DAQC-046-24
Site ID 13098 (B1)
Gene Henrie
Quality Crushing
956 South Canyon Drive
Cedar City, Utah 84720
Dear Mr. Henrie:
Re: Quality Crushing – Temporary Relocation/Operation, Notice of Intent – Emery County
Your Notice of Intent dated January 3, 2024, to relocate portable aggregate equipment to the
temporary project for Staker Parson Companies’ Ferron Facility, located approximately one mile north
of Ferron, on the east side of Highway 10, Emery County, Utah, was received by the Utah Division of
Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
500 TPH jaw crusher
Two (2) 400 TPH screens
300 TPH screen
400 TPH cone crusher
400 TPH impact rusher
725 kW generator
The above equipment has been permitted for operation in the State of Utah by Quality Crushing’s
portable Approval Order (AO) DAQE-AN130980008-18 dated May 2, 2018. The above location is a
permitted aggregate facility with established production limits and operating conditions. All
equipment at this site must be in accordance with the submitted Fugitive Dust Control Plan for this
project, and all the conditions, including opacity limits, and dust minimization requirements, of the
Staker Parson Companies’ current AO for this site DAQE-AN146070002-17 dated July 16, 2017.
As per the telephone conversation with Gene Henrie, dated January 19, 2024, a water line is being
installed within the operation area in order to provide continuous access to water applications for
minimizing fugitive dust.
+ 2 / 6 Ü Ú Û Ù Û Ý
DAQC-046-24
Page 2
The production of aggregate from this temporary project when combined with any permanent
equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.a of the AO
DAQE-AN146070002-17. The operation of the generator engine must be in accordance of Section
II.B.10 of the AO DAQE-AN130980008-18.
As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary
site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days,
starting from the initial relocation date. The operational days per site cannot be extended beyond the
stipulated 365 consecutive day period.
The owner/operator shall maintain records of the actual operation hours, days, and production rate, of
the above referenced equipment at this relocation site and have the ability to submit the information to
the DAQ upon the request of representatives of the director. Please make certain that the plant
operator is aware of all the location specific requirements for this site and the conditions of the
aforementioned Staker Parson AO DAQE-AN146070002-17.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations
be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also
mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which
are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure
proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current storm water construction requirements for
additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation process
please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
Addition of the generator email
Plotted UTM coordinates of Ferron operation
cc: Southeast Utah Health Department
Christian Boudreau, Staker Parson Companies
4 * - - $ . — ) B ? v A ? A C ? G w D D ˜
1/25/24, 11:40 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1787098726430165539%7Cmsg-f:1787098726430165539&…1/3
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Wed, Jan 3, 2024 at 12:29 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Quality Crushing has requested a Temporary Relocation. Please see the information below. Any attachments
can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-01-03 12:29:03 MST
IP: 72.249.248.147
ResponseID: R_3vjM7NxPB9xZ0zq
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
PeLNXZXoxBeE3QTjfc173-QY5RiR4KvDsc9s9V-bW8a3Z4v1fdcV0BXvI1tmgLAmkflNh
nH2gRby5xFLHHdiuWtiqrKt734uOJ9JGqQEC78wT6-PBhBY2AeKaR3GDUr5EWeO%
2EeJbdTqGBeBul4tv8bhNsh1uqB34tS1aDKv7NU1fedBtuCdvFRRDhrJbujil0oPo5I9m-9mnlrQ4-cGo%
2E73xesD4WpOYC9yrMXmmGUVrqc6Xgfh5C4KvlVRtOEeJe1SgMUwG3qKnRDJyEhdxSUsEGC4o710%
2E6QpYltqznnr4IJQGFPmbbVYGYDIB%2EqxJVnh19nlCIaJ4zLBlwi2nIQ
Response Summary:
Please fill out the information below:
Contact Person: Gene Henrie
Company Name: Quality Crushing
Mailing Address: 956 South Canyon Drive
City: Cedar City
Zip: 84720
Phone Number: 435-671-2263
Email: qualitycrushing@yahoo.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
No
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
A98A69587F
Briefly give directions to the site and/or physical address:
From Salt Lake City, head south on I-15 to Spanish Fork. At Spanish Fork, take the US-6 exit toward Price. Continue on
US-6 for approximately 68 miles. Take Exit 241 onto UT-10 S/Carbon Ave. Follow UT-10 for approximately 41 miles. Turn
right onto an unnamed dirt road. Continue along the dirt road to the Ferron Pit.
Proposed Relocation Information:
Closest City Ferron
County Emery
UTM X Coordinates 487412
UTM Y Coordinates 4328303
Approximate distance to the nearest house/business 1723 feet
UTM X Coordinates to nearest house/business 487174
UTM Y Coordinates to nearest house/business 4327834
1/25/24, 11:40 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1787098726430165539%7Cmsg-f:1787098726430165539&…2/3
Does this site currently have a permit with DAQ?
Unknown
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN130980008-18
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Jaw Crusher
Make/Model Unknown
Serial or ID# Unkown
Manufactured Date Unknown
Design Capacity 500 tph
2
Equipment Type Screen
Make/Model Unknown
Serial or ID# Unknown
Manufactured Date 2008
Design Capacity 400 tph
3
Equipment Type Screen
Make/Model Unknown
Serial or ID# Unknown
Manufactured Date 2006
Design Capacity 300 tph
4
Equipment Type Screen
Make/Model Unknown
Serial or ID# Unkown
Manufactured Date Unknown
Design Capacity 400 tph
5
Equipment Type Cone Crusher
Make/Model Unknown
Serial or ID# Unknown
Manufactured Date 1999
Design Capacity 400 tph
6
Equipment Type Impact Crusher
Make/Model Unknown
Serial or ID# Unknown
Manufactured Date 2014
Design Capacity 400 tph
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_29oEfftCGQCwnwH
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 12
Starting time of operation (am/pm) 6:00 AM
Ending time of operation (am/pm) 10:00 PM
Maximum hourly production rate for project 400 tph
Expected startup date 01/05/2024
Expected completion date 06/01/2024
What type of application is this for?
New Application
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_12Law8NMx6FMtpW
1/24/24, 5:55 PM State of Utah Mail - Re: Ferron Pit Air Quality Permit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1788825506060379600%7Cmsg-f:1788910919838560395&…1/3
Susan Weisenberg <sweisenberg@utah.gov>
Re: Ferron Pit Air Quality Permit
1 message
Chad Gilgen <cgilgen@utah.gov>Tue, Jan 23, 2024 at 12:32 PM
To: Susan Weisenberg <sweisenberg@utah.gov>
Cc: Marina Thomas <Marinathomas@agutah.gov>
Hi Susan,
I have plotted the UTM coordinates of the Staker Parson Ferron Pit and the Quality Crushing TRP location and compared
them to the boundaries of the Staker Parson Pit found in the 2017 NOI and it looks like you are correct about the TRP
coordinates being located within the boundaries of the Staker Parson Ferron Pit. See attached for additional information.
Thanks,
Chad
Chad Gilgen | Manager | Minor Source Compliance
385-306-6500 (cell)
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
On Tue, Jan 23, 2024 at 9:10 AM Susan Weisenberg <sweisenberg@utah.gov> wrote:
Hello - I'm having ongoing conversations with Gene Henrie and the pit operator Cassidy Ovard. It appears from the
attached photo that their proposed relocation is just to the right of the disturbed area that I believe is the permanent
Staker Ferron pit located on the west side of Highway 10. Attempting to make fine boundary distinctions on permits is
an issue that usually doesn't come up, however, I believe that Quality Crushing's proposed TRP is essentially within
Staker's pit.
I don't know if the existing permit makes it easier or harder to authorize the TRP under the circumstances. The AO at
least has been modeled as per our permitting standards and has a production limit. Just as additional information, Mr.
Henrie stated yesterday evening that they are having a water line dug in to make sure that the operation has constant
access to dust control. Thanks for your time with this.
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
---------- Forwarded message ---------
From: Gene Henrie <qualitycrushing@yahoo.com>
Date: Mon, Jan 22, 2024 at 5:07 PM
Subject: Re: Ferron Pit Air Quality Permit
To: Susan Weisenberg <sweisenberg@utah.gov>
Hi Susan,
1/24/24, 5:55 PM State of Utah Mail - Re: Ferron Pit Air Quality Permit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1788825506060379600%7Cmsg-f:1788910919838560395&…2/3
I've attached a screenshot of that pit location.
is that the same location that the AO?
Thanks for your help,
Cass
On Monday, January 22, 2024 at 05:01:42 PM MST, Susan Weisenberg <sweisenberg@utah.gov> wrote:
Hello, I pulled up the pin drop on Google Earth and it really looks like the same location as the Staker Ferron AO,
approved for the west side of highway 10.
Can you take a look at the attached AO and the Google Earth snapshot? The pin drop seemed to be pretty close to
where the trailers are parked. Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
On Mon, Jan 22, 2024 at 3:08 PM Gene Henrie <qualitycrushing@yahoo.com> wrote:
Gene just confimed that Nielson's does not have a permanent AO number. Gene also had a water line installed in
the pit he's setting up, so he will have a constant supply of city water to manage the dust.
Thanks!
Cass
On Monday, January 22, 2024 at 01:55:36 PM MST, Gene Henrie <qualitycrushing@yahoo.com> wrote:
Hi Susan,
I just wanted to touch base and make sure you got that pin. Gene said he's checking with Nielsons for an air quality
pit west of the highway. He's not in that pit by the radio towers where Nielson had their previous issues. Do you
need anything else for that air quality permit, or has it been approved?
Thanks!
Cassidy Ovard
(435) 421-9103
2 attachments
1/24/24, 5:55 PM State of Utah Mail - Re: Ferron Pit Air Quality Permit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1788825506060379600%7Cmsg-f:1788910919838560395&…3/3
Pit locations.jpg
717K
Staker Parson Boundaries.pdf
2249K
1/24/24, 5:23 PM State of Utah Mail - Ferron Temporary Relocation - Modification to include Generator
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1788445002028777628%7Cmsg-f:1788445002028777628&…1/1
Susan Weisenberg <sweisenberg@utah.gov>
Ferron Temporary Relocation - Modification to include Generator
1 message
Alysen Tarrant <alyswen@gmail.com>Thu, Jan 18, 2024 at 9:07 AM
To: Susan Weisenberg <sweisenberg@utah.gov>, Gene Henrie <qualitycrushing@yahoo.com>
Hi Susan,
I apologize for the oversight; the Temporary Relocation submitted for Quality Crushing (DAQE-AN130980008-18) on
January 3rd, 2024 needs to include a 725 kW Generator in the equipment list. Can this please be added?
Thank you!
--
Alysen D. Tarrant