HomeMy WebLinkAboutDAQ-2024-0043131
DAQC-1323-23
Site ID: 100775 (B4)
MEMORANDUM
TO: STACK TEST FILE – OVINTIV USA INC. – AMY UT 1-18 3-1
THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager
FROM: Paul Bushman, Environmental Scientist
DATE: December 7, 2023
SUBJECT: Source: Doosan 21.9L SN: EZYOF904114
Contact: Ryan Zillner: 720-876-3144
Location: Duchesne County, Utah
Test Contractor: Great Plains Analytical Services, Inc.
Permit/AO#: PBR
Action Code: TR
Subject: Review of stack test report dated December 7, 2023
On December 7, 2023, Utah Division of Air Quality (DAQ) received a test report for the above listed unit
at Amy UT 1-18 3-1 in Duchesne County, Utah. Testing was performed November 28, 2023, to
demonstrate compliance with the emission limits found in 40 CFR Part 60, Subpart JJJJ, and UAC
R307-510. The calculated test results are:
Source Test Date Test
Method Pollutant Tester
Results DAQ Results Limits
Doosan 21.9L
SN: EZYOF904114
November
28, 2023
ASTM
D6348-3
NOx 0.081 g/hp-hr 0.081 g/hp-hr 1.00
g/hp-hr
CO 0.621 g/hp-hr 0.620 g/hp-hr 2.00
g/hp-hr
VOC 0.038 g/hp-hr 0.038 g/hp-hr 0.7 g/hp-
hr
DEVIATIONS: None.
CONCLUSION: The stack test report appears to be acceptable.
RECOMMENDATION: The emissions from the above units should be considered to have been in
compliance with the emission limits of UAC R307-510 and 40 CFR 60
subpart JJJJ during testing.
ATTACHMENTS: DAQ stack test review excel spreadsheets, Ovintiv USA Inc. stack test
report
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44