HomeMy WebLinkAboutDAQ-2024-004667
DAQE-AN145490006-24
{{$d1 }}
Sam Cusick
CMC Rock, LLC
515 Sheffield Drive
Provo, UT 84604
samc@cmcrock.com
Dear Mr. Cusick:
Re: Approval Order: Administrative Amendment to Approval Order DAQE-AN145490001-12 for a
10-Year Review and Permit Updates
Project Number: N145490006
The attached Approval Order (AO) is issued pursuant to the Division of Air Quality conducting a
10-year administrative review of this source and its respective AO. CMC Rock, LLC must comply
with the requirements of this AO, all applicable state requirements (R307), and Federal Standards.
The project engineer for this action is Dungan Adams, who can be contacted at (385) 290-2474 or
dunganadams@utah.gov. Future correspondence on this AO should include the engineer's name as well
as the DAQE number shown on the upper right-hand corner of this letter. No public comments were
received on this action.
Sincerely,
{{$s }}
Bryce C. Bird
Director
BCB:DA:jg
cc: Salt Lake County Health Department
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
January 19, 2024
STATE OF UTAH
Department of Environmental Quality
Division of Air Quality
{{#s=Sig_es_:signer1:signature}}
{{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}}
{{#d2=date1_es_:signer1:date:format(date, "mmmm d, yyyy"):align(center)}}
APPROVAL ORDER
DAQE-AN145490006-24
Administrative Amendment to Approval Order
DAQE-AN145490001-12 for a 10-Year Review
and Permit Updates
Prepared By
Dungan Adams, Engineer
(385) 290-2474
dunganadams@utah.gov
Issued to
CMC Rock, LLC - Portable Aggregate Processing Equipment
Issued On
{{$d2 }}
Issued By
{{$s }}
Bryce C. Bird
Director
Division of Air Quality
January 19, 2024
TABLE OF CONTENTS
TITLE/SIGNATURE PAGE ....................................................................................................... 1
GENERAL INFORMATION ...................................................................................................... 3
CONTACT/LOCATION INFORMATION ............................................................................... 3
SOURCE INFORMATION ........................................................................................................ 3
General Description ................................................................................................................ 3
NSR Classification .................................................................................................................. 3
Source Classification .............................................................................................................. 4
Applicable Federal Standards ................................................................................................. 4
Project Description.................................................................................................................. 4
SECTION I: GENERAL PROVISIONS .................................................................................... 4
SECTION II: PERMITTED EQUIPMENT .............................................................................. 5
SECTION II: SPECIAL PROVISIONS ..................................................................................... 5
PERMIT HISTORY ................................................................................................................... 10
ACRONYMS ............................................................................................................................... 11
DAQE-AN145490006-24
Page 3
GENERAL INFORMATION
CONTACT/LOCATION INFORMATION
Owner Name Source Name
CMC Rock, LLC CMC Rock, LLC - Portable Aggregate
Processing Equipment
Mailing Address Physical Address
515 Sheffield Drive Not permanently based at a site.
Provo, UT 84604 Portable Source, UT
Source Contact
Name: Sam Cusick
Phone: (801) 368-9011
Email: samc@cmcrock.com
SIC code 1442 (Construction Sand & Gravel)
SOURCE INFORMATION
General Description
This AO is issued to CMC Rock, LLC (CMC Rock) for the purpose of operating a portable aggregate
plant. The plant subject to this AO shall be temporarily operated for a period of not more than 180
working days at any location. A relocation shall not exceed 365 consecutive days at any location in the
State of Utah.
Prior to commencement of operation at a location, the owner/operator shall submit a Notice of Temporary
Relocation to the Director and obtain a Temporary Relocation Approval Letter. If the owner/operator
operates at a location in compliance with the AO, the Notice of Temporary Relocation, and the
Temporary Relocation Approval Letter, dispersion modeling results have determined that there will be no
adverse impacts on air quality at the nearest residence or commercial establishment.
Compliance with the opacity limits and operating practices contained in the conditions of the AO shall be
considered as application of BACT. The emission control measures required in the conditions of this AO
shall apply to all of the locations at which the source approved by this AO operates. The source may be
required to adopt additional measures for controlling emissions to address location-specific concerns.
This AO limits the source to emissions that are below the major source threshold, making it a "Synthetic
Minor" source.
NSR Classification
10-Year Review
DAQE-AN145490006-24
Page 4
Source Classification
Located in
Portable Source County
Airs Source Size: SM
Applicable Federal Standards
NSPS (Part 60), A: General Provisions
NSPS (Part 60), OOO: Standards of Performance for Nonmetallic Mineral Processing Plants
NSPS (Part 60), IIII: Standards of Performance for Stationary Compression Ignition Internal
Combustion Engines
MACT (Part 63), A: General Provisions
MACT (Part 63), ZZZZ: National Emissions Standards for Hazardous Air Pollutants for
Stationary Reciprocating Internal Combustion Engines
Title V (Part 70) Area Source
Project Description
10-Year Review for existing portable source and the Approval Order associated with it.
SECTION I: GENERAL PROVISIONS
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in
the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions
refer to those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
I.3 Modifications to the equipment or processes approved by this AO that could affect the
emissions covered by this AO must be reviewed and approved. [R307-401-1]
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by
the owner/operator, shall be made available to the Director or Director's representative upon
request, and the records shall include the two-year period prior to the date of the request.
Unless otherwise specified in this AO or in other applicable state and federal rules, records
shall be kept for a minimum of two (2) years. [R307-401-8]
I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators
shall, to the extent practicable, maintain and operate any equipment approved under this AO,
including associated air pollution control equipment, in a manner consistent with good air
pollution control practice for minimizing emissions. Determination of whether acceptable
operating and maintenance procedures are being used will be based on information available to
the Director which may include, but is not limited to, monitoring results, opacity observations,
review of operating and maintenance procedures, and inspection of the source. All
maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4]
I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns.
[R307-107]
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories.
[R307-150]
DAQE-AN145490006-24
Page 5
SECTION II: PERMITTED EQUIPMENT
II.A THE APPROVED EQUIPMENT
II.A.1 Portable Source
Including: Aggregate Processing Equipment and Diesel-Fired Engines
II.A.2 Aggregate Processing Plants
These plants may be subject to NSPS Subpart OOO Requirements These plants include:
A. Crushers
B. Screens
C. Wash Plants
D. Conveyors, Feeders, Hoppers, and Stackers
II.A.3 Diesel-Fired Engines
These engines produce mechanical or electrical power to operate the plants in this AO.
These engines are subject to MACT Subpart ZZZZ Requirements
These engines may be subject to NSPS Subpart IIII Requirements.
SECTION II: SPECIAL PROVISIONS
II.B REQUIREMENTS AND LIMITATIONS
II.B.1 Notice of Temporary Relocation:
II.B.1.a The owner/operator shall submit a Notice of Temporary Relocation and obtain a Temporary
Relocation Approval Letter prior to operating a portable source at any location. [R307-401-8]
DAQE-AN145490006-24
Page 6
II.B.1.a.1 Notices of Temporary Relocation shall include the following information (Form 15a is available
from the DAQ):
A. The address and driving directions of the proposed location
B. A list of the equipment to be operated at the proposed location, including:
1. The type of equipment
2. The rated capacity of the equipment
3. The date of manufacture of the equipment
C. A site diagram showing the general equipment location on site (to scale), and the
distance to the nearest houses, barns or commercial operations (to scale if the
plant boundary is located within one (1) mile of these buildings)
D. The expected startup and completion dates for operating at the proposed
location
E. The expected hours of operation, including start and stop times
F. The emission control measures that the owner/operator proposes to adopt for
each emission point at each location; including a FDCP specific to the proposed
location
G. A reference to this AO.
[R307-401-8]
II.B.2 Temporary Relocation Approval Letter:
II.B.2.a The owner/operator shall operate and conduct its operations of the aggregate processing plant
and the diesel-fired engines in accordance with the terms and conditions of this AO and the terms
and conditions of the Temporary Relocation Approval Letter issued by the Director for each
relocation. In the case of any discrepancy between the conditions of this AO and the Temporary
Relocation Approval Letter, the owner/operator shall comply with the site-specific requirements
in the Temporary Relocation Approval Letter. [R307-401-8]
II.B.2.a.1 Portable sources that plan to relocate to a stationary source listed in the Utah PM10 or PM2.5 State
Implementation Plan (SIP) shall comply with the standards and adopt the control strategies listed
in the PM10 or PM2.5 SIP for the stationary source in addition to the requirements of this AO and
the Temporary Relocation Approval Letter. [R307-401-8]
II.B.3 Operations at Temporary Locations:
II.B.3.a The owner/operator may temporarily relocate this portable source to any temporary location.
The temporary relocation shall not exceed 180 working days and shall not exceed 365
consecutive days. If a temporary relocation is expected to exceed 180 working days, the
owner/operator shall submit an NOI in accordance with R307-401 for a permanent source and
obtain a valid AO prior to the end of the 180 working days. [R307-401-17]
II.B.3.a.1 The owner/operator shall keep and maintain the following records on site:
A. The initial relocation date at each location
B. Working days at each location
C. Consecutive days at each location.
[R307-401-17]
DAQE-AN145490006-24
Page 7
II.B.3.a.2 The owner/operator shall submit records of the working days at each site and the consecutive
days at each site to the Director at the end of each 180 calendar days. [R307-401-17]
II.B.3.b The owner/operator shall not exceed the daily production limit specified in the Temporary
Relocation Approval Letter. [R307-401-8]
II.B.3.b.1 The daily production shall be determined by belt scale records, scale house records, vendor
receipts or by any other method as acceptable to the Director or the Director's representative.
[R307-401-8]
II.B.3.b.2 The owner/operator shall keep and maintain the following production records on site for all
periods that the portable source is in operation at any location:
A. The date production occurs at each location
B. The production for that date at each location
C. The total production at each location.
[R307-401-8]
II.B.3.b.3 The owner/operator shall submit records of the actual production rate to the Director at the end of
each 180 calendar days. [R307-401-17]
II.B.3.c The owner/operator shall only operate between 6:00 AM and 10:00 PM each day. The hours of
operation may be altered upon approval of the Director; however, any request for a change in
these hours shall include modeling showing that all NAAQS are met. [R307-401-8]
II.B.3.c.1 The owner/operator shall keep and maintain the following records of operation for all periods
that the portable source is in operation at any location:
A. The time operations began each day at each location
B. The time operations ended each day at each location.
[R307-401-8]
II.B.3.d Unless otherwise specified in this AO, the owner/operator shall not allow visible emissions from
any installation of this AO to exceed 20 percent opacity. [R307-201-3, R307-305-3]
II.B.3.d.1 Unless otherwise specified in this AO, opacity observations of emissions from stationary sources
shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-201-3, R307-305-3]
II.B.4 Emission Estimates and Emissions Inventory:
II.B.4.a The owner/operator shall estimate the actual emissions that resulted from operating at each
location. These emissions shall be summarized for each piece of equipment, each source of
fugitive dust, and each source of fugitive emissions at the completion of operation at each
location. The Director may require a summary of emissions for each location at any time.
[R307-401-8, R307-150-1]
DAQE-AN145490006-24
Page 8
II.B.4.a.1 Records of actual emissions shall be kept for each location. Records of actual emissions shall
include the following:
A. The emission factors used to estimate emissions for each location
B. All variables (production, hours of operation, haul road lengths, etc.) used in
the emission estimates for each location
C. The actual emissions from each location, which includes emissions from each
emission unit, each source of fugitive dust, and each source of fugitive
emissions.
[R307-401-8, R307-150-1]
II.B.5 Haul Roads and Fugitive Dust Sources:
II.B.5.a The owner/operator shall comply with a FDCP consistent with R307-309-6 for each location.
The FDCP for a location shall address the control of all fugitive dust sources at that location.
[R307-401-8]
II.B.5.b The owner/operator shall not allow visible emissions from haul roads and fugitive dust sources to
exceed 20 percent opacity on site and 10 percent at the property boundary for each temporary
location. [R307-205-4, R307-309-5, R307-401-8]
II.B.5.b.1 Visible emission determinations for fugitive dust from haul roads and operational areas shall use
procedures similar to Method 9. The normal requirement for observations to be made at
15-second intervals over a six-minute period, however, shall not apply. Visible emissions shall
be measured at the densest point of the plume but at a point not less than one-half vehicle length
behind the vehicle and not less than one-half the height of the vehicle.
[R307-205-4, R307-309-5, R307-401-8]
II.B.5.c The owner/operator shall use water application or other control options contained in R307-309 to
minimize emissions from fugitive dust and fugitive emissions sources, including haul roads,
storage piles, and disturbed areas. Controls shall be applied to ensure the opacity limits in this
AO are not exceeded. [R307-309, R307-401-8]
II.B.6 Aggregate Processing Plants:
II.B.6.a The owner/operator shall not allow visible emissions from any crusher subject to this AO to
exceed 12 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.b The owner/operator shall not allow visible emissions from any screen subject to this AO to
exceed 7 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.c The owner/operator shall not allow visible emissions from any conveyor transfer point subject to
this AO to exceed 7 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.d The owner/operator shall not allow visible emissions from any conveyor drop point at each
temporary location to exceed 20 percent opacity. [R307-205-4, R307-309-5, R307-401-8]
II.B.6.e The owner/operator shall install water sprays on all crushers, all screens, all conveyor transfer
points, and all conveyor drop points at each location to control emissions. Sprays shall operate
as required to ensure the opacity limits in this AO are not exceeded. [R307-401-8]
II.B.6.f The owner/operator shall perform monthly periodic inspections to check that water is flowing to
discharge spray nozzles associated with each crusher, screen, and conveyor. If the
owner/operator finds that water is not flowing properly during an inspection of the water spray
nozzles, the owner/operator shall initiate corrective action within 24 hours and complete
corrective action as expediently as practical. [40 CFR 60 Subpart OOO, R307-401-8]
DAQE-AN145490006-24
Page 9
II.B.6.f.1 Records of the water sprays inspections shall be kept and maintained in a logbook for all periods
when the plant is in operation. The records shall include the following items:
A. Date the inspections were made
B. Any corrective actions taken
C. Control mechanism used if sprays are not operating.
[40 CFR 60 Subpart OOO, R307-401-8]
II.B.7 Crushers, Screens, and Conveyors subject to NSPS Subpart OOO:
II.B.7.a The owner/operator shall conduct an initial performance test for all crushers, screens, and
conveyor transfer points subject to this AO that are subject to NSPS OOO. Performance tests
shall meet the limitations specified in Table 3 to Subpart OOO. [40 CFR 60 Subpart OOO]
II.B.7.a.1 Initial performance tests for fugitive emissions limits shall be conducted according to 40 CFR
60.675(c). The owner or operator may use methods and procedures specified in 40 CFR
60.675(e) as alternatives to the reference methods and procedures specified in 40 CFR 60.675(c).
[40 CFR 60 Subpart OOO]
II.B.7.a.2 The owner/operator shall keep and maintain records of the initial performance test for each
crusher, screen, and conveyor for the life of the equipment. The record of the initial performance
test must be made available to the Director or the Director's representative upon request.
[40 CFR 60 Subpart OOO, R307-401-8]
II.B.8 Diesel-Fired Engines:
II.B.8.a The owner/operator shall comply with the applicable requirements in 40 CFR 63 Subpart ZZZZ
and 40 CFR 60 Subpart IIII for all stationary engines. An engine is considered a stationary
engine if the engine meets the definition of "stationary reciprocating internal combustion engine
(RICE)" in 40 CFR 63.6675 or "stationary internal combustion engine" in 40 CFR 60.4219. In
determining whether an engine is considered a stationary engine, the time the engine remains at a
location shall be considered. 40 CFR 1068.30 states that an engine is a stationary engine if:
A. The engine remains at a location for more than 12 consecutive months
B. The engine remains at a seasonal source during the full annual operating period
of the seasonal source. A seasonal source is a stationary source that remains in
a single location on a permanent basis (i.e., at least two (2) years) and that
operates at that single location approximately three (3) months (or more) each
year.
[40 CFR 60 Subpart IIII, 40 CFR 60 Subpart ZZZZ, R307-401-8]
II.B.8.b The owner/operator shall not allow visible emissions from any stationary diesel-fired engine
subject to this AO to exceed 20 percent opacity. [R307-201-3, R307-305-3, R307-401-8]
II.B.8.c The sulfur content of any fuel oil or diesel fuel burned in a stationary diesel-fired engine subject
to this AO shall not exceed 15 ppm.
[40 CFR 60 Subpart IIII, 40 CFR 63 Subpart ZZZZ, R307-401-8]
II.B.8.c.1 The sulfur content shall be determined by ASTM Method D2880-71, D4294-89, or approved
equivalent. Certification of diesel fuel shall be either by the owner/operator's own testing or by
test reports from the diesel fuel marketer. [R307-203-1, R307-401-8]
DAQE-AN145490006-24
Page 10
II.B.8.c.2 The owner/operator shall keep and maintain records of the test certification of sulfur content in
diesel fuel. Records of the test certification shall be kept for all periods when the plant is in
operation. [R307-203-1, R307-401-8]
PERMIT HISTORY
This Approval Order shall supersede (if a modification) or will be based on the following documents:
Supersedes AO DAQE-AN145490001-12 dated September 26, 2012
Incorporates Additional Information dated August 29, 2023
DAQE-AN145490006-24
Page 11
ACRONYMS
The following lists commonly used acronyms and associated translations as they apply to this document:
40 CFR Title 40 of the Code of Federal Regulations
AO Approval Order
BACT Best Available Control Technology
CAA Clean Air Act
CAAA Clean Air Act Amendments
CDS Classification Data System (used by Environmental Protection Agency to classify
sources by size/type)
CEM Continuous emissions monitor
CEMS Continuous emissions monitoring system
CFR Code of Federal Regulations
CMS Continuous monitoring system
CO Carbon monoxide
CO2 Carbon Dioxide
CO2e Carbon Dioxide Equivalent - Title 40 of the Code of Federal Regulations Part 98,
Subpart A, Table A-1
COM Continuous opacity monitor
DAQ/UDAQ Division of Air Quality
DAQE This is a document tracking code for internal Division of Air Quality use
EPA Environmental Protection Agency
FDCP Fugitive dust control plan
GHG Greenhouse Gas(es) - Title 40 of the Code of Federal Regulations 52.21 (b)(49)(i)
GWP Global Warming Potential - Title 40 of the Code of Federal Regulations Part 86.1818-
12(a)
HAP or HAPs Hazardous air pollutant(s)
ITA Intent to Approve
LB/YR Pounds per year
MACT Maximum Achievable Control Technology
MMBTU Million British Thermal Units
NAA Nonattainment Area
NAAQS National Ambient Air Quality Standards
NESHAP National Emission Standards for Hazardous Air Pollutants
NOI Notice of Intent
NOx Oxides of nitrogen
NSPS New Source Performance Standard
NSR New Source Review
PM10 Particulate matter less than 10 microns in size
PM2.5 Particulate matter less than 2.5 microns in size
PSD Prevention of Significant Deterioration
PTE Potential to Emit
R307 Rules Series 307
R307-401 Rules Series 307 - Section 401
SO2 Sulfur dioxide
Title IV Title IV of the Clean Air Act
Title V Title V of the Clean Air Act
TPY Tons per year
UAC Utah Administrative Code
VOC Volatile organic compounds
DAQE-
RN145490006
December 6, 2023
Sam Cusick
CMC Rock, LLC
515 Sheffield Drive
Provo, UT 84604
samc@cmcrock.com
Dear Sam Cusick,
Re: Engineer Review:
Administrative Amendment to Approval Order DAGE-AN145490001-12 for a 10-Year Review
and Permit Updates
Project Number: N145490006
The DAQ requests a company representative review and sign the attached Engineer Review (ER). This
ER identifies all applicable elements of the New Source Review (NSR) permitting program. CMC Rock,
LLC should complete this review within 10 business days of receipt.
CMC Rock, LLC should contact Dungan Adams at (385) 290-2474 if there are questions or concerns
with the review of the draft permit conditions. Upon resolution of your concerns, please email Dungan
Adams at dunganadams@utah.gov the signed cover letter. Upon receipt of the signed cover letter, the
DAQ will prepare an Approval Order (AO) for signature by the DAQ Director.
If CMC Rock, LLC does not respond to this letter within 10 business days, the project will move forward
without source concurrence. If CMC Rock, LLC has concerns that cannot be resolved and the project
becomes stagnant, the DAQ Director may issue an Order prohibiting construction.
Approval Signature _____________________________________________________________
(Signature & Date)
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
Department of
Environmental Quality
Kimberly D. Shelley Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird Director
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 1
UTAH DIVISION OF AIR QUALITY
ENGINEER REVIEW
SOURCE INFORMATION
Project Number N145490006
Owner Name CMC Rock, LLC
Mailing Address 515 Sheffield Drive
Provo, UT, 84604
Source Name CMC Rock, LLC- Portable Aggregate Processing Equipment
Source Location Not permanently based at a site.
Portable Source, UT
SIC Code 1442 (Construction Sand & Gravel)
Source Contact Sam Cusick
Phone Number (801) 368-9011
Email samc@cmcrock.com
Billing Contact Sam Cusick
Phone Number (801) 368-9011
Email samc@cmcrock.com
Project Engineer Dungan Adams, Engineer
Phone Number (385) 290-2474
Email dunganadams@utah.gov
Notice of Intent (NOI) Submitted August 9, 2023
Date of Accepted Application December 6, 2023
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 2
SOURCE DESCRIPTION
General Description
This AO is issued to CMC Rock, LLC (CMC Rock) for the purpose of operating a portable
aggregate plant. The plant subject to this AO shall be temporarily operated for a period of not
more than 180 working days at any location. A relocation shall not exceed 365 consecutive days
at any location in the State of Utah.
Prior to commencement of operation at a location, the owner/operator shall submit a Notice of
Temporary Relocation to the Director and obtain a Temporary Relocation Approval Letter. If the
owner/operator operates at a location in compliance with the AO, the Notice of Temporary
Relocation, and the Temporary Relocation Approval Letter, dispersion modeling results have
determined that there will be no adverse impacts on air quality at the nearest residence or
commercial establishment.
Compliance with the opacity limits and operating practices contained in the conditions of the AO
shall be considered as application of BACT. The emission control measures required in the
conditions of this AO shall apply to all of the locations at which the source approved by this AO
operates. The source may be required to adopt additional measures for controlling emissions to
address location-specific concerns.
This AO limits the source to emissions that are below the major source threshold, making it a
"Synthetic Minor" source.
NSR Classification:
10 Year Review
Source Classification
Airs Source Size: SM
Applicable Federal Standards
NSPS (Part 60), A: General Provisions
NSPS (Part 60), OOO: Standards of Performance for Nonmetallic Mineral Processing Plants
NSPS (Part 60), IIII: Standards of Performance for Stationary Compression Ignition Internal
Combustion Engines
MACT (Part 63), A: General Provisions
MACT (Part 63), ZZZZ: National Emissions Standards for Hazardous Air Pollutants for
Stationary Reciprocating Internal Combustion Engines
Title V (Part 70) Area Source
Project Proposal
Administrative Amendment to Approval Order DAGE-AN145490001-12 for a 10-Year Review
and Permit Updates
Project Description
10-Year Review for existing portable source
EMISSION IMPACT ANALYSIS
This is a 10-Year Review. No changes to equipment or emissions are being made at this time. Therefore,
modeling is not required. [Last updated December 6, 2023]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 3
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 4
Review of BACT for New/Modified Emission Units
1. BACT review regarding Portable Aggregate Processing Equipment
This is a 10-Year Review. No changes to equipment or emissions are being made at this time.
Therefore, a BACT analysis is not required. [Last updated August 29, 2023]
SECTION I: GENERAL PROVISIONS
The intent is to issue an air quality AO authorizing the project with the following recommended
conditions and that failure to comply with any of the conditions may constitute a violation of the
AO. (New or Modified conditions are indicated as “New” in the Outline Label):
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in
the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions
refer to those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
I.3 Modifications to the equipment or processes approved by this AO that could affect the
emissions covered by this AO must be reviewed and approved. [R307-401-1]
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by
the owner/operator, shall be made available to the Director or Director's representative upon
request, and the records shall include the two-year period prior to the date of the request.
Unless otherwise specified in this AO or in other applicable state and federal rules, records
shall be kept for a minimum of two (2) years. [R307-401-8]
I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators
shall, to the extent practicable, maintain and operate any equipment approved under this AO,
including associated air pollution control equipment, in a manner consistent with good air
pollution control practice for minimizing emissions. Determination of whether acceptable
operating and maintenance procedures are being used will be based on information available
to the Director which may include, but is not limited to, monitoring results, opacity
observations, review of operating and maintenance procedures, and inspection of the source.
All maintenance performed on equipment authorized by this AO shall be recorded. [R307-
401-4]
I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns.
[R307-107]
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-
150]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 5
SECTION II: PERMITTED EQUIPMENT
The intent is to issue an air quality AO authorizing the project with the following recommended
conditions and that failure to comply with any of the conditions may constitute a violation of the
AO. (New or Modified conditions are indicated as “New” in the Outline Label):
II.A THE APPROVED EQUIPMENT
II.A.1
NEW
Portable Source
Including: Aggregate Processing Equipment and Diesel-Fired Engines
II.A.2
NEW
Aggregate Processing Plants
These plants may be subject to NSPS Subpart OOO Requirements These plants include:
A. Crushers
B. Screens
C. Wash Plants
D. Conveyors, Feeders, Hoppers, and Stackers
II.A.3
NEW
Diesel-Fired Engines
These engines produce mechanical or electrical power to operate the plants in this AO.
These engines are subject to MACT Subpart ZZZZ Requirements
These engines may be subject to NSPS Subpart IIII Requirements
SECTION II: SPECIAL PROVISIONS
The intent is to issue an air quality AO authorizing the project with the following recommended
conditions and that failure to comply with any of the conditions may constitute a violation of the
AO. (New or Modified conditions are indicated as “New” in the Outline Label):
II.B REQUIREMENTS AND LIMITATIONS
II.B.1
NEW
Notice of Temporary Relocation:
II.B.1.a
NEW
The owner/operator shall submit a Notice of Temporary Relocation and obtain a Temporary
Relocation Approval Letter prior to operating a portable source at any location. [R307-401-8]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 6
II.B.1.a.1
NEW
Notices of Temporary Relocation shall include the following information (Form 15a is
available from the DAQ):
A. The address and driving directions of the proposed location
B. A list of the equipment to be operated at the proposed location, including:
1. The type of equipment
2. The rated capacity of the equipment
3. The date of manufacture of the equipment
C. A site diagram showing the general equipment location on site (to scale), and the
distance to the nearest houses, barns or commercial operations (to scale if the plant
boundary is located within one mile of these buildings)
D. The expected startup and completion dates for operating at the proposed location.
E. The expected hours of operation, including start and stop times
F. The emission control measures that the owner/operator proposes to adopt for each
emission point at each location; including a FDCP specific to the proposed location
G. A reference to this AO
[R307-401-8]
II.B.2
NEW
Temporary Relocation Approval Letter:
II.B.2.a
NEW
The owner/operator shall operate and conduct its operations of the aggregate processing plant
and the diesel-fired engines in accordance with the terms and conditions of this AO and the
terms and conditions of the Temporary Relocation Approval Letter issued by the Director for
each relocation. In the case of any discrepancy between the conditions of this AO and the
Temporary Relocation Approval Letter, the owner/operator shall comply with the site-specific
requirements in the Temporary Relocation Approval Letter. [R307-401-8]
II.B.2.a.1
NEW
Portable sources that plan to relocate to a stationary source listed in the Utah PM10 or PM2.5
State Implementation Plan (SIP) shall comply with the standards and adopt the control
strategies listed in the PM10 or PM2.5 SIP for the stationary source in addition to the
requirements of this AO and the Temporary Relocation Approval Letter. [R307-401-8]
II.B.3
NEW
Operations at Temporary Locations:
II.B.3.a
NEW
The owner/operator may temporarily relocate this portable source to any temporary location.
The temporary relocation shall not exceed 180 working days and shall not exceed 365
consecutive days. If a temporary relocation is expected to exceed 180 working days, the
owner/operator shall submit an NOI in accordance with R307-401 for a permanent source and
obtain a valid AO prior to the end of the 180 working days. [R307-401-17]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 7
II.B.3.a.1
NEW
The owner/operator shall keep and maintain the following records on site:
A. The initial relocation date at each location
B. Working days at each location
C. Consecutive days at each location
[R307-401-17]
II.B.3.a.2
NEW
The owner/operator shall submit records of the working days at each site and the consecutive
days at each site to the Director at the end of each 180 calendar days. [R307-401-17]
II.B.3.b
NEW
The owner/operator shall not exceed the daily production limit specified in the Temporary
Relocation Approval Letter. [R307-401-8]
II.B.3.b.1
NEW
The daily production shall be determined by belt scale records, scale house records, vendor
receipts or by any other method as acceptable to the Director or the Director's representative.
[R307-401-8]
II.B.3.b.2
NEW
The owner/operator shall keep and maintain the following production records on site for all
periods that the portable source is in operation at any location:
A. The date production occurs at each location
B. The production for that date at each location
C. The total production at each location
[R307-401-8]
II.B.3.b.3
NEW
The owner/operator shall submit records of the actual production rate to the Director at the
end of each 180 calendar days. [R307-401-17]
II.B.3.c
NEW
The owner/operator shall only operate between 6:00 AM and 10:00 PM each day. The hours
of operation may be altered upon approval of the Director; however, any request for a change
in these hours shall include modeling showing that all NAAQS are met. [R307-401-8]
II.B.3.c.1
NEW
The owner/operator shall keep and maintain the following records of operation for all periods
that the portable source is in operation at any location:
A. The time operations began each day at each location
B. The time operations ended each day at each location
[R307-401-8]
II.B.3.d
NEW
Unless otherwise specified in this AO, the owner/operator shall not allow visible emissions
from any installation of this AO to exceed 20 percent opacity. [R307-201-3, R307-305-3]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 8
II.B.3.d.1
NEW
Unless otherwise specified in this AO, opacity observations of emissions from stationary
sources shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-201-3,
R307-305-3]
II.B.4
NEW
Emission Estimates and Emissions Inventory:
II.B.4.a
NEW
The owner/operator shall estimate the actual emissions that resulted from operating at each
location. These emissions shall be summarized for each piece of equipment, each source of
fugitive dust, and each source of fugitive emissions at the completion of operation at each
location. The Director may require a summary of emissions for each location at any time.
[R307-401-8, R307-150-1]
II.B.4.a.1
NEW
Records of actual emissions shall be kept for each location. Records of actual emissions shall
include the following:
A. The emission factors used to estimate emissions for each location
B. All variables (production, hours of operation, haul road lengths, etc.) used in
the emission estimates for each location
C. The actual emissions from each location, which includes emissions from each
emission unit, each source of fugitive dust, and each source of fugitive emissions
[R307-401-8, R307-150-1]
II.B.5
NEW
Haul Roads and Fugitive Dust Sources:
II.B.5.a
NEW
The owner/operator shall comply with a FDCP consistent with R307-309-6 for each location.
The FDCP for a location shall address the control of all fugitive dust sources at that location.
[R307-401-8]
II.B.5.b
NEW
The owner/operator shall not allow visible emissions from haul roads and fugitive dust
sources to exceed 20 percent opacity on site and 10 percent at the property boundary for each
temporary location. [R307-205-4, R307-309-5, R307-401-8]
II.B.5.b.1
NEW
Visible emission determinations for fugitive dust from haul roads and operational areas shall
use procedures similar to Method 9. The normal requirement for observations to be made at
15-second intervals over a six-minute period, however, shall not apply. Visible emissions
shall be measured at the densest point of the plume but at a point not less than one-half vehicle
length behind the vehicle and not less than one-half the height of the vehicle. [R307-205-4,
R307-309-5, R307-401-8]
II.B.5.c
NEW
The owner/operator shall use water application or other control options contained in R307-309
to minimize emissions from fugitive dust and fugitive emissions sources, including haul roads,
storage piles, and disturbed areas. Controls shall be applied to ensure the opacity limits in this
AO are not exceeded. [R307-309, R307-401-8]
II.B.6
NEW
Aggregate Processing Plants:
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 9
II.B.6.a
NEW
The owner/operator shall not allow visible emissions from any crusher subject to this AO to
exceed 12 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.b
NEW
The owner/operator shall not allow visible emissions from any screen subject to this AO to
exceed 7 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.c
NEW
The owner/operator shall not allow visible emissions from any conveyor transfer point subject
to this AO to exceed 7 percent opacity. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.d
NEW
The owner/operator shall not allow visible emissions from any conveyor drop point at each
temporary location to exceed 20 percent opacity. [R307-205-4, R307-309-5, R307-401-8]
II.B.6.e
NEW
The owner/operator shall install water sprays on all crushers, all screens, all conveyor transfer
points, and all conveyor drop points at each location to control emissions. Sprays shall
operate as required to ensure the opacity limits in this AO are not exceeded. [R307-401-8]
II.B.6.f
NEW
The owner/operator shall perform monthly periodic inspections to check that water is flowing
to discharge spray nozzles associated with each crusher, screen, and conveyor. If the
owner/operator finds that water is not flowing properly during an inspection of the water spray
nozzles, the owner/operator shall initiate corrective action within 24 hours and complete
corrective action as expediently as practical. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.6.f.1
NEW
Records of the water sprays inspections shall be kept and maintained in a logbook for all
periods when the plant is in operation. The records shall include the following items:
A. Date the inspections were made
B. Any corrective actions taken
C. Control mechanism used if sprays are not operating.
[40 CFR 60 Subpart OOO, R307-401-8]
II.B.7
NEW
Crushers, Screens, and Conveyors subject to NSPS Subpart OOO:
II.B.7.a
NEW
The owner/operator shall conduct an initial performance test for all crushers, screens, and
conveyor transfer points subject to this AO that are subject to NSPS OOO. Performance tests
shall meet the limitations specified in Table 3 to Subpart OOO. [40 CFR 60 Subpart OOO]
II.B.7.a.1
NEW
Initial performance tests for fugitive emissions limits shall be conducted according to 40 CFR
60.675(c). The owner or operator may use methods and procedures specified in 40 CFR
60.675(e) as alternatives to the reference methods and procedures specified in 40 CFR
60.675(c). [40 CFR 60 Subpart OOO]
II.B.7.a.2
NEW
The owner/operator shall keep and maintain records of the initial performance test for each
crusher, screen, and conveyor for the life of the equipment. The record of the initial
performance test must be made available to the Director or the Director's representative upon
request. [40 CFR 60 Subpart OOO, R307-401-8]
II.B.8
NEW
Diesel-Fired Engines:
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 10
II.B.8.a
NEW
The owner/operator shall comply with the applicable requirements in 40 CFR 63 Subpart
ZZZZ and 40 CFR 60 Subpart IIII for all stationary engines. An engine is considered a
stationary engine if the engine meets the definition of "stationary reciprocating internal
combustion engine (RICE)" in 40 CFR 63.6675 or "stationary internal combustion engine" in
40 CFR 60.4219. In determining whether an engine is considered a stationary engine, the time
the engine remains at a location shall be considered. 40 CFR 1068.30 states that an engine is a
stationary engine if:
A. The engine remains at a location for more than 12 consecutive months.
B. The engine remains at a seasonal source during the full annual operating period of the
seasonal source. A seasonal source is a stationary source that remains in a single
location on a permanent basis (i.e., at least two years) and that operates at that single
location approximately three months (or more) each year.
[40 CFR 60 Subpart IIII, 40 CFR 60 Subpart ZZZZ, R307-401-8]
II.B.8.b
NEW
The owner/operator shall not allow visible emissions from any stationary diesel-fired engine
subject to this AO to exceed 20 percent opacity. [R307-201-3, R307-305-3, R307-401-8]
II.B.8.c
NEW
The sulfur content of any fuel oil or diesel fuel burned in a stationary diesel-fired engine
subject to this AO shall not exceed 15 ppm. [40 CFR 60 Subpart IIII, 40 CFR 63 Subpart
ZZZZ, R307-401-8]
II.B.8.c.1
NEW
The sulfur content shall be determined by ASTM Method D2880-71, D4294-89, or approved
equivalent. Certification of diesel fuel shall be either by the owner/operator's own testing or
by test reports from the diesel fuel marketer. [R307-203-1, R307-401-8]
II.B.8.c.2
NEW
The owner/operator shall keep and maintain records of the test certification of sulfur content
in diesel fuel. Records of the test certification shall be kept for all periods when the plant is in
operation. [R307-203-1, R307-401-8]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 11
PERMIT HISTORY
When issued, the approval order shall supersede (if a modification) or will be based on the
following documents:
Supersedes DAQE-AN145490001-12 dated September 26, 2012
Incorporates Additional Information dated August 29, 2023
REVIEWER COMMENTS
1. Comment regarding 10-Year Review:
The source is not modifying and/or installing any new equipment.
The rule references have been renumbered, the equipment list is separated into another area in the
2023 AO, and the text of each rule and condition have been modified to reflect the current language
and formatting. [Last updated December 6, 2023]
2. Comment regarding NSPS & MACT Applicability:
NSPS
NSPS Subpart OOO applies to each crusher, screening operation, and belt conveyor in fixed or
portable nonmetallic mineral processing plants manufactured after August 31 1983. The portable
equipment in this AO is used to process nonmetallic minerals according to 40 CFR 60.671;
therefore, NSPS Subpart OOO applies to this AO for portable equipment.
NSPS Subpart IIII applies to owners and operators of stationary CI ICE that commence construction
after July 11, 2005, where the stationary CI ICE are manufactured after April 1, 2006. The engines at
this portable source were manufactured after April 1, 2006; therefore, NSPS Subpart IIII applies to
this AO for portable equipment.
MACT
40 CFR 63 MACT Subpart ZZZZ applies to owners and operators of stationary RICE at a major or
area source of HAP emissions. This source has stationary RICE at an area source of HAP emissions;
therefore, MACT Subpart ZZZZ applies to the engines at this facility. [Last updated December 6,
2023]
3. Comment regarding Title V Applicability:
Title V of the 1990 Clean Air Act (Title V) applies to the following:
1. Any major source
2. Any source subject to a standard, limitation, or other requirement under Section 111 of the Act,
Standards of Performance for New Stationary Sources;
3. Any source subject to a standard or other requirement under Section 112 of the Act, Hazardous
Air Pollutants.
4. Any Title IV affected source.
The portable equipment in this AO is not part of a major source or a Title IV source, and is not
subject to 40 CFR 61 requirements, but the facility is subject to 40 CFR 60 NSPS Subpart OOO
requirements. Therefore, Title V applies to the facility as an area source. [Last updated December 6,
2023]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 12
4. Comment regarding Recordkeeping:
This AO contains numerous recordkeeping requirements to demonstrate compliance. To assist the
owner/operator, this Review Comment lists all the records that are required by this AO.
1. The initial relocation date at each location
2. Working days at each location
3. Consecutive days at each location
4. The date production occurs at each location
5. The production for each date at each location
6. The total production at each location
7. The time operations began each day at each location
8. The time operations ended each day at each location
9. The emission factors used to estimate emissions for each location
10. All variables used in the emission estimates for each location
11. The emissions from each emission unit, each source of fugitive dust, and each source of fugitive
emissions at each location
12. Date the water spray inspections were made
13. Any corrective actions taken for the water sprays
14. Control mechanism used if sprays are not operating.
15. The initial performance test for each affected facility as defined in NSPS Subpart OOO
16. The certification of sulfur content in fuel oil used in the asphalt plants
17. The pressure gauge reading for each day of operation
18. The applicable records contained in 40 CFR 60 Subpart IIII and 40 CFR 63 Subpart ZZZZ for
each engine subject to this AO.
19. The certification of sulfur content in diesel fuel used in the engines [Last updated December 6,
2023]
5. Comment regarding Reporting:
R307-401-17 requires that "records of the working days at each site, consecutive days at each site,
and actual production rate shall be submitted to the director at the end of each 180 calendar days."
The owner/operator must submit this information to be in compliance with R307-401-17. [Last
updated December 6, 2023]
Engineer Review N145490006: CMC Rock, LLC- Portable Aggregate Processing Equipment
December 6, 2023
Page 13
ACRONYMS
The following lists commonly used acronyms and associated translations as they apply to this
document:
40 CFR Title 40 of the Code of Federal Regulations
AO Approval Order
BACT Best Available Control Technology
CAA Clean Air Act
CAAA Clean Air Act Amendments
CDS Classification Data System (used by EPA to classify sources by size/type)
CEM Continuous emissions monitor
CEMS Continuous emissions monitoring system
CFR Code of Federal Regulations
CMS Continuous monitoring system
CO Carbon monoxide
CO2 Carbon Dioxide
CO2e Carbon Dioxide Equivalent - 40 CFR Part 98, Subpart A, Table A-1
COM Continuous opacity monitor
DAQ/UDAQ Division of Air Quality
DAQE This is a document tracking code for internal UDAQ use
EPA Environmental Protection Agency
FDCP Fugitive dust control plan
GHG Greenhouse Gas(es) - 40 CFR 52.21 (b)(49)(i)
GWP Global Warming Potential - 40 CFR Part 86.1818-12(a)
HAP or HAPs Hazardous air pollutant(s)
ITA Intent to Approve
LB/HR Pounds per hour
LB/YR Pounds per year
MACT Maximum Achievable Control Technology
MMBTU Million British Thermal Units
NAA Nonattainment Area
NAAQS National Ambient Air Quality Standards
NESHAP National Emission Standards for Hazardous Air Pollutants
NOI Notice of Intent
NOx Oxides of nitrogen
NSPS New Source Performance Standard
NSR New Source Review
PM10 Particulate matter less than 10 microns in size
PM2.5 Particulate matter less than 2.5 microns in size
PSD Prevention of Significant Deterioration
PTE Potential to Emit
R307 Rules Series 307
R307-401 Rules Series 307 - Section 401
SO2 Sulfur dioxide
Title IV Title IV of the Clean Air Act
Title V Title V of the Clean Air Act
TPY Tons per year
UAC Utah Administrative Code
VOC Volatile organic compounds
12/6/23, 5:16 PM State of Utah Mail - Review of Approval Order DAQE-IN145490001-12
https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r3145532301350341266&simpl=msg-a:r-29369246449688…1/4
Dungan Adams <dunganadams@utah.gov>
Review of Approval Order DAQE-IN145490001-12
10 messages
Dungan Adams <dunganadams@utah.gov>Wed, Aug 16, 2023 at 12:46 PM
To: toddc@cmcrock.com
Good afternoon Todd,
My name is Dungan Adams and I am with the Utah Division of Air Quality (UDAQ). As part of the UDAQ's 10-year review
process I have been assigned to review the Approval Order (AO) DAQE-AN145490001-12, dated September 26, 2012,
for CMC Rock, LLC Portable Aggregate Processing Equipment. I have attached the AO for your reference.
The 10-year review process is conducted to update older approval orders with new language and formatting, but also to
ensure any necessary changes to the permit are made. It is free of charge.
I have received your contact from the DAQ's most recent compliance evaluation and wanted to ask if you are able to
answer further questions? If not, would you please direct me to the appropriate individual.
Thanks and let me know if you have any questions.
--
Dungan Adams
Environmental Engineer I | Minor NSR Section
M: (385) 290-2474
airquality.utah.gov
DAQE-AN145490001-12.pdf
78K
Dungan Adams <dunganadams@utah.gov>Mon, Aug 28, 2023 at 8:35 AM
To: toddc@cmcrock.com
Good morning Todd,
I wanted to follow up with the review of Approval Order (AO) DAQE-AN145490001-12. Please let me know if you
receive this email.
Thanks,
[Quoted text hidden]
Todd Cusick <toddc@cmcrock.com>Mon, Aug 28, 2023 at 1:03 PM
To: Dungan Adams <dunganadams@utah.gov>
Cc: Sam Cusick <samc@cmcrock.com>
12/6/23, 5:16 PM State of Utah Mail - Review of Approval Order DAQE-IN145490001-12
https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r3145532301350341266&simpl=msg-a:r-29369246449688…2/4
I have been out of the country for a few weeks and just returned.
I now have this email. Between Sam (copied herein) and I we can answer the questions via email or over the phone; you
choose.
Sincerely,
Todd Cusick
CMC Rock
CMC Ready Mix
801-850-3108
[Quoted text hidden]
Dungan Adams <dunganadams@utah.gov>Mon, Aug 28, 2023 at 1:20 PM
To: Todd Cusick <toddc@cmcrock.com>
Cc: Sam Cusick <samc@cmcrock.com>
Todd,
Thanks for getting back to me. Please answer the following questions via email so the Division of Air Quality can keep a
record of the responses.
1. Can you please advise if the portable equipment is still operational and requires a permit? If not, it may be in your
company's best interest to request a revocation letter.
2. Please review the AO. Do any changes need to be made (such as a new mailing address, contacts, etc.)?
3. May I use you as the primary contact for this source? If not, could you please direct me to the appropriate individual.
Currently Rick Miller is listed as the primary contact.
Let me know if you have any questions.
Thank you,
[Quoted text hidden]
Sam Cusick <samc@cmcrock.com>Tue, Aug 29, 2023 at 10:20 AM
To: Dungan Adams <dunganadams@utah.gov>
Cc: Todd Cusick <toddc@cmcrock.com>
Dungan,
Yes this equipment is still operational, I do however need to do some replacement in kind on the equipment. Can you
please send me what I need to do in order to accomplish this?
We also are looking at adding equipment would it be better to apply for a new portable permit or add it to this one?
As for the primary contact can you put me.
Sam Cusick
CMC Rock
515 Sheffield Dr
Provo, UT 84604
801-368-9011
Sam Cusick
CMC Operations
c: (801) 368-9011
e: samc@cmcrock.com
12/6/23, 5:16 PM State of Utah Mail - Review of Approval Order DAQE-IN145490001-12
https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r3145532301350341266&simpl=msg-a:r-29369246449688…3/4
[Quoted text hidden]
Dungan Adams <dunganadams@utah.gov>Tue, Sep 5, 2023 at 9:27 AM
To: Sam Cusick <samc@cmcrock.com>
Cc: Todd Cusick <toddc@cmcrock.com>
Hi Sam,
Sorry for the delay. Here are the requirements for Replacement-in-Kind Equipment:
(a) the potential to emit of the process equipment is the same or lower
(b) the number of emission points or emitting units is the same or lower
(c) no additional types of air pollutants are emitted as a result of the replacement
(d) the pollution control is functionally equivalent to the replaced equipment
(e) the replaced equipment is permanently removed
(f) the replacement equipment does not trigger any new federal or state standards
If the replacement equipment meets these requirements then you need to submit written notification to the DAQ
specifying the replacement equipment and demonstrating that the above conditions are met. Let me know if you have any
questions about that and I can send you the more detailed code.
As for whether or not to add to the existing permit or request a new one it's really up to you. If you want the flexibility to be
able to move the new equipment different places from the current equipment, I'd apply for a new portable. If it's all going
to stay together, then a modification would make more sense. The cost should be the same.
Thanks,
[Quoted text hidden]
Dungan Adams <dunganadams@utah.gov>Fri, Sep 29, 2023 at 10:55 AM
To: Sam Cusick <samc@cmcrock.com>
Cc: Todd Cusick <toddc@cmcrock.com>
Hi Sam,
I am following up about the replacement-in-kind equipment. Can you provide me with some more information about the
equipment you wish to replace. As long as the equipment meets the requirements of the replacement-in-kind I can make
the changes for you in my 10-year review.
Thanks,
Dungan
[Quoted text hidden]
Sam Cusick <samc@cmcrock.com>Tue, Oct 3, 2023 at 11:39 AM
To: Dungan Adams <dunganadams@utah.gov>
Cc: Todd Cusick <toddc@cmcrock.com>
Hey Dungan,
I would like to do a replacement in kind as I believe we qualify. I also would like to do a new portable for a plant we are
looking at acquiring.
Sam Cusick
CMC Operations
c: (801) 368-9011
e: samc@cmcrock.com
[Quoted text hidden]
Sam Cusick <samc@cmcrock.com>Tue, Oct 3, 2023 at 11:53 AM
To: Dungan Adams <dunganadams@utah.gov>
12/6/23, 5:16 PM State of Utah Mail - Review of Approval Order DAQE-IN145490001-12
https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r3145532301350341266&simpl=msg-a:r-29369246449688…4/4
Cc: Todd Cusick <toddc@cmcrock.com>
I would like to replace the following equipment.
Cat Generator 325 A New cat Generator Rated at 325 Model xq350 serial number 4JK00658 Year 2021
300 TPH Cone New Patriot 300 TPH Cone Model P400 Serial number 1839248 Year 2020
300 TPH Jaw New Pioneer 300 TPH Jaw Model: CS3055 Serial 42006 Year 2022
Sam Cusick
CMC Operations
c: (801) 368-9011
e: samc@cmcrock.com
[Quoted text hidden]
Dungan Adams <dunganadams@utah.gov>Fri, Oct 20, 2023 at 10:26 AM
To: Sam Cusick <samc@cmcrock.com>
Cc: Todd Cusick <toddc@cmcrock.com>
Hi Sam,
Sorry for the delay. Thank you for the notification of the replacement-in-kind. All of the equipment qualifies and no
changes need to be made to the permit in order to make the changes. As for the portable plant, I've attached two forms
that you will need to fill out for the application. Let me know if you have any questions.
I am still working on the 10-year review for Approval Order DAQE-AN145490001-12 and will let you know any questions
come up.
Thanks,
Dungan
[Quoted text hidden]
2 attachments
Form15b.pdf
43K
Form15c.pdf
42K
Document Date: 10/04/2017
DAQ-20 7-013815
MEMORANDUM
DAQC-1319-17
Site ID 14549 (Bl)
TO:
THROUGH:
FROM:
DATE:
SUBJECT:
FILE - CMC Rock, EEC was Blue Mountain Crushing
Jay P. Morris, Minor Source Compliance Section Managej^s^^.
Greg Sorenson, Environmental Scientist
October 4, 2017
Full Compliance Evaluation, Minor, Salt Lake County
INSPECTION DATE:
SOURCE LOCATION:
SOURCE CONTACT(S):
OPERATING STATUS:
August 15, 2017
Temporary Relocation to Saratoga Springs. Mile marker 20 on Highway
68 south of Saratoga Springs.
Todd Cusick: 801-850-3108
Judd Christensen, Manager: 385-985-0669
The aggregate plant has been installed and operated, but was not operating
at time of inspection.
PROCESS DESCRIPTION: Aggregate plant with two crushers, a screen, and a wash plant. Storage
piles onsite included a reject pile and a washed gravel pile.
APPLICABLE
REGULATIONS: Temporary Relocation Approval Letter DAQC-1008-17, dated August 2,
2017
Portable Approval Order (AO) DAQE- AN 145490001-12, dated
September 26, 2012.
Portable AO DAQE-1125-92, dated December 28, 1992
SOURCE EVALUATION:
TEMPORARY RELOCATION APPROVAL LETTER (DAQC-1008-17)
1. The relocation letter authorized the operation to relocate portable aggregate equipment to the
temporary project located off mile marker 20, Highway 68, five miles south of Saratoga Springs,
Utah County, Utah
Status: In compliance. The plant is located at the designated location.
2. The following equipment has been approved for operation for this temporary project:
Cedar Rapids 3042 36442 jaw crusher
Kimball Equipment Company rental 300 ton per hour cone crusher
1
Kimball Equipment Company rental 725 kW Cat generator
Associated loaders
Status: Not in compliance. A gravel wash plant was not mentioned in the temporary relocation letter or
the AO. No action recommended since potential emissions are minimal. The designated
equipment was on site. The screen in the screen/cone crusher combination appeared to be
covered by the Kimball AO and included as the combination.
3. Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation
of equipment at this temporary site may be for up to 180 working days in any calendar year not to
exceed 365 consecutive days, starting from the initial relocation date. The operational days per site
cannot be extended beyond the stipulated 365 consecutive day period. Approval is subject to the
conditions of the dust control plan submitted for this location and the current Approval Orders (AO)
DAQE- AN145490001-12, dated September 26, 2012. Hours of operation shall be held tol2 hours
per each 24-hour day.
Status: In compliance. According to the manager’s record, equipment testing started July 19, 2017, and
they officially started operations on August 2, 2017. Manager reported operations less than 12
hours per day.
4. The maximum production rate shall be held to the requested 300 tons per hour.
Status: Incompliance. Production is limited by the initial jaw crusher.
Approval Order DAQE-AN 145490001-12, dated September 26, 2012
Section I: GENERAL PROVISIONS
1.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in
the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions
refer to those rules. [R307-101]
1.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
1.3 Modifications to the equipment or processes approved by this AO that could affect the
emissions covered by this AO must be reviewed and approved. [R307-401-1]
1.4 All records referenced in this AO or in other applicable rules, which are required to be kept
by the owner/operator, shall be made available to the Director or Director's representative
upon request, and the records shall include the two-year period prior to the date of the
request. Unless otherwise specified in this AO or in other applicable state and federal rules,
records shall be kept for a minimum of two (2) years. [R3 07-401-8]
Status: In compliance.
1.5 At all times, including periods of startup, shutdown, and malfunction, owners and opera shall,
to the extent practicable, maintain and operate any equipment approved under this AO,
including associated air pollution control equipment, in a manner consistent with good air
pollution control practice for minimizing emissions. Determination of whether acceptable
operating and maintenance procedures are being used will be based on information available
2
to the Director which may include, but is not limited to, monitoring results, opacity
observations, review of operating and maintenance procedures, and inspection of the source.
All maintenance performed on equipment authorized by this AO shall be recorded. [R307-
401-4]
Status: Not in compliance. They were not following good air pollution control practice, since at the time
of inspection equipment did not have spray bars. On September 27, 2017, Judd Christensen
reported sprays have been installed.
1.6 The owner/operator shall comply with UAC R307-107. General Requirements: Unavoidable
Breakdowns. [R307-107]
1.7 The owner/operator shall comply with UAC R307-150 Series. Inventories, Testing and
Monitoring. [R307-150]
Status: Not in compliance. The previous owner did not submit a 2014 inventory. No action
recommended due to ownership transfer. The current owner has had no inventory requests or
breakdowns.
Section II: SPECIAL PROVISIONS
II.A The approved installations shall consist of the following equipment:
II.A. 1 RM Sand & Gravel, An Aggregate Processing Plant
II.A.2 Crusher #1, One (1) jaw crusher rated at 300 tons per hour (tph), Make/Model: Cedar Rapids
3042, Serial Number: 36442, Manufactured Date: 1979
II.A.3 Crusher #2, One (1) cone crusher rated at 300 tph, Make/Model: JCI LSI200, Serial Number:
C050289, Manufactured Date: 2001, NSPS Subpart OOO equipment
II.A.4 Screen, One (1) screen 6 x 20, Make/Model: JCI 6203CC, Serial Number: 51569,
Manufactured Date: 2001, NSPS Subpart OOO equipment
II.A.5 Generator Engine #1, One (1) generator engine rated at 325 kW, Make/Model: Caterpillar,
Serial Number: 42R08102, Manufactured Date: 1997, MACT Subpart ZZZZ equipment
II.A.6 Generator Engine #2, One (1) generator engine rated at 725 kW, Make/Model: Caterpillar,
Serial Number: AFND3088, Manufactured Date: 2010, NSPS Subpart IIII equipment
II.A.7 Generator Engine #3, One (1) generator engine rated at 725 Kw, Make/Model: Caterpillar,
Serial Number: AFND01463, Manufactured Date: 2010, NSPS Subpart IIII equipment
II.A.8 Loaders, Four (4) loaders (for information only)
Manufacturers and Model/Serial Numbers are for identification purposes only
Status: Not in compliance. The wash plant was not included in the list of equipment or temporary
relocation letter. No action recommended since potential emissions are minimal. The crushing
equipment and screening equipment were reflected on the primary AO or the rental equipment
AO.
II.B Requirements and Limitations
II.B.l General Requirements and Limitations
II.B. 1 .a The owner/operator shall conduct its operations of the aggregate processing in accordance
with the terms and conditions of this AO and the terms and conditions of the Temporary
Relocation Approval Letter issued by the Director for each relocation. This Approval Letter
3
will be based on the DAQ analysis of the information submitted to the Director in the Notice
of Temporary Relocation Form. [R307-401-17]
II.B. 1 .b The daily production limit specified in the Temporary Relocation Approval Letter in tons of
product produced per 24-hour period (midnight to midnight) shall not be exceeded without
prior approval. Records of daily production shall be kept for all periods when the plant is in
operation. The daily production shall be determined by belt scale records, scale house
records, vendor receipts or by any other method as acceptable to the Director or the Director's
representative. Hours of operation shall be determined by the person monitoring and
maintaining the operations log. [R307-401-8]
Status: Not in Compliance. Operator did not record daily production and hours of operation. At the time
of inspection they only noted days of operation and start time. On September 27, 2017, Judd
Christensen reported that recordkeeping practiced were corrected.
II.B. 1 .c Equipment listed in II.A of this AO can be replaced by other equipment of equal or lesser
production capacity having the same function as the existing equipment with written
notification to the Director, and adherence to the following DAQ's "Replacement in Kind"
provision. [R307-401-11]
Status: In compliance. New equipment covered by a generic equipment AO.
II.B. 1 .d Visible emissions from the following emission points shall not exceed the following values:
A. All crushers - 15% opacity
B. All screens - 10% opacity
C. All conveyor transfer points - 10% opacity
D. All diesel engines - 20% opacity
E. All conveyor drop points - 20% opacity
F. All other points - 20% opacity [R307-401-8, 40 CFR 60 Subpart OOO]
II.B.l.d.l Opacity observations of emissions from stationary sources shall be conducted according to 40
CFR 60, Appendix A, Method 9. [40 CFR 60 Subpart OOO]
Status: Not observed. Equipment shut down as I arrived due to the wash plant being plugged.
II.B.l.d.2 The owner/operator shall conduct an initial performance test for all crushers, screens, and
conveyor transfer points on site that are subject to NSPS Subpart OOO. Performance tests
shall meet the limitations specified in Table 2 or Table 3 to NSPS Subpart OOO. [40 CFR 60
Subpart OOO]
II.B. 1 .d.3 Initial performance tests for stack emissions limits shall be conducted according to 40 CFR
60.675(b), and initial performance tests for fugitive emissions limits shall be conducted
according to 40 CFR 60.675(c). The owner or operator may use methods and procedures
specified in 40 CFR 60.675(e) as alternatives to the reference methods and procedures
specified in 40 CFR 60.675(b) and 60.675(c). [40 CFR 60 Subpart OOO]
Status: In compliance. Initial test records no longer available or required to be maintained. New
cone/screen facility/equipment replaced similar facility so 60.675 testing not required.
II.B. 1 .e Hours of Operation
4
A. The actual hours of operation of the plant shall not exceed 16 hours during any 24-hour
period (from midnight to midnight). The actual time of operation shall be between 6:00
AM and 10:00 PM. The hours of operation may be altered upon approval of the Director.
Any request for a change in these hours shall include modeling showing that all NAAQS
are met.
B. The total hours of actual operation/production shall not exceed 2,880 hours during the
entire period of relocation to any site.
C. Records of hours of operation shall be kept for all periods when the plant is in operation.
Hours of operation shall be determined by a supervisor responsible for the monitoring
and maintenance of an hours-of-operation log [R307-401-8]
Status: Not in compliance. They reported operation for 8 to 9 hours per day but did not have a written
record that specified hours. The record included start time but not end time. Compliance
assistance given. On September 27, 2017, Judd Christensen reported that hours of operation are
being recorded.
II.B.2 Temporary Relocation
II.B.2.a Prior to operating equipment at any site, the owner/operator shall obtain a Temporary
Relocation Approval Letter in accordance with R307-401-17, UAC. Temporary relocations
shall not exceed 180 operating days in any calendar year not to exceed 365 consecutive days,
starting from the initial relocation date, at any site. The DAQ needs at least ten working days
for processing and issuing a Temporary Relocation Approval Letter, however Notices of
Temporary Relocation may be submitted as soon as the details on equipment to be used and
when the equipment will be at each specific site are available. Notices of Temporary
Relocation shall include the following information (Form 15a is available from the DAQ):
A. The location of the proposed site (Please include directions on how to go to the site).
B. The expected startup and completion dates for operating at the proposed site.
C. A site diagram showing the general equipment location on site (to scale), and the
distance to the nearest houses, barns or commercial operations (to scale if the plant
boundary is located within one mile of these buildings).
D. A list of the equipment to be operated at the proposed site.
E. Additional emission control measures for various emission points that the source
proposes to adopt at each site, which will require application of emission controls
beyond the control measures required by this AO.
F. Include a reference to this AO [R307-401-17]
Status: In compliance. Operation was less than 30 days at the time of inspection. Compliance assistance
given. They planned to operate at the location for a longer period.
II.B.2.b Before granting a Temporary Relocation Approval Letter, the proposed site will be evaluated
by the Director to verify that the plant will not cause a new violation of the NAAQS. This
evaluation will be based on the air dispersion modeling conducted by the DAQ and
information that shall be submitted in the Notice of Temporary Relocation. The Notice of
Temporary Relocation shall be submitted at least 10 working days prior to the source
operation and shall contain an FDCP. If violations of the NAAQS are suspected at the
proposed site, the owner/operator shall be required to:
A. Apply air pollution controls at the proposed site which are more stringent than those
outlined in the conditions of this AO and/or
B. Perform continuous ambient monitoring for PM 10 for at least the first 30 days of
operation to demonstrate that the applicable NAAQS are not violated at the site under
5
normal operating conditions. Monitoring shall be initiated only after consultation with
DAQ and carried out in accordance with the Utah DAQ guidelines [R3 07-401-17]
II.B.2.C Relocations expected to exceed 180 operating days shall be preceded with a Notice of Intent
for a permanent source and a valid AO shall be obtained prior to the end of the 180 days.
[R307-401-17]
II.B.2.d Prior to granting the Temporary Relocation Approval Letter for operation at any site, the
DAQ will verify that the total emissions from the site (or other sites that are considered to be
adjacent or contiguous to the site) for all equipment owned or operated by a company
(including equipment permitted under a permanent AO) over any 12-month period does not
exceed major source thresholds, at each site, for the Operating Permit program. These
thresholds are 100 TPY of non-HAPs, 25 tons per year of any combination of HAPs and 10
TPY of any single HAP. [R307-401-17]
Status: In compliance. The relocation letter included emissions.
II.B.2.e Relocation to sites listed in the Utah PM10 State Implementation Plan: Temporary sources
that plan to relocate to sites listed in the Utah PM 10 State Implementation Plan (PM 10 SIP)
shall be required to meet standards and adopt control strategies listed in the PM 10 SIP for the
site, if the PM 10 SIP requirements for the site are more stringent than the requirements
specified in the conditions of this AO. For sources that submit a Notice of Temporary
Relocation to relocate to a site that is listed in the PM 10 SIP, the requirements under which
the source would be required to operate shall be specified in the Temporary Relocation
Approval Letter. [R307-401-17]
II.B.2.f The Temporary Relocation Approval Letter, which the source is required to possess prior to
operation at a site, shall list the allowable emissions for the relocation based on the aggregate
production capacity, the projected hours of operation during the period of relocation, and the
degree of enforceable emissions control that the source proposes to adopt during the period of
relocation. The owner/operator shall maintain records of all equipment listed in II. A of the
AO. The records shall contain actual hours of operation of the equipment at each site and the
actual emissions that resulted from the operation at each site. These emissions shall be
summarized for each piece of equipment at the completion of operation at each site, or every
six months, whichever comes first. [R307-401-17]
II.B.2.g In the case of any discrepancy between the Conditions of the AO and the Temporary
Relocation Approval Letter, the source shall be required to comply with the site-specific
requirements in the Temporary Relocation Approval Letter. [R307-401-8]
Status: In compliance.
II.B.3 Fugitive Dust Emissions
II.B.3.a The owner/operator shall comply with an FDCP acceptable to the Director for control of all
dust sources associated with the equipment listed in II.A of this AO. The owner/operator shall
submit an FDCP to the Director, attention: Compliance Section, for approval within 30 days
of the date of this AO. If the owner/operator has an approved FDCP in place, it shall comply
with the most current FDCP approved by the Director. [R307-205, R307-309]
6
LB.3.b The source shall comply with all applicable requirements of R307-205 (statewide) and R307-
309 for (PM 10 nonattainment areas of Salt Lake, Utah, Davis Counties and Ogden City) for
Fugitive Emission and Fugitive Dust sources. [R307-205, R307-309]
Status: Incompliance. They were using gravel and rotomil to control dust. A water truck was onsite.
II.B.3.C Visible fugitive dust emissions from haul-road traffic and mobile equipment in operational
areas shall not exceed 20% opacity at any point. [R3 07-401-8]
II.B.3.C.1 Visible emission determinations shall use procedures similar to Method 9. The normal
requirement for observations to be made at 15-second intervals over a six-minute period,
however, shall not apply. Visible emissions shall be measured at the densest point of the
plume but at a point not less than 1/2 vehicle length behind the vehicle and not less than V2
the height of the vehicle. [R3 07-401-8]
Status: In compliance. No visible emissions were observed from truck traffic.
II.B.3.d Haul Road Limitation
The speed of mobile equipment (trucks, front end loaders, etc.) shall not exceed 15 miles per
hour. The haul road speed shall be posted, at a minimum, on site at the beginning of the haul
road so that it is clearly visible from the haul road. [R307-401-8]
Status: Not in compliance. Speed was not posted, but the manager reported the truck drivers were
informed of speed limit. On September 27, 2017, Judd Christensen reported the signs are on
order.
Il.B.3.e Open Area Limitations
A. The area occupied by the storage piles generated by this operation shall not exceed 1.5
acres.
B. The area disturbed by this operation, which has not been stabilized to prevent wind
erosion, shall not exceed 5.0 acres [R307-205]
Status: In compliance. Piles appeared to be less than 1.5 acres, and disturbed area appeared to be less
than 5 acres.
II.B.3.f Control of storage piles and any disturbed or stripped areas at each temporary location shall
be required at all times for the duration of the project/operation to maintain the opacity limits
listed in this AO. [R307-403-8]
Status: In compliance.
II.B.4 Additional Requirements for Aggregate Processing Equipment
II.B.4.a Water sprays or chemical dust suppression sprays shall be installed at the following points to
control fugitive emissions:
A. All crushers
B. All screens
C. All unenclosed conveyor transfer points**
Sprays shall operate as required to ensure the opacity limits listed in this AO are not
exceeded.
** Enclosed is defined as having three (3) or more sides. [R307-401-8]
7
Status: Not in compliance. At the time of inspection, equipment did not have spray bars. On September
27, 2017, Judd Christensen reported sprays have been installed.
II.B.5 Conditions on Fuels
II.B.S.a The owner/operator shall use #1 or #2 fuel oil as fuel in the generator engines. [R307-401-8]
II.B.S.b The sulfur content of any diesel fuel burned shall not exceed 15 ppm by weight in all engines.
[R3 07-401-8, 40 CFR 60 Subpart IIII]
II.B.S.b. 1 The sulfur content shall be determined by ASTM Method D-4294-89 or approved equivalent.
Certification of the fuels shall be either by the owner/operator's own testing or test reports
from the fuel marketer. [R307-401-8]
Status: In compliance.
Section HI: APPLICABLE FEDERAL REQUIREMENTS
In addition to the requirements of this AO, all applicable provisions of the following federal programs
have been found to apply to this installation. This AO in no way releases the owner or operator from any
liability for compliance with all other applicable federal, state, and local regulations including UAC
R307.
UAC R307-210-1 incorporating 40 CFR Part 60 Subpart A: General Provisions
Status: Unable to determine compliance. Unable to determine if met threshold or time limits to conduct
performance test for any specific equipment. Source is no longer required to keep records.
UAC R307-210-1 incorporating 40 CFR Part 60 Subpart OOO Standards of Performance for Nonmetallic
Mineral Processing Plants
1. 40 CFR 60.670 Applicability and designation of affected facility, (a)(1) ...Crusher (Jaw, gyratory,
cone, roll, rod mill, hammermill, and impactor), grinding mill (Hammer, roller, rod, pebble and ball,
and fluid energy), screening operation, bucket elevator, belt conveyor, ... (c)...Facilities ...not
subject...(2) Portable sand and gravel plants and crushed stone plants with capacities 136
megagrams per hour (150 tons per hour) or less.
Status: In compliance. The standard applies with the 300 Ton/hour jaw crusher operating pre April 22,
2008, and with the new 2016, 300 ton/hour cone crusher/screen combination operating post April
22, 2008. The crushing equipment shut down during the inspection due to a plug in a wash plant.
Since all facilities in the production line were not replaced per 60.670(d), this subpart applies to
all the crushers and screens as pre April 22, 2008, facilities/equipment.
2. 40 CFR 60.672 Standard for particulate matter (PM), (b) Affected facilities must meet the fugitive
emission limits and compliance requirements in Table 3... The requirements in Table 3 of this
subpart apply for fugitive emissions from affected facilities without capture systems and for fugitive
emissions escaping capture systems, fugitive emissions limit for ... screening operations, ...
transfer points on belt conveyors 10 percent opacity... fugitive emissions limit for crushers 15
percent opacity.
Status: Not observed. The source was not operating crushers and screens. No capture systems present.
3. 40 CFR 60.674(b)... construction, modification, or reconstruction commenced on or after April 22,
2008, that uses wet suppression to control emissions ... must perform monthly periodic inspections
to check that water is flowing to discharge spray nozzles in the wet suppression system. ... must
initiate corrective action within 24 hours and complete corrective action as expediently as practical
record each inspection of the water spray nozzles, including the date of each inspection and any
corrective actions taken, in the logbook required under § 60.676(b).
Status: Not applicable. The source had facilities operating prior to 2008.
4. 40 CFR 60.675 Test methods and procedures, (a) In conducting the performance tests required in §
60.8, the owner or operator shall use as reference methods and procedures the test methods in
appendices A-l through A-7 of this part... (b) The owner or operator shall determine compliance
with the PM standards in § 60.672(a) as follows: ... (2) Method 9 of Appendix A-4 of this part and
the procedures in § 60.11 shall be used to determine opacity.
Status: Unable to determine compliance. Source is no longer required to keep records.
5. 40 CFR 60.676 Reporting and recordkeeping, (f) The owner or operator of any affected facility shall
submit written reports of the results of all performance tests conducted to demonstrate compliance
with the standards set forth in § 60.672 of this subpart, including reports of opacity observations
made using Method 9
Status: Unable to determine compliance. Source is no longer required to keep records.
UAC R307-210-1 incorporating 40 CFR Part 60 IIII: Standards of Performance for Stationary
Compression Ignition Internal Combustion Engines
1. 40 CFR 60.4200 Am I subject to this subpart?
Status: Not applicable. The portable diesel generator is not stationary therefore, this subpart does not
apply.
UAC R307-214-2 incorporating 40 CFR Part 63 Subpart A - General Provisions
Status: In compliance.
UAC R307-214-2 incorporating 40 CFR Part 63 Subpart ZZZZ - National Emission Standards for
Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines.
1. 40 CFR 63.6585(f)(2) Am I Subject to this Subpart?
Status: Not Applicable. At the time of inspection the plant 725 kW generator was considered portable.
The engine has not remained onsite for 12 consecutive months or a season.
AREA SOURCE RULES
UAC R307-305 Nonattainment and Maintenance Areas for PM10: Emission Standards.
1. R307-305-3. Visible Emissions. (1) Visible emissions from existing installations except diesel
engines shall be of a shade or density no darker than 20% opacity.
9
Status: In compliance.
UAC R307-309 Nonattainment and Maintenance Areas for PM10 and PM2.5: Fugitive Emissions and
Fugitive Dust.
1. R307-309-4 - fugitive emissions from any source shall not exceed 15% Opacity. (2) .. .with EPA
Method 9. (3) For intermittent and mobile sources ... observations to be made at 15 second intervals
shall not apply.
Status: In compliance. No fugitive emissions were observed.
2. R307-309-5. General Requirements for Fugitive Dust. (1) Except as provided in R307-309-5(3),
opacity caused by fugitive dust shall not exceed: (a) 10% at the property boundary; and (b) 20% on
site
Status: In compliance. No visible emissions noted.
3. R307-309-6. Fugitive Dust Control Plan. (1) Any person owning or operating a new or existing
source of fugitive dust... shall submit a fugitive dust control plan on a form provided by the director
or another format approved by the director.
Status: In compliance. They have a fugitive dust plan.
4. R307-309-7. Storage, Hauling and Handling of Aggregate Materials. Any person owning, operating
or maintaining a new or existing material storage, handling or hauling operation shall prevent, to the
maximum extent possible, material from being deposited onto any paved road other than a designated
deposit site. Any such person who deposits materials that may create fugitive dust on a public or
private paved road shall clean the road promptly.
Status: In compliance.
5. R307-309-9. Roads.
(1) Any person responsible for construction or maintenance of any existing road or having right-of-
way easement or possessing the right to use the same whose activities result in fugitive dust from the
road shall minimize fugitive dust to the maximum extent possible. Any such person who deposits
materials that may create fugitive dust on a public or private paved road shall clean the road
promptly.
(2) Unpaved Roads. Any person responsible for construction or maintenance of any new or existing
unpaved road shall prevent, to the maximum extent possible, the deposit of material from the unpaved
road onto any intersecting paved road during construction or maintenance. Any person who deposits
materials that may create fugitive dust on a public or private paved road shall clean the road
promptly.
Status: In compliance.
EMISSION INVENTORY: Potential to Emit (PTE) emission calculations were not found in the
AO. The emissions estimates for the 2017 to 2018 project are
(Pollutant, tons/yr): PM10, 8.05; SOx. 2.98; NOx, 20.09; CO, 5.40;
VOC, 0.86.
10
PREVIOUS ENFORCEMENT
ACTIONS:
COMPLIANCE STATUS &
RECOMMENDATIONS:
RECOMMENDATION FOR
NEXT INSPECTION:
ATTACHMENTS:
None.
The source should be considered not to be in compliance with the
conditions of the AO. A compliance Advisory was issued on
September 13, 2017. On September 27, 2017, Judd Christensen
responded to the Compliance Advisory with actions taken. Recommend
a Warning letter be issued.
None
VEO Form, photographs of crushers, CA response email
11
Source Name:
STATE OF UTAH, DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF AIR QUALITY
ERA METHOD 9 - VISIBLE EMISSION OBSERVATION FORM
t? L Its OBSERVATION DATE: %
Page__of
Street Address: 5-/5- SAe-CTf Jdr
City/County:
Phone:eAol - ^ So - 3 i 0'S foctrL CjJ
Site ID:l
Facility:
9 ' - | |---------------------------------
Equipment/Process: Cr^U
Control Equipment:
^ r"i jj V JjEmission Point: /cWp CfexVrr^^3^ *
Sky Conditions: Clear [ ] Partly Cloudy [ ]
Precipitation: No [ ] Yes [ 1
Wind: Direction: Speed:
Ambient Temp: °F RH: %
Height Relative to Observer:
Distance From Observer:
Overcast
mph
Condensed Water Vapor Present: No Yes [ ]
Attached [ ] Detached [ ]
Length of Condensed Water Vapor Plume: r
Background: _____________________________________
Start time:Stop time:
Sketch process unit: indicate observer position relative to
source; indicate potential emission points and/or actual
emission points.
Distrib: white-file; canary-inspector; pink-owner/operator
sec
min 0 15 30 45
1
2 __K /
)U^ (
3 j r ^i
4 /
5 T~
6
7
8
9
10
11
12
COMMENTS:
I have received a copy of these observations:
/ // „ y ^
if/ / —' /SIGNATURE:
Printed Name: -7
O 'J
Title:yuV
DEL
NIBER
Mi
tODUCT
emt\f\cation 1
UWVBER
OF
[Sft^NUFACTURE
TEREX USA
LLC, CEDAR RAPSDS, IOWA U-S.A.04493-035
CrusWngXscreening Paten's
fniiowtnq pateo^5•
ht
t
p
s
:
/
/
m
a
i
l
.
g
o
o
g
l
e
.
c
o
m
/
m
a
i
l
/
u
/
0
/
?
u
i
=
2
&
i
k
=
c
2
f
5
1
8
d
5
1
7
&
j
s
v
e
r
=
E
a
l
L
6
u
z
d
l
9
M
.
e
n
.
&
v
i
e
w
=
p
t
&
s
e
a
r
c
h
:
=
i
n
b
o
x
&
t
h
=
1
5
e
c
4
e
8
6
5
a
8
3
1
199
&
s
i
m
l
=
1
5
e
c
4
e
8
6
5
a
8
3
1
19
9