Loading...
HomeMy WebLinkAboutDAQ-2024-008399Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.energyfuels.com June 12, 2024 Bryce Bird Division Director Utah Department of Environmental Quality Air Quality Division 195 North 1950 West Salt Lake City, Utah 84116 Re: Notification of Ventilation Hole Replacement, the La Sal Mines Complex Mr. Bird: Energy Fuels Resources (USA), Inc. (“EFRI”) notified Division of Oil, Gas and Mining (the “Division) that EFRI would be performing maintenance on Pandora 9 (the “Vent”) by letter dated February 6, 2024 (Attachment A). The Vent is located within the La Sal Mine Complex (the “Mine”) area as shown in Figure 1 of Attachment B. The Vent had experienced sloughing of material into the hole opening, temporarily blocking off the Vent preventing air flow exchanges. Vents are needed to provide fresh air exchanges for the safety of our employees working underground in accordance with state and federal requirements. A drill rig was contracted to complete the maintenance on the Vent as previously described. While the rig was being set up to begin the maintenance, the concrete pad around the vent collapsed rendering the Vent unusable. Therefore, EFRI is going to replace the Vent at this time. The replacement Vent will be installed within the existing disturbance area using the contracted drill rig. The Vent is located on lands managed by the United States Forest Services (“USFS”). Therefore, the Vent will be constructed in accordance with the Division and USFS requirements. The Vent will not intercept the D-aquifer; however, EFRI will be casing the Vent with this installation. As the Vent is being replaced within the existing disturbance all baseline surveys were previously completed and are part of the approved Environment Assessment. There will be no increase in surface disturbance as the Vent is going in the same area of existing disturbance. Likewise, no new access to the Vent is required as that is already established. The Vent is also already bonded through the surety approved by the Division in letter dated April 5, 2023, and there will be no need to revise the bond amount as a result of this replacement. Once constructed, the Vent will be operated and monitored according to the above-named agencies’ requirements. Energy Fuels Resources (USA), Inc. Pandora 9 Replacement Notification June 12, 2024 Please contact me at 303-389-4132 or sbakken@energyfuels.com, if you have any questions, or require more information. Sincerely, ENERGY FUELS RESOURCES (USA) INC. Scott A. Bakken Vice President Regulatory Affairs SB/dk Encl: Attachment A Attachment B CC: K. Weinel, D. Kolkman, R. Fisher (EFRI) J. Morris, C. Kijowski (DAQ) Energy Fuels Resources (USA), Inc. Pandora 9 Replacement Notification June 12, 2024 Attachment A Energy Fuels Resources (USA), Inc. Pandora 9 Replacement Notification June 12, 2024 Attachment B