Loading...
HomeMy WebLinkAboutDAQ-2024-008249fff&npk PERM!T DEVIATIOM REPORT TO: Executive Secretary, Utah Air Quality Board UTAH DEPffTTMENT OF ENVIRONMENTAL OUAUTY \4AR - 1 2A24 I'}IVISION OF AIR QUALTTYRE: DATE: Deviation Report for Permit # 2100036004 02l20l2024 ln accordance with Operating Permit provision 1.5.2.b, and Utah Administrative Code (UAC) R307-4L5-5a (3XcXii), the following deviation report is submitted. 1 Dates that the deviation occurred: o2l20l2O24 2 Permit conditions for which deviation occurred: Operational Permit provision l.L. and Utah Administrative Code (UAC) R307- 415-5c(5). 3 Describe the deviation that occurred: Annual Compliance Certification for operations date 1 March 2O22to28 February 2023 was filed incomplete. Correction made on 20 February 2024. 4 Was the deviation due to and "upset condition" as defined in Section ll of the permit. NO 5 Describe the probable cause of the deviation: Local change in upper management delayed the process. 6 Describe any corrective actions or prevention measures taken: Correction and training with management team on reporting time frames. ln accordance with Operating Permit Provision l.K and UAC R3O7-415-5b and based on information and belief formed after responsible inquiry I certify that the statement and information in this document are true, accurate and complete. *zq sW Signature 9f responsible Official for the source. Genpak, LLC 279LW Hwy 55 Cedar City, UT 84720 435-865-702s Print or type the name and title of Responsible Official. REVIEWED Initials JBR Date 6/4/2024 Comp Status Meets File # 11767 Blue 2 late T5 annl cert - fix with new rpt miss filed NFA