HomeMy WebLinkAboutDAQ-2024-004504Robert Checketts
Vice President
Operations and Engineering
January 26,2024
Mr. Bryce Bird
Executive Secretary
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, UT 84116
RE: Veyo Compressor Station
Permit No. 5300050003
Semiannual Monitoring Report
Dear Mr. Bird:
A BERKSHIiE HATHAWAY ENERGY COMPANY
2755 E. Cottonwood Parkway, Suite 300
Salt Lake City, UT 84121
80 r-937-6103
UTAH DEPARTMENT OF
ENVIRONMENTAL OUALIry
JAN 3t ?-ai)/+
DIVISION OF AIR QUALITY
Kern River Gas Transmission Company (Kern River) operates the Veyo compressor station
located in Veyo, Utah, under its current Title V Operating Permit 5300050003 issued December
19,2019.
Enclosed, please find the second 2023 Semiannual Monitoring Report covering the period from
July l, 2023, to December 31, 2023, as required by Condition I.S.2.a of the Operating Permit.
Ifthere are any questions, or if any additional information is needed, please contact Denise Kohtala
at (80 1 ) 937 -63 47 or denise.kohtala@kemrivergas.com.
I certiff that, based on information and belief formed after reasonable inquiry, the statements and
information in this document are true, accurate and complete.ruw
cc: EnvironmentalProtectionAgency
Office of Partnerships and Regulatory Assistance
Air and Radiation Program (8P-AR)
1595 Wynkoop Street
Denver, CO 80202-1129
Enclosure
REVIEWED
Initials JBR Date 2/7/2024
Comp Status Meets
File # 12512 Blue 2
rcds review no dev noted
'!-
Semiannual Monitoring A EERK,SHNE HATHAWAY ENfRGY COIIIPANY
Report
TO: Executive Secretary, Utah Air Quality Board
FROM: Kern River Gas Transmission Company, Veyo Compressor Station
RE: Permit # 5300050003
DATE: January 26,2024
In accordance with Operating Permit Condition I.S.2.a and Utah Administrative Code (UAC) R307-415-
6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from July 112023 to December 31, 2023.
For the indicated reporting period:
X There were no deviations from any permit requirements.
tr Attached is a list of permit requirements for which there were deviations. The list includes the
information required by Operating Permit provision I.S.2.a, and UAC R307-415-6a(3)(c)(i).
tr In lieu of attaching the above list, deviation reports submitted in accordance with permit provision
I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below.
In accordance with Operating Permit provision LK and UAC R307-415-5d, and based on information and belief
formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate,
and complete.
Robert Checketts, Vice President - Operations and Engineering
Name of Responsible Official
Januarv 26,2024
ture of Responsible Official
Page 1 of 1