Loading...
HomeMy WebLinkAboutDAQ-2024-0084041 DAQC-CI160740001-24 Site ID 16074 (B1) MEMORANDUM TO: FILE – KINDER MORGAN ALTAMONT, LLC – Section 8 Compressor Station THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Paul Bushman, Environmental Scientist DATE: June 11, 2024 SUBJECT: ATTEMPTED COMPLIANCE EVALUATION , Minor, Duchesne County INSPECTION DATE: June 10, 2024 SOURCE LOCATION: 40.236162, -110.3679 5.5 North of Duchesne SOURCE CONTACTS: Erin Dunman, EHS - Air Permitting and Compliance 713-628-2073, Erin_Dunman@kindermorgan.com Garrett Taylor, Ops Manager 435-823-0823, Garrett_Taylor@kindermorgan.com OPERATING STATUS: Not yet operational. PROCESS DESCRIPTION: Natural gas from the Altamont field will enter the site through pipelines. Incoming field gas will be sent through a slug catcher where free liquids are separated. The free liquids are directed to a gunbarrel tank where the free liquids are separated into water and condensate. The separated condensate is directed to two condensate tanks and is stored to be removed via truck load-out. The separated water remains in the gunbarrel tank and is removed through truck load-out. Overhead vapor from the gunbarrel and condensate tanks is sent to an enclosed combustor. Overhead gas from the slug catcher is directed to a natural gas manifold connected to three natural gas-fired compressor engines. Natural gas for the compressor engines will be provided by the Altamont Main Gas Plant. Any liquid removed throughout the compression stages is recycled back to the inlet slug catcher. Compressed gas is directed to a sulfur scrubbing process. After treatment, the gas is discharged to the triethylene glycol (TEG) unit, equipped with a flash tank and still vent condenser, for the removal of entrained water. Gas from the dehydration unit flash tank is routed to the facility flare, while still vent condenser vapors are routed to an enclosed combustor. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN160740001-22, dated April 4, 2022 2 SOURCE EVALUATION: The site is still under construction and should be complete within the next year. COMPLIANCE STATUS & RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN160740001-22, dated April 4, 2022: Compliance not determined. The source is expected to become operational within the next year. HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: Contact source prior to inspection to determine whether the site is operational. ATTACHMENTS: None.