Loading...
HomeMy WebLinkAboutDAQ-2024-004289 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-1282-23 Site 12121 (B1) Tyler Hodson Kilgore Companies 7057 West 2100 South Salt Lake City, Utah 84128 Dear Mr. Hodson: Re: Kilgore Companies – Modification to Temporary Relocation/Operation – DAQC-1101-23 – Additional Equipment – Juab County Your request dated November 20, 2023, to add an additional VSI crusher and a feeder to the temporary project for Kilgore Construction's Pit, located 2.2 miles north of Mona, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has now been approved for operation for this temporary project: Aztek VSO crusher Site boss feeder Remco VSI crusher Finlay two deck track mounted screen plant Astec CS3055 jaw crusher Caterpillar 300 kW generator The State of Utah has permitted portable aggregate equipment for operation for your company on the Approval Order (AO) DAQE-AN129310019-18 dated April 12, 2018. The above relocation address is a permanent aggregate processing operation with established rolling total production limits. All equipment operating at this location must be in accordance with this site’s current AO DAQE-AN121210002-16, originally issued to Westroc Inc., dated March 7, 2016. The production of aggregate from this temporary project when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.b.A of this AO. " " * " / Þ Û Ù Û Ü DAQC-1282-23 Page 2 Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The operational days per site cannot be extended beyond the stipulated 365 consecutive day period. The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted equipment addition request DAQC-1101-23 Authorization Letter cc: Central Utah Public Health Department 4 * - - $ . — C v A ? A B @ A w ? G ˜ 11/21/23, 7:10 PM State of Utah Mail - RE: Mona Pit equipment added authorization https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1131149012396902844%7Cmsg-f:1783130569936959616…1/2 Susan Weisenberg <sweisenberg@utah.gov> RE: Mona Pit equipment added authorization 1 message Tyler Hodson <Tyler.Hodson@kilgorecompanies.com>Mon, Nov 20, 2023 at 5:16 PM To: Susan Weisenberg <sweisenberg@utah.gov> Cc: Lee Ware <Lee.Ware@kilgorecompanies.com>, Bryan Jorgensen <Bryan.Jorgensen@kilgorecompanies.com> Hi Susan, I am needing to make a modification to our Temporary Relocation permit for our Highland site in Utah County, Permit # C- 1101-23. We are adding some new equipment temporarily to the site. The information for the equipment are as follows: Equipment Type: VSI Crusher Make/Model: FT 2500 Aztek Serial #: 420094 Manufactured Date: 2022 Design Capacity: 300 tph Equipment Type: Track Feeder Make/Model: Site Boss Feeder Serial #: SB848T119 Manufactured Date: 2022 Design Capacity: 800 tph Startup time: 6:00 am Total Operation per 24 hour period: 12 hours Maximum hourly production rate: 180 tons Expected startup date: 11/22/2023 Expected completion date: 12/22/2023 All other information that was submitted for this relocation permit will remain the same. Please let me know if you need any other information from me. Thank you, Tyler Hodson Environmental Compliance Coordinator 11/21/23, 7:10 PM State of Utah Mail - RE: Mona Pit equipment added authorization https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1131149012396902844%7Cmsg-f:1783130569936959616…2/2 (385)228-3653 Tyler.hodson@kilgorecompanies.com From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Monday, October 16, 2023 9:14 AM To: Tyler Hodson <Tyler.Hodson@kilgorecompanies.com> Subject: Mona Pit equipment added authorization This message originated from outside your organization Susan Weisenberg, Environmental Scientist Office: 385-306-6512 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-1101-23 Site 12121 (B1) Tyler Hodson Kilgore Companies 7057 West 2100 South Salt Lake City, Utah 84128 Dear Mr. Hodson: Re: Kilgore Companies – Modification to Temporary Relocation/Operation – DAQC-760-23 – Additional Equipment – Juab County Your request dated October 10, 2023, to add a VSI crusher and a track mounted screen plant to the temporary project for Kilgore Construction's Pit, located 2.2 miles north of Mona, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has now been approved for operation for this temporary project: Remco VSI crusher Finlay two deck track mounted screen plant Astec CS3055 jaw crusher Caterpillar 300 kW generator The State of Utah has permitted portable aggregate equipment for operation for your company on the Approval Order (AO) DAQE-AN129310019-18 dated April 12, 2018. The above relocation address is a permanent aggregate processing operation with established rolling total production limits. All equipment operating at this location must be in accordance with this site’s current AO DAQE-AN121210002-16, originally issued to Westroc Inc., dated March 7, 2016. The production of aggregate from this temporary project when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.b.A of this AO. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The operational days per site cannot be extended beyond the stipulated 365 consecutive day period. 1 , " / Ú ß Û Ù Û Ü DAQC-1101-23 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted equipment addition request DAQC-760-23 Authorization Letter cc: Central Utah Public Health Department 4 * - - $ . — / @ B v A ? A B @ B w C A ˜ 10/10/23, 7:23 PM State of Utah Mail - RE: Relocation modification to Mona Pit approved https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-2745629855792654459%7Cmsg-f:177938396808022358…1/2 Susan Weisenberg <sweisenberg@utah.gov> RE: Relocation modification to Mona Pit approved 1 message Tyler Hodson <Tyler.Hodson@kilgorecompanies.com>Tue, Oct 10, 2023 at 9:46 AM To: Susan Weisenberg <sweisenberg@utah.gov> Cc: Lee Ware <Lee.Ware@kilgorecompanies.com>, Bryan Jorgensen <Bryan.Jorgensen@kilgorecompanies.com> Hi Susan, I am needing to make a modification to our Temporary Relocation permit for our Mona site in Juab County, Permit # C- 760-23. We are adding some new equipment temporarily to the site. The information for the equipment is as follows: Equipment Type: VSI Crusher Make/Model: REMCO 4060-ST Sandmax Serial #: TR-4060-0922-117 Manufactured Date: 2023 Design Capacity: 300 tph Equipment Type: Track Mount Screen Plant Make/Model: Finlay 969 2 Deck Serial #: TRX00696LDGP41320 Manufactured Date: 2023 Design Capacity: 100 tph Startup time: 4:00 am Total Operation per 24 hour period: 20 hours Maximum hourly production rate: 400 tons Expected startup date: 10/16/2023 Expected completion date: 11/13/2023 All other information that was submitted for this relocation permit will remain the same. Please let me know if you need any other information from me. Thank you, Tyler Hodson Environmental Compliance Coordinator (385)228-3653 Tyler.hodson@kilgorecompanies.com 10/10/23, 7:23 PM State of Utah Mail - RE: Relocation modification to Mona Pit approved https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r-2745629855792654459%7Cmsg-f:177938396808022358…2/2 From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Tuesday, July 25, 2023 6:02 PM To: Tyler Hodson <Tyler.Hodson@kilgorecompanies.com> Subject: Relocation modification to Mona Pit approved This message originated from outside your organization Susan Weisenberg, Environmental Scientist Office: 385-306-6512 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-760-23 Site 12121 (B1) Tyler Hodson Kilgore Companies 7057 West 2100 South Salt Lake City, Utah 84128 Dear Mr. Hodson: Re: Kilgore Companies – Modification to Temporary Relocation/Operation DAQC-614-23 – Crusher Replacement – Juab County Your request dated July 20, 2023, to replace an Eagle HSI crusher with an Astec jaw crusher, at the temporary project for Kilgore Construction's Pit, located 2.2 miles north of Mona, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has now been approved for operation for this temporary project: Astec CS3055 jaw crusher Caterpillar 300 kW generator The State of Utah has permitted portable aggregate equipment for operation for your company on the Approval Order (AO) DAQE-AN129310019-18 dated April 12, 2018. The above relocation address is a permanent aggregate processing operation with established rolling total production limits. All equipment operating at this location must be in accordance with this site’s current AO DAQE-AN121210002-16, originally issued to Westroc Inc., dated March 7, 2016. The production of aggregate from this temporary project when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.b.A of this AO. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The operational days per site cannot be extended beyond the stipulated 365 consecutive day period. DAQC-760-23 Page 2 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted replacement request Original electronic submission cc: Central Utah Public Health Department