Loading...
HomeMy WebLinkAboutDAQ-2024-006883ROCKY MOUNTAIN PdYER UTAH DEPARTMEI'IT OF Lake side Power Plant ENVIRONMENTAL ouALlrY 1825 North Pioneer Lane Vineyard,W 84042 :il - ) ::l,it, January 30,2024 Mr. Bryce Bird, Director DlvlsloN oF AIR QUALITY Utah Department of Environmental Quality Division of Air Quality P.O Box 144820 salt Lake city, UT 841144820 Re: SIX-MONTH MONITORING RBPORT FOR LAKE SIDE POWER PLAI\T (Title V Permit #4900241002) DearMr. Bird: Attached is the Six-Month Monitoring Report for the Lake Side Power Plant for the period of July l, 2023 through and including December 31,2023. The information contained herein is submitted in accordance with Provision I.S.2.a of the take Side Power Plant Title V Operating Permit (Permit #4900241 002) I hereby certify that the information submitted therein is true, accurate and complete, based on information and belief formed after reasonable inquiry. Should you have any questions regarding this report, please contact Veronica Reyes, Environmental Analyst, Lake Side Power Plant, at 801 -796-1916. Sincerely, ^/e-Ab^ Dustian Weaver- Lake Side Plant Manager cc: Veronica Reyes - Lake Side Plant Environmental Analyst B-2-13031 ROCKY MOUNTAIN Pol'I'ER Lake Side Power Plant - Operating Permit #4900241002 SIX.MONTH MONITORING REPORT Reporting Period: July I through December 31,2023 The Lake Side plant has completed all monitoring as required by the Title V operating permit except for the monitoring deviations that were promptly reported in the following deviation reports: Date of Deviation Reoort Permit Condition for Which Deviation Was Reported No Deviations The results of the monitoring conducted in accordance with the permit conditions demonstrated that all emission units were operated in compliance with the permit terms and conditions except for the periods identified in the following deviation reports: Date of Deviation Reoort*Permit Condition for Which Deviation Was Reoorted 8/23t2023 II.B.2.d - Emissions of COfrom each HRSG stack shall not exceed 50 ppmv, dry @ l5% 02 during short-term excursions. A rapid load change due to a sub-station trip resulted in a permit deviation due to the 15 minute average concentration of corrected carbon monoxide being greater than 50 ppm. *Reported in Quarterly State Excess Emission Report I certifu that, based on information and belief formed after reasonable inquiry, the statements and information contained in this report are true, accurate and complete. Dustian Weaver Lake Side Plant Manager/Responsible Official DIVISION OF AIR OIIAL ITY