Loading...
HomeMy WebLinkAboutDAQ-2024-0042501 DAQC-003-24 Site ID 14436 (B4) MEMORANDUM TO: STACK TEST FILE – KINDER MORGAN ALTAMONT – Ravolla Compressor Station THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Paul Bushman, Environmental Scientist DATE: January 3, 2024 SUBJECT: Source: One (1) 1380 hp Compressor Engine (II.A.3) RICE-5 and one (1) 1680 hp Compressor Engine RICE-7 (II.A.4) Location: Duchesne County, UT Contact: Erin Dunman: 303-914-7605 Tester: Kinder Morgan Emissions Testing Group Site ID #: 14436 Permit/AO #: DAQE-AN144360008-21 dated April 28, 2021 Action Code: TR Subject: Review of stack test report dated December 12, 2023 On December 21, 2023, Utah Division of Air Quality (DAQ) received a test report for the above listed units at the Ravolla Compressor Station in Duchesne County. Testing was performed October 31, 2023, to determine compliance with the emission limits found in conditions II.B.7.a and II.B.7.b of Approval Order DAQE-AN144360008-21 and 40 CFR Part 60 subpart JJJJ. The DAQ-calculated test results are: Source Test Date Test Method Pollutant Tester Results DAQ Results Limits RICE-5 SN: JEF03321 October 31, 2023 7E NOx 34 ppmvd @ 15%O2 34.095 ppmvd @ 15%O2 82 ppmvd @ 15%O2 1.10 lb/hr 1.098 lb/hr 1.51 lb/hr 0.5 g/bhp-hr 0.452 g/bhp-hr 1.0 g/bhp-hr 10 CO 0 ppmvd @ 15%O2 0.118 ppmvd @ 15%O2 270 ppmvd @ 15%O2 0.00 lb/hr 0.002 lb/hr 0.5 lb/hr 0.0 g/bhp-hr 0.001 g/bhp-hr 2.0 g/bhp-hr ASTM D6348- 03 VOC 15 ppmvd @ 15%O2 14.560 ppmvd @ 15%O2 60 ppmvd @ 15%O2 0.50 lb/hr 0.481 lb/hr 0.73 lb/hr 0.2 g/bhp-hr 0.185 g/bhp-hr 0.7 g/bhp-hr RICE-7 SN: 5283705149 October 31, 2023 7E NOx 7 ppmvd @ 15%O2 7.065 ppmvd @ 15%O2 82 ppmvd @ 15%O2 0.30 lb/hr 0.303 lb/hr 1.85 lb/hr 0.1 g/bhp-hr 0.104 g/bhp-hr 1.0 g/bhp-hr 2 Source Test Date Test Method Pollutant Tester Results DAQ Results Limits 10 CO 32 ppmvd @ 15%O2 32.052 ppmvd @ 15%O2 270 ppmvd @ 15%O2 0.84 lb/hr 0.836 lb/hr 3.00 lb/hr 0.3 g/bhp-hr 0.287 g/bhp-hr 2.0 g/bhp-hr ASTM D6348- 03 VOC 0 ppmvd @ 15%O2 0.031 ppmvd @ 15%O2 60 ppmvd @ 15%O2 0.0 lb/hr 0.001 lb/hr 0.11 lb/hr 0.0 g/bhp-hr 0.000 g/bhp-hr 0.7 g/bhp-hr DEVIATIONS: None. CONCLUSION: The stack test appears to be acceptable. RECOMMENDATION: The emissions from RICE-5 and RICE-7 should be considered to have been in compliance with the emission limits found in the conditions II.B.7.a and II.B.7.b of Approval Order DAQE-AN144360008-21 and 40 CFR Part 60 subpart JJJJ. ATTACHMENTS: DAQ stack test review spreadsheets, Kinder Morgan stack test report. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222