Loading...
HomeMy WebLinkAboutDDW-2024-007994Sanitary Survey - Deficiency Report PWS Number:UTAH17035 Deficiency Points:75 Survey Date:05/30/2024 Survey Name:BEAR LAKE PARK - NORTH EDEN CAMPGROUND Surveyor:Danielle Zebelean Sanitary Survey Category: TR SDWIS Severity Code: Minor Deficiency Management and Operations | DS001 | UTAH17035 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-7, 8 & 18, R309-100 through 605 Trigger for regulatory followup to address concerns. Notes:Need to see a copy with North Eden added. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH17035 DISTRIBUTION SYSTEM 33. Documentation of annual public awareness and/or employee training Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. Notes:No documentation at time of survey Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH17035 DISTRIBUTION SYSTEM 35. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. Notes:Need to make and inventory of all the spigots Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS001 | NORTH EDEN CAMPGROUND WELL 64. Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) Notes:Sample tap had threads on it initially. Contractor sawed off threads during survey visit to make into a smooth nose sample tap. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S023 NO SMOOTH NOSED SAMPLING TAP ON DISCHARGE PIPING Sanitary Survey Category: FW SDWIS Severity Code: Significant Deficiency Storage Tanks | ST001 | NORTH EDEN TANK 79. Access opening locked Rule: R309-545-14(3)Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Missing lock during initial visit. Jefferey placed lock after survey and sent photos. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: V029 STORAGE TANK ACCESS OPENING LACKS A LOCK