Loading...
HomeMy WebLinkAboutDAQ-2024-004425July 30, 2023 Minor Source Compliance Section Utah Division of Air Quality Attn: Chad Gilgen P.O. Box 144820 Salt Lake City Utah 84114-4820 Dear Mr. Gilgen, The New Source Performance Standards for Small Industrial-Commercial-institutional Steam Generating Units (NSPS Boilers) 40 CFR 60 Subpart Dc reporting the quantity of fuel other than natural gas combusted during the reporting period for St. George Hospital Utah DAQ Site ID 12960. - Six month reporting period covered under this is from January 1, through June 30, 2023. - The 4-duel fuel boiler had a total of 15 hours of operation on diesel fuel for the reporting period. - A copy of the most recent diesel fuel analysis report is included as reference. In accordance with Utah Administrative Code R307-415-5d and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Sincerely, Jim Blankenau, P.G. Environmental Engineer Intermountain Health, Canyons 383 W. Vine Street (4th floor), Murray, UT 84124 801-484-6114 James.Blankenau@imail.org Attachments: St. George Fuel Analysis Report Initials: CG Date: 8-1-23 Compliance Status: In compliance - Subpart Dc Semi-Annual Notification File # 12960 (B2) 8/1/23, 3:38 PM State of Utah Mail - St. George Semi-Annual Diesel Reporting https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1772968623974833731&simpl=msg-f:17729686239748337…1/2 Chad Gilgen <cgilgen@utah.gov> St. George Semi-Annual Diesel Reporting 2 messages James Blankenau <James.Blankenau@imail.org>Mon, Jul 31, 2023 at 2:17 PM To: Chad Gilgen <cgilgen@utah.gov> Chad, Please see the attached report for the St. George Hospital to meet 40 CFR Dc requirements. Thanks, Jim Jim Blankenau, P.G. Environmental Engineer Intermountain Health, Canyons 383 W. Vine Street (4th floor), Murray, UT 84124 Mobile: 801.484.6114 NOTICE: This e-mail is for the sole use of the intended recipient and may contain confidential and privileged information. If you are not the intended recipient, you are prohibited from reviewing, using, disclosing or distributing this e-mail or its contents. If you have received this e- mail in error, please contact the sender by reply e-mail and destroy all copies of this e-mail and its contents. January to July 23Boiler Diesel Fuel Compliance SubmissionSigned.pdf 266K Chad Gilgen <cgilgen@utah.gov>Tue, Aug 1, 2023 at 3:38 PM To: James Blankenau <James.Blankenau@imail.org> Jim, Received. Thanks, Chad Chad Gilgen | Manager | Minor Source Compliance 385-306-6500 (cell) Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] 8/1/23, 3:38 PM State of Utah Mail - St. George Semi-Annual Diesel Reporting https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1772968623974833731&simpl=msg-f:17729686239748337…2/2