HomeMy WebLinkAboutDAQ-2024-007770
1
DAQC-378-24
Site ID 12825 (B5)
MEMORANDUM
TO: FILE – UTAH ASSOCIATED MUNICIPAL POWER SYSTEM – NEBO Plant
THROUGH: Harold Burge, Major Source Compliance Section Manager
FROM: Rob Leishman, Environmental Scientist
DATE: April 23, 2024
SUBJECT: Utah Associated Municipal Power System – Nebo Power Station (NEBO Power),
Major, NSPS, HAPs, Title IV, and Title V, Utah County, FRS # UT0000004900234
INSPECTION TYPE: State Electronic Data Report (SEDR) Review
REVIEW DATE: April 23, 2024
SOURCE LOCATION: Payson (West side of I-15)/Utah County
SOURCE CONTACT: David Gammell – Plant Manager – (801) 925-4012
APPLICABLE
REGULATIONS: Title V Operating Permit
Permit Number: 4900234004
Date Of Permit: January 18, 2022
Date of Last Revision: January 18, 2022
SOURCE INSPECTION
EVALUATION: With the exception of sources that only monitor for opacity,
quarterly report memoranda will only address the findings of the
quarterly report. Approval Order and Title V permit conditions
addressing continuous emission monitoring requirements will be
addressed in NEBO’s relative accuracy performance
specification test review memorandum.
SEDR Review:
First Quarter 2024
% Monitor Availability (MA) Performance Test Dates
(N/A to Opacity)
Summary of Excess Emissions During
Point Source Operation
Point
Source
Op.
hrs. Channel MA CGA Lin RATA Point
Source Channel Hrs. Limitation
BYPASS 0 CO
Point
source
not
operated
BYPASS CO 0.00
25
Ppmvdc -
8-Hour
Avg
1 8 2
2
First Quarter 2024
% Monitor Availability (MA) Performance Test Dates
(N/A to Opacity)
Summary of Excess Emissions During
Point Source Operation
Point
Source
Op.
hrs. Channel MA CGA Lin RATA Point
Source Channel Hrs. Limitation
BYPASS 0 NOx
Point
source
not
operated
BYPASS NOx 0.00
9 Ppmvdc
- 30-Day
RA
BYPASS 0 O2
Point
source
not
operated
BYPASS NOx 0.00
97.12
Ppmvdc -
4-Hour
RA
HRSG 2079 CO 100% 01/23/24 06/01/23 HRSG CO 0.00
10
Ppmvdc -
8-Hour
Avg
HRSG 2079 NOx 100% 01/23/24 06/01/23 HRSG NOx 0.00
5 Ppmvdc
- 30-Day
RA
HRSG 2079 O2 100% 01/23/24 06/01/23 HRSG NOx 0.00
97.12
Ppmvdc -
4-Hour
RA
Excess Emission Report - Hourly Summary
Point
Source Channel
Startup
&
Shutdown
Control
Equipment
Problems
Process
Problems
Other
Known
Causes
Unknown
Causes
Emission
Limit
BYPASS CO 0 0 0 0 0 25 Ppmvdc - 8-Hour Avg
BYPASS NOx 0 0 0 0 0 9 Ppmvdc - 30-Day RA
BYPASS NOx 0 0 0 0 0 97.12 Ppmvdc - 4-Hour RA
HRSG CO 0 0 0 0 0 10 Ppmvdc - 8-Hour Avg
HRSG NOx 0 0 0 0 0 5 Ppmvdc - 30-Day RA
HRSG NOx 0 0 0 0 0 97.12 Ppmvdc - 4-Hour RA
3
CMS Performance Summary - Hourly Summary
Point
Source Channel Monitor
Malfunction
Non-monitor
Malfunction
QA
Calibrations
Other
Known
Causes
Unknown
Causes
BYPASS CO 0 0 0 0 0
BYPASS NOx 0 0 0 0 0
BYPASS O2 0 0 0 0 0
HRSG CO 0 0 5 0 0
HRSG NOx 0 0 5 0 0
HRSG O2 0 0 5 0 0
Pollutant Concentration
Exceeded Span of CEM
Monitor Outage During
Point Source Operation
Alternate
Sampling CEM Modifications
0 Hours 0 Hours 0 Hours 0 Events
SOURCE INSPECTION
SUMMARY EVALUATION: NEBO maintains its CEMS as required in R307-170 and
40 CFR 60.13.
CURRENT
RECOMMENDATIONS: All deviations appear to be a result of breakdown or process
related problems that do not warrant issuing a violation. Periods
of excess emissions that were recorded by the CMS in service on
each point source during this reporting period are summarized in
the SEDR and described in Pivot Table 400 “Excess Emissions
Review.” NEBO was in compliance during this reporting
period. NSPS monitoring system meets the performance
standards of 40 CFR 60, Appendix B Performance
Specifications. NEBO’s acid rain monitoring system meets the
performance standards of 40 CFR 75 Acid Rain Performance
Specifications.
HPV: No
RECOMMENDATION
FOR NEXT INSPECTION: Check DAS for daily zero and span drift.
Check the QC program to ensure that monitor drift is being
tracked and that the source can identify excessive drift.
ATTACHMENT: Excel spreadsheet review
UAMPS Nebo EER 1Q2024
Point Source Information Late Expired Cal. Gas Valid Cal. Gas Days Yes No
1 Type Code 100
(Company Information)Type Code Company Manager Company Name AIRS # Phone Number
Environmental
Contact
1 100 David Gammell 04900234 (801)707-0255 Eric Hutchinson
1 100 0 0 0 0
1 Type Code 110
(Point Source Identification)Type Code Point Source
Quarter
1 - 4 Year
Point Source
Operating Hrs. in
Quarter
1 110 1 2024 0
1 110 1 2024 2079
1 110 0 0 0
1 110 0 0 0
1 Type Code 200
(Monitor Identification)Type Code Point Source Channel Manufacturer Model No. Monitor SN Low Span High Span Installation Date
Monitor
Location
1 200 CO THERMO 48I-AGPCA 1501663829 100 1000 4/21/2015 BYPASS STACK
1 200 NOx THERMO 42ILS-ANSSPCA 1501663828 20 200 4/21/2015 BYPASS STACK
1 200 O2 THERMO 48I-AGPCA 1501663829 0 25 4/21/2015 BYPASS STACK
1 200 CO THERMO 48I-AGPCA 1501663829 100 1000 4/21/2015 HSRG STACK
1 200 NOx THERMO 42ILS-ANSSPCA 1501663828 20 200 4/21/2015 HSRG STACK
1 200 O2 THERMO 48I-AGPCA 1501663829 0 25 4/21/2015 HSRG STACK
1 200 0 0 0 0 0 0 1/0/1900 0
1 200 0 0 0 0 0 0 1/0/1900 0
1
Type Code310
(Excess Emissions)
SUMMARY REPORT
Type Code Channel
Total Hours of Excess
Emissions
Excess Emissions -
% of Total
Operating Hours
RC 701 Hours -
start
up/Shutdown
RC 702 Hours-
Control Equipment
Problems
RC 703 Hours -
Process Problems
RC 704, 706, 707
Hours -Other Known
Causes
RC 705 Hours -
Unknown
Causes
Emission
Limitation
Emission
Limitation
Units
Emission
Limitation
Averaging
Period
1 Point source not operated 310 CO 0 0.00% 0 0 0 0 0 25 Ppmvdc 8-Hour Avg
1 Point source not operated 310 NOx 0 0.00% 0 0 0 0 0 9 Ppmvdc 30-Day RA
1 Point source not operated 310 NOx 0 0.00% 0 0 0 0 0 97.12 Ppmvdc 4-Hour RA
1 TRUE 310 CO 0 0.00% 0 0 0 0 0 10 Ppmvdc 8-Hour Avg
1 TRUE 310 NOx 0 0.00% 0 0 0 0 0 5 Ppmvdc 30-Day RA
1 TRUE 310 NOx 0 0.00% 0 0 0 0 0 97.12 Ppmvdc 4-Hour RA
1 310 0 0 0 0 0 0 0 0 0
1 310 0 0 0 0 0 0 0 0 0
1 Type Code 300 (CMS
Performance Summary) Type Code Channel
Point Source Operating
Hours
Downtime - % of
Total Operating
Hours
Total CMS
Downtime
RC 721 Hours -
Monitor
Malfunction
RC 722 Hours -
Non-monitor
Malfunction
RC 723 Hours -
QA Calibrations
RC 724 Hours -
Other Known
Causes
RC 725
Hours -
Unknown
Causes
1 Point source not operated 300 CO 0 0.00% 0 0 0 0 0 0
1 Point source not operated 300 NOx 0 0.00% 0 0 0 0 0 0
1 Point source not operated 300 O2 0 0.00% 0 0 0 0 0 0
1 TRUE 300 CO 2079 0.24% 5 0 0 5 0 0
1 TRUE 300 NOx 2079 0.24% 5 0 0 5 0 0
1 TRUE 300 O2 2079 0.24% 5 0 0 5 0 0
1 300 0 0 0 0 0 0
1 300 0 0 0 0 0 0
1
Type Code 250
(Performance Specification
RATA Results)
Type Code Channel
Date of Most Current
RATA
Date of Preceding
RATA
Months Between
RATA's
Units of
Measurement CEM Value Reference Method
Value
Relative
accuracy Pass/ Fail
1 365 Days 250 CO 06/01/23 06/01/22 12 C15 2.1 2 5.20% Pass
1 365 Days 250 NOx 06/01/23 06/01/22 12 C15 4.45 4.24 6.38% Pass
1 365 Days 250 NOx 06/01/23 06/01/22 12 lbs/mmbtu 0.016 0.017 5.13% Pass
1 365 Days 250 O2 06/01/23 06/01/22 12 Pct 14.78 15.27 0.49% Pass
1 0 Days 250 0 01/00/00 01/00/00 0 0 0 0 0.00% 0
1 Type Code 260
(CGA Results)Type Code Channel Date Audit Point No. Cylinder ID
Cylinder
Expiration Date
Type of
Certification
Units of
Measurement CEM Value Cylinder
Value
Precision
%Pass/ Fail Range - High or
Low
1 Valid Cal. Gas 260 CO 01/23/24 CO CC741396 02/09/25 0 PPM 28.133 27.5 2.30% Pass 0
1 Valid Cal. Gas 260 CO 01/23/24 CO CC736016 02/21/29 0 PPM 58.233 58.3 0.10% Pass 0
1 Valid Cal. Gas 260 CO 01/23/24 CO CC464906 02/11/29 0 PPM 286.4 286.6 0.10% Pass 0
1 Valid Cal. Gas 260 CO 01/23/24 CO ALM027371 05/24/27 0 PPM 591.633 591.1 0.10% Pass 0
1 260 0 01/00/00 0 0 01/00/00 0 0 0 0 0.00% 0 0
1 Type Code 270
(Linearity Test Results)Type Code Channel Date Audit Point No. Cylinder ID
Cylinder
Expiration Date
Type of
Certification
Units of
Measurement CEM Value Cylinder
Value
Precision
%Pass/ Fail Range - High or
Low
1 Valid Cal. Gas 270 NOx 01/23/24 Low CC741396 02/09/25 QA PPM 5.633 5.7 1.20% Pass Low
1 Valid Cal. Gas 270 NOx 01/23/24 Mid CC736016 02/21/29 QA PPM 11.9 11.9 0.00% Pass Low
1 Valid Cal. Gas 270 NOx 01/23/24 High CC212187 08/02/26 QA PPM 18.3 18.3 0.00% Pass Low
1 Valid Cal. Gas 270 NOx 01/23/24 Low CC464906 02/11/29 QA PPM 58.4 58.3 0% Pass High
1 Valid Cal. Gas 270 NOx 01/23/24 Mid ALM027371 05/24/27 QA PPM 118.333 118 0% Pass High
1 Valid Cal. Gas 270 NOx 01/23/24 High CC421631 07/31/31 QA PPM 181.5 181.5 0% Pass High
1 Valid Cal. Gas 270 O2 01/23/24 Low 2A-79101 07/12/26 QA PERCENT 7.1 7 1.40% Pass 0
1 Valid Cal. Gas 270 O2 01/23/24 Mid 702531Y 07/12/26 QA PERCENT 14.5 14.5 0.00% Pass 0
1 Valid Cal. Gas 270 O2 01/23/24 High ALM019259 05/14/27 QA PERCENT 20.567 20.5 0.30% Pass 0
1 270 0 01/00/00 0 0 01/00/00 0 0 0 0 0.00% 0 0
1
Type Code 210
(Pollutant Concentration
Exceeded Span of CEM)
Type Code Channel Start Date Start Time End Date End Time Hours
1 0 210 0 1/0/00 0:00 1/0/00 0:00
1
1 None Reported
1 0 TC 220 Hours 0.00 TC 220 Hours 0.00 TC 230 Hours 0.00 Events 0.00 Hours 0.00 Events 0.00 0.00
1 15.00 TC 300 Hours 15.00 FALSE
None Reported None Reported None Reported None Reported None Reported None Reported
Point Source
Point Source
Point Source
Point Source
Point Source
Point Source
None Reported
BYPASS
HRSG
0
0
HRSG
HRSG
BYPASS
HRSG
HRSG
HRSG
HRSG
HRSG
0
0
BYPASS
BYPASS
BYPASS
Type Code 550
(Changes in Operation in
Control Equipment When
CEM Data Not Available)
Type Code 500
(Boiler Operating Days
w/o 18 Hours of Data)
UAMPS NEBO Power Station
0
Type Code 450
(Data Excluded)
BYPASS
BYPASS
BYPASS
HRSG
HRSG
HRSG
0
0
HRSG
0
0
BYPASS
BYPASS
Type Code 210
(Pollutant Concentration
Exceeded Span of CEM)
Type Code 220
(Monitor Outage
During Point Source Operation)
Type Code 230
(Manual Sample - Alternate
Sampling During Monitor
Outage)
Type Code 240
(CEM Modifications)
Type Code 530
(Excess Emissions During
Emergency Conditions)
HRSG
HRSG
HRSG
0
HRSG
HRSG
HRSG
0
HRSG
HRSG
HRSG
HRSG
0
HRSG
HRSG
HRSG
HRSG
HRSG
0
UAMPS Nebo EER 1Q2024
Relative Accuracy Overview
Point Source Channel
Date of Most
Current
RATA
Date of
Preceding
RATA
Months Between
RATA's
Units
Measured CEM Value Reference Method
Value
Relative
Accuracy Pass/ Fail 2024
HRSG CO 06/01/23 06/01/22 12 C15 2.1 2.00 5.20% Pass
HRSG NOx 06/01/23 06/01/22 12 C15 4.45 4.24 6.38% Pass
HRSG NOx 06/01/23 06/01/22 12 lbs/mmbtu 0.016 0.02 5.13% Pass
HRSG O2 06/01/23 06/01/22 12 Pct 14.78 15.27 0.49% Pass
*
NSPS CGA First 2024
Audit Gas Ranges Audit Gas Ranges
AP1 Low AP2 Low AP1 High AP2 High
HRSG CO 1/23/24 100 27.5 20 to 30 50 to 60
HRSG CO 1/23/24 100 58.3 20 to 30 50 to 60
HRSG CO 1/23/24 1000 286.6 200 to 300 500 to 600
HRSG CO 1/23/24 1000 591.1 200 to 300 500 to 600
*
Acid Rain Audit Linearity First 2024
Low Span Gas Ranges High Span Gas Ranges
Low Mid High Low Mid High
HRSG NOx 1/23/24 20 5.7 4 to 6
HRSG NOx 1/23/24 20 11.9 10 to 12
HRSG NOx 1/23/24 20 18.3 16 to 20
HRSG NOx 1/23/24 200 58.3 40 to 60
HRSG NOx 1/23/24 200 118 100 to 120
HRSG NOx 1/23/24 200 181.5 160 to 200
HRSG O2 1/23/24 25 7 5 to 7.5
HRSG O2 1/23/24 25 14.5 12.5 to 15
HRSG O2 1/23/24 25 20.5 20 to 25
Audit Gas Used
Point Source Channel Audit Date Low Span
Point Source Channel Audit Date Low Span
Audit Gas Used High Span Audit Gas Used
High SpanAudit Gas Used
UAMPS Nebo EER 1Q2024
Monitoring Information TC 210, 230, & 240
Type Code 210
(Pollutant Concentration Exceeded Span of CEM) - 500 (All)
*
Sum of Hours Column Labels
Row Labels (blank) Grand Total
(blank)0 0
Grand Total 0 0
*
Type Code 230
(Manual Sample - Alternate Sampling During Monitor Outage) - 500 (All)
*
Sum of Hours Column Labels
Row Labels (blank) Grand Total
(blank)0 0
Grand Total 0 0
*
Type Code 240
(CEM Modifications) - 100 (All)
*
Count of Channel Column Labels
Row Labels (blank) Grand Total
(blank)
(blank)
Grand Total
UAMPS Nebo EER 1Q2024
Type Code 220
(Monitor Outage During Point Source Operation) - 600 (All)
*
Sum of Hours Column Labels
Row Labels (blank) Grand Total
(blank)
(blank)
0 0
Grand Total 0 0
UAMPS Nebo EER 1Q2024
NOx *
NOx Type Code 420 (NOx) - 6000 (All)
NOx *
NOx Count of Magnitude of Emissions Column Labels
NOx Row Labels Grand Total
NOx Grand Total
NOx d *
NOx d Type Code 421 (Daily NOx Emissions) - 500 (All)
NOx d *
NOx d Count of Reason Code Column Labels
NOx d Row Labels Grand Total
NOx d Grand Total
CO *
CO Type Code 440
(CO) - 6000 (All)
CO *
CO Count of Magnitude of Emissions Column Labels
CO Row Labels Grand Total
CO Grand Total
O2 *
O2 Type Code 470
(TRS as O2) - 6000 (All)
O2 *
O2 Count of Magnitude of Emissions Column Labels
O2 Row Labels Grand Total
O2 Grand Total
UAMPS Nebo EER 1Q2024
Type Code 500
Before February 28, 2005 (Boiler Operating Days w/o 18 Hours of
Data) After February 28, 2005 (90% Operating Hours For each 30 BOD)
- 500
(All)
*
Count of Channel Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 510
(F-factor, Equations & Conversion Factors) - 500 (All)
Count of F-factor Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 520
(Minimum Data Not
Obtained <22/30 BODs) - 500
(All)
Count of Channel Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 530
(Excess Emissions During Emergency Conditions) - 500 (All)
Count of Date Column Labels
Row Labels Grand Total
Grand Total
*
Type Code 540
(Fuel Pre-treatment Credit SO2) - 500 (All)
Count of Date Column Labels
Row Labels Grand Total
Grand Total
*
TypeCode 550
(Changes in Operation in Control Equipment When CEM Data Not
Available) - 500
(All)
Column Labels
Row Labels Grand Total
Grand Total