HomeMy WebLinkAboutDAQ-2024-004425July 30, 2023
Minor Source Compliance Section
Utah Division of Air Quality
Attn: Chad Gilgen
P.O. Box 144820
Salt Lake City Utah 84114-4820
Dear Mr. Gilgen,
The New Source Performance Standards for Small Industrial-Commercial-institutional Steam
Generating Units (NSPS Boilers) 40 CFR 60 Subpart Dc reporting the quantity of fuel other than
natural gas combusted during the reporting period for St. George Hospital Utah DAQ Site ID 12960.
- Six month reporting period covered under this is from January 1, through June 30, 2023.
- The 4-duel fuel boiler had a total of 15 hours of operation on diesel fuel for the reporting
period.
- A copy of the most recent diesel fuel analysis report is included as reference.
In accordance with Utah Administrative Code R307-415-5d and based on information and belief
formed after reasonable inquiry, I certify that the statements and information in this document are
true, accurate, and complete.
Sincerely,
Jim Blankenau, P.G.
Environmental Engineer
Intermountain Health, Canyons
383 W. Vine Street (4th floor),
Murray, UT 84124
801-484-6114
James.Blankenau@imail.org
Attachments: St. George Fuel Analysis Report
Initials: CG Date: 8-1-23
Compliance Status: In compliance - Subpart Dc
Semi-Annual Notification
File # 12960 (B2)
8/1/23, 3:38 PM State of Utah Mail - St. George Semi-Annual Diesel Reporting
https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1772968623974833731&simpl=msg-f:17729686239748337…1/2
Chad Gilgen <cgilgen@utah.gov>
St. George Semi-Annual Diesel Reporting
2 messages
James Blankenau <James.Blankenau@imail.org>Mon, Jul 31, 2023 at 2:17 PM
To: Chad Gilgen <cgilgen@utah.gov>
Chad,
Please see the attached report for the St. George Hospital to meet 40 CFR Dc requirements.
Thanks, Jim
Jim Blankenau, P.G.
Environmental Engineer
Intermountain Health, Canyons
383 W. Vine Street (4th floor), Murray, UT 84124
Mobile: 801.484.6114
NOTICE: This e-mail is for the sole use of the intended recipient and may contain confidential and privileged information. If you are not the
intended recipient, you are prohibited from reviewing, using, disclosing or distributing this e-mail or its contents. If you have received this e-
mail in error, please contact the sender by reply e-mail and destroy all copies of this e-mail and its contents.
January to July 23Boiler Diesel Fuel Compliance SubmissionSigned.pdf
266K
Chad Gilgen <cgilgen@utah.gov>Tue, Aug 1, 2023 at 3:38 PM
To: James Blankenau <James.Blankenau@imail.org>
Jim,
Received.
Thanks,
Chad
Chad Gilgen | Manager | Minor Source Compliance
385-306-6500 (cell)
Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements.
[Quoted text hidden]
8/1/23, 3:38 PM State of Utah Mail - St. George Semi-Annual Diesel Reporting
https://mail.google.com/mail/u/0/?ik=36f4379b4d&view=pt&search=all&permthid=thread-f:1772968623974833731&simpl=msg-f:17729686239748337…2/2