HomeMy WebLinkAboutDAQ-2024-007778
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-350-24
Site 12776 (B1)
Grant Ensign
Geneva Rock Products
730 North 1500 West
Orem, UT 84057
Dear Mr. Ensign:
Re: Geneva Rock Products – Temporary Relocation/Operation, Notice of Intent – Salt Lake
County
Your Notice of Intent dated April 3, 2024, to relocate portable aggregate equipment to the
temporary project for Geneva Rock Product’s Mount Jordan Pit, located at 15200 South Pony
Express Boulevard, Bluffdale, UT, was received by the Utah Division of Air Quality (DAQ) and
has been reviewed.
The following equipment has been approved for operation for this temporary project:
500 tph VSI crusher
CAT 328 kW generator
KPI/JCI 500 tph mobile crusher
Screens
Conveyors
The State of Utah has permitted portable equipment for Geneva Rock Products on the Approval
Order (AO) AO DAQE-AN110420003-21 dated February 17, 2021. The above referenced
location is a permitted facility with established production limits. The portable equipment
operating at this facility must be done in accordance with the permanent Geneva Rock Products
AO DAQE-AN127760008-22 dated February 17, 2022. The production of aggregate and hours of
operation from all temporary projects when combined with the permanent equipment’s production
and hours of operation cannot exceed the 12-month rolling limits as per conditions II.B.1.b and
II.B.3.a of this AO.
6 Ú Û Ù Û Ý
DAQC-350-24
Page 2
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the
operation of equipment at this temporary site may be for up to 180 working days in any calendar
year not to exceed 365 consecutive days, starting from the initial relocation date. The operational
days per site cannot be extended beyond the stipulated 365 consecutive day period.
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens, and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process, please contact Jordan Garahana at (385) 271-2871.
Sincerely,
Jay P. Morris
Assistant Director
JPM:JG:jl
Enclosure: Submitted Temporary Relocation Form
cc: Salt Lake County Health Department
4 * - - $ . — + - A H v A ? A C @ D w A ? ˜
4/11/24, 11:38 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=038c40f7b3&view=pt&search=all&permmsgid=msg-f:1795335289186225373&simpl=msg-f:1795335289186225373 1/2
Jordan Garahana <jordangarahana@utah.gov>
Portable/Temporary Relocation Form
noreply@qemailserver.com <noreply@qemailserver.com>Wed, Apr 3, 2024 at 11:25 AM
Reply-To: trigger@qemailserver.com
To: jordangarahana@utah.gov
Susan/Chad:
Site # -- Geneva Rock Products has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-04-03 11:25:44 MDT
IP: 64.77.251.44
ResponseID: R_2XjGpboaDQ80kdC
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
AG2eN6eFx0FgRDOEY1P8xPlLOG25RFX4HIr3YS7jRTrD8U%2EeWVpF7l7v4SkTNdWa7AMYHyUiPOT
0SiGJajZuWBsH0MkQZ6cd33BQzsqXGlHCvx0bhjZTArAmQBHmzq2F1NNMeiB8ZDnO8j6lWYT4jU6WCRWIAeSFJrDI2
bwdN92ENG109DCGGtz-Pgkv6lEGcvADEm9ViFsvT7sesWjTecWub0aHNgzUctVLPCBW57fdWMlQIvKOu3I%
2EKtRf4AP9lNdwcdL8xpHusMklMDaiA-hDbsngJwC2M2Reg-4%2Ee6J99IGj1RUe1Y2EwUImMQaLtwpL
cWa1OK8v4hOEXrBg4w
Response Summary:
Please fill out the information below:
Contact Person: Grant Ensign
Company Name: Geneva Rock Products
Mailing Address: 730 N 1500 West
City: Orem
Zip: 84057
Phone Number: 8018026954
Email: gensign@clydeinc.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
db9ef44a-0320-4079-a2dd-3793e0d1b11f
Briefly give directions to the site and/or physical address:
Mount Jordan Operations, Across I-15 from Pt. of Mtn., Facility on West side.
Proposed Relocation Information:
Closest City Bluffdale
County Salt Lake
UTM X Coordinates 40.464634
UTM Y Coordinates -111.919720
Approximate distance to the nearest house/business 1,900 feet
UTM X Coordinates to nearest house/business 40.468498
UTM Y Coordinates to nearest house/business -111.914864
Does this site currently have a permit with DAQ?
Yes
4/11/24, 11:38 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=038c40f7b3&view=pt&search=all&permmsgid=msg-f:1795335289186225373&simpl=msg-f:1795335289186225373 2/2
If yes, what is the Permit (DAQ-AN) # ?
DAQE-AN127760008-22
If yes, what is the Permit Holder's Name?
Geneva Rock Products, Inc.
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type VSI Crusher
Design Capacity 500 tph
2
Equipment Type Generator
Make/Model CAT
Design Capacity 328 KW
3
Equipment Type Associated Conveyors, screens, and feeders
4
Equipment Type Mobile Crusher
Make/Model KPI/JCI
Serial or ID# 4250
Design Capacity 500 tph
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 5 AM
Ending time of operation (am/pm) 9 PM
Maximum hourly production rate for project 500 tph
Expected startup date 04/15/2024
Expected completion date 04/15/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_O2PhhFeY0s8Q6cx
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_3feFM07nWaiqA7j