Loading...
HomeMy WebLinkAboutDAQ-2024-008013REyTEwED Initrats: @o^rr, *h / [tr Compliance Status: f€.c€r\fv c9 F,t,# 130I Ll January 25,2024 Utah Department of Environmental Quality Division of Air Quality - Compliance Section 195 North 1950 West Salt Lake ciry, uT 84116 RE: NSPS KKK Semiannual Report Harley Dome NGL Extraction Facility Grand County, Utah Dear Sir/Madam: Utah Gas Corp UGC Midstream 1125 Escalante Drive Rangely, CO 81648 Phone 970.675.4400 I'TAH DEPAHTMENT OF EWIRONMENTAL OUATITY JAN 3 0 2024 DIVISION OF AIR QUALTTY UGC Midstream, LTD, LLC (UGC Midstream) operates the Harley Dome NGL Extraction Facility (Harley Dome) located in Grand County, Utah. UGC Midstream is submitting this semiannual compliance report for the period of July 1,2023 through December 31,2023 in accordance with 40 CFR Part 60 Subpart KKK. During July through December 2023, Trihydro Corporation (Trihydro) completed routine monthly monitoring for fugitive emissions as required by the Leak Detection and Repair (LDAR) program for the Harley Dome facility. The monitoring activities were completed to satisfy the requirements of the New Source Performance Standard (NSPS) Subpart KKK regulation. NSPS Subpart KKK Requirements Subpart KKK requires that a semiannual report be submitted for each process unit and month within the reporting period. The semiannual report must include: t o The number of valves, pressure-relief devices (PRDs), pumps, and compressors for which leaks were detected. . The number of valves, PRDs, pumps, and compressors for which leaks were not repaired as required or placed on the delay of repair (DOR) list. o The facility is required to report the reason for each DOR, the dates of process unit shutdowns that occurred within the reporting period, and revisions to the component inventory. Results In accordance with USEPA Method 2l protocol, Trihydro personnel monitored components in volatile organic compound (VOC) service or in wet gas service. There were no leaks detected from components monitored during the 6-month reporting period, as reported in Attachment A. There were no components added or removed from the inventory during the reporting period. The facility were no process unit shutdowns occurred during the reporting period. If you have any questions or need any other information, please contact me at (970) 307-5032 or by email at tweiner@utahqascorp. com. Sincerely, Utah Gas Corp Z-,- fut; Taryn Weiner Manager, Air and Sustainability Attachment A: Harley Dome NSPS KKK Semi-Annual Report cc: Chris Forster, UGC April Mestas, UGC Page2l2 Semi-Annual Report From:71112023 To: 1213112023, Rule: NSPS - KKK UGC Midstream - Harley Dome Red Rock Gathering - Harley DomeUnit: Delay of Repairs: r uomponents: $ Added: I Perm. OOS: Valves: 391 0 0 Pumps:3 0 0 Compressors:0 0 0 PRVs:3 0 0 Month:Leaking: Not Repaired in Repair Period:Leaking: Not Repaired in Repair Period:Leaking: Not Repaired in Repair Period:Leaking: Not Repaired in Repair Period: July 2023 0 0 0 0 0 0 0 0 August 2023 0 0 0 0 0 0 0 0 September 2023 0 0 0 0 0 0 0 0 October 2023 0 0 0 0 0 0 0 0 November 2023 0 0 0 0 0 0 0 0 December 2023 0 0 0 0 0 0 0 0 No Delay of Repairs Performed. Late Repairs: No Late Repairs. Signature: 7*'- Nil UTAH DEPARTMENT OF EI{VIRONMENTAL QUALITY DIVISION OF AIR OUALlTY