HomeMy WebLinkAboutDAQ-2024-008159
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-488-24
Site 12905 (B1)
Quin Bingham
Granite Construction Company
1000 North Warm Springs Road
Salt Lake City, Utah 84116-2321
Dear Mr. Bingham:
Re: Granite Construction Company – Temporary Relocation/Operation, Notice of Intent –
Box Elder County
Your Notice of Intent dated May 15, 2024, to relocate portable aggregate equipment to the
temporary project for Granite Construction Company’s Wells and Wells South Aggregate
facilities, located at 750 North State Route 89, Willard, Utah was received by the Utah Division of
Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Terex 130 < kW < 560 diesel-fired track-mounted cone crusher and screen
Two conveyors
The State of Utah has permitted portable aggregate equipment for Granite Construction Company
for operation in the State of Utah on the Approval Order (AO) DAQE-AN127270014-19 dated
February 27, 2019. The above relocation address is a permitted aggregate facility with established
production limits. All equipment operating at this site must be in accordance with the current AO
for this site DAQE-AN129050012-24 dated March 15, 2024. The production of aggregate and
hours of operation from all temporary projects when combined with the permanent equipment’s
production cannot exceed the 12-month rolling limits as per Conditions II.B.1.a of this AO.
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the
operation of equipment at this temporary site may be for up to 180 working days in any calendar
year not to exceed 365 consecutive days, starting from the initial relocation date.
6 Û â Û Ù Û Ý
DAQC-488-24
Page 2
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
cc: Bear River Health Department
4 * - - $ . — 4 A G v A ? A C @ D w @ H ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Wed, May 15, 2024 at 11:07 AM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Granite Construction Company has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-05-15 11:07:14 MDT
IP: 161.69.114.49
ResponseID: R_2Pc9WBKmIOiE50g
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
1m1XCs4ET8tUqmvuRCs4ZYM%2E4PV%2E9PKnAGnhGCwT0phfUQpGwklRQP0U4jABytj9McjwUf9v%
2EYBjgq2aOGC59OrUpWS-A5SwNcdNiuB-Zh%2Ev58RfKgf5kvoN838PMXZSwE5chi%2EnU4fne7%2EZ%
2ElZdTMgP7S2AhxqfLh3xZ3dwJ9tXMMhhtIRtYekdXBEJb%2EvCCxi4nxdLRjFWPGUUvd5goOm0Bi
bjC2Qa1ITtouQqSSQgNCCZXt9xQSaZHd1DDFu3VaDhDFG9%2EPEKZRolkId6QvcRypMszT2nnwW6oi9EK8g4-
FT7Vv%2EJ1R%2EY0ggIlanH1ywFeA%2EBnhapdwbcxGlbIQ
Response Summary:
Please fill out the information below:
Contact Person: Quin Bingham
Company Name: Granite Construction Company
Mailing Address: 1000 N Warm Springs Road
City: Salt Lake City
Zip: 84116
Phone Number: 4357704319
Email: quin.bingham@gcinc.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
322df723-c873-4a9e-87f9-30d7af57d2ab
Briefly give directions to the site and/or physical address:
Head west from I-15 FWY exit 357
Proposed Relocation Information:
Closest City Willard
County Box Elder
UTM X Coordinates 41.416113
UTM Y Coordinates -112.025043
Approximate distance to the nearest house/business 0.43 miles
UTM X Coordinates to nearest house/business 41.413835
UTM Y Coordinates to nearest house/business -112.032835
Does this site currently have a permit with DAQ?
5/21/24, 11:39 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1799135643332585868%7Cmsg-f:1799139199232160859&…1/2
Yes
If yes, what is the Permit (DAQ-AN) # ?
129050012-24
If yes, what is the Permit Holder's Name?
Granite Construction Company
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
129050012-24
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Trackmounted Cone and Screen
Make/Model Terex C1540RS
Design Capacity 200 TPH
2
Equipment Type 80' Conveyor
Make/Model Terex WR80
Design Capacity 200 TPH
3
Equipment Type 80' Conveyor
Make/Model Terex WR80
Design Capacity 200 TPH
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_806WKGuDsViXtCN
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 0600
Ending time of operation (am/pm) 2200
Maximum hourly production rate for project 200 TPH
Expected startup date 05/24/2024
Expected completion date 05/24/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1ZjC74B74gKBxIt
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1JFbfMMwCzMtVpT
5/21/24, 11:39 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1799135643332585868%7Cmsg-f:1799139199232160859&…2/2
Susan Weisenberg <sweisenberg@utah.gov>
Re: request for power rating for Willard track cone/screen
1 message
Bingham, Quin <Quin.Bingham@gcinc.com>Thu, May 23, 2024 at 12:40 PM
To: Susan Weisenberg <sweisenberg@utah.gov>
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Thursday, May 23, 2024 10:53:32 AM
To: Bingham, Quin <Quin.Bingham@gcinc.com>
Subject: Re: request for power ra ng for Willard track cone/screen
CAUTION: External Email: Be Cyber-Alert
Sorry Quinn, the photo didn't come through in my email. Can you send it again? Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
On Wed, May 22, 2024 at 4:58 PM Bingham, Quin <Quin.Bingham@gcinc.com> wrote:
Hi Susan,
Here is a photo of the engine placard with the power rating and emissions controls. Looks to at a minimum Tier 3 but
based on the list of emissions controls, I would assume it to be Tier 4. Let me know if you have any requests.
Best,
Quin
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Wednesday, May 22, 2024 11:57 AM
To: Bingham, Quin <Quin.Bingham@gcinc.com>
Subject: request for power ra ng for Willard track cone/screen
CAUTION: External Email: Be Cyber-Alert
Hello, with regards to the TRP for the Willard operation, my management has requested the power rating for the listed
track mounted cone and screen plant. Thanks, I appreciate your time with this.
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
5/24/24, 11:34 AM State of Utah Mail - Re: request for power rating for Willard track cone/screen
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1155345859669169360%7Cmsg-f:1799869846188252821…1/2
original-DADCF02A-F6AE-4DF0-8183-BA0FC263CFB4.jpeg
230K
5/24/24, 11:34 AM State of Utah Mail - Re: request for power rating for Willard track cone/screen
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1155345859669169360%7Cmsg-f:1799869846188252821…2/2