Loading...
HomeMy WebLinkAboutDAQ-2024-0043551 DAQC-1290-23 CAERS ID: 100808 (B4) MEMORANDUM TO: STACK TEST FILE – OVINTIV USA INC. – Wakefield UT 1-6 4-1 THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Paul Bushman, Environmental Scientist DATE: November 27, 2023 SUBJECT: Source: Doosan 14.6L SN: EEZOG400845 Contact: Ryan Zillner: 720-876-3144 Location: Duchesne County, Utah Test Contractor: Great Plains Analytical Services, Inc. Permit/AO#: PBR Action Code: TR Subject: Review of stack test report dated November 22, 2023 On November 22, 2023, Utah Division of Air Quality (DAQ) received a test report for the above listed unit Wakefield UT 1-6 4-1 in Duchesne County, Utah. Testing was performed November 13, 2023, to demonstrate compliance with the emission limits found in 40 CFR Part 60, Subpart JJJJ and UAC R307-510. The calculated test results are: Source Test Date Test Method Pollutant Tester Results DAQ Results Limits Doosan 14.6L SN: EEZOG400845 November 13, 2023 ASTM D6348-3 NOx 0.131 g/hp-hr 0.133 g/hp-hr 1.00 g/hp-hr CO 0.101 g/hp-hr 0.100 g/hp-hr 2.00 g/hp-hr VOC 0.004 g/hp-hr 0.003 g/hp-hr 0.7 g/hp-hr DEVIATIONS: None. CONCLUSION: The stack test report appears to be acceptable. RECOMMENDATION: The emissions from the above units should be considered to have been in compliance with the emission limits of UAC R307-510 and 40 CFR 60 subpart JJJJ during testing. ATTACHMENTS: DAQ stack test review excel spreadsheets, Ovintiv USA Inc. stack test report 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44