MEMORANDUM
TO: FILE – MONARCH NATURAL GAS, LLC – Gate Canyon Natural Gas
Compressor Station
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: March 27, 2024
SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Carbon County
INSPECTION DATE: March 20, 2024
SOURCE LOCATION: Remote location
Carbon County, UT
DIRECTIONS: Near Nine Mile Canyon
SOURCE CONTACTS: Glen Hicks, Environmental Contact
O: 832-280-5072, C: 724-263-6199
ghicks@mngllc.com
OPERATING STATUS: Temporarily down due to low natural gas prices.
PROCESS DESCRIPTION: Natural gas is routed into the facility via pipeline. The gas is then
sent through a dehydration unit before being compressed and
routed back into the pipeline. Liquids recovered from the gas are
stored in a 300 bbl condensate tank and a 100 bbl water tank.
Emissions from the storage tanks and vapor collection system
are routed to a flare.
APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN130090005-11, dated
December 6, 2011
NSPS (Part 60) JJJJ : Standards of Performance for Stationary
Spark Ignition Internal Combustion Engines,
MACT (Part 63) – HH: National Emission Standards for
Hazardous Air Pollutants from Oil and Natural Gas Production
Facilities
MACT (Part 63) -ZZZZ: National Emissions Standards for
Hazardous Air Pollutants for Stationary Reciprocating Internal
Combustion Engines,
2
SOURCE EVALUATION:
Name of Permittee: Permitted Location:
Monarch Natural Gas, LLC- Gate Canyon Natural
Gas Compressor Station
5613 DTC Parkway, Suite 200 Remote location
Greenwood Village, CO 80111 Carbon County, UT
SIC Code: 1311: (Crude Petroleum & Natural Gas)
Section I: GENERAL PROVISIONS
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the
UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to
those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
Status: In Compliance. No limits appear to have been exceeded.
I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions
covered by this AO must be reviewed and approved. [R307-401-1]
Status: In Compliance. No modifications to the equipment or processes were observed
during the inspection.
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by
the owner/operator, shall be made available to the Director or Director's representative upon
request, and the records shall include the two-year period prior to the date of the request. Unless
otherwise specified in this AO or in other applicable state and federal rules, records shall be kept
for a minimum of two (2) years. [R307-401-8]
Status: In Compliance. Records are kept as required and were made available to be
reviewed upon request.
I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall,
to the extent practicable, maintain and operate any equipment approved under this AO, including
associated air pollution control equipment, in a manner consistent with good air pollution control
practice for minimizing emissions. Determination of whether acceptable operating and
maintenance procedures are being used will be based on information available to the Director
which may include, but is not limited to, monitoring results, opacity observations, review of
operating and maintenance procedures, and inspection of the source. All maintenance performed
on equipment authorized by this AO shall be recorded. [R307-401-4]
Status: In Compliance. The equipment appeared to be maintained and operated in a
manner consistent with good air pollution control practices.
I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns.
[R307-107]
Status: In Compliance. No breakdowns have been reported.
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150]
Status: In Compliance. An emissions inventory was submitted for the 2020 operating year.
3
Section II: SPECIAL PROVISIONS
II.A The approved installations shall consist of the following equipment:
II.A.1 Gate Canyon Compressor Station
Natural gas compressor station
II.A.2 Compressor Engine (E-2)
One (1) compressor engine
Capacity: 290 hp
Fuel: natural gas
Attached equipment: catalytic converter
II.A.3 Natural Gas Dehydrator
One (1) natural gas dehydration unit
Solvent: triethylene glycol
Attached equipment: 1,000,000 Btu/hr boiler and vapor collection system
Fuel: natural gas
II.A.4 Storage Tanks (T-1, T-2, T-3)
Three (3) vertical, fixed-roof storage tanks
Capacity: 12,600 gallons each
Service: natural gas condensates
Attached equipment: tank heaters rated at 125,000 Btu/hr each
Fuel: natural gas
II.A.5 Flare Device
One (1) flare device
Fuel: natural gas or vapor collection system gas
II.A.6 Vapor Collection System
With attached BTEX condenser and flare device
II.A.7 Fugitives from condensate loading
Truck loading
Status: In Compliance. The compressor engine is an Ajax 360LE with SN: 83235. The
dehydrator is a 250 kBtu/hr unit, and there is a 250 kBtu/hr line heater that is used
seasonally. There is one unheated 300 bbl condensate tank, and one unheated 100 bbl
water storage tank. The flare is a TCI 2000.
II.B Requirements and Limitations
II.B.1 The Gate Canyon Natural Gas Compressor Station shall be subject to the following.
II.B.1.a Visible emissions from any stationary point or fugitive emission source associated with the plant
operations or with the control facilities shall not exceed 10% opacity. Opacity observations of
emissions from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix
A, Method 9. [R307-401-8]
Status: In Compliance. No visible emissions were observed from any point during the
inspection.
II.B.1.b The following limit shall not be exceeded:
1,686,300 gallons of natural gas condensates throughput per rolling 12-month period.
[R307-401-8]
4
II.B.1.b.1 A new 12-month total shall be calculated on a monthly basis by summing the monthly totals for
the previous consecutive 12-months. Monthly calculations shall be made no later than 20 days
after the end of each month. Records of condensate throughput shall be kept for all periods when
the plant is in operation. Condensate throughput shall be determined by examination of company
and/or customer billing records. The records of condensate throughput shall be kept on a daily
basis. [R307-401-8]
Status: In Compliance. Records reviewed show condensate throughput to be below the
1,686,300 gallon limit.
II.B.1.c All exhaust air from the vapor collection system shall be routed through, and combusted within
the flare device before being vented to the atmosphere. [R307-401-8]
Status: In Compliance.
Section III: APPLICABLE FEDERAL REQUIREMENTS
In addition to the requirements of this AO, all applicable provisions of the following federal programs
have been found to apply to this installation. This AO in no way releases the owner or operator from any
liability for compliance with all other applicable federal, state, and local regulations including UAC
R307.
NSPS (Part 60) JJJJ : Standards of Performance for Stationary Spark Ignition Internal Combustion Engines
Status: In Compliance. The Ajax 360LE is required to submit an initial performance, but is not
required to perform any subsequent performance tests unless the engine is rebuilt or undergoes major
repair or maintenance. The initial performance test was conducted on June 30, 2009. A copy of the test
can be found in DAQC-1365-21.
MACT (Part 63) – HH: National Emission Standards for Hazardous Air Pollutants from Oil and Natural Gas
Production Facilities
Status: In Compliance. This subpart is applicable to the Gate Canyon Compressor station due to the use
of triethylene glycol (TEG) as the scrubbing liquor in the dehydrator. Due to the throughput capacity
and low concentrations of benzene, there are no emissions standards or compliance standards that
apply.
MACT (Part 63) -ZZZZ: National Emissions Standards for Hazardous Air Pollutants for Stationary
Reciprocating Internal Combustion Engines
Status: In Compliance. Adhering to NSPS JJJJ requirements satisfies MACT ZZZZ.
AREA SOURCE RULES EVALUATION:
The following Area Source Rules were evaluated during this inspection:
Oil and Gas Industry: General Provisions [R307-501]
Status: In Compliance. Monarch performs monthly flare inspections where the flare's pilot light
function is verified, and that the flare is operating with no visible emissions. See attached records.
5
Oil and Gas Industry: Pneumatic Controllers. [R307-502]
Status: In Compliance. The source does not use any continuous bleed pneumatic controllers at this
compressor station.
Oil and Gas Industry: Flares. [R307-503]
Status: In Compliance. The flare onsite is equipped with an operational auto-igniter.
Oil and Gas Industry: Tank Truck Loading [R307-504]
Status: In Compliance. The source is equipped to load trucks through bottom filling.
EMISSION INVENTORY:
Listed before are the Actual Emissions Inventory provided from Monarch Natural Gas, LLC Gate Canyon
Natural Gas Compressor Station. A comparison of the estimated total potential emissions (PTE) on AO:
DAQE-AN130090005-11, dated December 6, 2011, is provided. PTE are supplied for supplemental
purposes only.
Criteria Pollutant PTE tons/yr Actuals tons/yr
CO2 Equivalent 1884.00 N/A
Carbon Monoxide 15.30 0.6961
Nitrogen Oxides 8.30 5.444
Particulate Matter - PM10 0.20 0.0857
Particulate Matter - PM2.5 0.20 0.0857
Sulfur Oxides 0.18 0.0010
Volatile Organic Compounds 21.10 6.8343
PREVIOUS ENFORCEMENT
ACTIONS: No enforcement actions within the past five years.
COMPLIANCE STATUS &
RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN130090005-11,
dated December 6, 2011: In compliance at the time of inspection.
The facility appears to be well maintained and operated.
Required records were current and made available after the
inspection via email.
HPV STATUS: Not Applicable.
RECOMMENDATION FOR
NEXT INSPECTION: Inspect at the typical inspection frequency for this type of
source.
ATTACHMENTS: Applicable supporting documentation included.
Date
Suction
PSI
Discharge
PSI
Flow
MCF
Fuel, Gas
MCF
Fuel Gas
PSI
Down
Hours
Dehy
Hrs
Ran
Yesterday
MCF
Questar
MCF
Difference
of Questar
and Meter Total Comments
Feet Inches BBLS Feet Inches BBLS BBLS
Bom 0 0 0
1 72 615 699 43 18 0 24 381 330 51 4 0 80 3 2 36 116
2 73 600 338 42 18 0 24 473 420 53 4 0 80 3 2 36 116
3 72 605 669 43 18 0 24 473 420 53 4 0 80 3 2 36 116
4 72 604 570 43 18 0 24 385 356 29 4 0 80 3 7 41 121
5 72 616 135 37 18 0 24 325 354 (29)4 0 80 3 7 41 121
6 72 611 254 44 18 0 24 425 379 46 4 0 80 3 7 41 121
7 76 623 515 41 18 0 24 408 359 49 4 0 80 3 7 41 121
8 79 633 642 45 18 0 24 410 360 50 4 0 80 3 7 41 121
9 80 609 367 45 18 0 24 409 356 53 4 0 80 3 7 41 121
10 79 680 550 44 18 0 24 419 376 43 4 0 80 3 7 41 121
11 80 643 162 43 18 0 24 446 394 52 4 0 80 3 7 41 121
12 80 615 505 44 18 0 24 408 354 54 4 0 80 3 7 41 121
13 80 568 181 45 18 0 24 388 335 53 4 0 80 3 7 41 121
14 80 607 326 44 18 0 24 392 343 49 4 0 80 3 7 41 121
15 80 621 137 43 18 0 24 409 360 49 4 0 80 3 7 41 121 dominion site was down
16 80 613 222 43 18 0 24 396 351 45 4 0 80 3 7 41 121
17 80 608 547 44 18 0 24 469 416 53 4 0 80 3 7 41 121
18 80 597 200 44 18 0 24 433 381 52 4 0 80 3 7 41 121
19 80 604 243 44 18 0 24 284 230 54 4 0 80 3 7 41 121
20 80 632 439 45 18 0 24 242 191 51 4 0 80 3 7 41 121
21 80 622 0 45 18 0 24 221 151 70 4 0 80 3 7 41 121
22 80 605 239 45 18 0 24 221 159 62 4 0 80 3 7 41 121
23 81 594 280 43 18 0 24 226 164 62 4 0 80 3 7 41 121
24 81 588 347 44 18 0 24 243 189 54 4 0 80 3 7 41 121
25 81 591 622 44 18 0 24 377 332 45 4 0 80 3 7 41 121
26 80 587 0 44 18 0 24 384 337 47 4 0 80 3 7 41 121
27 81 601 569 44 18 0 24 418 371 47 4 0 80 3 7 41 121
28 80 607 608 42 18 0 24 428 376 52 4 0 80 3 7 41 121
29 80 604 484 43 18 0 24 399 355 44 4 0 80 3 7 41 121
30 80 602 445 43 18 0 24 399 346 53 4 0 80 3 7 41 121
31 82 570 120 43 18 0 24 393 345 48 4 0 80 3 7 41 121
Totals and Averages 78 609 368 1,346 18 0 744 11,684 10,190 1,494
300 bbl tank 100 bbl tank
Gate Canyon Compressor Site
January-00
COMPRESSOR STATISTICS Pig Tank Sump Tank
LB RB I I E E
#1 #1
#2 #2
#3 #3
Current Kill Setting Suc.Dish.#4 #4
P1 90 25/130 T1 181 #5 #5
P2 260 75/350 T2 218 #6 #6
P3 620 100/750 T3 #7 #7
P4 T4 #8 #8
P5 T5 #9 #9
P6 T6 #10 #10
Eop.RPM Overspeed 440 #11 #11
Cop.#12 #12
Tawp.#13 #13
Ejwp.16 #14 #14
Eot.#15 #15
Cot.#16 #16
Ejwt 127
Tawt. 61
Eng. Man. Psi/Hg. R
Eng. Man. Psi/Hg. L
Engine Hours:
Volume:
Coalescer Diff Oil Filter Diff. Process Diff.
#1 513 #2 532 #3 Diff.Pressure drop
#4 #5 #6 0.5 0
#7 #8 #9
#10 #11 #12
#13 #14 #15
#16
FIELD SERVICE ORDER
DATE:
change air filters, change spark plugs, grease cooler, do panel check, check belts.
rebuild injection pump, install new coils and repair wires to the coils.
313
Kill Setting
COUNTY/STATE:
Engine Timing
Unit number
TECH NAME:
Lease name:Gate Canyon
2/10/2023
Duchesne/Utah
321
327
Al Kettle
20
16
65037
Frick Information
Eng. Exhaust
Tempature
Fuel Psi
O2 Setting
Eng. Thrust
Comp. Thrust
Coupl. Alignment
CommentsQuantity
Received Quantity Used Part Number Part Description Warehouse
Work Description:
Technician Last Diff status date
12/7/2018
Catalyst
FIELD SERVICE ORDER
Emplyee Signature
Catalyst Serial's/ CommentCatalyst Status
0.50
LB RB I I E E
#1 #1
#2 #2
#3 #3
Current Kill Setting Suc.Dish.#4 #4
P1 75 25/130 T1 204 #5 #5
P2 250 75/350 T2 244 #6 #6
P3 640 100/750 T3 #7 #7
P4 T4 #8 #8
P5 T5 #9 #9
P6 T6 #10 #10
Eop.RPM Overspeed 440 #11 #11
Cop.#12 #12
Tawp.#13 #13
Ejwp.16 #14 #14
Eot.#15 #15
Cot.#16 #16
Ejwt 125
Tawt. 80
Eng. Man. Psi/Hg. R
Eng. Man. Psi/Hg. L
Engine Hours:
Volume:
Coalescer Diff Oil Filter Diff. Process Diff.
#1 560 #2 500 #3 Diff.Pressure drop
#4 #5 #6 0.5 0
#7 #8 #9
#10 #11 #12
#13 #14 #15
#16
FIELD SERVICE ORDER
Emplyee Signature
Catalyst Serial's/ CommentCatalyst Status
0.50
Technician Last Diff status date
12/7/2018
Catalyst
Work Description:
CommentsQuantity
Received Quantity Used Part Number Part Description Warehouse
Al Kettle
20
16
67051
Frick Information
Eng. Exhaust
Tempature
Fuel Psi
O2 Setting
Eng. Thrust
Comp. Thrust
Coupl. Alignment
FIELD SERVICE ORDER
DATE:
change air filters, change spark plugs, grease cooler, do panel check, check belts.
308
Kill Setting
COUNTY/STATE:
Engine Timing
Unit number
TECH NAME:
Lease name:Gate Canyon
5/5/2023
Duchesne/Utah
321
327
LB RB I I E E
#1 #1
#2 #2
#3 #3
Current Kill Setting Suc.Dish.#4 #4
P1 75 25/130 T1 235 #5 #5
P2 250 75/350 T2 283 #6 #6
P3 610 100/750 T3 #7 #7
P4 T4 #8 #8
P5 T5 #9 #9
P6 T6 #10 #10
Eop.RPM Overspeed 440 #11 #11
Cop.#12 #12
Tawp.#13 #13
Ejwp.16 #14 #14
Eot.#15 #15
Cot.#16 #16
Ejwt 133
Tawt. 101
Eng. Man. Psi/Hg. R
Eng. Man. Psi/Hg. L
Engine Hours:
Volume:
Coalescer Diff Oil Filter Diff. Process Diff.
#1 517 #2 474 #3 Diff.Pressure drop
#4 #5 #6 0.5 0
#7 #8 #9
#10 #11 #12
#13 #14 #15
#16
FIELD SERVICE ORDER
Emplyee Signature
Catalyst Serial's/ CommentCatalyst Status
0.50
Technician Last Diff status date
12/7/2018
Catalyst
Work Description:
CommentsQuantity
Received Quantity Used Part Number Part Description Warehouse
Al Kettle
20
16
68965
Frick Information
Eng. Exhaust
Tempature
Fuel Psi
O2 Setting
Eng. Thrust
Comp. Thrust
Coupl. Alignment
FIELD SERVICE ORDER
DATE:
change air filters, change spark plugs, grease cooler, do panel check, check belts.
306
Kill Setting
COUNTY/STATE:
Engine Timing
Unit number
TECH NAME:
Lease name:Gate Canyon
7/24/2023
Duchesne/Utah
321
327
LB RB I I E E
#1 #1
#2 #2
#3 #3
Current Kill Setting Suc.Dish.#4 #4
P1 75 25/130 T1 245 #5 #5
P2 250 75/350 T2 272 #6 #6
P3 630 100/750 T3 #7 #7
P4 T4 #8 #8
P5 T5 #9 #9
P6 T6 #10 #10
Eop.RPM Overspeed 440 #11 #11
Cop.#12 #12
Tawp.#13 #13
Ejwp.16 #14 #14
Eot.#15 #15
Cot.#16 #16
Ejwt 133
Tawt. 85
Eng. Man. Psi/Hg. R
Eng. Man. Psi/Hg. L
Engine Hours:
Volume:
Coalescer Diff Oil Filter Diff. Process Diff.
#1 576 #2 476 #3 Diff.Pressure drop
#4 #5 #6 0.5 0
#7 #8 #9
#10 #11 #12
#13 #14 #15
#16
FIELD SERVICE ORDER
Emplyee Signature
Catalyst Serial's/ CommentCatalyst Status
0.50
Technician Last Diff status date
12/7/2018
Catalyst
Work Description:
CommentsQuantity
Received Quantity Used Part Number Part Description Warehouse
Al Kettle
20
16
70039
Frick Information
Eng. Exhaust
Tempature
Fuel Psi
O2 Setting
Eng. Thrust
Comp. Thrust
Coupl. Alignment
FIELD SERVICE ORDER
DATE:
change air filters, change spark plugs, grease cooler, do panel check, check belts.
clean pre cumbustion chamber check valves
313
Kill Setting
COUNTY/STATE:
Engine Timing
Unit number
TECH NAME:
Lease name:Gate Canyon
9/7/2023
Duchesne/Utah
321
327
LB RB I I E E
#1 #1
#2 #2
#3 #3
Current Kill Setting Suc.Dish.#4 #4
P1 85 25/130 T1 225 #5 #5
P2 290 75/350 T2 262 #6 #6
P3 680 100/750 T3 #7 #7
P4 T4 #8 #8
P5 T5 #9 #9
P6 T6 #10 #10
Eop.RPM Overspeed 440 #11 #11
Cop.#12 #12
Tawp.#13 #13
Ejwp.16 #14 #14
Eot.#15 #15
Cot.#16 #16
Ejwt 131
Tawt. 85
Eng. Man. Psi/Hg. R
Eng. Man. Psi/Hg. L
Engine Hours:
Volume:
Coalescer Diff Oil Filter Diff. Process Diff.
#1 580 #2 563 #3 Diff.Pressure drop
#4 #5 #6 0.5 0
#7 #8 #9
#10 #11 #12
#13 #14 #15
#16
FIELD SERVICE ORDER
DATE:
change air filters, change spark plugs, grease cooler, do panel check, check belts.
rebuil injector #1
308
Kill Setting
COUNTY/STATE:
Engine Timing
Unit number
TECH NAME:
Lease name:Gate Canyon
11/6/2023
Duchesne/Utah
321
327
Al Kettle
20
16
71482
Frick Information
Eng. Exhaust
Tempature
Fuel Psi
O2 Setting
Eng. Thrust
Comp. Thrust
Coupl. Alignment
CommentsQuantity
Received Quantity Used Part Number Part Description Warehouse
Work Description:
Technician Last Diff status date
12/7/2018
Catalyst
FIELD SERVICE ORDER
Emplyee Signature
Catalyst Serial's/ CommentCatalyst Status
0.50