DIVISION OF AIR OUALNRE: Deviation Report for Permit # 4900234004
DATE: 1212812023
In accordance with Operating Permit provision I.S.2.b, and Utah Administrative Code (UAC)
R3 07-4 I 5 -6a(3 )(c)(ii), the fol lowing deviation report is submitted :
l. List the dates that the deviation occurred:Start: l/3112023 End:511012023
Permit condition for which deviation occurred: 2022 Annual Compliance Certification Report was
not submitted by the required date as specified in the Title 5 permit.
Describe the deviation that occurred: 2022 Annual Compliance Certification Report was not
submitted by the required date as specified in the title 5 permit.
Was the deviation due to an "upset condition" as defined in Section II of the permit?
Yes _X_No _"upset condition" not defined in Section IL
Describe the probable cause of deviation: Past manager failed to submit 2022 Annual Compliance
Certification report in the required timeline per the Title 5 permit.
Describe any corrective actions or preventive measures taken: Additional personnel will be
reviewing submittals of required reports, and reviewing necessary requirements for such actions.
Also, electronic calendar reminders have been created.
In accordance with Operating Permit provision t.K and UAC R307-415-5d, and based on information and
belief formed after reasonable inquiry, I certifi that the statements and information in this document are
true, accurate, and complete.
2.
3.
4.
5.
6.
t.fzaln
Date
NOTE: Was the deviation due to an unavoidable breakdown as defined in UAC R307-107?
If so, be sure to include the information required under R307- 107 in this or a separate report in
accordance with R307- I 07.
Print or type the name and ti
No deviation determined by inspector at the time report was received. 5/10/23 reportwas a revision to prior submittal.
B-2-12825
TO:
FROM:
RE:
PERMIT DEYIATION REPORT
Executive Secretary, Utah Air Quality Board
Utah Assoc. Municipal Power Systems
Deviation Report for Permit # 4900234004
UTAH DEPABTMENT OF
ENVIRONMENTAL OUATJTY
I a \t
"-t Ari . L L,JL,i
DIVISION OF AIR OUALIW
DATE: 1212812023
In accordance with Operating Permit provision I.S.2.b, and Utah Administrative Code (UAC)
R3 07-4 I 5-6a(3)(c)(ii), the following deviation report is submitted:
l. List the dates that the deviation occurred:Start:211312023 End:1212812023
Permit condition for which deviation occurred: Deviation Report was not submitted when it was
required.
Describe the deviation that occurred: Deviation Report was not submitted by the required
"Prompt" notification period on the late submittal of the 2022 Annual Compliance Certification
report date as specified in the Title 5 permit.
Was the deviation due to an "upset condition" as defined in Section II of the permit?
Yes _t_No _ "upset condition" not defined in Section II.
Describe the probable cause of deviation: Past manager failed to submit Deviation Report in the
late submittal of the 2022 Annual Compliance Certification report as required "Prompt" timeline
per the Title 5 permit.
Describe any corrective actions or preventive measures taken: Additional personnel will be
reviewing submittals of required reports, and reviewing necessary requirements for such actions.
Also, electronic calendar reminders have been created.
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and
belief formed after reasonable inquiry, I certiff that the statements and information in this document are
true, accurate, and complete.
2.
J.
4.
5.
6.
til,/,
NOTE: Was the deviation due to an unavoidable breakdown as defined in UAC R307-107?
If so, be sure to include the information required under R307-107 in this or a separate report in
accordance with R307- 107.
Official for the Source
Print or type the name and title Responsible Official
PERMIT DEVIATION RE PORT
Executive Secretary, Utah Air Quality Board
UTAH DEPABTMENT OF
ENVIBONMENTAL QUAUTY
TO:
l,.i
FROM: Utah Assoc. Municipal Power Systems
RE: Deviation Report for Permit # 4900234004 DIVISION OF AIR QUALITY
DATf,: 1212812023
In accordance with Operating Permit provision I.S.2.b, and Utah Administrative Code (UAC)
R3 07-4 I 5 -6a(3 )(c)(i i), the following deviation report is subm itted :
2.
J.
Permit condition for which deviation occurred:
Starti 713012023 End:81212023
Due date of 713012023 for Q2 EDR Submission.
Describe the deviation that occurred:2023 Q2 EDR Submission was submitted three days past due
date.
4. Was the deviation due to an "upset condition" as defined in Section II of the permit?
Yes _/_No _"upset condition" not defined in Section II.
Describe the probable cause of deviation: Past manager failed to submit 2023 Q2 EDR by the
require due day as per the Title 5 permit.
Describe any corrective actions or preventive measures taken: Additional personnel will be
reviewing submittals of required reports, and reviewing necessary requirements for such actions.
Also, electronic calendar reminders have been created.
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and
belief formed after reasonable inquiry, I certifu that the statements and information in this document are
true, accurate, and complete.
,'fu*
NOTE: Was the deviation due to an unavoidable breakdown as defined in UAC R307-107?
If so, be sure to include the information required under R307-107 in this or a separate report in
accordance with R307- I 07.
5.
6.
PERMIT DEVIATION RE PORT
TO: Executive Secretary, Utah Air Quality Board
FROM: Utah Assoc. Municipal Power Systems
RE:
l.
2.
UTAH DEPARTNIEN OF
ENVIBONMENTAL OUALITY
JAI'j - '( .,-/.-,
DIVISION OF AIR QUALINDeviation Report for Permit # 4900234004
DATE: 1212812023
ln accordance with Operating Permit provision I.S.2.b, and Utah Administrative Code (UAC)
R307-4 I 5-6a(3)(c)(ii), the following deviation report is submitted:
List the dates that the deviation occurred:Start:811312023 End:1212812023
J.
4.
5.
6.
Permit condition for which deviation occurred: Deviation Report was not submitted when
required.
Describe the deviation that occurred: Deviation Report was not submitted by the required
"Prompt" notification period on the late submittal of 2023 Q2 EDR Submission.
Was the deviation due to an "upset condition" as defined in Section II of the permit?
Yes XNo _"upset condition" not defined in Section IL
Describe the probable cause of deviation: Past manager failed to submit Deviation Report in the
late submittal of the 2023 Q2 EDR submission as required "Prompt" timeline as per the Title 5
permit.
Describe any corrective actions or preventive measures taken: Additional personnel will be
reviewing submittals of required reports, and reviewing necessary requirements for such actions.
Also, electronic calendar reminders have been created.
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and
belief formed after reasonable inquiry, I certifr that the statements and information in this document are
true, accurate, and complete.
,d+
NOTE: Was the deviation due to an unavoidable breakdown as defined in UAC R307-107?