HomeMy WebLinkAboutDDW-2024-007799
May 10, 2024
Paul Wright
District Engineer
Utah Department of Environmental Quality
620 S 400 E #400
St. George, UT 84770
RE: Request for Operating Permit for Bryce Canyon Shadows RV Park
Dear Paul Wright:
Regarding the above referenced project please note the following:
1. The project was completed according to the approved drawings and specifications, with
minor changes that do not affect water quality or quantity and are in compliance with Utah
Administrative Rules.
2. One set of construction record drawings has been given to the Owner.
3. Flushing and disinfection of the new water lines has been completed in accordance with
appropriate AWWA/ANSIS standards.
4. Bacteriological samples have been taken for the well and water line and are included with
this letter.
5. An Operation and Maintenance manual has been sent to the owner.
If you have any questions or need additional information, please call me at 435-757-0308.
Sincerely,
James Saunders, P.E.
JONES & DeMILLE ENGINEERING, INC.
Enclosures:
• As-Built Construction Record Drawings
• Project Specifications
• Bacteriological Samples
• Operation & Maintenance Manual