tank Battery
included for informational purposes- powered by electricity
II.A.23 One Skim Tank
Capacity: 200 bbls
II.A.24 Six Produced Water Tanks
Capacity: 1,000 bbls Each
II.A.25 Gas Sweetening Unit
Included for informational purposes
II.A.26 Electric Pump
Included for informational purposes
Status: In Compliance. The above equipment was observed during the inspection. However,
according to the Production Foreman Mr. Geary, two of the three compressor
engines are permanently out of service. The source is determining the cost
effectiveness of replacing the out of service engines with electrified versions. The
source is aware that they will need to modify the AO once they have decided which
engines will replace the two engines that are permanently out of service.
Additionally, there is an additional separator vessel on-site, and two additional
electric pumps on site. No recommended enforcement action as these pieces of
equipment do not add to the source's potential to emit emissions.
II.B Requirements and Limitations
II.B.1 Site-Wide Requirements.
II.B.1.a Unless otherwise specified in this AO, the owner/operator shall not allow visible emissions from
any stationary point or fugitive emission source on site to exceed 10 percent opacity.
[R307-401-8]
II.B.1.a.1 Unless otherwise specified in this AO, opacity observations of emissions from stationary sources
shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-201-3]
Status: In Compliance. No visible emissions were observed during the inspection from any
point.
5
II.B.1.b The owner/operator shall use natural gas as fuel in all process equipment. [R307-401-8]
Status: In Compliance. Natural gas is used to fuel all process equipment.
II.B.2 Crude Oil and Produced Water Storage Tank Requirements
II.B.2.a The owner/operator shall not produce more than 146,000 barrels (1 barrel = 42 gallons) of crude
oil per rolling 12-month period and 5,749,442 barrels of produced water per rolling 12-month
period. [R307-401-8]
II.B.2.a.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new
12-month total by the 20th day of each month using data from the previous 12 months. Records
of crude oil and produced water production shall be kept for all periods when the Production
Tank Battery is in operation. Crude oil and produced water production shall be determined by
process flow meters or sales records. The records of crude oil and produced water production
shall be kept on a daily basis. [R307-401-8]
Status: In Compliance. The source produced 107,507 barrels of crude oil, and 4,874,887
barrels of produced water for the most recent rolling 12-month period. See attachments.
II.B.2.b The owner/operator shall load the tanker trucks on site by the use of submerged loading or
bottom filling. [R307-401-8, R307-504]
Status: In Compliance. Submerged loading is used for truck loading operations.
II.B.2.b.1 The owner/operator shall keep the storage tank thief hatches and other tank openings closed and
sealed except during tank unloading or other maintenance activities. [R307-401-8]
Status: In Compliance. Storage tank thief hatches and other tank openings were closed and
sealed during the inspections. No VOC emissions were observed with the OGI camera.
II.B.2.c The owner/operator shall ensure VOC emissions during truck loading operations are controlled at
all times using a vapor capture line. The vapor capture line shall be connected from the tanker
truck to a control device or process. [R307-504]
Status: In Compliance. A vapor capture line has been installed and routed to a control
device.
II.B.3 Combustor Requirements
II.B.3.a The owner/operator shall route all exhaust gas/vapors from the crude oil associated with the
Production Tank Battery to the operating combustor. [R307-401-8]
Status: In Compliance. All exhaust gas/vapors from the crude oil associated with the
Production Tank Battery are routed to the combustor.
II.B.3.b The combustor shall operate with no visible emissions. [R307-401-8]
II.B.3.b.1 Visual determination of smoke emissions from the combustor shall be conducted according to 40
CFR 60, Appendix A, Method 22. [R307-401-8]
Status: In Compliance. No visible emissions were observed from the combustor.
II.B.4 Leak Detection and Repair Requirements
II.B.4.a The owner/operator shall conduct a leak detection inspection for each valve(s), flange(s) or other
connection, pump(s), compressor(s), pressure relief device(s) or other vent(s), process drain(s),
open-ended valve(s), pump seal(s), compressor seal(s), and access door seal(s) or other seal
containing or contacting a process stream with hydrocarbons that is associated with each of the
approved emission unit listed in Section II.A.
6
Leak detection inspections shall be conducted according to the following schedule:
a. No later than 90 days after startup or 180 days from the date of this AO.
b. At least once every 12 months after the initial leak detection inspection. [R307-401-8]
II.B.4.b Inspections shall be conducted in one of two ways;
1. An analyzer that meets U.S. EPA Method 21, 40 CFR Part 60, Appendix A
2. An optical gas imaging instrument as defined in 40 CFR 60.18(g)(4)
The optical gas imaging instrument must meet requirements specified in 40 CFR 60.18(i)(3).
Any emissions detected with an optical gas imaging instrument shall be considered a leak in need
of repair unless the owner/operator evaluates the leak with an analyzer meeting U.S. EPA
Method 21, 40 CFR Part 60 and the analyzer reading is less than 500 ppmv. A reading of 500
ppmv or greater shall be considered a leak in need of repair.
Emissions detected from tank gauging, load-out operations, venting of pneumatics, properly
operating pressure relief valves, or other maintenance activities shall not be considered leaks.
[R307-401-8]
II.B.4.c The owner/operator is exempt from inspecting a valve, flange or other connection, pump or
compressor, pressure relief device, process drain, open-ended valve, pump or compressor seal
system degassing vent, accumulator vessel vent, agitator seal, or access door seal under any of
the following circumstances:
a. The contacting process stream only contains glycol, amine, methanol, or produced water.
b. Monitoring could not occur without elevating the monitoring personnel more than six feet
above a supported surface or without the assistance of a wheeled scissor-lift or hydraulic type
scaffold.
c. Monitoring could not occur without exposing monitoring personnel to an immediate danger as
a consequence of completing monitoring.
d. The item to be inspected is buried, insulated in a manner that prevents access to the
components by a monitor probe, or obstructed by equipment or piping that prevents access to the
components by a monitor probe. [R307-401-8]
II.B.4.d If a leak is detected at any time, the owner/operator shall attempt to repair the leak no later than 5
calendar days after detection. Repair of the leak shall be completed no later than 15 calendar
days after detection, unless parts are unavailable or unless repair is technically infeasible without
a shutdown. The owner/operator shall inspect the repaired leak no later than 15 calendar days
after the leak was repaired to verify that it is no longer leaking.
If replacement parts are unavailable, the replacement parts must be ordered no later than 5
calendar days after detection, and the leak must be repaired no later than 15 calendar days after
receipt of the replacement parts.
If repair is technically infeasible without a shutdown, the leak must be repaired by the end of the
next shutdown. If a shutdown is required to repair a leak, the shutdown must occur no later than
6 months after the detection of the leak unless the owner/operator demonstrates that emissions
generated from the shutdown are greater than the fugitive emissions likely to result from delay of
repair. [R307-401-8]
7
II.B.4.e Records of inspections and leak detection and repair shall include the following:
a. The date of the inspection
b. The name of the person conducting the inspection
c. Any component not exempt under II.B.4.c that is not inspected and the reason it was not
inspected
d. The identification of any component that was determined to be leaking
e. All records shall be maintained for optical gas imaging instrument as per 40 CFR
60.18(i)(4)(vi)
f. The date of first attempt to repair the leaking component
g. Any component with a delayed repair
h. The reason for a delayed repair
1. For unavailable parts:
i. The date of ordering a replacement component
ii. The date the replacement component was received
2. For a shutdown:
i. The reason the repair is technically infeasible
ii. The date of the shutdown
iii. Emission estimates of the shutdown and the repair if the delay is longer than
6 months
i. Corrective action taken
j. The date corrective action was completed
k. The date the component was verified to no longer be leaking
l. The records of each component exempt under II.B.4.c
1. Type of component
2. Description of qualifying exemption. [R307-401-8]
Status: In Compliance. LDAR is conducted annually. The most recent survey was
conducted September 11 and 12, 2024. See attached records.
II.B.5 Gas Plant Requirements
II.B.5.a The owner/operator shall not exceed the following production and consumption limits associated
with the gas plant per rolling 12-month period:
A. 532.2 million standard cubic feet of processed gas
B. 56.981 million standard cubic feet of natural gas consumed. [R307-401-8]
II.B.5.a.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new
12-month total by the 20th day of each month using the most recent 12 months of data. Records
of production and consumption shall be kept for all periods when the plant is in operation.
[R307-401-8]
Status: In Compliance. The source reported the following records:
A. 201.2 million standard feet of processed gas.
B. 25.5 million standard cubic feet of natural gas consumed.
See attachments.
II.B.6 Compressor Engine Requirements
II.B.6.a The owner/operator shall maintain visible emissions from each engine at or below 20% opacity.
[R307-401-8]
Status: In Compliance. No visible emissions were observed from the operating compressor
engine.
8
II.B.6.b The owner/operator shall use non-selective catalytic reduction to control emissions from each
compressor engine on site. [R307-401-8]
Status: In Compliance. The compressor engines are controlled with non-selective catalytic
reduction.
II.B.6.c The owner/operator shall not allow emissions from each compressor engine to exceed the
following rates:
Pollutant lb/hr
NOx 0.661
CO 1.022. [R307-401-8]
II.B.6.c.1 A. Notification:
At least 30 days prior to conducting any emission testing required under any part of UAC, R307,
the owner/operator shall notify the Director of the date, time and place of such testing and, if
determined necessary by the Director, the owner/operator shall attend a pretest conference. A
source test protocol shall be submitted to DAQ when the testing notification is submitted to the
Director. The source test protocol shall be approved by the Director prior to performing the tests.
The source test protocol shall outline the proposed test methodologies, stack to be tested, and
procedures to be used. A pretest conference shall be held, if directed by the Director. The pretest
conference shall include representation from the owner/operator, the tester, and the Director.
B. Sample Location:
The emission point shall be designed to conform to the requirements of 40 CFR 60, Appendix A,
Method 1, or other methods as approved by the Director. An Occupational Safety and Health
Administration (OSHA)- or Mine Safety and Health Administration (MSHA)-approved access
shall be provided to the test location.
C. Volumetric Flow Rate:
40 CFR 60, Appendix A, Method 2, 19, or other EPA-approved testing methods acceptable to the
Director
D. NOx:
40 CFR 60, Appendix A, Method 7, 7A, 7B, 7C, 7D, 7E, or other EPA-approved testing methods
acceptable to the Director
E. CO:
40 CFR 60, Appendix A, Method 10, or other EPA-approved testing methods acceptable to the
Director
F: Calculations:
To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the
appropriate methods above shall be multiplied by the volumetric flow rate and any necessary
conversion factors determined by the Director, to give the results in the specified units of the
emission limitation.
G: New Source Operation:
For a new source/emission point, the production rate during all method-testing shall be no less
than 90% of the maximum production rate (rated capacity) of the source. If the production rate
has not been achieved at the time of the test, method-testing shall be conducted at no less than
90% of the maximum production rate achieved as of the date of the test. [R307-401-8]
9
II.B.6.c.2 Stack testing to show compliance with the emission limitations stated in the above condition
shall be performed as specified below:
Source: Each Compressor Engine
Pollutant Testing Status Test Frequency
NOx * #
CO * #
* Initial compliance testing completed.
# Compliance test shall occur subsequent to the initial compliance test every three (3) years or
8,760 hours of use, whichever comes first. The Director may require testing at any time. [40 CFR
63 Subpart ZZZZ Table 3(4), R307-401-8]
Status: In Compliance. Engine 1 (North Engine) was last tested on December 13, 2023, with
passing results. See DAQC-331-24. Engine 2 was tested on December 28, 2022, with passing
results. See DAQC-055-23. Engine 3 was tested on February 17, 2023, with passing results.
See DAQC-322-23. However, Mr. Geary stated that Engines 2 and 3 are now permanently
out of service due to catastrophic malfunction. Mr. Geary does not know when the engines
are planned to be replaced, and with what type. The source understands that they will need
to update the AO when they determine what replacement units they will install.
Section III: APPLICABLE FEDERAL REQUIREMENTS
In addition to the requirements of this AO, all applicable provisions of the following federal programs
have been found to apply to this installation. This AO in no way releases the owner or operator from any
liability for compliance with all other applicable federal, state, and local regulations including UAC
R307.
MACT (Part 63) -HH : National Emission Standards for Hazardous Air Pollutants From Oil and Natural Gas
Production Facilities
Status: In Compliance. The actual annual average flowrate of natural gas to the glycol dehydration unit
is under the 85,000 m3/d limit. All produced gas goes through this unit which indicates an average daily
flowrate of approximately 551 mcf which equals 15,602 m3/d which is below the 85.000 m3/d limit.
MACT (Part 63) -ZZZZ: National Emissions Standards for Hazardous Air Pollutants for Stationary
Reciprocating Internal Combustion Engines
Status: In Compliance. Stack tests conducted have met the ZZZZ emission limit requirement of 270
ppmvd @ 15% O2 for CO. However, Mr. Geary stated that Engines 2 and 3 are now permanently out of
service due to catastrophic malfunction. Mr. Geary does not know when the engines are planned to be
replaced, and with what type. The source understands that they will need to update the AO when they
determine what replacement units they will install.
10
EMISSION INVENTORY:
Listed before are the Actual Emissions Inventory provided from Citation Oil & Gas Corp. - Pineview
Tank Battery and Gas Plant. A comparison of the estimated total potential emissions (PTE) on AO:
DAQE-AN155130002-22 dated August 15, 2022. PTE are supplied for supplemental purposes only.
Criteria Pollutant PTE tons/yr Actuals tons/yr
CO2 Equivalent 11671.00 N/A
Carbon Monoxide 10.10 0.334
Nitrogen Oxides 6.84 0.268
Particulate Matter - PM10 0.31 0.011
Particulate Matter - PM2.5 0.03 0.011
Sulfur Dioxide 0.02 0.00
Volatile Organic Compounds 51.42 10.47
PREVIOUS ENFORCEMENT
ACTIONS: Compliance Advisory (DAQC-338-23) issued March 27, 2023,
for a failed stack test. Early Settlement Agreement
(DAQC-449-23) issued May 1, 2023, regarding failed stack test.
Compliance Advisory (DAQC-903-23) issued August 25, 2023,
for not having a vapor capture line for truck loading operations.
Early Settlement Agreement (DAQC-1156-23) issued October
24, 2023, regarding the vapor capture line.
COMPLIANCE STATUS &
RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN155130002-22
dated August 15, 2022: In compliance. The facility appears to be
well maintained and operated. Required records were current and
made available both during the inspection and afterwards via
email.
HPV STATUS: Not Applicable.
RECOMMENDATION FOR
NEXT INSPECTION: Inspect at the typical inspection frequency for this type of
source. Contact source prior to inspection.
ATTACHMENTS: Applicable Supporting Documentation Included
Record Date Oil Production
(bbl)
Oil Production
12-Month
Rolling Period
(bbl)
Gas
Production
(mscf)
Gas
Production 12-
Month Rolling
Period (mscf)
Natural Gas
Consumed -
Fuel (mscf)
Natural Gas
Consumed 12-
Month Rolling
Period (mscf)
Water
Production
(bbl)
Water
Production 12-
Month Rolling
Period (bbl)
Mar‐24 7,999.50 107,507.93 15,739.00 201,215.00 2,608.00 25,516.03 387,980.00 4,874,887.00
Feb‐24 7,696.23 106,973.78 13,208.00 197,084.00 2,151.00 25,587.02 321,938.00 4,779,707.00
Jan‐24 7,965.85 109,265.58 14,079.00 200,966.00 2,215.00 26,272.03 414,611.00 4,837,120.00
Dec‐23 9,132.69 112,266.97 11,124.00 206,040.00 1,637.00 26,966.04 427,675.00 4,836,783.00
Nov‐23 7,698.08 114,296.13 16,705.00 214,476.01 2,513.00 28,356.04 404,400.00 4,794,651.00
Oct‐23 9,636.42 115,565.83 18,974.00 213,008.00 2,383.00 28,702.03 429,860.00 4,664,611.00
Sep‐23 10,285.95 113,872.70 20,322.00 207,549.00 2,100.00 29,128.03 447,239.00 4,498,394.00
Aug‐23 10,865.63 110,917.73 21,609.00 200,626.00 2,242.00 29,551.04 458,643.00 4,352,855.00
Jul‐23 9,325.29 108,637.52 20,010.00 195,474.00 1,963.00 29,786.03 423,489.00 4,220,862.00
Jun‐23 5,784.25 108,697.39 10,765.00 193,368.00 1,179.00 30,347.02 242,196.00 4,140,187.00
May‐23 10,348.61 112,036.03 19,195.99 199,543.00 2,334.99 31,671.01 461,866.00 4,238,722.00
Apr‐23 10,769.44 111,460.19 19,484.01 197,976.01 2,190.04 32,509.01 454,990.00 4,140,121.00
Mar‐23 7,465.34 108,811.80 11,608.00 193,308.99 2,678.99 33,102.97 292,800.00 4,007,939.00
Feb‐23 9,988.03 111,035.73 17,090.00 199,126.97 2,836.01 34,160.99 379,351.00 4,094,153.00
Jan‐23 10,967.24 109,805.88 19,153.00 197,505.97 2,909.01 34,800.98 414,274.00 4,054,927.00
Dec‐22 11,161.85 108,302.84 19,560.01 195,174.97 3,027.00 35,045.97 385,543.00 4,016,861.00
Nov‐22 8,967.78 106,411.87 15,236.99 192,616.96 2,858.99 34,773.98 274,360.00 4,005,756.00
Oct‐22 7,943.29 106,770.64 13,515.00 195,099.96 2,809.00 34,350.99 263,643.00 4,115,769.00
Sep‐22 7,330.98 108,498.19 13,399.00 200,090.96 2,523.01 33,930.00 301,700.00 4,254,352.00
Aug‐22 8,585.42 111,026.85 16,457.00 205,444.96 2,476.99 33,761.99 326,650.00 4,357,169.00
Jul‐22 9,385.16 112,246.75 17,904.00 208,994.96 2,523.99 33,967.01 342,814.00 4,452,834.00
Jun‐22 9,122.89 112,865.71 16,940.00 210,966.96 2,502.99 34,360.04 340,731.00 4,527,621.00
May‐22 9,772.77 113,401.26 17,629.00 213,132.95 3,172.99 34,250.04 363,265.00 4,593,898.00
Apr‐22 8,121.05 114,009.30 14,816.99 215,218.95 2,784.00 33,495.04 322,808.00 4,647,870.00
Mar‐22 9,689.27 115,748.73 17,425.98 218,144.96 3,737.01 33,292.05 379,014.00 4,716,003.00
Citation Oil & Gas
Pineview Tank Battery
2023 Utah Permit
OGI Survey Report
Survey Date: Monday – September 11, 2023 – Tuesday – September 12, 2023
Site Coordinates: Latitude: 40.223583, Longitude: -109.324667
Safety • Integrity • Leadership Innovation •
Pride and Respect
TEAM, INC.
www.teamindustrialservices.com
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 5
Page 1 of 1
OGI CAMERA
DAILY INSTRUMENT CHECK FORM
Date & Time 9/11/2023 Camera Make FLIR Camera Serial # GFx320 74900625
Camera Model ☒ GFx320 (IS) ☐ GF320 Camera Lens: ☒ 23mm (24°) ☐ 38mm
Temperature (Deg. F) 52 Barometric Pressure (in Hg) 30.02 Wind Speed (mph) 3mph
Cloud Cover ☒ Sunny/Clear ☐ Partly Cloudy ☐ Overcast DIC Pic
# DC_0529/IR_0530 DIC Video # MOV_0532
Calculate Required Flow Rate for Actual Conditions:
Ps * Vs * (459.67+Ta) Va =
Pa * (459.67+Ts)
Where
Pa = actual pressure (psia)
Ta = actual temperature (deg. F)
Va = required flow rate for actual conditions (liters per minute)
Ps = standard pressure (14.7 psia)
Ts = standard temperature (deg. F)
Vs = required flow rate at standard conditions (0.508 liters per minute) 1
Camera Thermal Settings Check:
☒Auto ☒Black Hot
☒HSM ☒White Hot
Natural Gas Emission Source Observed ☒ YES Distance from Emission Source (ft.) 40'
Calculated Flow Rate (L/min) 0.51 Gas Cylinder Type Prefilled 1 lb. Cylinder Contents Propane
Darin Ward Darin Ward
Name of OGI Technician - 1 (Print) Signature
Name of OGI Technician - 2 (Print) Signature
Notes: 1 Refer to Team’s OGI Daily Instrument Check spreadsheet for derivation of required flow rate.
Example
Actual Temperature: 80 F
Actual Pressure: 14.49 psia
Required Flow Rate: 0.51 L/min
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 5
Page 1 of 1
OGI CAMERA
DAILY INSTRUMENT CHECK FORM
Date & Time 9/12/2023 Camera Make FLIR Camera Serial # GFx320 74900625
Camera Model ☒ GFx320 (IS) ☐ GF320 Camera Lens: ☒ 23mm (24°) ☐ 38mm
Temperature (Deg. F) 49 Barometric Pressure (in Hg) 29.86 Wind Speed (mph) 4mph
Cloud Cover ☒ Sunny/Clear ☐ Partly Cloudy ☐ Overcast DIC
Pic # DC_0614/IR_0615 DIC Video # MOV_0003
Calculate Required Flow Rate for Actual Conditions:
Ps * Vs * (459.67+Ta) Va =
Pa * (459.67+Ts)
Where
Pa = actual pressure (psia)
Ta = actual temperature (deg. F)
Va = required flow rate for actual conditions (liters per minute)
Ps = standard pressure (14.7 psia)
Ts = standard temperature (deg. F)
Vs = required flow rate at standard conditions (0.508 liters per minute) 1
Camera Thermal Settings Check:
☒Auto ☒Black Hot
☒HSM ☒White Hot
Natural Gas Emission Source Observed ☒ YES Distance from Emission Source (ft.) 40'
Calculated Flow Rate (L/min) 0.51 Gas Cylinder Type Prefilled 1 lb. Cylinder Contents Propane
Darin Ward Darin Ward
Name of OGI Technician - 1 (Print) Signature
Name of OGI Technician - 2 (Print) Signature
Notes: 1 Refer to Team’s OGI Daily Instrument Check spreadsheet for derivation of required flow rate.
Example
Actual Temperature: 80 F
Actual Pressure: 14.49 psia
Required Flow Rate: 0.51 L/min
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 1 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Company CITATION OIL & GAS Facility Name PINEVIEW TANK BATTERY
Latitude 40.56189 Longitude 111.093 Is the facility in operation? ☒ Yes ☐ No
Name of Person(s) Performing Inspection Darin Ward
Training / Experience of Inspector ☒ Completed Certified Level I Infrared Thermography OGI course ☐ Received on-site training from certified employee
Date of Surveillance 9/11/2023 Start Time 9:15am End Time 3:15pm Site Pic Id#
Temperature (°F) 52 Max Wind Speed (mph) 3mph Barometric Pressure (inHg) 30.02 Cloud Cover Sunny / Clear
Camera Model and Serial # GFx 320, 74900625 Picture/Video ID# Range (Need at least one pic during survey) DC_0529 – IR_0618
Deviations from monitoring plan? ☒ No Deviations ☐ Deviations (Explain)
Leak Tag
ID
Equipment Type
(Description of
component leaking)
Leak Description (include component
description, location, and if DTM or UTM) Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair Attempt
Successful?
17A REGULATOR INSIDE DEHY BUILDING ON REBOILER
Leak Pic ID DC_0541/IR_0543 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0542
Repair Pic ID
Repair Vid ID
17B .25” BALL VALVE INSIDE DEHY BUILDING W. SIDE OF REBOILER
Leak Pic ID DC_0544/IR_0545 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0546
Repair Pic ID
Repair Vid ID
17C BALL VALVE INSIDE DEHY BUILDING ON S. SIDE OF
REBOILER
Leak Pic ID DC_0547/IR_0548 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0549
Repair Pic ID
Repair Vid ID
18A .25” PLUG S. SIDE OF FINFAN S. OF DEHY BUILDING
Leak Pic ID DC_0553/IR_0555
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
RETAPED AND
TIGHTENED PLUG
Yes ☒
No ☐(2)
Leak Vid ID MOV_0554
Repair Pic ID DC_0558/IR_0559
Repair Vid ID MOV_0560
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 2 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Facility Name CITATION OIL & GAS – PINEVIEW TANK BATTERY Date of Surveillance 9/11/2023
Leak Tag
ID
Equipment
Type
(Description of
component
leaking)
Leak Description (include
component description,
location, and if DTM or UTM)
Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair
Attempt
Successful?
20A UNION S. SIDE OF MRU SKID BOTTOM OF
SKID
Leak Pic ID DC_0563/IR_0564
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED UNION
Yes ☐
No ☒(2)
Leak Vid ID MOV_0565
Repair Pic ID DC_0566/IR_0567/IR_0648
Repair Vid ID MOV_0568/MOV_0650
20B UNION NUT S. SIDE OF MRU SKID BOTTOM OF
SKID
Leak Pic ID DC_0566/IR_0567
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED UNION
NUT
Yes ☒
No ☐(2)
Leak Vid ID MOV_0568
Repair Pic ID DC_0568/IR_0569
Repair Vid ID MOV_0570
21A PLUG INSIDE WATER BUILDING S. WEST
CORNER
Leak Pic ID DC_0574/IR_0575
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
RETAPED AND
TIGHTENED PLUG
Yes ☒
No ☐(2)
Leak Vid ID MOV_576
Repair Pic ID DC_0577/IR_0578
Repair Vid ID MOV_0579
22A CONNECTOR W. OF FUEL GAS FILTER BY SIDEWALK
ON GROUND
Leak Pic ID DC_0583/IR_0584 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0585
Repair Pic ID
Repair Vid ID
22B REGULATOR N. SIDE OF FUEL GAS FILTER ON
REGULATOR
Leak Pic ID DC_0586/IR_0587 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0588
Repair Pic ID
Repair Vid ID
22C CONNECTOR E. SIDE OF FUEL GAS FILTER AT
GROUND
Leak Pic ID DC_0589/IR_0590 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0591
Repair Pic ID
Repair Vid ID
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 3 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Facility Name CITATION OIL & GAS – PINEVIEW TANK BATTERY Date of Surveillance 9/11/2023
Leak Tag
ID
Equipment Type
(Description of
component leaking)
Leak Description (include component
description, location, and if DTM or UTM)
Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair Attempt
Successful?
22D CONNECTOR EAST SIDE OF FUEL GAS AT GROUND COUPLER
Leak Pic ID DC_0589/IR_0590
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0591
Repair Pic ID
Repair Vid ID
22E CONTROL VALVE SOUTH SIDE OF FUEL GAS FILTER
Leak Pic ID DC_0592/IR_0593 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0594
Repair Pic ID
Repair Vid ID
23A GLOBE VALVE EAST SIDE OF RECYCLE SCRUBBER ON
SIGHTGLASS EAST OF COMP BUILDING
Leak Pic ID DC_0597/IR_0598 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0599
Repair Pic ID
Repair Vid ID
23B CONNECTOR SE OF RECYCLE SCRUBBER IN PIPING - .25” LINE
Leak Pic ID DC_0600/IR_0601
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
Tightened Tube
Fitting
Yes ☒
No ☐(2)
Leak Vid ID MOV_0602
Repair Pic ID DC_0604/IR_0605
Repair Vid ID MOV_0606
25A CONNECTOR EAST SIDE OF COMPRESSOR BUILDING CLOSE TO
MRU SKID
Leak Pic ID DC_0607/IR_0608 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☒(2)
Leak Vid ID
Repair Pic ID
Repair Vid ID
25B UNION EAST SIDE OF COMPRESSOR BUILDING CLOSE TO
MRU SKID IN PIPING
Leak Pic ID DC_0611/IR_0612 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☒(2)
Leak Vid ID MOV_0613
Repair Pic ID
Repair Vid ID
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 1 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Company CITATION OIL & GAS Facility Name PINEVIEW TANK BATTERY
Latitude 40.56189 Longitude 111.093 Is the facility in operation? ☒ Yes ☐ No
Name of Person(s) Performing Inspection Darin Ward
Training / Experience of Inspector ☒ Completed Certified Level I Infrared Thermography OGI course ☐ Received on-site training from certified employee
Date of Surveillance 9/12/2023 Start Time 9:15AM End Time 4:00PM Site Pic Id# DC_0687 / IR_0688
Temperature (°F) 49 Max Wind Speed (mph) 4mph Barometric Pressure (inHg) 29.86 Cloud
Cover Sunny / Clear
Camera Model and Serial # GFx320 74900625 Picture/Video ID# Range (Need at least one pic during survey) DC_0529 – MOV_0688
Deviations from monitoring plan? ☒ No Deviations ☐ Deviations (Explain)
Leak Tag
ID
Equipment Type
(Description of
component leaking)
Leak Description (include component
description, location, and if DTM or UTM) Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair Attempt
Successful?
26A PLUG N. SIDE OF C101 N. WEST COMP HEAD
Leak Pic ID DC_0619/IR_0620 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0621
Repair Pic ID
Repair Vid ID
26B TUBE FITTING N. COMP C101 N.E. HEAD TOP TUBE FITTING
Leak Pic ID DC_0622/IR_0624 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED FITTING
Yes ☒
No ☐(2)
Leak Vid ID MOV_0623
Repair Pic ID DC_0625/IR_0626
Repair Vid ID MOV_0627
26C TUBE FITTING EASTSIDE OF 3RD STAGE KNOCKOUT ON C101
Leak Pic ID DC_0628/IR_0629 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED FITTING
Yes ☐
No ☒(2)
Leak Vid ID MOV_0630
Repair Pic ID DC_0631/IR_0632
Repair Vid ID MOV_0633
26D BALL VALVE ON FUEL GAS LINE BY 3RD STAGE KO C101
Leak Pic ID DC_0634/IR_0635 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0636
Repair Pic ID
Repair Vid ID
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 2 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Facility Name CITATION OIL & GAS – PINEVIEW TANK BATTERY Date of Surveillance 9/12/2023
Leak Tag
ID
Equipment Type
(Description of
component leaking)
Leak Description (include component
description, location , and if DTM or UTM)
Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair Attempt
Successful?
28A THEIF HATCH THEIF HATCH ON SLO TANK
Leak Pic ID DC_0641/IR_0642
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0643
Repair Pic ID
Repair Vid ID
28B WELD O LET TOP OF SLOP TANK MIDDLE OF TANK
Leak Pic ID DC_0645/DC_0646 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0648
Repair Pic ID
Repair Vid ID
30A GATE VALVE S. OF MIDDLE PUMP N. SIDE OF STORAGE TANKS
Leak Pic ID DC_0655/IR_0656 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED PACKING
Yes ☐
No ☒(2)
Leak Vid ID MOV_0657
Repair Pic ID DC_0684/IR_0685
Repair Vid ID MOV_0686
30B BALL VALVE BY SMALL TANK ON FILTERS N. SIDE OF STORAGE
TANKS
Leak Pic ID DC_0658/IR_0659 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED STEM
Yes ☒
No ☐(2)
Leak Vid ID MOV_0660
Repair Pic ID
Repair Vid ID
30C PLUG N. E SIDE OF E. STORAGE TANK ON N. BOTTOM
LINE
Leak Pic ID DC_0661/IR_0662
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
RETAPED AND
REPLACED PLUG
Yes ☒
No ☐(2)
Leak Vid ID MOV_0663
Repair Pic ID DC_0678/IR_0679
Repair Vid ID MOV_0680
30D REGULATOR ON PIPING IN BETWEEN STORAGE TANKS
Leak Pic ID DC_0664/IR_0665 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☐
No ☒(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0666
Repair Pic ID
Repair Vid ID
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure Supplement Corporate
Form
Rev. 3
Page 3 of 3
OGI CAMERA FIELD SURVEILLANCE FORM
Facility Name CITATION OIL & GAS – PINEVIEW TANK BATTERY Date of Surveillance 9/12/2023
Leak Tag
ID
Equipment Type
(Description of
component leaking)
Leak Description (include component
description, location, and if DTM or UTM)
Picture/Video ID
(if applicable)
Detection
Method
First Repair
Attempted?
Repair Attempt
Successful?
31A BALL VALVE EAST END OF TRUCK LOADING RACK END OF
HOSE
Leak Pic ID DC_0669/IR_0670
IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
TIGHTENED STEM
Yes ☒
No ☐(2)
Leak Vid ID MOV_0671
Repair Pic ID DC_0672/IR_0673
Repair Vid ID MOV_0674
31B END OF HOSE EAST SIDE OF TRUCK LOADING RACK END OF
HOSE
Leak Pic ID DC_0675/DC_0676 IR Camera ☒
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID MOV_0678
Repair Pic ID
Repair Vid ID
Leak Pic ID IR Camera ☐
Method 21 ☐
AVO ☐
Yes ☐
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID
Repair Pic ID
Repair Vid ID
Leak Pic ID IR Camera ☐
Method 21 ☐
AVO ☐
Yes ☐
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID
Repair Pic ID
Repair Vid ID
Leak Pic ID IR Camera ☐
Method 21 ☐
AVO ☐
Yes ☒
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID
Repair Pic ID
Repair Vid ID
Leak Pic ID IR Camera ☐
Method 21 ☐
AVO ☐
Yes ☐
No ☐(1)
Repair Method:
Yes ☐
No ☐(2)
Leak Vid ID
Repair Pic ID
Repair Vid ID
(1) If first repair is not attempted immediately, a physical numbered tag must be attached to the leaking component, and the LDAR Leak Repair Tag Tracking Form must be completed.
First repair must be attempted within 30 days of leak identification.
(2) If repair is not successful a physical numbered tag must be attached to the leaking component and the LDAR Leak Repair Tracking form must be completed.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 1 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 17A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0541 / IR_0543
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0542
Description of Leak (include if DTM or UTM): REGULATOR – INSIDE DEHY BLDG ON REBOILER
Maintenance Attempt 1
Description of Repair: Repair Pic/Video ID#: NA
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: NA Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☒ Yes (Explain Below) ☐ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☒ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 2 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 17B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0544 / IR_0545
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0546
Description of Leak (include if DTM or UTM): .25” BALL VALVE – INSIDE DEHY BLDG WEST SIDE OF REBOILER
Maintenance Attempt 1
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: NA Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☒ Yes (Explain Below) ☐ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☒ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 3 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 17C
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0547 / IR_0548
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0549
Description of Leak (include if DTM or UTM): BALL VALVE – INSIDE DEHY BLDG ON SOUTH SIDE OF REBOILER
Maintenance Attempt 1
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☒ Yes (Explain Below) ☐ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☒ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 4 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 18A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0553 / IR_0555
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0554
Description of Leak (include if DTM or UTM): .25” PLUG – SOUTH SIDE OF FIN FAN S. OF DEHY BLDG
Maintenance Attempt 1
Description of Repair: Re-Taped & Tightened Plug Repair Pic/Video ID#: DC_0558/IR_0559/MOV_0560
Date of Repair: 9/11/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/11/2023 Instrument ID: GFx320 74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/11/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/11/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 5 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 20A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0563 / IR_0564
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0555
Description of Leak (include if DTM or UTM): UNION – S. SIDE OF MRU SKID BOTTOM OF SKID
Maintenance Attempt 1
Description of Repair: Tightened Union Repair Pic/Video ID#:
DC_0566/IR_0567/IR_0648/MOV_0568/MOV_0650
Date of Repair: 9/11/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/11/2023 Instrument ID: GFx320 74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☒ No ☐ Repair Complete? Yes ☐ No ☒
Maintenance Attempt 2
Description of Repair: Replaced & Tightened Union Repair Pic/Video ID#: NA
Date of Repair: 9/12/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/12/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/11/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 6 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 20B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0566 / IR_0567
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0568
Description of Leak (include if DTM or UTM): UNION NUT – S. SIDE OF MRU SKID BOTTOM OF SKID
Maintenance Attempt 1
Description of Repair: Tightened Union Nut Repair Pic/Video ID#: DC_0568/IR_0569 /
MOV_0570
Date of Repair: 9/11/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/11/2023 Instrument ID: GFx320 74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/11/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/11/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 7 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 21A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0574 / IR_0575
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0576
Description of Leak (include if DTM or UTM): PLUG – INSIDE WATER BLDG S. WEST CORNER
Maintenance Attempt 1
Description of Repair: Re-Taped & Tightened Plug Repair Pic/Video ID#:
DC_0577/IR_0578/MOV_0579
Date of Repair: 9/11/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/11/2023 Instrument ID: GFX320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/11/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/11/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 8 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 22A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0583 / IR_0584
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0585
Description of Leak (include if DTM or UTM): CONNECTOR – W. OF FUEL GAS FILTER BY SIDEWALK ON GROUND
Maintenance Attempt 1
Description of Repair: Replaced 2” 90 & Piping Repair Pic/Video ID#: NA
Date of Repair: 9/19/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/20/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/19/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/20/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 9 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 22B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0586 / IR_0587
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0588
Description of Leak (include if DTM or UTM): REGULATOR – N. SIDE OF FUEL GAS FILTER ON REGULATOR
Maintenance Attempt 1
Description of Repair: Removed Regulator & Repumped Pipe Repair Pic/Video ID#: NA
Date of Repair: 9/20/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/20/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/20/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/20/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 10 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 22C
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0589 / IR_0590
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0591
Description of Leak (include if DTM or UTM): CONNECTOR – E. SIDE OF FUEL GAS FILTER AT GROUND
Maintenance Attempt 1
Description of Repair: Replaced Fittings Repair Pic/Video ID#: NA
Date of Repair: 9/19/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/19/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/19/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/19/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 11 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 22D
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0589 / IR_0590
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0591
Description of Leak (include if DTM or UTM): CONNECTOR – E. SIDE OF FUEL GAS FILTER AT GROUND
Maintenance Attempt 1
Description of Repair: Replaced Coupler Repair Pic/Video ID#: NA
Date of Repair: 9/19/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/19/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/19/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/19/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 12 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 22E
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0592 / IR_0593
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0594
Description of Leak (include if DTM or UTM): CONTROL VALVE – SOUTH SIDE OF FUEL GAS FILTER
Maintenance Attempt 1
Description of Repair: Replaced Control Valve Repair Pic/Video ID#: NA
Date of Repair: 9/20/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/20/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/20/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/20/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 13 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 23A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0597 / IR_0598
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0599
Description of Leak (include if DTM or UTM): GLOBE VALVE – EAST SIDE OF RECYCLE SCRUBBER ON SIGHTGLASS EAST
OF COMPRESSOR BLDG
Maintenance Attempt 1
Description of Repair: Removed Sight Glass & Plugged Holes Repair Pic/Video ID#: NA
Date of Repair: 9/23/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/24/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/23/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/23/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 14 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 23B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0600 / IR_0601
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0602
Description of Leak (include if DTM or UTM): .25” TUBE FITTING – S.E. OF RECYCLE SCRUBBER ON PIPING
Maintenance Attempt 1
Description of Repair: Tightened Tube Fitting Repair Pic/Video ID#:
DC_0604/IR_0605/MOV_0606
Date of Repair: 9/11/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/11/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/11/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/11/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 15 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 25A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0607 / IR_0608
30 Day Repair Due Date: 10/10/2023 Leak Video ID#:
Description of Leak (include if DTM or UTM): CONNECTOR – EAST SIDE OF COMPRESSOR BLDG CLOSE TO MRU SKID
Maintenance Attempt 1
Description of Repair: Replaced Piping & Retaped Repair Pic/Video ID#: NA
Date of Repair: 9/13/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/13/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/13/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/13/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 16 of 16
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/11/2023 Tag Number: OGI SPOT 25B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0611/IR_0612
30 Day Repair Due Date: 10/10/2023 Leak Video ID#: MOV_0613
Description of Leak (include if DTM or UTM): UNION – EAST SIDE OF COMPRESSOR BLDG CLOSE TO MRU SKID IN
PIPIMH
Maintenance Attempt 1
Description of Repair: Replaced Union Repair Pic/Video ID#: NA
Date of Repair: 9/13/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/13/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/13/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/13/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 1 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 26A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0619 / IR_0620
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0621
Description of Leak (include if DTM or UTM): PLUG – N. SIDE OF C101 N.WEST COMP HEAD
Maintenance Attempt 1
Description of Repair: Replaced Plug Repair Pic/Video ID#: NA
Date of Repair: 9/15/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/15/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/15/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/15/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 2 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 26B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0622 / IR_0624
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0623
Description of Leak (include if DTM or UTM): TUBE FITTING – N. COMP C101 N.E. TOP TUBE FITTING
Maintenance Attempt 1
Description of Repair: Tightened Fitting Repair Pic/Video ID#:
DC_0625/IR_0626/MOV_0627
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 3 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 26C
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0628 / IR_0629
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0630
Description of Leak (include if DTM or UTM): TUBE FITTING – EAST SIDE OF 3RD STATE KNOCKOUT ON C101
Maintenance Attempt 1
Description of Repair: Tightened Fitting Repair Pic/Video ID#:
DC_0631/IR_0632/MOV_0633
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☒ No ☐ Repair Complete? Yes ☐ No ☒
Maintenance Attempt 2
Description of Repair: Replaced Tubing & Fitting Repair Pic/Video ID#: NA
Date of Repair: 9/15/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/15/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/15/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 4 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 26D
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0634 / IR_0635
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0636
Description of Leak (include if DTM or UTM): BALL VALVE – ON FUEL GAS LINE BY 3RD STAGE KO C-101
Maintenance Attempt 1
Description of Repair: Re-Taped Repair Pic/Video ID#: NA
Date of Repair: 9/15/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/15/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/15/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/15/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
*
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 5 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 28A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0641 / IR_0642
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0643
Description of Leak (include if DTM or UTM): THIEF HATCH – ON SLO TANK
Maintenance Attempt 1
Description of Repair: Replaced Thief Hatch Repair Pic/Video ID#: NA
Date of Repair: 9/18/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/18/2023 Instrument ID: Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/18/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/18/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 6 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 28B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0645/IR_0646
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0648
Description of Leak (include if DTM or UTM): WELD O-LET – TOP OF SLOP TANK MIDDLE OF TANK
Maintenance Attempt 1
Description of Repair: Sanded Fiberglass & Welded Repair Pic/Video ID#: NA
Date of Repair: 9/18/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/18/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/18/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/18/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 7 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 30A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0655/IR_0656
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0657
Description of Leak (include if DTM or UTM): GATE VALVE – S. OF MIDDLE PUMP N. SIDE OF STORAGE TANKS
Maintenance Attempt 1
Description of Repair: Tightened Packing Repair Pic/Video ID#:
DC_0684/IR_0685/MOV_0686
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFX320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☒ No ☐ Repair Complete? Yes ☐ No ☒
Maintenance Attempt 2
Description of Repair: Replaced Valve Repair Pic/Video ID#: NA
Date of Repair: 9/20/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/20/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/20/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 8 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 30B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0658 / IR_0659
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0660
Description of Leak (include if DTM or UTM): BALL VALVE – BY SMALL TANK OF FILTERS N. SIDE OF STORAGE TANKS
Maintenance Attempt 1
Description of Repair: Tightened Stem Repair Pic/Video ID#:
DC_0681/IR_0682/MOV_0683
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 9 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 30C
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0661 / IR_0662
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0663
Description of Leak (include if DTM or UTM): PLUG – N.E. SIDE OF EAST STORAGE TANK ON N. BOTTOM LINE
Maintenance Attempt 1
Description of Repair: Re-Taped & Replaced Plug Repair Pic/Video ID#:
DC_0678/IR_0679/MOV_0680
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
*
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 10 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 30D
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0664 / IR_0665
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0666
Description of Leak (include if DTM or UTM): REGULATOR – ON PIPING IN BETWEEN STORAGE TANKS
Maintenance Attempt 1
Description of Repair: Replaced Regulator Repair Pic/Video ID#: NA
Date of Repair: 9/18/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/18/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/18/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/18/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 11 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 31A
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0669 / IR_0670
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0671
Description of Leak (include if DTM or UTM): BALL VALVE – EAST END OF TRUCK LOADING RACK END OF HOSE
Maintenance Attempt 1
Description of Repair: Tightened Stem Repair Pic/Video ID#:
DC_0672/IR_0673/MOV_0674
Date of Repair: 9/12/2023 Resurvey method: OGI ☒ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: 9/12/2023 Instrument ID: GFx320
74900625 Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Darin Ward Initials: D.W. Date: 9/12/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/12/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Emission Control Services (ECS) Procedure
Supplement Corporate
Form
Rev. 4
Page 12 of 12
LDAR LEAK REPAIR TRACKING FORM
(Complete for leaks not repaired at the time of discovery)
Facility Name: Citation Oil & Gas – Pineview Tank Battery
Email All Maintenance Information To: Heather.Washburn@TeamInc.com
Leaking Component Information
Date Leak Detected: 9/12/2023 Tag Number: OGI SPOT 31B
Person who Detected Leak: Darin Ward Leak Picture ID#: DC_0675 / IR_0676
30 Day Repair Due Date: 10/11/2023 Leak Video ID#: MOV_0678
Description of Leak (include if DTM or UTM): END OF HOSE – EAST SIDFE OF TRUCK LOADING RACK END OF HOSE
Maintenance Attempt 1
Description of Repair: Replaced Valve Repair Pic/Video ID#: NA
Date of Repair: 9/18/2023 Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☒
Date of Repair Verification: 9/18/2023 Instrument ID: NA Repair Attempt? Yes ☒ No ☐
Further Repair Required: Yes ☐ No ☒ Repair Complete? Yes ☒ No ☐
Maintenance Attempt 2
Description of Repair: Repair Pic/Video ID#:
Date of Repair: Resurvey method: OGI ☐ Method 21 ☐ Soap Solution ☐
Date of Repair Verification: Instrument ID: Repair Attempt? Yes ☐ No ☐
Further Repair Required: Yes ☐ No ☐ Repair Complete? Yes ☐ No ☐
Deviations from monitoring plan (if applicable)? ☐ Yes (Explain Below) ☒ No Deviations from Plan
Reason for Delayed Repair:
☐ Parts are unavailable (1) Date parts ordered:
☐ Equipment requires shutdown to complete repair (2)
☐ Other good cause exists (3) Explain good cause:
(1) If parts are unavailable, they must be ordered promptly, and the repair must be made within 30 working days of
receipt of the parts.
(2) If shutdown is required; the leak must be repaired during the next scheduled shutdown.
(3) If delay is attributable to other good cause; repairs must be completed within 30 working days after the cause of
delay ceases to exist.
Person Performing Repair: Jeremy Geary Initials: J.G. Date: 9/18/2023
Name of Supervisor: Jeremy Geary Initials: J.G. Date: 9/18/2023
* First attempt at repair must be completed within 30 days of leak identification.
* Leak verification inspection must be completed within 30 days of repair.
Chateau Reporting
Simplified Leak History
5/7/2024
Units: Pineview Tank Battery
StartDate: 9/1/2023 EndDate: 9/30/2023 Regulations: Utah State Permit
Comp Types: All Component Types
Unit Tag Type Sub Location Leak
Def
Leak
Date
Leak
PPM
Reg 1stAtt
Done
1stRet
Done
Latest
Att
Latest
ReT
Latest
AttMthd
FinalRes
DueDate
FinalRes
Done
Last
PPM
Leak
Status
Close
Why
Work
Order
Pinevie
w Tank
Battery
OGI Spot
17A
Valve INSIDE DEHY
BUILDING ON
REBOILER
S.SIDE
AVO 09/11/23 Utah State
Permit
10/11/23 09/12/23 Closed DOR
Pinevie
w Tank
Battery
OGI Spot
17B
Valve DEHY BUILDING
E.SIDE OF
REBOILER
AVO 09/11/23 Utah State
Permit
10/11/23 09/12/23 Closed DOR
Pinevie
w Tank
Battery
OGI Spot
17C
Valve INSIDE OF DEHY
BUILDING ON
S.SIDE OF
REBOILER
AVO 09/11/23 Utah State
Permit
10/11/23 09/12/23 Closed DOR
Pinevie
w Tank
Battery
OGI Spot
18A
Connect
or
S.SIDE OF
FINFIN SOUTH
OF DEHY
BUILDING
AVO 09/11/23 Utah State
Permit
09/11/23 09/11/23 09/11/23 09/11/23 Re-Taped
& Tighten
Plug
10/11/23 09/11/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
20A
Connect
or
SSIDE OF MRU
SKID BOTTOM
OF SKID
AVO 09/11/23 Utah State
Permit
09/11/23 09/12/23 Replaced &
Tighten
Union
10/11/23 09/12/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
20B
Connect
or
SSIDE OF MRU
UNIT BOOTOM
BY SKID UNION
NUT
AVO 09/11/23 Utah State
Permit
09/11/23 09/11/23 09/11/23 09/11/23 Tighten
Union Nut
10/11/23 09/11/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
21A
Connect
or
INSIDE WATER
BUILDING SE
CORNER ON 1/2
PIPING
AVO 09/11/23 Utah State
Permit
09/11/23 09/11/23 09/11/23 09/11/23 Re-Taped
& Tighten
Plug
10/11/23 09/11/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
22A
Hard
Piping
West of Fuel Gas
filter by walkway
at Ground
AVO 09/11/23 Utah State
Permit
09/19/23 09/19/23 Replaced
2" 90 &
Piping
10/11/23 09/19/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
22B
Valve N.SIDE OF FUEL
GAS FILTER ON
REGULATOR
AVO 09/11/23 Utah State
Permit
09/20/23 09/11/23 09/20/23 09/11/23 Removed
Regulator
&
Repumped
Pipe
10/11/23 09/20/23 Closed Soap
Solution
Page 1 of 4
Chateau Reporting
Simplified Leak History
5/7/2024
Units: Pineview Tank Battery
StartDate: 9/1/2023 EndDate: 9/30/2023 Regulations: Utah State Permit
Comp Types: All Component Types
Unit Tag Type Sub Location Leak
Def
Leak
Date
Leak
PPM
Reg 1stAtt
Done
1stRet
Done
Latest
Att
Latest
ReT
Latest
AttMthd
FinalRes
DueDate
FinalRes
Done
Last
PPM
Leak
Status
Close
Why
Work
Order
Pinevie
w Tank
Battery
OGI Spot
22C
Connect
or
EASTSIDE FUEL
GAS FILTER
PIPING AT
GROUND
AVO 09/11/23 Utah State
Permit
09/19/23 09/19/23 Replaced
Fittings
10/11/23 09/19/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
22D
Connect
or
EASTSIDE OF
FUEL GAS AT
GROUND
COUPLER
AVO 09/11/23 Utah State
Permit
09/19/23 09/19/23 Replaced
Coupler
10/11/23 09/19/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
22E
Valve SOUTHSIDE OF
FUEL GAS
FILTER
CONTROL VALVE
AVO 09/11/23 Utah State
Permit
09/20/23 09/20/23 Replaced
Control
Valve
10/11/23 09/20/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
23A
Valve EASTSIDE OF
RECYCLE
SCRUBBER ON
SIGHTGLASS
EAST OF COMP
BUILDING
AVO 09/11/23 Utah State
Permit
09/23/23 09/23/23 Removed
Sight Glass
& Plugged
Holes
10/11/23 09/23/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
23B
Connect
or
SE OF RECYCLE
SCRUBBER IN
PIPING .25 LINE
AVO 09/11/23 Utah State
Permit
09/11/23 09/11/23 09/11/23 09/11/23 Tighten
Tube
Fitting
10/11/23 09/11/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
25A
Connect
or
EASTSIDE OF
COMPRESS
BUILDING CLOSE
TO MRU SKID
UNION NUT
AVO 09/11/23 Utah State
Permit
09/13/23 09/13/23 Replaced
Piping &
Re-Taped
10/11/23 09/13/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
25B
Connect
or
EASTSIDE OF
COMPRESOR
BUILDING CLOSE
TO MRU SKID IN
PIPING UNION
AVO 09/11/23 Utah State
Permit
09/13/23 09/13/23 Replaced
Union
10/11/23 09/13/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
26A
Connect
or
N.SIDE OF C101
NW HEAD ON
PLUG
AVO 09/12/23 Utah State
Permit
09/15/23 09/15/23 Replaced
Plug
10/12/23 09/15/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
26B
Connect
or
NSIDE OF COMP
C101 NE HEAD
TOP TUBE
FITTING
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/12/23 09/12/23 Tightened
Fitting
10/12/23 09/12/23 Closed Pass
Page 2 of 4
Chateau Reporting
Simplified Leak History
5/7/2024
Units: Pineview Tank Battery
StartDate: 9/1/2023 EndDate: 9/30/2023 Regulations: Utah State Permit
Comp Types: All Component Types
Unit Tag Type Sub Location Leak
Def
Leak
Date
Leak
PPM
Reg 1stAtt
Done
1stRet
Done
Latest
Att
Latest
ReT
Latest
AttMthd
FinalRes
DueDate
FinalRes
Done
Last
PPM
Leak
Status
Close
Why
Work
Order
Pinevie
w Tank
Battery
OGI Spot
26C
Connect
or
ON 3RD STAGE
KO ON C101
COMP
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/15/23 09/12/23 Replaced
Tubing &
Fitting
10/12/23 09/15/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
26D
Valve FUEL GAS LINE
BY 3RD STAGE
KNOCKOUT ON
C101
AVO 09/12/23 Utah State
Permit
09/15/23 09/15/23 Re-taped 10/12/23 09/15/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot 28 OGI
Spot
SLOP TANK NW
CORNER OF
PLANT BY GATE
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 10/12/23 09/12/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
28A
Connect
or
THEIF HATCH
TOP OF SLOP
TANK
AVO 09/12/23 Utah State
Permit
09/18/23 09/18/23 Replaced
Thief
Hatch
10/12/23 09/18/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
28B
Connect
or
TOP MIDDLE OF
SLOP TANK
MIDDLE WELD O
LET
AVO 09/12/23 Utah State
Permit
09/18/23 09/18/23 Sanded
Fiberglass
& Welded
10/12/23 09/18/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
30A
Valve S.SIDE OF
MIDDLE PUMP.
N.SIDE OF
STORE TANKS
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/20/23 09/12/23 Replaced
Valve
10/12/23 09/20/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
30B
Valve BY SMALL TANK
ON FILTERS
N.SIDE OF
STORAGE TANKS
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/12/23 09/12/23 Tightened
Stem
10/12/23 09/12/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
30C
Connect
or
NE SIDE OF
EAST STORAGE
TANK ON NORTH
LINE ON
BOTTOM
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/12/23 09/12/23 Re-Taped
& Replaced
Plug
10/12/23 09/12/23 Closed Pass
Pinevie
w Tank
Battery
OGI Spot
30D
Valve PIPING IN
BETWEEN
STORAGE TANKS
ON REGULATOR
AVO 09/12/23 Utah State
Permit
09/18/23 09/18/23 Replaced
Regulator
10/12/23 09/18/23 Closed Soap
Solution
Pinevie
w Tank
Battery
OGI Spot
31A
Valve EASTSIDE
TRUCK LOADING
RACK END OF
HOSE
AVO 09/12/23 Utah State
Permit
09/12/23 09/12/23 09/12/23 09/12/23 Tightened
Stem
10/12/23 09/12/23 Closed Pass
Page 3 of 4
Chateau Reporting
Simplified Leak History
5/7/2024
Units: Pineview Tank Battery
StartDate: 9/1/2023 EndDate: 9/30/2023 Regulations: Utah State Permit
Comp Types: All Component Types
Unit Tag Type Sub Location Leak
Def
Leak
Date
Leak
PPM
Reg 1stAtt
Done
1stRet
Done
Latest
Att
Latest
ReT
Latest
AttMthd
FinalRes
DueDate
FinalRes
Done
Last
PPM
Leak
Status
Close
Why
Work
Order
Pinevie
w Tank
Battery
OGI Spot
31B
Connect
or
EASTSIDE OF
TRUCK LOAFING
RACK END OF
HOSE
AVO 09/12/23 Utah State
Permit
09/18/23 09/18/23 Replaced
Valve
10/12/23 09/18/23 Closed Soap
Solution
Page 4 of 4