HomeMy WebLinkAboutDSHW-2024-006532May 29, 2024
Andrew Caloway
Environmental Programs Manager
Saint-Gobain North America
20 Moores Road
Malvern, PA 19355
RE: Memorandum on Sampling Planfor 2025 Groundwater Monitoring
Eastman Christensen Industrial Road Plant (IRP) Site
1822 South Industrial Road Salt Lake City, Utah
EPA ID No. UTD982581753
Dear Mr. Calway:
The Division of Waste Management and Radiation Control (Division) has completed its review of the memorandum prepared by ERM and dated May 22, 2024, which summarizes a meeting discussion
on April 22, 2024 regarding the groundwater sampling for the former Eastman Christensen site located at 1822 South IndustrialRoad in Salt Lake City, Utah. The next groundwater sampling
will be conducted in 2025 for the following monitoring wells MW-5, MW-5A, MW-11, MW-15, and MW-20. The 2025 groundwater monitoring report will include statistical trend analysis of
the monitoring data. Please provide at least a seven-day notice before the sampling event.
If you have any questions, please contact Hao Zhu at 8015589833.
Sincerely,
Paige Walton, Program Manager
Correction Action Section
Division of Waste Management and Radiation Control
PW/HZ/
c: Angela C. Dunn, MD, MPH, Health Officer, Salt Lake County Health Dept.
Dorothy Adams, Deputy Director, Salt Lake County Health Dept.
Ron Lund, Environmental Health Director, Salt Lake County Health Dept.
Avery Soplata, ERM (Email) <Avery.Soplata@erm.com>
Mike Kraeski, ERM (Email <Mike.Kraeski@erm.com>,
Andrew Caloway, Saint-Gobain North America (Email and Hard Copy)
Andrew.d.caloway@saint-gobain.com