HomeMy WebLinkAboutDAQ-2024-008016Robert Checketts
Vice President
Operations and Engineering
January 16,2024
Mr. Bryce Bird
Executive Secretary
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, LIT 84121
801-937-5103
UTAH DEPARTMENT OF
ENVIRONMENTAL OUAUTY
JAN 1 I 2t?4
D:VISION OF AIR OUALIT\
A BERKSHIRE HATHAWAY ENEFGY COMPANY
2755 E. Cottonwood Parkway, Suite 300
REUEWED
Initials: @o*, /;r/Z!
Compliance Stutrr. feCLr' fY
Fr..# lz-.€q(o
Salt Lake City, Utah 84116
RE: Salt Lake Compressor Station, Unit 2 Turbine Overhaul/Exchange
Permit DAQE-AN 1259 60016-23
Dear Mr. Bird:
Kern River Gas Transmission Company (Kern River) is submitting notification of a like-kind
exchange of Unit 2 at the Fillmore compressor station. The like-kind exchange is scheduled for
the week of March 18, 2024. Kern River will schedule a Subpart GG test of this turbine to occur
after the exchange is complete. A protocol will be submitted to the Division at least 30 days prior
to testing.
The exchange of Unit 2 involves the gas producer and power turbine modular component of the
turbine. The exchange of these components is part of Kern River's routine maintenance program.
Failure to perform the exchange could result in the catastrophic failure of critical components with
inherent risk to property, personnel, and the environment.
Replaced components were refurbished in Solar Turbines, Incorporated overhaul facility. The
overhaul consists of the complete disassembly, inspection rework, reassembly, and testing of the
gas turbine to the original thermodynamic and mechanical performance. The exchange turbine is
identical or functionally equivalent and will have the identical horsepower, heat rate, and emissions
characteristics as the components being replaced. There are no physical or operational changes in
the equipment. A refurbished engine core maintains the same mass flow, firing temperature, and
control parameters as it did before the overhaul.
Other components of the original package including the control system, fuel system, lubrication
system, backup power system, cooling system, driven equipment, structures, enclosures, skids,
inlet and exhaust ducting, etc., remain unchanged and in place. Only the accessory gearbox, gas
producer and power turbine modular components are affected by the exchange.
Enclosed is the pricing for the exchange unit. The cost of the exchange is less thanl}oh of the cost
of the new turbine. The turbine exchange cost is $3.2m and the cost of a new turbine package
would be $10.4m. This exchange does not meet the definition of reconstruction and therefore no
permitting should be required.
\
,\This exchange should be considered routine maintenance. If you have any questions or comments,
please contact Denise Kohtala at (801) 937-6347 or denise.kohtala@kernrivereas.com.
I certifr that, based on information and belief formed after reasonable inquiry, the statements and
-* nc: Jon L. Black
ManagerNew source Review Section
Utah Division of Air Quatlty
195 North 1950 West
Salt Lake City, Utah 84116
Enclosure
are true, accurate and complete.
Kem River Salt Lake Engine Unit 2 Overhaul-EOH/SSolarTurbines
A Gateryillar Conpany
Gonfidential: Do Not Fonruard Without Solar's Written
Approval
Page 1