Loading...
HomeMy WebLinkAboutDAQ-2024-004504Robert Checketts Vice President Operations and Engineering January 26,2024 Mr. Bryce Bird Executive Secretary Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 RE: Veyo Compressor Station Permit No. 5300050003 Semiannual Monitoring Report Dear Mr. Bird: A BERKSHIiE HATHAWAY ENERGY COMPANY 2755 E. Cottonwood Parkway, Suite 300 Salt Lake City, UT 84121 80 r-937-6103 UTAH DEPARTMENT OF ENVIRONMENTAL OUALIry JAN 3t ?-ai)/+ DIVISION OF AIR QUALITY Kern River Gas Transmission Company (Kern River) operates the Veyo compressor station located in Veyo, Utah, under its current Title V Operating Permit 5300050003 issued December 19,2019. Enclosed, please find the second 2023 Semiannual Monitoring Report covering the period from July l, 2023, to December 31, 2023, as required by Condition I.S.2.a of the Operating Permit. Ifthere are any questions, or if any additional information is needed, please contact Denise Kohtala at (80 1 ) 937 -63 47 or denise.kohtala@kemrivergas.com. I certiff that, based on information and belief formed after reasonable inquiry, the statements and information in this document are true, accurate and complete.ruw cc: EnvironmentalProtectionAgency Office of Partnerships and Regulatory Assistance Air and Radiation Program (8P-AR) 1595 Wynkoop Street Denver, CO 80202-1129 Enclosure REVIEWED Initials JBR Date 2/7/2024 Comp Status Meets File # 12512 Blue 2 rcds review no dev noted '!- Semiannual Monitoring A EERK,SHNE HATHAWAY ENfRGY COIIIPANY Report TO: Executive Secretary, Utah Air Quality Board FROM: Kern River Gas Transmission Company, Veyo Compressor Station RE: Permit # 5300050003 DATE: January 26,2024 In accordance with Operating Permit Condition I.S.2.a and Utah Administrative Code (UAC) R307-415- 6a(3)(c)(i), the following monitoring report is submitted. This report covers the period from July 112023 to December 31, 2023. For the indicated reporting period: X There were no deviations from any permit requirements. tr Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision I.S.2.a, and UAC R307-415-6a(3)(c)(i). tr In lieu of attaching the above list, deviation reports submitted in accordance with permit provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below. In accordance with Operating Permit provision LK and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Robert Checketts, Vice President - Operations and Engineering Name of Responsible Official Januarv 26,2024 ture of Responsible Official Page 1 of 1