Loading...
HomeMy WebLinkAboutDDW-2024-008270 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, P.E. Interim Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor November 22, 2023 Noreen Johnson, Mayor Bicknell Town P.O. Box 96 Bicknell Town, Utah 84715 Subject: Operating Permit, Mountain Spring Transmission Pipeline Repair/Replacement; Bicknell Town, System #28001, File #13499 Dear Mayor Noreen Johnson: The Division of Drinking Water (the Division) received a request for an Operating Permit for the Mountain Spring Transmission Pipeline Repair/Replacement from your consultant, Kelly Chappell with Ensign Engineering on November 15, 2023. The Division issued Plan Approval for this project on August 31, 2023. Our understanding of the project is that a large section of the existing 4-inch diameter PVC pipe that carries the mountain spring water to the storage tanks was damaged and has now been replaced. The section of piping that has been replaced is immediately above the storage tanks and chlorination building. This project replaced approximately 2,600 feet of the existing 4-inch diameter PVC piping with 6-inch diameter HDPE DR 11 piping. The necessary valving was installed in the new pipeline and a new turn-out was placed on this pipeline just above the existing meter station. We have received the following information for the Mountain Spring Transmission Pipeline Repair/Replacement Project: 1. Certification of Rule Conformance with plan approval conditions by a professional engineer. 2. As-built or record drawings. 3. Satisfactory bacteriological results as evidence of proper disinfection and flushing. Mayor Noreen Johnson Page 2 of 2 November 22, 2023 We have determined that all conditions for operating permit issuance have been met. On this basis, an Operating Permit for the Mountain Spring Transmission Pipeline is hereby issued as constituted by this letter. You may now place the new spring transmission pipeline in service in your water system. Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this Operating Permit, please contact John Chartier, DEQ Central District Engineer, at (435) 559-1969, or Michael Newberry, Permitting and Engineering Support Manager, at (385) 515-1464. Sincerely, Nathan Lunstad, P.E. Interim Director JLC/mrn/mdb cc: Eric Larsen, Central Utah Public Health Department, elarsen@centralutahhealth.org Kelly Chappell, P.E., Ensign Engineering, kchappell@ensignutah.com Brennan Rees, Ensign Engineering, brees@ensignutah.com Mayor Noreen Johnson, Bicknell Town, noreen.johnson@yahoo.com John L. Chartier, P.E., DEQ Central District Office, jchartier@utah.gov Heather Pattee, Division of Drinking Water, hpattee@utah.gov DDW-2023-039536