Loading...
HomeMy WebLinkAboutDAQ-2024-006958 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-221-24 Site 14205 (B1) Christian Boudreau Staker Parson Companies 89 West 13490 South, Suite 100 Draper, Utah 84020 Dear Mr. Boudreau: Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Kane County Your Notice of Intent dated March 6, 2024, to relocate portable aggregate equipment to the temporary project for Western Rock Companies’ Paria facility, located 14 miles north of Big Water on highway 89 at mile marker 21, east from Kanab, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: II.A.86 aggregate plant with generators The State of Utah has permitted portable equipment for Staker Parson Companies on the Approval Order DAQE-AN115180014-15 dated July 6, 2015. The above relocation address is a permitted aggregate facility with established production limits and operation hours. All equipment operating at this site must be in accordance with the current AO for this site DAQE-AN0142050001-09 dated June 13, 2009. The total production of aggregate from all temporary projects when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.b. The referenced portable generator will use only low sulfur fuel as per Condition II.B.3.a. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the / % Ú Þ Û Ù Û Ý DAQC-221-24 Page 2 information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Southwest Utah Public Health Department 4 * - - $ . — - @ C v A ? A C ? G w @ E ˜ 3/6/24, 4:42 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1792798187266721582%7Cmsg-f:1792798187266721582&…1/2 Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Wed, Mar 6, 2024 at 10:19 AM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Staker Parson has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2024-03-06 10:19:32 MST IP: 67.182.223.139 ResponseID: R_7saHoNhXn417BZV Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/h6dXV6x1Dbaf- ZNEMrjtCKrlPLnY43xK4-aWlTzP%2E-6sRjY-ASnkPQsa1jf0zCAHYHHaUyFK51nH5e zjvt9NzDSBXGRRxOwcbfuYllNJyBaiRBXccd7gBoDT2vKe41EP4zzqU1j1WQ-pLyV9BWIVXBUWcKlF%2E- zulkyKr6VDXhcpHdzwKJ3LGAFscYdJ8IQW%2Epp7gg7bUWiVrfW%2EEBMlr9kORMsz18%2EhXFAlHwPiUkAeHWWlU- wwXWVkeqquIP32N%2EBUH5qDGjh4XfbxuP8LQBlwdyfx58cMm42OVIlgbRFE92zzRYP3voa99F5q jb8w%2EfNUyZeC5IrmfRWm0EETIg Response Summary: Please fill out the information below: Contact Person: Christian Boudreau Company Name: Staker Parson Mailing Address: 89 W 13490 S City: Draper Zip: 84020 Phone Number: 3853186938 Email: christian.boudreau@stakerparson.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... No All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 02C82DEA8B Briefly give directions to the site and/or physical address: Heading eastbound from Kanab on US 89, mile marker 21 Proposed Relocation Information: Closest City Kanab County Kane UTM X Coordinates 12 0418802 E UTM Y Coordinates 4107790 N Approximate distance to the nearest house/business 2500 ft UTM X Coordinates to nearest house/business 12 0418227 E UTM Y Coordinates to nearest house/business 4107291 N Does this site currently have a permit with DAQ? 3/6/24, 4:42 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1792798187266721582%7Cmsg-f:1792798187266721582&…2/2 Yes If yes, what is the Permit (DAQ-AN) # ? DAQE-AN0142050001-09 If yes, what is the Permit Holder's Name? Western Rock Products Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN0115180014-15 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Aggregate Plant w/ Generators Serial or ID# II.A.86 Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_3dKvXbgwm5a60Iy Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 5am Ending time of operation (am/pm) 9pm Maximum hourly production rate for project 400TPH Expected startup date 03/08/2024 Expected completion date 03/08/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2313EOtZsy0OZVA Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2CZni0AxfYQKmYK 3/12/24, 9:34 AM State of Utah Mail - RE: [EXT] March 6 relocation as an addition or new https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-8676236202358717367%7Cmsg-f:179333291203496831…1/2 Susan Weisenberg <sweisenberg@utah.gov> RE: [EXT] March 6 relocation as an addition or new 1 message Boudreau, Christian (Staker & Parson) <christian.boudreau@stakerparson.com>Tue, Mar 12, 2024 at 8:58 AM To: Susan Weisenberg <sweisenberg@utah.gov> Hi Susan, The recent application submitted for the Paria Pit is for a new TRP. The equipment set requested in the January TRP is currently operating in a different location. Thank you, Christian Boudreau Environmental Specialist West Division Staker Parson A CRH COMPANY 89 West 13490 South Draper, Utah 84020 O +1 (801) 871 6704 C +1 (385) 318 6938 E christian.boudreau@stakerparson.com From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Friday, March 8, 2024 12:33 PM To: Boudreau, Christian (Staker & Parson) <christian.boudreau@stakerparson.com> Subject: [EXT] March 6 relocation as an addition or new CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you are expecting this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish button. 3/12/24, 9:34 AM State of Utah Mail - RE: [EXT] March 6 relocation as an addition or new https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-8676236202358717367%7Cmsg-f:179333291203496831…2/2 Hello, the Compliance Section Manager, Chad Gilgen, requested that I check to see if you would like the equipment going to Western Rock's Paria Pit to be in addition to the attached January Relocation, or as a new TRP. Thanks Susan Weisenberg, Environmental Scientist Office: 385-306-6512 ATTENTION: Ce courriel vient de l'exterieur de l'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pièces jointes, à moins que vous ne connaissiez l'expéditeur du courriel et savez que le contenu est sécuritaire. Si vous pensez qu’il s’agit d’un courriel d’hameçonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tentative d’hameçonnage.