Loading...
HomeMy WebLinkAboutDAQ-2024-008159 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-488-24 Site 12905 (B1) Quin Bingham Granite Construction Company 1000 North Warm Springs Road Salt Lake City, Utah 84116-2321 Dear Mr. Bingham: Re: Granite Construction Company – Temporary Relocation/Operation, Notice of Intent – Box Elder County Your Notice of Intent dated May 15, 2024, to relocate portable aggregate equipment to the temporary project for Granite Construction Company’s Wells and Wells South Aggregate facilities, located at 750 North State Route 89, Willard, Utah was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Terex 130 < kW < 560 diesel-fired track-mounted cone crusher and screen Two conveyors The State of Utah has permitted portable aggregate equipment for Granite Construction Company for operation in the State of Utah on the Approval Order (AO) DAQE-AN127270014-19 dated February 27, 2019. The above relocation address is a permitted aggregate facility with established production limits. All equipment operating at this site must be in accordance with the current AO for this site DAQE-AN129050012-24 dated March 15, 2024. The production of aggregate and hours of operation from all temporary projects when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Conditions II.B.1.a of this AO. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. 6 Û â Û Ù Û Ý DAQC-488-24 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Bear River Health Department 4 * - - $ . — 4 A G v A ? A C @ D w @ H ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Wed, May 15, 2024 at 11:07 AM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Granite Construction Company has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2024-05-15 11:07:14 MDT IP: 161.69.114.49 ResponseID: R_2Pc9WBKmIOiE50g Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/ 1m1XCs4ET8tUqmvuRCs4ZYM%2E4PV%2E9PKnAGnhGCwT0phfUQpGwklRQP0U4jABytj9McjwUf9v% 2EYBjgq2aOGC59OrUpWS-A5SwNcdNiuB-Zh%2Ev58RfKgf5kvoN838PMXZSwE5chi%2EnU4fne7%2EZ% 2ElZdTMgP7S2AhxqfLh3xZ3dwJ9tXMMhhtIRtYekdXBEJb%2EvCCxi4nxdLRjFWPGUUvd5goOm0Bi bjC2Qa1ITtouQqSSQgNCCZXt9xQSaZHd1DDFu3VaDhDFG9%2EPEKZRolkId6QvcRypMszT2nnwW6oi9EK8g4- FT7Vv%2EJ1R%2EY0ggIlanH1ywFeA%2EBnhapdwbcxGlbIQ Response Summary: Please fill out the information below: Contact Person: Quin Bingham Company Name: Granite Construction Company Mailing Address: 1000 N Warm Springs Road City: Salt Lake City Zip: 84116 Phone Number: 4357704319 Email: quin.bingham@gcinc.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 322df723-c873-4a9e-87f9-30d7af57d2ab Briefly give directions to the site and/or physical address: Head west from I-15 FWY exit 357 Proposed Relocation Information: Closest City Willard County Box Elder UTM X Coordinates 41.416113 UTM Y Coordinates -112.025043 Approximate distance to the nearest house/business 0.43 miles UTM X Coordinates to nearest house/business 41.413835 UTM Y Coordinates to nearest house/business -112.032835 Does this site currently have a permit with DAQ? 5/21/24, 11:39 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1799135643332585868%7Cmsg-f:1799139199232160859&…1/2 Yes If yes, what is the Permit (DAQ-AN) # ? 129050012-24 If yes, what is the Permit Holder's Name? Granite Construction Company Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) 129050012-24 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Trackmounted Cone and Screen Make/Model Terex C1540RS Design Capacity 200 TPH 2 Equipment Type 80' Conveyor Make/Model Terex WR80 Design Capacity 200 TPH 3 Equipment Type 80' Conveyor Make/Model Terex WR80 Design Capacity 200 TPH Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_806WKGuDsViXtCN Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 0600 Ending time of operation (am/pm) 2200 Maximum hourly production rate for project 200 TPH Expected startup date 05/24/2024 Expected completion date 05/24/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1ZjC74B74gKBxIt Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1JFbfMMwCzMtVpT 5/21/24, 11:39 AM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1799135643332585868%7Cmsg-f:1799139199232160859&…2/2 Susan Weisenberg <sweisenberg@utah.gov> Re: request for power rating for Willard track cone/screen 1 message Bingham, Quin <Quin.Bingham@gcinc.com>Thu, May 23, 2024 at 12:40 PM To: Susan Weisenberg <sweisenberg@utah.gov> From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Thursday, May 23, 2024 10:53:32 AM To: Bingham, Quin <Quin.Bingham@gcinc.com> Subject: Re: request for power rang for Willard track cone/screen CAUTION: External Email: Be Cyber-Alert Sorry Quinn, the photo didn't come through in my email. Can you send it again? Thanks Susan Weisenberg, Environmental Scientist Office: 385-306-6512 On Wed, May 22, 2024 at 4:58 PM Bingham, Quin <Quin.Bingham@gcinc.com> wrote: Hi Susan, Here is a photo of the engine placard with the power rating and emissions controls. Looks to at a minimum Tier 3 but based on the list of emissions controls, I would assume it to be Tier 4. Let me know if you have any requests. Best, Quin From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Wednesday, May 22, 2024 11:57 AM To: Bingham, Quin <Quin.Bingham@gcinc.com> Subject: request for power rang for Willard track cone/screen CAUTION: External Email: Be Cyber-Alert Hello, with regards to the TRP for the Willard operation, my management has requested the power rating for the listed track mounted cone and screen plant. Thanks, I appreciate your time with this. Susan Weisenberg, Environmental Scientist Office: 385-306-6512 5/24/24, 11:34 AM State of Utah Mail - Re: request for power rating for Willard track cone/screen https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1155345859669169360%7Cmsg-f:1799869846188252821…1/2 original-DADCF02A-F6AE-4DF0-8183-BA0FC263CFB4.jpeg 230K 5/24/24, 11:34 AM State of Utah Mail - Re: request for power rating for Willard track cone/screen https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1155345859669169360%7Cmsg-f:1799869846188252821…2/2