Loading...
HomeMy WebLinkAboutDAQ-2024-004361 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-1374-23 Site 12085 (B1) Christian Boudreau Staker Parson Companies 89 West 13490 South, Suite 100 Draper, Utah 84020 Dear Mr. Boudreau: Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Utah County Your Notice of Intent dated December 26, 2023, to relocate portable aggregate equipment to the temporary project for Staker Parson Companies’ Lehi-Peck Pit, located at approximately 89 West 13490 South, 5.6 miles west of Lehi, Saratoga Springs, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Jaw crusher with track mounted C-13 diesel fired engine Two (2) screens with track mounted C-13 diesel fired engine Two (2) cone crushers with track mounted C-13 diesel fired engine Standalone C-13 diesel generator The State of Utah has permitted portable equipment for Staker Parson Companies on the Approval Order DAQE-AN115180014-15 dated July 6, 2015. The above relocation address is a permitted aggregate facility with established production limits and operation hours. All equipment operating at this site must be in accordance with the current AO for this site DAQE-AN120850002-23 dated July 20, 2023. The total production of aggregate from all temporary projects when combined with the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition II.B.1.a.A. The equipment daily operation hours shall remain within the established limits of II.B.1.c of this AO. + 2 / 6 â Û Ù Û Ý DAQC-1374-23 Page 2 Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. The operational days per site cannot be extended beyond the stipulated 365 consecutive day period. The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Utah County Health Department 4 * - - $ . — ) G v A ? A C ? H w B @ ˜ 12/27/23, 5:12 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1786367075310682986%7Cmsg-f:1786367075310682986&…1/2 Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Tue, Dec 26, 2023 at 10:39 AM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Staker Parson has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2023-12-26 10:39:40 MST IP: 166.199.149.30 ResponseID: R_7PqbTSImMt7elJ4 Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/GiS4W3KQepGvNR% 2EjuUYQ4iMDSeKPT9nGztKXeK%2EgedjTwRp7uFqXBmDMGKZRr1CJID7Kf55- AOH95Kp4MldgktZ4E4F2LKbdCnCTMRc0ylr3bADIdn2h0JX3fNamPEWCQXdjNcBYTsjxvS62h8cL4715I5rMQQb- CAteDrI7VRIU89a6gOW9Gnq8ReqwpAt9ScAb4Qjx8jvMFA7b-JBMUBrKsppjoWoJyNmJBnv3y4mihuj XofsdgtPwennRjLw1%2EqLWsegyHfr2AxbsIkSdn1GXq6GE%2EUcwYiTQ3l9jguWTmzOa6Yj0YBdxl ysOyPYO3sgVlHexmJJ0COEdHVFQRA Response Summary: Please fill out the information below: Contact Person: Christian Boudreau Company Name: Staker Parson Mailing Address: 89 W 13490 S City: Draper Zip: 84020 Phone Number: 3853186938 Email: christian.boudreau@stakerparson.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... C3AB99A062 Briefly give directions to the site and/or physical address: 12436 UT-73, Eagle Mountain, UT 84005 Proposed Relocation Information: Closest City Saratoga Springs County Utah UTM X Coordinates 12 0422385 E UTM Y Coordinates 4471061 N Approximate distance to the nearest house/business 1650 ft UTM X Coordinates to nearest house/business 12 0418670 E UTM Y Coordinates to nearest house/business 4470664 N Does this site currently have a permit with DAQ? 12/27/23, 5:12 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1786367075310682986%7Cmsg-f:1786367075310682986&…2/2 Yes If yes, what is the Permit (DAQ-AN) # ? DAQE-AN120850002-23 If yes, what is the Permit Holder's Name? Staker Parson Companies Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) DAQE-AN115180014-15 Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Jaw Crusher with track mounted C-13 engine Serial or ID# II.A.55 Design Capacity 700 TPH 2 Equipment Type Screen with track mounted C-13 engine Serial or ID# II.A.56 3 Equipment Type Screen with track mounted C-13 engine Serial or ID# II.A.58 4 Equipment Type Cone with track mounted C-13 engine Serial or ID# II.A.59 5 Equipment Type Cone with track mounted C-13 engine Serial or ID# II.A.57 6 Equipment Type Standalone generator C-13 engine Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2X0gkUz8nr98oWU Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 6 am Ending time of operation (am/pm) 10 pm Maximum hourly production rate for project 700 tph Expected startup date 12/29/2023 Expected completion date 12/29/2024 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_PU7yBTCRKmy5jNv Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_wZxEftK7gDPJnIl