Loading...
HomeMy WebLinkAboutDAQ-2024-0074481 DAQC-337-24 Site ID 11979 (B2) MEMORANDUM TO: FILE – WASHINGTON COUNTY SANITARY LANDFILL THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Joseph Randolph, Environmental Scientist DATE: April 15, 2024 SUBJECT: Title V Annual Compliance Certification Receipt/Review, FRS ID # UT0000004905300053 REPORT RECEIVED/DUE DATE: April 5, 2024 (email)/ April 15, 2024 TITLE V PERMIT #: 5300053004 DATE OF LAST PERMIT REVISION: August 10, 2022 CERTIFICATION PERIOD: March 1, 2023 to February 29, 2024 FACILITY REPORTED COMPLIANCE STATUS: Continuous REPORT EVALUATION: • Was report submitted on time? Yes • Did report identify status of compliance for each condition? Yes • Was compliance status marked as continuous/intermittent for each condition? Yes • Did report identify method used to determine compliance with each condition? Yes • Was report signed and properly certified by responsible official? Yes • Were exceedances/excursions reported? No • Were deviations reported? No COMMENTS/RECOMMENDATION: The report appears to meet the requirements of Title V operating permit condition I.L. ATTACHMENT: Annual Compliance Certification Report 0 ( 8 April 5, 2024 rvcd email 04/05/2024 Page 1 of 9 TO: Director, Utah Division of Air Quality (DAQ) FROM: Washington County Landfill RE: Annual Compliance Certification for Permit # 5300053004 DATE: April 15, 2024 In accordance with Operating Permit provision I.L and Utah Administrative Code (UAC) R307-415-6c(5), the following compliance certification is submitted. This certification covers operations from 3/01/2023 to 2/29/2024. (Note: The certification period must be consecutive to the last certification, and cannot cover more than one year. Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.B Was the source operated in compliance with the operating permit? Recordkeeping and Reporting. Continuous None Page 2 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.C.1 Did the permittee comply with all the conditions of the operating permit? Recordkeeping and Reporting. Continuous None I.C.3 Did the permittee furnish information requested by the Director within reasonable time? Recordkeeping and Reporting. Continuous None I.E Did permittee submit a timely and complete application for renewal? Recordkeeping and Reporting. Continuous None I.G.1 Did the permittee pay the annual emission fee? Recordkeeping and Reporting. Continuous None I.G.2 Was the fee paid on time? Recordkeeping and Reporting. Continuous None I.J Permittee allowed Director or authorized representative to perform items in I.J.1. a through I.J.1.d Recordkeeping and Reporting. Continuous None I.K Were all application forms, reports and certifications submitted pursuant to the permit certified by a responsible official? Recordkeeping and Reporting. Continuous None I.L.1 Did the permittee submit a complete compliance certification on time? Recordkeeping and Reporting. Continuous None I.L.2 Did the permittee also send all compliance certifications to EPA? Recordkeeping and Reporting. Continuous None Page 3 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.N If an emergency occurred, permittee complied with provisions I.N.2.a. through I.N.2.d Recordkeeping and Reporting. Continuous None I.S.1.a Did the permittee properly retain all records required by the permit for at least 5 years? Recordkeeping and Reporting. Continuous None I.S.1.b Did the permittee include all applicable information in records of monitoring required by the permit? Recordkeeping and Reporting. Continuous None Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.S.2.a Did the permittee submit monitoring reports every six months, or more frequently if specified in Section II, and were all instances of deviation from permit requirements clearly identified in the monitoring reports? Recordkeeping and Reporting. Continuous None I.S.2.b All reports submitted were certified by a Responsible Official? Recordkeeping and Reporting. Continuous None Page 4 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. I.S.2.c Did the permittee promptly notify the Director of all deviations from permit requirements? Recordkeeping and Reporting. Continuous None I.U Did the permittee submit the inventory required by R307-150 in accordance with the requirements of that rule? Recordkeeping and Reporting. Continuous None II.B.1.a.2 Did the permittee maintain records of measures taken to minimize fugitive dust? Recordkeeping and Reporting. Continuous None II.B.1.b Visible emissions were no greater than 20% opacity. Recordkeeping and Reporting. Continuous None II.B.1.b.1 Did the permittee perform a visual opacity survey of each affected emission unit quarterly as required under the condition? Quarterly Visual Opacity Survey. Record Keeping and Reporting. Continuous None II.B.1.b.2 Did the permittee maintain a log of visual opacity surveys on the affected emission unit? Quarterly Visual Opacity Survey. Record Keeping and Reporting. Continuous None II.B.1.c Did the permittee operate and monitor sources in a manner consistent with safety and good air pollution control practices to minimize emissions during periods of operation and startup, shutdown and malfunction? II.B.1.c.1 through II.B.1.c.3 Monitoring, Recordkeeping and Reporting Continuous None Page 5 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. II.B.1.d Did the permittee maintain up-to- date, readily assessable records of the design capacity report, current amount of solid waste in-place, and year-by-year waste acceptance rate, performance testing, collection system downtime, GCCS operational exceedances, for at last 5 years? II.B.1.d.1 through II.B.1.d.3 Recordkeeping and Reporting. Continuous None II.B.1.e Did the permittee maintain up-to- date, readily accessible records of collection system exceedances of the operational negative pressure standards in this condition? II.B.1.e.1 through II.B.1.e.3 Recordkeeping and Reporting Continuous None II.B.1.f Did the permittee maintain up-to- date, readily accessible records of collection system exceedances of the operational temperature standards in this condition? II.B.1.f.1 through II.B.1.f.3 Recordkeeping and Reporting Continuous None II.B.1.g Did the permittee maintain up-to- date, readily accessible records of surface emissions exceedances of the operational standards in this condition? II.B.1.g.1 through II.B.1.g.3 Surface Emissions Monitoring, Recordkeeping and Reporting Continuous None II.B.1.h Did the permittee calculate NMOC emission rate in accordance with permit requirement II.B.1.h.1? Recordkeeping and Reporting. Continuous None II.B.1.i Did the permittee develop and maintain a startup, shutdown, and malfunction (SSM) plan and keep up-to-date, readily accessible SSM records in accordance with this condition? II.B.1.i.1 through II.B.1.i.3? Recordkeeping and Reporting Continuous None Page 6 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. II.B.1.j Unless a natural barrier deters public access, did permittee comply with either the fencing and warning sign requirements (40 CFR 61.154) or cover material with 6 inches of non-asbestos containing material daily. Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.j.1 Did permittee perform a visual inspection of the property quarterly (warning signs) or daily visual inspections (6 inches of cover material) Quarterly Visual Opacity Survey. Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.j.2 Did the permittee maintain a log of visual opacity observations or visual inspections of asbestos disposal operation? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.k Did permittee either discharge no visible emissions to the outside air or cover asbestos-containing material for all asbestos operations. Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.k.1 Did the permittee perform daily visual opacity observation or visual inspection of sites where asbestos containing waste is deposited? Daily Observations/ Inspections, Record Keeping and Reporting. Continuous Site does not accept asbestos. II.B.1.k.2 Did the permittee maintain a log of inspections of monitoring activities? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.l.2 Did the permittee maintain waste shipment records of all asbestos- containing waste material received? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.l.3 Did the permittee perform shipment tracking and document instances of improperly enclosed or uncovered asbestos-containing wastes? Recordkeeping and Reporting. Continuous Site does not accept asbestos. Page 7 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. II.B.1.m.2 Did the permittee maintain a map of records of the location, depth, and quantity of asbestos- containing waste on site until closure? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.m.3 Did the permittee report any excavations of asbestos- containing waste material that has been deposited on site to the Director in writing at least 45 days prior to excavation activities? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.n Upon closure of an asbestos- containing waste disposal site, permittee shall submit a copy of waste disposal locations and quantities and comply with either discharging no visible emissions to the outside air or covering asbestos-containing material. Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.n.1 Did the permittee perform quarterly visual inspections of each closed site where asbestos-containing waste material is deposited? Quarterly Visual Opacity Survey. Record Keeping and Reporting. Continuous Site does not accept asbestos. II.B.1.n.2 Did the permittee maintain a log of quarterly inspections on above monitoring activities? Recordkeeping and Reporting. Continuous Site does not accept asbestos. Page 8 of 9 Term Description of permit provision Method used to determine compliance status Was compliance during report period continuous, intermittent or undetermined? Other info relevant to compliance status, including references to any and all deviations; reason for “undetermined” status; any excursions or exceedances (for CAM provisions only); etc. II.B.1.n.3 Did the permittee report any excavations to the Director at least 45 days prior to excavating and record a notation on the deed to the facility property that the site has been used for asbestos- containing waste material? Recordkeeping and Reporting. Continuous Site does not accept asbestos. II.B.1.o Was the H2S content of the LFG monitored at least once per calendar year? II.B1.o.1 through II.B.1.o.3 Annual Monitoring; Recordkeeping and Reporting Continuous The H2S content of the LFG was sampled on February 3, 2022 and results were 1,200 parts per million (ppm) for both readings. The next annual sampling event will be completed prior to the end of March 2023. II.B.1.p Was the flare operated with no visible emissions (except for periods not to exceed a total of 5 minutes during any 2 consecutive hours), and continuously operated with a flame present except for periods of startup, shutdown, or malfunction? II.B.1.p.1 through II.B.1.p.3. Recordkeeping and Recording Continuous None