HomeMy WebLinkAboutDSHW-2024-006468CORRECTIVE ACTION SECTION – SITE VISIT REPORT
SITE NAME: _________________________________________ DATE: ______/_______/___________
EPA ID #: _________________________________________ UTCA ID#: ______________________
LOCATION: ___________________________________________________________________________
PROJECT MANAGER: ____________________________________________________________________
SITE STATUS
___ Active Investigation ___ Long-term Institutional Controls in-place
___ Long-term Groundwater Monitoring
___ Closed w/ No More Work Needed OTHER (describe):
PURPOSE OF SITE VISIT
___ Confirm Cleanup Completed
___ Confirm Integrity of Engineering Controls
___ Confirm SMP is Being Complied With
D2# for SMP: DSHW-________-_______________
___ Post-Closure Permit Verification
___ Document Change in Land Usage
___Drive-by (windshield survey)
___Sample Observation &/or Collection
___Site Investigation
___Cleanup Activities Inspection
___Confirm Current Land Usage
OTHER (describe):
FIELD OBSERVATIONS:
SAMPLE COLLECTION
Were Environmental Samples Collected per the approved Sampling & Analysis Plan?
YES ___ NO ___ N/A ___
COMMENTS:
Ongoing Cleanup Activities
Confirmation Sampling
Gordo 05 23 2024
Kearns Blvd and Richardson Flat Rd, Park City, Utah
Karen Wallner
Waste characterization sampling.
4
Sample locations with the highest metals concentrations are targeted for sampling. Six locations
were selected for sampling: one in Zone 2, and five in Zone 1. Specific locations of previous high
concentrations are located onsite for waste characterization sampling using GPS coordinates.
The entire soil column above native soils is extracted as a core and used for the five-point/entire
soil column composite sample. The entire soil column may be used for the sample to ensure a
large enough sample for TCLP analysis at locations where the fill materials are shallower. An
aliquot from the highest concentration depth interval is included in the composite sample.
Sampling equipment is decontaminated between borings by scrubbing with detergent water and
using a pressurized spray.
4
Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)?
YES ___ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
CURRENT LAND USAGE
___ Residential
___ Commercial
___ Industrial
___ Mixed Commercial w/ Residential
___ Under Construction &/or Development
___ Other: __________________________________
COMMENTS:
FUTURE LAND USAGE
___ Residential ___ Mixed Commercial w/ Residential
___ Commercial ___ Other: (describe below)
___ Industrial ___ Unknow at this time
COMMENTS:
POST-CLEANUP SITE VISITS
Is the Completed Cleanup Remedy Still Protective Based on Current Land Use?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
LONG-TERM INSTITUTION CONTROL(S) VERIFICATION
Are Components or Restrictions of the SMP &/or EC Currently Being Complied with?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
SITE VISIT CONCLUSIONS
RECOMMENDATIONS
ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES ___ NO ___
SIGNATURE:
4
4 Open land
4
N/A
N/A
Waste characterization samples appear to be collected according to the Corrective Action Plan.
None.
4
May 23, 2024 – Gordo Waste Characterization Sampling Event
Obtaining soil core from location B-3.
Soil cores from location B-3 ready for sampling.
Decontamination of drilling equipment.