HomeMy WebLinkAboutDAQ-2024-004361
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-1374-23
Site 12085 (B1)
Christian Boudreau
Staker Parson Companies
89 West 13490 South, Suite 100
Draper, Utah 84020
Dear Mr. Boudreau:
Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Utah
County
Your Notice of Intent dated December 26, 2023, to relocate portable aggregate equipment to the
temporary project for Staker Parson Companies’ Lehi-Peck Pit, located at approximately 89 West
13490 South, 5.6 miles west of Lehi, Saratoga Springs, Utah, was received by the Utah Division
of Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Jaw crusher with track mounted C-13 diesel fired engine
Two (2) screens with track mounted C-13 diesel fired engine
Two (2) cone crushers with track mounted C-13 diesel fired engine
Standalone C-13 diesel generator
The State of Utah has permitted portable equipment for Staker Parson Companies on the Approval
Order DAQE-AN115180014-15 dated July 6, 2015. The above relocation address is a permitted
aggregate facility with established production limits and operation hours. All equipment operating
at this site must be in accordance with the current AO for this site DAQE-AN120850002-23 dated
July 20, 2023. The total production of aggregate from all temporary projects when combined with
the permanent equipment’s production cannot exceed the 12-month rolling limits as per Condition
II.B.1.a.A. The equipment daily operation hours shall remain within the established limits of
II.B.1.c of this AO.
+ 2 / 6 â Û Ù Û Ý
DAQC-1374-23
Page 2
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the
operation of equipment at this temporary site may be for up to 180 working days in any calendar
year not to exceed 365 consecutive days, starting from the initial relocation date. The operational
days per site cannot be extended beyond the stipulated 365 consecutive day period.
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
cc: Utah County Health Department
4 * - - $ . — ) G v A ? A C ? H w B @ ˜
12/27/23, 5:12 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1786367075310682986%7Cmsg-f:1786367075310682986&…1/2
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Tue, Dec 26, 2023 at 10:39 AM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson has requested a Temporary Relocation. Please see the information below. Any attachments can
be access by clicking on the links.
Recipient Data:
Time Finished: 2023-12-26 10:39:40 MST
IP: 166.199.149.30
ResponseID: R_7PqbTSImMt7elJ4
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/GiS4W3KQepGvNR%
2EjuUYQ4iMDSeKPT9nGztKXeK%2EgedjTwRp7uFqXBmDMGKZRr1CJID7Kf55-
AOH95Kp4MldgktZ4E4F2LKbdCnCTMRc0ylr3bADIdn2h0JX3fNamPEWCQXdjNcBYTsjxvS62h8cL4715I5rMQQb-
CAteDrI7VRIU89a6gOW9Gnq8ReqwpAt9ScAb4Qjx8jvMFA7b-JBMUBrKsppjoWoJyNmJBnv3y4mihuj
XofsdgtPwennRjLw1%2EqLWsegyHfr2AxbsIkSdn1GXq6GE%2EUcwYiTQ3l9jguWTmzOa6Yj0YBdxl
ysOyPYO3sgVlHexmJJ0COEdHVFQRA
Response Summary:
Please fill out the information below:
Contact Person: Christian Boudreau
Company Name: Staker Parson
Mailing Address: 89 W 13490 S
City: Draper
Zip: 84020
Phone Number: 3853186938
Email: christian.boudreau@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
C3AB99A062
Briefly give directions to the site and/or physical address:
12436 UT-73, Eagle Mountain, UT 84005
Proposed Relocation Information:
Closest City Saratoga Springs
County Utah
UTM X Coordinates 12 0422385 E
UTM Y Coordinates 4471061 N
Approximate distance to the nearest house/business 1650 ft
UTM X Coordinates to nearest house/business 12 0418670 E
UTM Y Coordinates to nearest house/business 4470664 N
Does this site currently have a permit with DAQ?
12/27/23, 5:12 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1786367075310682986%7Cmsg-f:1786367075310682986&…2/2
Yes
If yes, what is the Permit (DAQ-AN) # ?
DAQE-AN120850002-23
If yes, what is the Permit Holder's Name?
Staker Parson Companies
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN115180014-15
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Jaw Crusher with track mounted C-13 engine
Serial or ID# II.A.55
Design Capacity 700 TPH
2
Equipment Type Screen with track mounted C-13 engine
Serial or ID# II.A.56
3
Equipment Type Screen with track mounted C-13 engine
Serial or ID# II.A.58
4
Equipment Type Cone with track mounted C-13 engine
Serial or ID# II.A.59
5
Equipment Type Cone with track mounted C-13 engine
Serial or ID# II.A.57
6
Equipment Type Standalone generator C-13 engine
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2X0gkUz8nr98oWU
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6 am
Ending time of operation (am/pm) 10 pm
Maximum hourly production rate for project 700 tph
Expected startup date 12/29/2023
Expected completion date 12/29/2024
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_PU7yBTCRKmy5jNv
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_wZxEftK7gDPJnIl