Loading...
HomeMy WebLinkAboutDAQ-2024-0080551 DAQC-463-24 Site ID 10569 (B4) MEMORANDUM TO: STACK TEST FILE – KILGORE COMPANIES, LLC – West Valley Pit #10 – Salt Lake County THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Kyle Greenberg, Environmental Scientist DATE: May 14, 2024 SUBJECT: Source: Dillman 500 TPH Portable Counter-flow Hot Mix Asphalt Plant Location: 6200 West 5400 South, Kearns, UT 84118 Contact: Lee Ware: 801-831-7402 Tester: Montrose Air Quality Services, LLC Site ID #: 10569 Permit/AO #: DAQE-AN105690012-19 dated April 30, 2019 Subject: Review of Pretest Protocol dated May 13, 2024 On May 13, 2024, Utah Division of Air Quality (DAQ) received a protocol for testing of Dillman 500 TPH Portable Counter-flow Hot Mix Asphalt Plant at West Valley Pit #10 in Salt Lake County. Testing will be performed on June 19, 2024, to determine compliance with the emission limits found in conditions II.B.1.b and II.B.2.c of Approval Order DAQE-AN105690012-19. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3 used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 5 used to determine particulate matter emissions: OK 6. RM 9 used to determine visible emissions opacity: OK 7. RM 202 used to determine condensable particulate matter: OK DEVIATIONS: None. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: The methods proposed in the pretest protocol are sufficient to determine particulate matter emissions and visible emissions from the Dillman 500 TPH Portable Counter-flow Hot Mix Asphalt Plant. It is recommended that the pretest protocol be determined as acceptable. ATTACHMENTS: Kilgore Company’s Test Notification Letter and Pretest Protocol Source Test Plan for 2024 PM, PM10, PM2.s, and VEOs Compliance Testing Dillman 500 TPH Portable Counter-flow Hot Mix Asphalt (HMA) Plant Kilgore Companies LLC West Valley Pit #10 HMA Plant Kearns, Utah 84118 Prepared For: Kilgore Companies LLC West Valley Pit #10 HMA Plant 6200 West 5400 South Kearns, Utah 84118 Prepared By: Montrose Air Quality Services, LLC 6823 South 3600 West Spanish Fork, Utah 84660 For Submission To: State of Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West Salt Lake City, Utah 84114-4820 Document Number: GP081AS-041316-PP-848 Proposed Test Date: June 19, 2024 Submittal Date: May 13, 2024 MO A I R QUA l IT Y SE RV ICES STAe .r.. l!#IO(Nlnl.rt~COIA!Q ~ TOASTH O..U ONL-Y Ctt1't1J;aHI Revi ew and Certification I certify that, to the best of my knowledge, the information contained i n this document is complete and accurate and conforms to the requirements of the Montrose Quality Management System and ASTM D7036-04. Signature: Date: May 13, 2024 N ame: Cheyney Guymon Title: Field Project Manager I have reviewed, technically and editorially, details and other appropriate written materials contained herein. I hereby certify that to the best of my knowledge the presented material is authentic and accurate and conforms to the requirements of the Montrose Quality Management System and ASTM D7036-04. Signature: Date: May 13, 2024 Name: Joby bunmire Title: QA/QC Specialist Facility Certification I have reviewed this document and agree that the information contained herein is true, accurate, and complete, to the best of my knowledge. Signature: Date: May 09, 2024 Name: Bryan Jorgensen Title: Environmental Manager ~ilgo-;'co,;pa ~;;s -~- ,bo24 PM , PM,o , PM 2s , and VEOs Compliance Source Test Plan , Wes t Valley Pit #10 , Di ll man 500 T PH HMA ~.1~ear'!s, ~a~ _ ~ 2 of 62 GP0SlAS-041316-PP-848 Table of Contents Section Page 1.0 Introduction ........................................................................................................ 5 1.1 Summary of Test Program ............................................................................. 5 1.2 Applicable Regulations and Emission Limits ...................................................... 6 1.3 Key Personnel .............................................................................................. 7 2.0 Plant and Sampling Location Descriptions ................................................................ 8 2.1 Process Description, Operation, and Control Equipment ..................................... 8 2.2 Flue Gas Sampling Location ........................................................................... 8 2.3 Operating Conditions and Process Data ........................................................... 9 2.4 Plant Safety ................................................................................................. 9 2.4.1 Safety Responsibilities .......................................................................... 9 2.4.2 Safety Program and Requirements ....................................................... 11 3.0 Sampling and Analytical Procedures ..................................................................... 11 3.1 Test Methods ............................................................................................. 11 3.1.1 EPA Method 1, Sample and Velocity Traverses for Stationary Sources ...... 12 3.1.2 EPA Method 2, Determination of Stack Gas Velocity and Volumetric Flow Rate (Type S Pitot Tube) ................................................. : .................. 12 3.1.3 EPA Method 3, Gas Analysis for the Determination of Dry Molecular Weight 12 3.1.4 EPA Method 4, Determination of Moisture Content in Stack Gas ............... 13 3.1.5 EPA Methods 5 and 202, Determination of Particulate Matter from Stationary Sources and Dry Impinger Method for Determining Condensable Particulate Emissions from Stationary Sources ...................................... 14 3.1.6 EPA Method 9, Visual Determination of the Opacity of Emissions ............. 15 4.0 Quality Assurance and Reporting .......................................................................... 16 4.1 QA Audits .................................................................................................. 16 4.2 Quality Control Procedures .......................................................................... 16 4.2.1 Equipment Inspection and Maintenance ................................................ 16 4.2.2 Audit Samples ................................................................................... 16 4.3 Data Analysis and Validation ........................................................................ 16 4.4 Sample Identification and Custody ................................................................ 17 4.5 Quality Statement ...................................................................................... 17 4.6 Reporting .................................................................................................. 17 4.6.1 Example Report Format ...................................................................... 18 4.6.2 Example Presentation of Test Results ................................................... 18 Kilgore Companies 2024 PM , PM ,o, PM 2 ,, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 3 of 58 GP0SlAS-041316-PP-848 List of Appendices A Supporting Information ...................................................................................... 20 A.1 Units and Abbreviations .............................................................................. 21 A.2 Accreditation Information/Certifications ........................................................ 22 A.3 AO DAQE-AN0105690012-19 ...................................................................... 31 "S" Field Work Safety Plan ....................................................................................... 44 List of Tables 1-1 Summary of Test Program and Proposed Schedule .................................................. 6 1-2 Reporting Units and Emission Limits ................................................. : .................... 6 1-3 Test Personnel and Responsibilities ....................................................................... 8 2-1 Sampling Location ............................................................................................... 9 4-1 Example Emissions Results -Dillman 500 Portable Counter-flow HMA Plant, Kearns, Utah ................................................................................................................. 19 List of Figures 3-1 EPA Methods 5/202 Sampling Train ..................................................................... 15 4-1 Typical Report Format ....................................................................................... 18 Kilgore Compan ies 2024 PM , PM ,o, PM 2.5, and VEOs Compliance Source Test Plan , West Valley P it #10 , Dillman 500 TPH HMA P lant, Kearns, Utah Page 4 of 58 GP0SlAS-041316-PP-848 1.0 Introduction 1.1 Summary of Test Program Kilgore Companies, LLC (Kilgore) contracted Montrose Air Quality Services, LLC (Montrose) to perform a particulate matter (PM), particulate matter less than 10 micron~ in aerodynamic diameter (PM10), particulate matter less than 2.5 microns in aerodynamic diameter (PM2.s) and visible emissions of opacity (VEOs) compliance emissions test program on the outlet of the Dillman 500 TPH Portable Counter-flow Hot Mix Asphalt (HMA) Plant at the West Valley Pit #10 HMA facility located in Kearns, Utah. The tests are conducted to determine compliance with the emission limits listed in Approval Order (AO) DAQE-AN105690012-19, issued by the State of Utah Department of Environmental Quality, Division of Air Quality. A copy of the AO is attached as Appendix A- 3. The specific objectives are to: • Measure emissions of PM/PM10/PM2.s at the outlet of the Dillman 500 TPH Portable Counter-flow HMA Plant, Natural Gas Drum Dryer, controlled by a baghouse • Determine the opacity of emissions (VEOs) at the outlet of the Dillman 500 TPH Portable Counter-flow HMA Plant, Natural Gas Drum Dryer, controlled by a baghouse • Conduct the test program with a focus on safety Montrose will provide the test personnel and the necessary equipment to measure emissions as outlined in this test plan. Facility personnel will provide the process and production data to be included in the final report. A summary of the test program and proposed schedule is presented in Table 1-1. Ki lgore Com panies 2024 PM, PM ,o, PM 2 s, and VE Os Comp liance Sou rce Tes t P lan, Wes t Valley Pit #10 , Dil lman 500 TPH HMA Plan t, Kearns , Utah Page 5 of 58 GP0BlAS-041316-PP-848 Table 1-1 Summary of Test Program and Proposed Schedule Proposed Unit ID/ TatDate(s) soureeNatne Adivfty /~rlirrletel'$ Velocity/Volumetric EPA 1, 2, 3A, 3 ~60 Flow Rate 4 Dillman 500 TPH Portable 02, CO2 EPA3A 3 ~60 June 19, 2024 Counter-flow ~60 Moisture EPA4 3 HMA PM/PM 10/PM2.s EPA 5/202 3 ~60 Opacity EPA 9 3 ~6 To simplify this test plan, a list of Units and Abbreviations is included in Appendix A. Throughout this test plan, chemical nomenclature, acronyms, and reporting units are not defined. Please refer to the list for specific details. 1.2 Applicable Regulations and Emission Limits The results from this test program are presented in units consistent with those listed in the applicable regulations or requirements. The reporting units and emission limits are presented in Table 1-2. Table 1-2 ' Reporting Units and Emission Limits Unit ID/ SourceName Parameter Reporting Units i:m lb/hr virgin material 5.52 gr/dscf virgin material 0.024 AN105690012-Dillman 500 PM/PM 10/PM2.s .__ ________ --+--------< TPH Portable Counter-flow HMA Opacity Kilgo re Companies lb/hr RAP material gr/dscf RAP material % 6.44 0.028 20 19, §I1.B.2.c. AN105690012-19, §I1.B.2.c.1. 2024 PM , PM 1o, PM2 5, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Pla nt, Kea rns , Utah Page 6 of 58 GP081AS-041316-PP-848 1.3 Key Personnel A list of project participants is i ncluded below : Facility Information Source Location: Kilgore Companies West Valley Pit #10 6200 West 5400 South Project Contact: Role: Company: Telephone: Email: Agency Information Kearns, Utah 84118 Bryan Jorgensen Environmental Manager Kilgore Companies 801-250-0132 Bryan.Jorgensen@kilgorecompanies .com Regulatory Agency: State of Utah DEQ, Division of Air Quality Agency Contact: Chad Gilgen, Minor Source Compliance Telephone: 385-306-6500 Email: cgilgen@utah.gov Testing Company Information Testing Firm: Montrose Air Quality Services, LLC Contact: Beckie Hawkins Title: District Manager Telephone: 801-372-7049 Email: BeHawkins@montrose-env.com Kilgore Compan ies Austin Tramell Field Project Manager 801-645-2353 AuTramell@montrose-env.com 2024 PM, PM ,o, PM 2s, and VEOs Compliance Source Test Plan , West Va ll ey Pit #10 , Di ll man 500 TPH HMA Plant , Keams , Utah Page 7 of 58 GP0BlAS-041316-PP-848 Tab le 1-3 det a il s t he roles and r espons i b il ities of the test tea m. Table 1-3 Test Personnel and Responsibilities Role District Manager Field Project Manager Field Technician Primary Assignment- Coordinate Project Operate mobile lab Execute stack platform responsibilities Post-test follow up Facility interface, test crew coordinatio n Preparation, support PM 2.0 Plant and Sampling Location Descriptions 2.1 Process Description, Operation, and Control Equipment Kilgore currently operates an aggregate processing and hot mix asphalt (HMA) plant in Kearns, Salt Lake County. To produce HMA, raw materials such as sand, coarse aggregate, lime, fly ash, asphalt oil, and/or recycled asphalt pavement (RAP) is brought on site and stored. Sand, coarse aggregate, and RAP are stockpiled; lime and fly ash are pneumatically loaded into silos; and asphalt oil is unloaded into storage tanks. The stockpiled aggregate materials are sized and sorted via crushers, conveyors and screens. The aggregate materials are then dried and mixed with lime and asphalt in a heated mixer to produce HMA. The finished HMA product is stored in silos on site and unloaded into trucks for sale and distribution. This facility is powered via line power, with the exception of the natural gas-fired, hot mix asphalt counter-flow drum burner. Particulate emissions are controlled with a baghouse. 2.2 Flue Gas Sampling Location Actual stack measurements, number of traverse points, and location of traverse points will be evaluated in the field as part of the test program. Table 2-1 presents the anticipated stack measurements and traverse points for the sampling locations listed. Kilgore Companies 2024 PM, PM10, PM 2s, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dil lman 500 TPH HMA Plant, Keams, Utah Page 8 of 58 GP0BlAS-041316-PP-848 Table 2-1 Sampling Location samplfng LOcati6n Dillman 500 Stack Inside Diameter (ih.) TPH Portable 66.0 in . X Counter-flow 66.0 in HMA outlet Distance from Nearest Disflirtianc:e, DOwnstream EPA u -S" (in /clia.') ~" (1~1, 212.0/3.21 39.0/0.59 Isokinetic : 25 (5/port) Flow: 25 (5/port) Gaseous: Single point or 3-point short line The sample location is verified in the field to conform to EPA Method 1. Acceptable cyclonic flow conditions are confirmed prior to testing using EPA Method 1, Section 11.4. 2.3 Operating Conditions and Process Data Emission tests are performed while the source and air pollution control devices are operating at the conditions required by the permit. Plant personnel are responsible for establishing the test conditions and collecting all applicable unit-operating data. Data collected includes the following parameters: • Throughput, tons per hour (ton/hr or tph) • Static pressure drop across the HMA baghouse (inches of water column or in. we) • Asphalt mix temperature (°F) 2.4 Plant Safety Montrose will comply with all safety requirements at the facility. The facility Client Sponsor, or designated point of contact, is responsible for ensuring routine compliance with plant entry, health, and safety requirements. The Client Sponsor has the authority,, to impose or waive facility restrictions. The Montrose test team leader has the authority to negotiate any deviations from the facility restrictions with the Client Sponsor. Any deviations must be documented. 2.4.1 Safety Responsibilities Planning • Montrose must complete a fie ld review with the Client Sponsor prior to the project date. The purpose of the review is to develop a scope of work that identifies the conditions, equipment, methods, and physical locations that will be utilized along with any policies or procedures that will affect our work. • We must reach an agreement on the proper use of client emergency services and ensure that proper response personnel are available, as needed. Kilgore Companies 2024 PM, PM 10, PM 2s , and VEOs Compl iance Source Test P lan, West Va ll ey P it #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 9 of 58 GP0SlAS-041316-PP-848 • The potential for chemical exposure and actions to be taken in case of exposure must be communicated to Montrose. This information must include expected concentrations of the chemicals and the equipment used to identify the substances.2 • Montrose will provide a list of equipment being brought to the site, if required by the client. Project Day • Montrose personnel will arrive with the appropriate training and credentials for the activities they will be performing and the equipment that they will operate. • Our team will meet daily to review the Project Scope, Job Hazard Assessment, and Work Permits. The Client Sponsor and Operations Team are invited to participate. • Montrose will provide equipment that can interface with the client utilities previously identified in the planning phase and only work with equipment that our client has made ready and prepared for connection. • We will follow client direction regarding driving safety, safe work permitting, staging of equipment, and other crafts or work in the area. • As per 40 CFR Part 60 Subpart A, Section 60.8, the facility must provide the following provisions at each sample location: o Sampling ports, which meet EPA minimum requirements for testing. The caps should be removed or be hand-tight. o Safe sampling platforms. o Safe access to the platforms and test ports, including any scaffolding or man lifts. o Sufficient utilities to perform all necessary testing. • Montrose will use the client communication system, as directed, in case of plant or project emergency. • Any adverse conditions, unplanned shutdowns or other deviations to the agreed scope and project plan must be reviewed with the Client Sponsor prior to continuing work. This will include any safe work permit and hazard assessment updates. Completion • Mo nt rose personnel will report any process concerns, incidents or near misses to the Client Sponsor prior to leaving the site. • Montrose will clean up our work area to the same condition as it was prior to our arrival. • We will ensure that all utilities, connection points or equipment have been returned to the pre-project condition or as stated in the safe work permit. In Kilgore Companies 2024 PM , PM 10, PM 2 s, and VEOs Compliance Source Test Plan, West Valley Pit #10 , DIiiman 500 TPH HMA Plant, Kearns , Utah Page 10 of 58 GP 0SlAS-041316-PP-848 addition, we will walk out the job completion with Operations and the Client Sponsor if required by the facility. 2.4.2 Safety Program and Requirements Montrose has a comprehensive health and safety program that satisfies State and Federa l OSHA requirements. The program includes an Illness and Injury Prevention Program, site- specific safety meetings, and training in safety awareness and procedures. The basic elements include: • All regulatory required policies/procedures and training for OSHA, EPA and FMCSA • Medical monitoring, as necessary • Use of Personal Protective Equipment (PPE) and chemical detection equipment • Hazard communication • Pre-test and daily toolbox meetings • Continued evaluation of work and potential hazards • Near-miss and incident reporting procedures as required by Montrose and the Client Montrose will provide standard PPE to employees. The PPE will include but is not limited to; hard hats, safety shoes, glasses with side shields or goggles, hearing protection, hand protections, and fall protection. In addition, our trailers are equipped with four gas detectors to ensure that workspace has no unexpected equipment leaks or other ambient hazards. The detailed Site Safety Plan for this project is attached to this test plan in Appendix "S". 3.0 Sampling and Analytical Procedures 3.1 Test Methods The test methods for this test program have been presented in Table 1-1. Additional information regarding specific applications or modifications to standard procedures is presented below. Kilgore Companies 2024 PM, PM 10, PM 2s, and VEOs Compliance Source Test Plan, West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 11 of 58 GP0SlAS-041316-PP-848 3 .1 .1 EPA Method 1 , Sample and Velocity Traverses for Stationary Sources EPA Method 1 is used to assure that representative measurements of volumetric flow rate are obtained by dividing the cross-section of the stack or duct into equal areas, and then locating a traverse point within each of the equal areas. Acceptable sample locations must be located at least two stack or duct equivalent diameters downstream from a flow disturbance and one-half equivalent diameter upstream from a flow disturbance. 3.1.2 EPA Method 2, Determination of Stack Gas Velocity and Volumetric Flow Rate (Type S Pitot Tube) EPA Method 2 is used to measure the gas velocity using an 5-type pitot tube connected to a pressure measurement device, and to measure the gas temperature using a calibrated thermocouple connected to a thermocouple indicator. Typically, Type S (Stausscheibe) pitot tubes conforming to the geometric specifications in the test method are used, along with an inclined manometer. The measurements are made at traverse points specified by EPA Method 1. The molecular weight of the gas stream is determined from independent measurements of 02, CO2, and moisture. The stack gas volumetric flow rate is calculated using the measured average velocity head, the area of the duct at the measurement plane, the measured average temperature, the measured duct static pressure, the molecular weight of the gas stream, and the measured moisture. Pertinent information regarding the performance of the method is presented below: • 5-type pitot tube coefficient is 0.84. • Shortridge multimeter may be used to measure velocity. The typical sampling system is detailed as part of the EPA Method 5/202 sampling train in Figure 3-1. 3.1 .3 EPA Method 3, Gas Analysis for the Determination of Dry Molecular Weight EPA Method 3 is used to calculate the dry molecular weight of the stack gas by measuring the percent 02 and CO2 in the gas stream. A gas sample is extracted from the stack by one of the following methods: (1) single-point, grab sampling; (2) single-point, integrated sampling; or (3) multi-point, integrated sampling. The gas sample is analyzed for percent CO2 and percent 02 using either an Orsat or a Fyrite analyzer. Kilgore Companies 2024 PM, PM ,o, PM2 ,, and VE Os Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 12 of 58 GP0SlAS-041316-PP-848 Pertinent information regarding the performance of the method is presented below : • Method Options: o A Fyrite-type combustion gas analyzer is used to measure the analyte concentrations o An Orsat analyzer is used to measure the analyte concentrations o Single-point grab sampling is performed o Single-point integrated sampling is performed o Less than 28 L (1.0 ft3 ) is collected o Multi-point integrated sampling is performed • Target and/or Minimum Required Sample Duration: 60 minutes • Target and/or Minimum Recommended Sample Volume: 1.0 ft3 • Target Analytes: 02 and CO2 3.1.4 EPA Method 4, Determination of Moisture Content in Stack Gas EPA Method 4 is a manual method used to measure the moisture content of gas streams. Gas is sampled at a constant sampling rate through a probe and impinger train. Moistur_e is removed using a series of pre-weighed impingers containing methodology-specific liquids and silica gel immersed in an ice water bath. The impingers are weighed after each run to determine the percent moisture. Pertinent information regarding the performance of the method is presented below: • Condensed water is measured gravimetrically • Moisture sampling is performed as part of the EPA Method 5/202 sample trains • Since it is theoretically impossible for measured moisture to be higher than psychrometric moisture, the psychrometric moisture is also calculated, and the lower moisture value is used in the calculations • Target Sample Duration: 60 minutes • Minimum Required Sample Volume: 21 scf As the EPA Method 5/202 sampling train will be used to collect moisture, sampling will not be constant; rather, sampling will be isokinetic as per the criteria set forth in EPA Methods 5/202. The typical sampling system is detailed as part of the EPA Method 5/202 sampling train in Figure 3-1. Kilgore Companies 2024 PM, PM IO, PM2,, and VEOs Compliance Sou rce Test Plan, West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 13 of 58 GPOS lAS-041316-PP-848 3.1.5 EPA Methods 5 and 202, Determination of Particulate Matter from Stationary Sources and Dry Impinger Method for Determining Condensable Particulate Emissions from Stationary Sources EPA Methods 5 and 202 are m anua l, isokinetic methods used t o measure FPM and CPM emissions. The methods are performed in conjunction with EPA Methods 1, 2, 3, and 4. The stack gas is sampled through a nozzle, probe, heated filter, unheated CPM filter, condenser, and impinger train. FPM is collected from the probe and heater filter. CPM is collected from the unheated CPM filter and the impinger train. The samples are analyzed gravimetrically. The sum of FPM and CPM represents TPM. The FPM, CPM, and TPM results are reported in emission concentration and emission rate units. Pertinent information regarding the performance of the method is presented below: • Glass sample nozzles and probe liners are used • Condensed water is measured gravimetrically • As an alternative to baking glassware, a field train proof blank sample may be recovered • If no water is collected before the CPM filter, the post-test nitrogen purge will be omitted • The post-test nitrogen purge may be performed using the sampling system meter box and vacuum pump • The post-test nitrogen purge may be performed by passing nitrogen through the train under pressure • Method 5/202 total PM results will be used to demonstrate compliance with the individual PM, PM10 and PM2.s emission limits • Target Sample Duration: 60 minutes • Minimum Required Sample Volume: 31.8 dscf (0.90 dscm) • Method Options: o EPA Approved Alternative Method 009 (ALT-009) is used as an alternative to a two-point post-test meter box calibration. This procedure uses a calculation to check the meter box calibration factor rather than requiring a physical post-test meter box calibration using a standard dry gas meter. The average calculated meter box percent(%) error must result in a percent error within ±5% of Y. If not, a full calibration is performed, and the results are presented using the Y factor that yields the highest emissions. The typical sampling system is detailed in Figure 3-1. K ilgore Companies 2024 PM . PM 10, PM2.s, and VEOs Comp li ance Source Test Plan, Wes t Valley Pit #10 , Dill man 500 TPH HMA P lant, Kearns, Utah Page 14 of 58 GP081AS-041316-PP-848 Figure 3-1 EPA Methods 5/202 Sampling Train Tl-ffiVOCClR.E ! f-&TB:)FRCcE l\l:22lE----<> TYFE"S' RTOf ~ ------0 ~ f-EATB:) PftA 1H3'MXO..R..E RLlml-0.ilR 11-ERYtXXl.R.E 1COn1,;,o (modied /"' ti~ 2D-:a::Q;i rnYGIIS !VETER BY-PPSSVAL 'vE 911caG'1 (mrilfie:;t/roti~ !fin,-VPO...UMGAUGE J 3.1.6 EPA Method 9, Visual Determination of the Opacity of Emissions VPO...UM <!--LINE />OIIPTCR VKl.JLM <1--LINE EPA Method 9 is used to observe the visual opacity of emissions (opacity). The observer stands at a distance sufficient to provide a clear view of the emissions with the sun oriented in the 140° sector to their back. The line of vision is perpendicular to the plume direction and does not include more than one plume diameter. Observations are recorded at 15- second intervals and are made to the nearest 5% opacity. The qualified obsE;rver is certified according to the requirements of EPA Method 9, section 3.1. • Observations are attempted to be made during each concurrent particulate run, unless weather conditions are unfavorable. • Total Observation Period Duration: 6 minutes (40 CFR Part 60, Subpart I) Kilgore Companies 2024 PM , PM 10, PM 2s, and VEOs Compliance Sou rce Test P lan, W est Valley Pit #10 , Dillman 500 TPH HMA Plant , Kearns , Utah Page 15 of 58 GP0BlAS-041316-PP-848 4.0 Quality Assurance and Reporting 4.1 QA Audits Montrose has instituted a rigorous QA/QC program for its a i r quality testi ng . 'Quality assurance audits are performed as part of the test program to ensure that the results are calculated using the highest quality data available. This program ensures that the emissions data we report are as accurate as possible. The procedures included in the cited reference methods are followed during preparation, sampling, calibration, and analysis. Montrose is responsible for preparation, calibration, and cleaning of the sampling apparatus. Montrose will also perform the sampling, sample recovery, storage, and shipping. Approved contract laboratories may perform some of the preparation and sample analyses, as needed. 4.2 Quality Control Procedures Montrose calibrates and maintains equipment as required by the methods performed and applicable regulatory guidance. Montrose follows internal procedures to prevent the use of malfunctioning or inoperable equipment in test programs. All equipment is operated by trained personnel. Any incidence of nonconforming work encountered during testing is reported and addressed through the corrective action system. 4.2.1 Equipment Inspection and Maintenance Each piece of field equipment that requires calibration is assigned a unique identification number to allow tracking of its calibration history. All field equipment is visually inspected prior to testing and includes pre-test calibration checks as required by the test method or regulatory agency. 4.2.2 Audit Samples When required by the test method and available, Montrose obtains EPA TNI SSAS audit samples from an accredited provider for analysis along with the samples. Currently, the SSAS program has been suspended pending the availability of a second accredited audit sample provider. If the program is reinstated, the audit samples will be order ed. If required as part of the test program, the audit samples are stored, shipped, and analyzed along with the emissions samples collected during the test program. The audit sample results are reported along with the emissions sample results. 4.3 Data Analysis and Validation Montrose converts the raw field, laboratory, and process data to reporting units consistent with the permit or subpart. Calculations are made using proprietary computer spreadsheets or data acquisition systems. One run of each test method is also verified using a separate example calculation. The example calculations are checked against the spreadsheet results and are included in the final report. The "Standard Conditions" for this project are 29.92 inches of mercury and 68 °F. Kilgore Companies 2024 PM , PM ,o, PM 2 6, and VEOs Compliance Source Test Plan, West Valley Pit #10 , Di llman 500 TPH HMA Plant, Kearns , Utah Page 16 of 58 GP0SlAS-041316-PP-848 4.4 Sample Identification and Custody The on-site Field Project Manager will assume or assign the role of sample and data custodian until relinquishing custody. The sample custodian will follow proper custody procedures before departing from the test site including: • Assign the unique sample identification number to each sample. • Attach sample labels and integrity seals to all samples. • Complete COC form(s), ensuring that the sample identification numbers on the samples match the sample identification numbers on the COC. • Pack and store samples in accordance with the test method requirements in appropriate transport containers for protection from breakage, contamination, or loss. • Keep samples in a secure locked area if not in the direct presence of Montrose staff. The sample custodian will follow proper custody procedures upon arriving at the Montrose office including: • Remove samples and COC documents from vehicles and check into designated secure sample holding areas. • Store samples requiring additional measures such as refrigeration or dry ice appropriately. 4.5 Quality Statement Montrose is qualified to conduct this test program and has established a quality management system that led to accreditation with ASTM Standard D7036-04 (Standard Practice for Competence of Air Emission Testing Bodies). Montrose participates in annual functional assessments for conformance with D7036-04 which are conducted by the American Association for Laboratory Accreditation (A2LA). All testing performed by Montrose is supervised on site by at least one Qualified Individual (QI) as defined in D7036-04 Section 8.3.2. Data quality objectives for estimating measurement uncertainty within the documented limits in the test methods are met by using approved test protocols for each project as defined in D7036-04 Sections 7.2.1 and 12.10. Additional quality assurance information is included in the appendices. The content of this test plan is modeled after the EPA Emission Measurement Center Guideline Document (GD-042). 4.6 Reporting Montrose will prepare a final report to present the test data, calculations/equations, descriptions, and results. Prior to release by Montrose, each report is reviewed and certified by the project manager and their supervisor, or a peer. Source test reports will be submitted to the facility or appropriate regulatory agency (upon customer approval) within 30 days of the completion of the field work. The report will include a series of appendices to Kilgore Companies 2024 PM, PM ,o , PM 2 s, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 17 of 58 GP081AS-041316-PP-848 present cop ies of the i ntermediate calculations and example calcu lations, r aw field dat a, laboratory analysis data, process data, and equipment calibration data. 4.6.1 Example Report Format T he report is divided into various sections describing the different aspects of the source testing program. Figure 4-1 presents a typical Table of Contents for the final report. Figure 4-1 Typical Report Format Cover Page Certification of Report Table of Contents Section 1.0 Introduction 2.0 Plant and Sampling Location Descriptions 3.0 Sampling and Analytical Procedures 4.0 Test Discussion and Results 5.0 Internal QA/QC Activities Appendices A Field Data and Calculations B Facility Process Data C Laboratory Analysis Data D Quality Assurance/Quality Control E Regulatory Information 4.6.2 Example Presentation of Test Results Table 4-1 p r esents the typical tabu la r fo r mat that is used to summarize the results in the final source test report. Separate tables will outline the results for each target analyte and compare them to their respective emissions limits. Kilgore Companies 2024 PM , PM,o , PM, s, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns, Utah Page 18 of 58 GP081AS-041316-PP-848 Table 4-1 Example Emissions Results - Dillman 500 Portable Counter-flow HMA Plant, Kearns, Utah Parameter/Units R1811 Run 2 - i~ Date xx xx xx xx Time xx xx xx xx Process Data . Throughput, ton/hr xx xx xx xx Baghouse Static Pressure, in. wc xx xx xx xx Asphalt Mix Temperature, 0 f xx xx xx xx Sampling & Flue Gas Parameters 02, % volume dry xx xx xx xx CO2,% volume dry xx xx xx xx flue gas temperature, 0 f xx xx xx xx moisture content, % volume xx xx xx xx volumetric flow rate, dscfm xx xx xx xx PM/PM10/PM2.s Results (Virgin or RAP) Concentration, gr/dscf xx xx xx xx Emission rate, lb/hr xx xx xx xx Opacity of Emissions Results Opacity,% xx xx xx xx Kilgore Companies 2024 PM, PM 10, PM 2 s, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns , Utah Page 19 of 58 GP0BlAS-041316-PP-848 Kilgore Companies Appendix A Supporting Information 2024 PM , PMw, PM 25, and VEOs Compliance Source Test Plan, West Valley Pit #10 , Dillman 500 TPH HMA Plant, Kearns. Utah Page 20 of 58 GP0SlAS-041316-PP-848 KIigore Companies Appendix A.1 Units and Abbreviations 2 024 PM , PM ,o , PMu, and VEOs Complian ce Sou rce Test P lan , West Va ll ey Pit #10 , Di ll man 500 TPH HMA Plant, Kearns , Utah Page 21 of 58 GP081AS-041316-PP-848 @X%02 ICCJ ldl oc OF OR "H20 13.6 .t.H .t.P 8 µg Pa Pw acfm An As Btu Bws Ca CAvg Cm, cf or ft3 cfm CGas CM cm or m3 CMA Co Cµ c. cs Cs Cv D def dcm Dn o. dscf dscfm dscm Fd fpm fps ft tt2 g gal gr UNITS OF MEASUREMENT corrected to X% oxygen (corrected for dilution air) absolute value of the confidence coefficient absolute value of the mean differences degrees Celsius degrees Fahrenheit degrees Rankine inches of water column specific gravity of mercury pressure drop across orifice meter, inches H20 velocity head of stack gas, inches H20 total sampling time, minutes microgram density of acetone, mg/ml density of water, 0.9982 g/ml or 0.002201 lb/ml actual cubic feet of gas per minute at stack conditions cross-sectional area of nozzle, tt2 cross-sectional area of stack, square feet (fl2) British thermal unit proportion by volume of water vapor in gas stream particulate matter concentration in stack gas, gr/acf average unadjusted gas concentration, ppmv measured concentration of calibration gas, ppmv cubic feet cubic feet per minute average gas concentration adjusted for bias, ppmv average of initial and final system bias check responses from upscale calibration gas, ppmv cubic meters actual concentration of the upscale calibration gas, ppmv average of initial and final system bias check responses from low-level calibration gas, ppmv pitot tube coefficient particulate matter concentration in stack gas, gr/dscf calibration span, % or ppmv measured concentration of calibration gas, ppmv manufactured certified concentration of calibration gas, ppmv drift assessment, % of span dry cubic feet dry cubic meters diameter of nozzle, inches diameter of stack, inches dry standard cubic feet dry standard cubic feet per minute dry standard cubic meters F-factor, dscf/MMBtu of heat input feet per minute feet per second feet square feet gram gallons grains (7000 grains per pound) Page 22 of 58 GP0SlAS-041316-PP-848 gr/dscf hr I in k K K3 Ki kg KP kwscfh I lb/hr lb/MMBtu 1pm m M m3 ma Md meq mg Mg min ml ormL mm MM MMBtu/hr mn mol mol. wt. or MW Ms MW n ng nm Nm3 Pbar pg Pg Pm ppb ppbv ppbvd ppm ppmv ppmvd ppmvw Ps psi psia psig UNITS OF MEASUREMENT grains per dry standard cubic feet hour percent of isokinetic sampling inch kilo or thousand (metric units, multiply by 103) kelvin (temperature) conversion factor 0.0154 gr/mg conversion factor 0.002668 ((in. Hg}(ft3 })/((ml)(0 R)) kilogram pitot tube constant (85.49 ft/sec) thousand wet standard cubic feet per hour liters pounds per hour pounds per million Btu liters per minute meter or milli thousand (English units) or mega (million, metric units) cubic meters mass of residue of acetone after evaporation, mg molecular weight of stack gas; dry basis, lb/lb-mole milliequivalent milligram megagram (106 grams) minute milliliter millimeter million (English units) million Btu per hour total amount of particulate matter collected, mg mole molecular weight molecular weight of stack gas; wet basis, lb/lb-mole molecular weight or megawatt number of data points nanogram nanometer normal cubic meter barometric pressure, inches Hg picogram stack static pressure, inches H2 O barometric pressure of dry gas meter, inches Hg parts per billion parts per billion, by volume parts per billion by volume, dry basis parts per million parts per million, by volume parts per million by volume, dry basis parts per million by volume, wet basis absolute stack gas pressure, inches Hg pounds per square inch pounds per square inch absolute pounds per square inch gauge Page 23 of 58 GP0SlAS-041316-PP-848 Pstd Oa a. Ostd R SBfinal S81 scf scfh scfm scm scmh sec sf, sq. ft., or tt2 std t T o.e1s Ta Tm ton or t tph or tons/hr tpy or tons/yr Ts Tstd V Va Yaw V,c Vm Vm{std) Yma Vn v. Ywc{std) Vwi{std) Ywsg(std) w Wa W;mp Wsg y UNITS OF MEASUREMENT standard absolute pressure, 29.92 inches Hg volumetric flow rate, actual conditions, acfm volumetric flow rate, standard conditions, scfm volumetric flow rate, dry standard conditions, dscfm ideal gas constant 21.85 ((in. Hg) (ft3l)/((0 R) (lbmole)) post-run system bias check, % of span pre-run system bias check, % of span standard cubic feet standard cubic feet per hour standard cubic feet per minute standard cubic meters standard cubic meters per hour second square feet standard metric ton (1000 kg) t-value absolute average ambient temperature, 0 R (+459.67 for English) absolute average dry gas meter temperature, 0 R (+459.67 for English} ton = 2000 pounds tons per hour tons per year absolute average stack gas meter temperature, 0 R (+459.67 for English) absolute temperature at standard conditions volt volume of acetone blank, ml volume of acetone used in wash, ml total volume H20 collected in impingers and silica gel, grams volume of gas sampled through dry gas meter, ft 3 volume of gas measured by the dry gas meter, corrected to standard conditions, dscf stack gas volume sampled, acf volume collected at stack conditions through nozzle, acf average stack gas velocity, feet per second volume of water vapor condensed, corrected to standard conditions, scf volume of water vapor in gas sampled from impingers, scf volume of water vapor in gas sampled from silica gel, scf watt weight of residue in acetone wash, mg total weight of impingers, grams total weight of silica gel, grams dry gas meter calibration factor, dimensionless Page 24 of 58 GP0SlAS-041316-PP-848 AAS ACDP ACE AD ADL AETB AS ASTM BACT BDL BHP BIF BLS cc CD CE CEM CEMS GERMS CET CFR CGA CHNOS CNCG co coc COMS CPM CPMS CT CTM CTO CVAAS De DE Dioxins DLL DNCG ECD EIT ELCD EMPC EPA EPRI ES ESP EU FCCU FGD Fl FIA FID FPD FPM ABBREVIATIONS atomic absorption spectroscopy air contaminant discharge permit analyzer calibration error, percent of span absolute difference above detection limit Air Emissions Testing Body applicable standard {emission limit) American Society For Testing And Materials best achievable control technology below detection limit brake horsepower boiler and industrial furnace black liquor solids confidence coefficient calibration drift calibration error continuous emissions monitor continuous emissions monitoring system continuous emissions rate monitoring system calibration error test Code of Federal Regulations cylinder gas audit elemental analysis for determination of C, H, N, 0, and S content in fuels concentrated non-condensable gas catalytic oxidizer chain of custody continuous opacity monitoring system condensable particulate matter continuous parameter monitoring system combustion turbine conditional test method catalytic thermal oxidizer cold vapor atomic absorption spectroscopy equivalent diameter destruction efficiency polychlorinated dibenzo-p-dioxins {PCDDs) detection level limited dilute non-condensable gas electron capture detector Engineer In Training electrolytic conductivity detector {hall detector) estimated maximum possible concentration US Environmental Protection Agency Electric Power Research Institute emission standard {applicable limit) electrostatic precipitator emission unit fluid catalytic cracking unit flue gas desulfurization flame ionization flame ionization analyzer flame ionization detector flame photometric detector filterable particulate matter Page 25 of 58 GP0SlAS-041316-PP-848 FTIR FTPB FTRB Furans GC GC/MS GFMS GFC GHG HAP HC HHV HPLC HRGC/HRMS HRSG IC ICAP ICPCR ICP-MS IR ISO kW LFG LHV LPG MACT MDI MDL MNOC MRL MS NA NCASI NCG ND NDIR NESHAP NG NIOSH NIST NMC NMOC NMVOC NPD NSPS OSHA PAH PCB PCWP PE PFAS Pl PIO PM ABBREVIATIONS Fourier-transform infrared spectroscopy field train proof blank field train recovery blank polychlorinated dibenzofurans (PCDFs) gas chromatography gas chromatography/mass spectroscopy graphite furnace atomic absorption spectroscopy gas filter correlation greenhouse gas hazardous air pollutant hydrocarbons higher heating value high performance liquid chromatography high-resolution gas chromatography/high-resolution mass spectroscopy heat recovery steam generator ion chromatography inductively-coupled argon plasma emission spectroscopy ion chromatography with a post-column reactor inductively coupled plasma-mass spectroscopy infrared radiation International Standards Organization kilowatts landfill gas lower heating value liquified petroleum gas maximum achievable control technology methylene diphenyl diisocyanate method detection limit maximum normal operating conditions method reporting limit mass spectrometry not applicable or not available National Council For Air And Steam Improvement non-condensable gases not detected non-dispersive infrared National Emissions Standards For Hazardous Air Pollutants natural gas National Institute For Occupational Safety And Health National Institute Of Standards And Technology non-methane cutter non-methane organic compounds non-methane volatile organic compounds nitrogen phosphorus detector New Source Performance Standards Occupational Safety And Health Administration polycyclic aromatic hydrocarbons polychlorinated biphenyl compounds plywood and composite wood products Professional Engineer per-and polyfluoroalkyl substances (PFAS) photoionization photoionization detector particulate matter Page 26 of 58 GP0SlAS-041316-PP-848 PM 10 PM2.s POM PS PSD PSEL PST PTE PTM QA/QC QI QSTI RA RAA RACT RATA RCTO RICE RM RTO SAM SCD SCR SD Semi-VOST SRM TAP TBD TCA TCD TGNENMOC TGNMOC TGOC THC TIC TO TO TPM TSP TTE ULSD UV VE voe VOST WC WWTP ABBREVIATIONS particulate matter less than 10 microns in aerodynamic diameter particulate matter less than 2.5 microns in aerodynamic diameter polycyclic organic matter performance specification particle size distribution plant site emission limits performance specification test permanent total enclosure performance test method quality assurance and quality control Qualified Individual Qualified Source Testing Individual relative accuracy relative accuracy audit reasonably available control technology relative accuracy test audit rotary concentrator thermal oxidizer stationary reciprocating internal combustion engine reference method regenerative thermal oxidizer sulfuric acid mist sulfur chemiluminescent detector selective catalytic reduction system standard deviation semi-volatile organic compounds sample train standard reference material toxic air pollutant to be determined thermal conductivity analyzer thermal conductivity detector total gaseous non-ethane non-methane organic compounds total gaseous non-methane organic compounds total gaseous organic compounds total hydrocarbons tentatively identified compound thermal oxidizer toxic organic (as in EPA Method TO-15) total particulate matter total suspended particulate matter temporary total enclosure ultra-low sulfur diesel ultraviolet radiation range visible emissions volatile organic compounds volatile organic sample train water column waste water treatment plant Page 27 of 58 GP0SlAS-041316-PP-848 CHEMICAL NOMENCLATURE Ag silver Se selenium As arsenic S02 sulfur dioxide Ba barium S03 sulfur trioxide Be beryllium SOx sulfur oxides C carbon TCDD tetrachlorodibenzodioxin Cd cadmium TCDF tetrachlorodibenzofuran CdS cadmium sulfide TGOC total gaseous organic concentration CH20 formaldehyde THC total hydrocarbons CH3CHO acetaldehyde Tl thallium CH30H methanol TRS total reduced sulfur compounds CH4 methane Zn zinc C2H40 ethylene oxide C2Hs ethane C3 H40 acrolein C3 H6 0 propionaldehyde CsHa propane C6 H5 0H phenol Cl 2 chlorine CI02 chlorine dioxide co carbon monoxide Co cobalt CO2 carbon dioxide Cr chromium Cu copper EtO ethylene oxide EtOH ethyl alcohol (ethanol) H2 hydrogen H20 water H202 hydrogen peroxide H2S hydrogen sulfide H2S04 sulfuric acid HCI hydrogen chloride Hg mercury IPA isopropyl alcohol MDI methylene diphenyl diisocyanate MeCl2 methylene chloride MEK methyl ethyl ketone MeOH methanol Mn manganese Nz nitrogen NH3 ammonia Ni nickel NO nitric oxide N02 nitrogen dioxide NOx nitrogen oxides 02 oxygen p phosphorus Pb lead PCDD polychlorinated dibenzo-p-dioxins PCDF polychlorinated dibenzofurans Sb antimony Page 28 of 58 GP081AS-041316-PP-848 Appendix A.2 Accreditation Information/Certifications KIigore Companies 2024 PM, PM,o, PM , 5, and VEOs Compli ance Source Test Plan, West Valley Pit #10 , Dillman 500 T PH HMA Plant, Kearns, Utah Page 29 of 58 GP0BlAS-041316-PP-848 STA<! A m erican Association for Laboratory Accre d itatio n STACK TESTING ACCREDITATION COUNCIL Accredited Air Emission Testing Body A2LA has accredited MONTROSE AIR QUALITY SERVICES In recognition of the successful completion of the joint A2LA and Stack Testing Accreditation Council (STAC) evaluation process, this laboratory is accredited to perform testing activities in compliance with ASTM D7036:2004 -Standard Practice for Competence of Air Emission Testing Bodies . Pr"'L 27~ day of February 2024 . Vice President, Accreditation Service s For the Accreditation Council Certificate Number 3925.01 Valid to February 28, 2026 This accreditation program is not included under the A2LA ILAC Mutual Recognition Arrangement . Page 30 of 58 GP0BlAS-041316-PP-848 Appendix A.3 AO DAQE-AN0105690012-19 Kilgore Companies 2024 PM , PM 10 , PM 25 , and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plan t , Kearns , Utah Page 31 of 58 GP081AS-041316-PP-848 State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor April 30, 2019 ' Lee Ware Department of Environmental Quality Alan Matheson Executive Director DNISION OF AIR QUALITY Btyce C. Bird Director Kilgore Contracting, LLC P.O. Box 869 Magna, UT 84044 Dear Mr. Ware: DAQE-AN105690012-19 Re: Approval Order: Administrative Amendment to Approval Order DAQE-AN0105690009-10 for Administrative Changes Project Number: Nl0569-0012 The attached document is the Approval Order for the above-referenced project. Future correspondence on this Approval Order should include the engineer's name as well as the DAQE number as shown on the upper right~hand corner of this letter. The project engineer for this action is Ana Williams, who may be reached at (801) 536-4153. 4-y~ Bryce C. Bird Director BCB:AW:sa ?e_u: C,(!1-I 4-,,JJ__ /J-o cc: Salt Lake County Department ~'.\\.)11/ 195 North 1950 West• Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printe'paJ~o/~'1c~f''lf~per GP0BlAS-041316-PP-848 t I I STATE OF UTAH · Department of Environmental Quality Division of Air Quality APPROVAL ORDER: Administrative Amendment to Approval Order DAQE-AN0105690009-10 for Administrative Changes Prepared By: Ana Williams, Engineer Phone: (801) 536-4153 Email: anawilliams@utah.gov APPROVAL ORDER NUMBER DAQE-AN105690012-19 Date:_ April 30, 2019 Kilgore Contracting, LLC West Valley Pit #10 Source Contact: Lee .Ware, Environmental Manager Phone: (801) 250-0132 Ext 1412 . Email: lee.ware@kilgorecompanies.com Bryce C. Bird Director Page 33 of 58 GP0SlAS-041316-PP-848 Abstract Kilgore Companies, LLC dba Kilgore Co~b:a~iing (Kilg~re) ciperates the West Valley Pit #10 in West Valley, Salt Lake County. Kilgore has requested an ad:ministrative amendment to AO DAQE- AN0105690009-10, dated June 8, 2010, to revise the plant jaw crusher configuration and plant screen configuration under UAC R307-401-12, Reduction in Air Pollutants, replace the asphalt plant drum and burner under UAC R307-401-l l, Replacement-in-Kind Equipment, and update AO conditions. The PTE for the source will remain the same with these changes. ' Salt Lake County is a NAA of the NAAQS f.9r ozone, PM2.s, PM 10 , and SO2, and an attainment area for ( all other criteria pollutants. NSPS (40 CFR 60 Subparts A, I, and 000) andMACT (40 CFR 63 Subparts A and ZZZZ) regulatiqns apply to this source. NESHAP ( 40 CFR 61) regulations do not apply to this source. The Kilgore West Valley Pit #10 is a Title V area source. The PTE, in TPY, will remain as follows: PM 10 = 40.85, PM2.s (subset of PM10) = 40.85, NOx = 42.73, SO2 = 7.51, CO= 80.34, VOC = 27.23, and HAPs = 3.92. This air quality AO authorizes the project with the following conditions and failure to comply with any of the conditions may constitute a violation of this order; This AO is issued to, and applies to the following: Name of Permittee: Permitted Location: Kilgore Contracting, LLC PO Box 869 West Valley Pit #10 6200 West 5400 South Keams, UT 84118 Magna, UT 84044 UTM coordinates: 411,500 m Easting, 4,500,500 m Northing, UTM Zone 12 I.1 I.2 I.3 I.4 I.5 UTM Datum: NAD27 . SIC code: 1442 (C.onstruction Sand & Gravel) Section I: GENERAL PROVISIONS All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R.307-101] The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] Modifications to the equipment or pro.cesses approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R.307-401-1] All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two (2) year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] At all times, including periods of start-up, shutdown; and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, ahd inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] Page 34 of 58 GP0SlAS-041316-PP-848 DAQE-AN105690012-19 Page 3 · I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] · I, 7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150] IT.A II.Al II.A2 II.A3 II.A.4 II.AS II.A6 II.A? II.AS II.A9 II.AlO II.All II.A12 II.Al3 II.Al4 II.A15 II.A.1.6 ' Section IT: SPECIAL PROVISIONS . The approved installations shall consist of the following equipment: Kilgore West Vi;uleyPit #10 Two (2) Jaw Crushers Capacity: 500 tph each Three (3) Cone or Impact Crushers Capacity: 250 tph each Four ( 4) Screens Capacity: Three (3) 250 tph each and one (1) 500 tph .Four (4) Feeder/Hoppers One (1) Counter Flow Continuous Mix Asphalt Plant Capacity: 500 tph Burner Rating: 125 MMBtu/hr One (1) Baghouse Capacity: 109,000 acfm Two (2) Liquid Asphalt Storage Tanks Capacity: 35,000 gallons each Six (6) Asphalt Storage Silos Capacity: 300 tons each One (1) Lime Silo Eight (8) Cold Feed Storage Bin~ Two (2) Fuel Storage Tanks Capacity: 30,000 gallons each One (1) Fuel/Petroleum Storage Tank Capacity: 250,000 gallons · One (1) Ce~tral Mix Concrete :Batch Plant Capacity: 200 cubic yards per hour One:(1) Truck Mix Concrete Batch Plant Capacity: 120 cubic yards per hour One (1) Flyash Silo Capacity: 40 ton Page 35 of 58 GP0SlAS-041316-PP-848 DAQE-AN105690012-19 Page4 II.A.17 II.A.18 II.A.19 II.A.20 II.A.21 II.A.22 II.A.23 II.A.24 II.B II.BJ II.B.1.a One (1) Flyash Silo Capacity: 140 ton One (1) Cement Silo Capacity: 60 ton One (1) Cement Silo Capacity: 140 ton One (1) Natural Gas Boiler Capacity: 9.0 MMBTU/hr One (1) Diesel Generator Rating: 565 kW One (1) Diesel Generator Rating: 370 kW One (1) Diesel Generator Rating: 365 kW Miscellaneous Equipment Includes: Conveyors, Stackers, Loaders, Dozers, Material Haul Trucks, Water Trucks, and Small Fuel Storage Tanks Requirements and Limitations Pit #10 shall be subject to the following: The following production and/or consumption limits shall not be exceeded: A. Aggregate Plant Operations: 1,000,000 tons of processed aggregate material total for all aggregate operations and equipment approved under this AO, per rolling 12-month period B. Asphalt Plant Operations: 800,000 tons of combined asphalt production (virgin and recycled asphalt product) per rolling 12-month period. (480,000 tons of asphalt can be produced with on specification used oil or #1, #2,. or any combination of#l or #2 fuel oil with the remaining asphalt produced with natural gas). C. Concrete Plant Operations: 340,000 cubic yards ofconcrete production per rolling 12-month total D. Diesel Generator Usage: The maximum hours of operation per rolling 12-month period for each diesel generator shall be limited to 1,667. [R307-401-8] Page 36 of 58 GP0SlAS-041316-PP-848 j_ I i \ DAQE-AN105690012-19 Page5 II.B.1.a.1 II.B.1.b II.B.1.b.1 II.B.2 II.B.2.a II.B.2.b II.B.2.b.1 To determine compliance with a rolling 12-month total the owner/operator shall calculate a new 12-month total by the 20th day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. Production shall be determined by scale house records or vendor receipts. The records of production shall be kept on a daily basis. Hours of operation shall be determined by supervisor monitoring and 1 maintaining of an operations log. [R.307-401..:8] Visible emissions from the following emission points shall not exceed the following values: A. All crushers -12% opacity B. All screens -7% opacity C All baghouse/bin vent exhaust points -10% opacity D. All conveyor transfer points -7% opacity E. . All conveyor drop points -20% opacity F. All diesel engines~ 20% opacity G. All concrete batch plants -7% opacity H. All other points -20% opacity [R307-312, R307-401-8] Opacity observations of emissions from stationary sources shall be conducted according to 40 CFR 60_, Appendix A, Method 9. For sources that are subject to NSPS, opacity shall be determined by conducting observations in accordance with 40 CFR 60.1 l{b) and 40 CFR 60, Appendix A, Method 9. [R.307-305-3] The Asphalt Plant on site shall he subject to the following: The asphalt plant baghouse shall control process streams from the asphalt plant drum mixer/dryer. This baghouse shall be sized to handle at least 109,000 ACFM for the existing conditions. All exhaust air from the. asphalt plant drum mixer/dryer shall be routed through the baghouse before being vented to the atm(?sphere. [R307-401-8] The following operating parameters shall be maintained within the indicated ranges for the asphalt plant baghouse: A. The pressure drop shall not be less than 1.5 inches of water column or more than 6.0 inches of water column. B. The asphalt mix temperature shall not exceed 375 °F. [R307-401-8] They shall be monitored with equipment located such that an inspector/operator can safely read the output any time. The readings shall be accurate to within the following ranges: A. Pressure drop -Plus or minus 1.0 inches of water column Page 37 of 58 GP0SlAS-041316-PP-848 DAQE-ANl 05690012,.19 Page6 II.B.2.c II.B.2.c.1 II.B.2.c.2 B. Asphalt mix temperature-Plus or minus 10 °F All instruments shall be calibrated according to the manufacturer's instructions at least once every 12 months. [R307-401-8] Emissions to the atmosphere from the Asphalt Plant Baghouse Exhaust Stack shall not exceed the following rates and concentrations: Pollutant lb/hr grain/dscf (68 °F, 29.92 in Hg) PM10 (virgin) · PM10 (RAP) 5.52 6.44 0.024 0.028 [R307-401-8] Stack testing to show compliance with the emission limitations stated in the above condition shall be pe1formed as specified below: Emission Point: Drum Exhaust Passing through Baghouse Pollutant TSP Testing Status * Test Frequency # (virgin & RAP) PM10 ** @ (virgin & RAP) * ** # @ Initial compliance testing is required for the asphalt plant. The initial test date shall be perf01med as soon as possible and in no case later than 180 days after the start-up of a new emission source, an existing source without an AO, or the granting of an AO to an existing emission source that is modified. A compliance test is required on the modified emission point that has an emission rate limit. Compliance testing shall not be required for both virgin and recycled materials during the same testing period. Testing shall be performed for the product being produced during the time of testing. Initial test is not required unless directed otherwise by the Director. Initial test is required. Subsequent tests shall only be performed for PM10 , Test every three (3) years or sooner if directed by the Director. Tests may be required if the source is suspected to be in violation with other conditions of this AO. Compliance testing shall not be required for both virgin and recycled materials during . the same testing period. Testing shall be performed for the product being produced during the time of testing. [R307-165] Notification The Director shall be notified at least 30 days prior to conducting any required emission testing. A source test protocol shall be submitted to DAQ when the testing notification is submitted to the Director. Page 38 of 58 GP081AS-041316-PP-848 DAQE~AN105690012-19 Page7 II.B.2.c.3 II.B.2.c.4 The source test protocol shall be approved by the Director prior to performing the test. The source test protocol shall outline the proposed test methodologies, and stack to be tested, procedures to be used. A pretest conference shall be held, if directed by the Director. [R307-l65] Sample Location The emission point shall be designed to conform to the requirements of 40 CFR 60, Appendix A, Method 1, or other methods as approved by the Director. An Occupational Safety and Health Administration (OSHA)-or Min<:i Safety and Health Administration (MSHA)-approved access shall be provided :to the test location. [R307-401] Volumetric Flow Rate 40 CFR 60,. Appendix A, Method 2 or other testing methods approved by the Director [R307-401] II.B.2.c.5 PM10 II.B.2.c.6 II.B.2.c.7 For stacks in which no liquid drops are present, the following methods shall be used: 40 CFR 51, Appendix M, Methods 201, 201a, or other testing methods approved by the Director. The back half condensibles shall also be tested using the method specified by the Director. All particulate captured shall be considered PM10 • For stacks in which liquid drops are present, methods to eliminate the liquid drops should be explored. If no reasonable method to eliminate the drops exists, then the following methods shall be used: 40 CFR 60, Appendix A, Method 5, Sa, Sd, or Se as appropriate, or other testing methods approved by the Director. The back halfcondensibles shall also be tested using the method specified by the Director. The portion of the front halfof the catch considered PM10 shall be based on information in Appendix B of the fifth edition of the EPA document, AP-42, or other data acceptable to the Director. The back half condensibles shall not be used for compliance demonstration but shall be used for inventory purposes. [R307-401] Calculations To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director, to give the results in the specified units of the emission limitation. [R307-401] New Source Operation For a new source/emission point, the production rate during all compliance testing shall be no less than 90% of the production rate listed in this AO. If the maximum AO allowable production rate has not been achieved at the time of the test, the following procedure shall be followed: Page 39 of 58 GP0SlAS-041316-PP-848 DAQE-AN105690012-19 Page8 II.B.2.c.8 II.B.2.d II.B.3 II.B.3.a II.B.3.a.l 1) 2) Testing shall be at no less than 90% of the production rate achieved to date. If the test is passed, the new maximum allowable production rate shall be 110% of the tested achieved rate, but not more than the maximum allowable production rate. This new allowable maximum production rate shall remain in effect until successfully tested at a higher rate 3) The owner/operator shall request a higher production rate when necessary. Testing at no less than 90% of the higher rate shall be conducted. A new maximum production rate (110% of the new rate) will then be allowed if the test is successful. This process may be repeated until the maximum AO production rate is achieved. [R307-401] Existing Source Operation For an existing source/emission point, the production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. [R307-401] The amount of recycled asphalt used in the asphalt production shall not exceed 40% of the total product at any time. Compliance shall be determined by the hourly amount of recycled product introduced to the plant divided by the actual hourly production of the plant. Daily records maintained on site shall include: A. · Total production B. Amount of recycled asphalt used in the total production C. Daily calculations of the percent recycled used in the total production [R307-401-8] All Haul Roads and Fugitive Dust Sources on site shall be subject to the following: All unpaved roads and other unpaved operational areas that are used by mobile equipment shall be water sprayed and/or chemically treated to control fugitive dust. The application of water or chemical treatment shall be used. Treatment shall be of sufficient frequency and quantity to maintain the surface material in a damp/moist condition or unless it is below freezing. The opacity shall not exceed 20% on site and 10% at the property boundary during all times the areas are in use. If chemical treatment is to be used, the plan must be approved by the Director. [R307-309, R307-401-8] Records of water and/or chemical treatment shall be kept for all periods when the plant is in operation .. The records shall include the following items: A. Date B. Number of treatments made, dilution ratio, and quantity C. Rainfall received, if any, and approximate amount D. Time of day treatments were made [R307-401_;8] Page 40 of 58 GP081AS-041316-PP-848 1- 1 I i I t- i I I I I I DAQE-ANl 05690012-19 Page9 II.B.3.b Il.B.3.b.1 II.B.3.c II.B.3.d Il.B.3.e II.B.3.f II.BA.a II.B.4.b II.B.4.c II.BA.cl II.B.4.d.1 II.B.4.e Visible fugitive dust emissions from haul-road traffic and mobile equipment in operational areas shall not .exceed 20% opacity on site and 10% opacity at the property boundary. [R307-309-5] Visible emissions determinations for traffic sources shall use procedures similar to Method 9. The normal requirement for observations to be made at 15-second intervals over a six ( 6)- minute period, however, shall not apply. Six (6) points, distributed along the length of the haul road or in the operational area, shall be-chosen by the Director or the Director's representative. An opacity reading shall be made at each point when a vehicle passes the selected points. Opacity readings shall be made not less than 1/2 the vehicle length behind the vehicle and not less than 1/2 the height of the vehicle. The accumulated six ( 6) readings shall be averaged for the compliance value. [R307-309-5] The haul road limitations shall be: A. 0. 7 miles in length B. 0,009 miles in length paved C. 10 miles per hour The haul road speed shall be posted, at a minimum,. on site at the beginning of the haul road so that it, is clearly visible from the haul road. [R307-401-8J The storage piles shall be watered to minimize generation of fugitive dusts, as dry conditions warrant or as determined necessary by the Director. [R307-401-8] The owner/operator shall comply with a FDCP acceptable to the Director for control of all dust sources associated with the Pit #10 location. The owner/operator shall comply with the most current FDCP approved by the ,Director. [R307-309-6] The owner/operator shall comply with all applicable requirements.ofR307-309 for PM10 and PM2.s NAA for fugitive emission and fugitive dust sources. [R307-309] AU Fuels Consumed on site shall be subject to the following: The owner/operator shall use natural gas, fuel oil, or on-specification used oil as defined in R315-15, in the asphalt plant burner. [R307-401-8] The owner/operator shall use only natural gas as a primary fuel in the boiler. [R307-4Q1..;8] The owner/operator shall use only diesel fuel (e.g. fuel oil #1, #2, or diesel fuel oil additives) in all other on-site equipment. [R307-401-8] The sulfur content of any fuel oil, except# 1 and #2 diesel fuel, or on-specification used oil burned in the asphalt plant burner shall not exceed 0.50% by weight. [R307-401-8] "The sulfur content shall be determined by ASTM Method D-4294-89 or approved equivalent. Certification of sulfur content shall be either by the owner/operator's-own testing or by test reports from the fuel marketer. [R307-203-1] The owner/operator shall combust only diesel fuel that meets the definition of ultra-low sulfur diesel (ULSD), which has a sulfur content of 15 ppm or less. [R307-401-8] Page 41 of 58 GP0SlAS-041316-PP-848 DAQE-AN105690012-19 Page 10 II.B.4.e.l To demonstrate compliance with the ULSD fuel requirement, the owner/operator shall maintain records of diesel fuel purchase invoices or obtain certification of sulfur content from the diesel fuel supplier. The diesel fuel purchase invoices shall indicate the diesel fuel meets the ULSD requirements. [R307-401-8] Section ill: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. . NSPS (Part 60), A: General Provisions NSPS (Part 60), I: Standards of Performance for Hot Mix Asphalt Facilities NSPS (Part 60), 000: Standards of Performance for Nonmetallic Mineral Processing Plants MACT (Part 63), A: General Provisions MACT (Part 63), ZZZZ: NESHAP for Stationary Reciproc~ting Internal Combustion Engines Title V (Part, 70) Area Source PERMIT IDSTORY This AO is based on the following documents: Supersedes Is Derived From Incorporates AO DAQE-AN0105690009-10 dated June 8, 2010 NOI dated October 12, 2018 Additional Infonnation dated November 7, 2018 ADMINISTRATIVE CODING The following information is for UDAQ internal classification use only: Salt Lake County CDS SM MACT (Part 63}, Nonattainment or Maintenance Area, Title V (Part 70) Area Source, NSPS (Part 60) Page 42 of 58 GP081AS-041316-PP-848 DAQE-ANl 05690012-19 Page 11 ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document: 40CFR AO BACT CAA CAAA CDS CEM CEMS CFR CMS co CO2 C02e COM DAQ/UDAQ DAQE EPA FDCP GHG GWP HAPorHAPs ITA LB/HR MACT MMBTU. NAA NMQS NESHAP NOI NOx NSPS NSR PM10 PM2,5 PSD PTE R307 R307-401 S02 TitleN Title V TPY UAC voe Title 40 of the Code of Federal Regulations Approval Order Best Available Control.Technology Clean Air Act Clean Air Act Amendments Classification Data System (used by BP A to classify sources by size/type) Continuous emissions monitor Continuous emissions monitoring system Code of Federal Regulations Continuous monitoring system Carbon monoxide Carbon Dioxide Carbon Dioxide Equivalent -40 CFR Part 98, Subpart A, Table°A-1 Continuous opacity monitor · Division of Air. Quality This is a document tracking code for internal UDAQ use Environmental Protection Agency Fugitive dust control plan Greenhouse Gas( es) -40 CPR 52.21 (b)( 49)(i) Global Warming Potential -40 CFR Part 86.1818-12(a) Hazardous .air pollutant(s) Intent to Approve Pounds per hour Maximum Achievable Control Technology Million British Thermal Units Nonattainment Area National Ambient Air Quality Standards National Emission Standards for Hazardous Air Pollutants Notice of Intent Oxides of nitrogen New Source.Performance Standard New Source Review Particulate matter less than 10 microns in size Particulate matter less than 2.5 microns in size Prevention of Significant Deterioration Potential to Emit Rules Series 307 Rules Series 307 -Section40l Sulfur dioxide Title N of the Clean Air Act Title V of the Clean Air Act Tons per year Utah Administrative Code Volatile organic compounds Page 43 of 58 GP081AS-041316-PP-848 Kilgore Companies Appendix "S" Field Work Safety Plan 2024 PM , PM ,o, PM 2s, and VEOs Compliance Source Test Plan , West Valley Pit #10 , Dillman 500 TPH HMA Plant, Keams , Utah Page 44 of 58 GP0BlAS-041316-PP-848 SITE SAFETY PLAN BOOKLET Project: PROJ-041316 Customer: Kilgore Companies LLC Location: Kearns, Utah Units: West Valley Pit #10 Dillman 500 TPH Counter-flow HMA Plant Client Project Manager: Beckie Hawkins Revision Date: January 21, 2022 Page 45 of 58 GP0SlAS-041316-PP-848 Page 1 of2 Site Safety Plan and JHA Purpose and Instructions Purpose Employee safety is the top priority of Montrose Environmental Group. All employees must be trained to assess and mitigate hazards. The District Manager and Project Manager are responsible to ensure all hazards have been properly identified and managed. All employees have Stop Work Authority in all situations where an employee feels they or their co-worker cannot perform a job safely or if there is a task for which they have not been adequately trained. The Site Safety Plan (SSP) has been developed to help assist Montrose test crews with identifying physical and health hazards and determining how the hazards will be managed. Additionally, the SSP will help each crew manage the safety of the employees by providing emergency procedures and information. The booklet contains a several safety forms that may be required in the field. Instructions The SSP consists of the following: 1. A Pre-Mobilization Test Plan -To be completed in it's entirety by the client project Manager prior to the test. 2. A Job Hazard Analysis is a standardized, two-page, fillable form that is used to evaluated the task/site's particular hazards and controls. The form also includes a daily toolbox topic and daily hazard review with sign off by the team. The client Project Manager is responsible to complete the JHA form through section 8. Upon arrival at the test site, the team will review the form for accuracy, making any corrections required and complete the remainder of the JHA. Section 9 will require at least three tasks, hazards and controls be identified for the project. Each team member has the option to discuss making changes or adding to the JHA and must sign on the Job Hazard Analysis form in agreement and sign in Section 10. The JHA is to be modified when conditions change. A toolbox meeting with a daily topic in addition to a review of the hazard analysis is required daily for the duration of the test. An additional sheet of paper with the toolbox topic and signatures can be added to the SSP packet. 3. Hazard Control Matrix -contains useful information on both engineering and administrative controls that a crew can use to reduce or eliminate the hazards they have observed plus applicable PPE that may be required. 4. Emergency Action Plan -The Job Supervisor/ Client Project Manager (CPM) will complete the Emergency Action Plan form and ensure that all employees are familiar with the facility emergency and evacuation procedures, assembly/ rally points, alert systems, and signals prior to work commencing. In the event of an emergency situation/ evacuation, the Job Supervisor/ CPM will maintain a roster and be responsible for accounting for all employees. The Job Supervisor/ CPM will ensure that this Emergency Action Plan Form is completed, communicated to all employees, signed, and posted. 5. Additional Forms, as applicable a. MEWP Lift Inspection Form b. Heat Stress Prevention Form Based on Heat Index c. Extended Hours Form Page 46 of 58 AQS-FRM-1.13R1 GP0BlAS-041316-PP-848 Page 2 of2 Site SafetyPlan and JHA Purpose and Instructions The SSP is a living document. The Project Manager should continually update their SSPs as new information and conditions change or if new hazards are presented. Each completed SSP should be maintained with the Test Plan in the office for a period of 3 years. There will be an audit process developed for the Site Safety Plans. Page 47 of 58 AQS-FRM-1.13R1 GP0SlAS-041316-PP-848 Page 1 of 2 PRE-MOBILIZATION TEST INFORMATION PROJECT NAME/LOCATION: WValley Pit #10 HMA PROJECT #: PROJ-041316 TEST DATE: __ J_u_n_e_1~9,~2_0_24 __ _ PROJECT MANAGER: __ A_us_ti_n_T_ra_m_e_ll __ TEST SCOPE: PM/PM10/PM2.5 and VEOs on Dillman 500 TPH Counter-flow HMA SITE CONT ACT: Name: Bryan Jorgensen Contact Phone: 801-250-0132 ---------- Source Type : New Source: Revisit:~ Prj#/Date/Tech: __________ _ Coal Fired Electric Utility: __ Ethanol Plant: Chemical Mfg. of _________ _ Cement/Lime Kiln Plant: Specialty Mfg. of: ____ _ Other: _____ _ Anticipated Effluent Composition -check all that apply and fill in expected concentration in ppm/% □ □ □ □ □ co NOx voe other If other, explain: ______________________ _ Flammable: __ _ Toxic: __ _ Engineering Controls to be Implemented: Additional Safety Equipment Required : Personal gas monitors: __ Respiratory Protection: Corrosive: __ _ Dust: ___ _ Half Face__ Full Face__ HEPA Filters __ Supplied Air: __ (Safety Dept. Approval) Approximate Flue Gas Temperatures, (F) □ lK) below210 210 to 450 If other, explain: Approximate Duct Pressure, (iwg): □ [x] below -3 -3 to +3 If other, explain: □ 450to 950 □ +3to+7 Page 48 of 58 □ above 950 □ above +7 □ other □ other AQS-FRM-1.17 GP081AS-041316-PP-848 Page 2 of 2 PRE-MOBILIZATION TEST INFORMATION Sampling Location : Stack Port .1S_ Approximate Sa m pling Platform Heig ht, (ft) □ IB] □ below6 6to 50 50 to 100 Duct Port □ □ above 100 other If other, explain : _______________________ _ A ccess and Prot ection: Elevators: Ladders : MEWP Lift: Scaffold: Equipment Hoist: __ Guardrails: Toe plate: __ Engineered Tie Off Points: __ Heat Shield: Other: Existing platforms and handrails Desc r ibe how equi p men t w ill be mobilized t o the sampling location : Hoisted by rope or hand-carried Additional Information: Effluent Chemical Regulatory Limits Chemical Cal OSHA PEL 1 Cal OSHA NIOSH REL Cal OSHA Gas Name Formula (ppm) STEL2 TWA3 (ppm) Ceiling (oom) (ppm) . Carbon Monoxide co 25 200 35 200 Nitric Oxide NOx 25 ND5 25 ND Sulfur Dioxide S02 2 5 2 ND Hydrogen Chloride HCI 0.3 2 ND 2 Hydrogen Sulfide H2S 10 15 10 (10 min.f 50 California Occupational Safety and Health Administration (OSHA) Permissible Exposure Limit (PEL) based on an 8-hour shift; 2: Cal OSHA Short-term Exposure Limit (STEL) based on a 15-minute period; IDLH4 (ppm) 1,200 100 100 50 100 3: National Institute for Occupational Safety and Hearth (NIOSH) Recommended Exposure Limit (REL) Time-weighted Average (TWA) based on an 8-hour shift; 4: Immediately Dangerous to Life or Hearth (IDLH); 5: Not Defined (ND); C: Celfing Umit -Maximum affowable human exposure limit for an airborne or gaseous substance, which Is not to be exceeded, even momentarily. Prepared by: Joby Dunmire Reviewed by: ----------------- Page 49 of 58 Date: May 7th, 20024 Date: --------- AQS-FRM-1.17 GP0SlAS-041316-PP-848 1. Client Facility Client Rep Job Preparation Job Hazard Analysis Contact Name SSPWriter D Job Site Walk Through Completed D Site Specific Training Complete 0 Safe Work Permit Received from Client mmlll lmll A l l hazards and mitigation steps mL1st be documented. If tl11s JHA does not cover all the hazards identified, use Section 9 to document that 111forniation. If the heat index is expected to be above 91 ", fill out the Heat Stress Prevention Form . 2. Facility Information/Emergency Preparedness If non-emergency medical attention is needed, call : AXIOM#: 877-502-9466. Plant Emergency # _________ Certified Fi rst Aid Person : EMS Location Evacuation Routes Rally Point Severe Weather Shelter Location Eye Wash & Safety Shower Location Operational: □Yes □No Source Information: (list type): Stack Gas Temp. (°F) Stack Gas Press. ("H20) ___ Stack Gas Components : ____________ _ Dv es D No If yes, see List of Hazard Chemicals. Stack Gas Inhalation Potential? 3. Error Risk 0 Time Pressure D Lack of procedures D Monotonous Activity 4. Physical Hazards Dust Hazards Thermal Bum Electrical Hazards Inadequate Lighting Slip and Trip Hand Protection D Remote Work Location D Extreme temps, wind >30mph D First day back after time off D > 12 hr shift D Personal illness/fatigue 0 Multiple job locations D Working > 8 consecutive days 0 Vague work guidance 0 Other: Hazard Controls D Dust Mask O Goggles D Other: ------------------□ Hot Gloves O Heat Shields O Other Protective Clothing: D Connections Protected from Elements D External GFCI □Other: D XP Rating Requirement O Intrinsically Safe Requirement --------- □ Install Temporary Lighting O Headlamps D Housekeeping D Barricade Area D Other: -----------------□ Cut Resistant Gloves D Pinch Pts. 0 General D Electrical D Impact Resistant 0 Other: Potential Hazards for Consideration Secondary Permits D Hot Work D Confined Space D Excavation W?rking from Heights O Falling objects D Fall protection D Drop zone protection D Platform load ratings See also Sect. 7 D Scaffold inspection D Ladder inspection D Barricades for equipment Electrical D Exposed wire/connector D Verify equipment grounding D Arc Flash Lifting O Crane lift plan D Rigging inspection D Tag lines used D Hoists in place Respiratory D Unexpected exposure O Chemical D Dust (combustible) D PEL provided See also Sect. 8 D Cartridaes or supplied air available O Gas detection eauipment 5. Required PPE D Hi-Vis Vests 0 Hard Hats O Safety Glasses D Metatarsal Guards 0Nomex/FRC D Harness/Lanyard* D Hot Gloves 0 OtherPPE : D Safety Toe Shoe/Boot D Hearing Protection □Safety Spotter D Goggles O Personal Monitor Type: 0 Face Shield O Respirator Type: Page 50 of 58 1 of 3 Job Hazard Analysis Additional Work Place Hazards 6. Critical Procedures -check all that apply-*indicates additional form must be completed or collected from client D Heat Stress Prevention* D Confined Space* D MEWP* D Roof Work D Scaffold D Cold Weather Work D Hazardous Energy Control* D Exposure Monitoring D Other: ---------- 7. Working From Heights Fall Protection \ D Fixed Guardrails/Toe boards D Fall Prevention PPE Warning Line System 8. 9. Falling Objects Protection Fall Hazard Communication · \ D Barricading D Netting D House Keeping D Tethered Tools D Catch Blanket or Tarp ID Adjacent/Overhead Workers D Contractor Contact D Client Contact Other Considerations Environmental Hazards -Weather Forecast 0 Heat/Cold □Lightning □Rain □Snow D Ice □Tornado □Wind Speed Steps for Mitigation: Electrical Safety Planning Plant Hook up: 011ov 0 220/240V 0 480V D Generator D Hard wired into panel Electrical Classified Area: □Yes D No Trailer Grounded: □Yes □No Plug Type Electrical Hook Up Responsibility: List of Hazardous Chemicals Other Chemicals: D Acetone D Nitric Acid D Hydrogen Peroxide D Compressed Gases D Hexane D Sulfuric Acid D lsopropyl Alcohol D Flammable Gas □Toluene D Hydrochloric Acid D Liquid Nitrogen D Non-Flammable Gas 0H2S D Carbon Monoxide Steps for Mitigation: Wildlife/Fauna in Area 0 Poison Ivy □Poison Oak Otnsects: □Wildlife: Personnel w/ known allergies to bees stings or other allergens? □Yes 0No Observed Hazards and Mitigation Steps Task Potential Hazard(s) Steps for Mitigation • 1 1 2 2 3 3 • 1 1 2 2 3 3 • 1 2 2 3 3 • 1 1 2 2 3 3 2 of3 Page 51 of 58 GPos1As-041316-=~:-s4§'" • • • - fA. •·· . .,-,~<\ N} () N. i H.() )) L .. •!\'',: \ ,.,:.:•,t· Job Hazard Analysis 10 , JHA REVIEW: Crew Names & Signatures Printed Name 11 Daily JHA Meeting & Review Items to review: • Change in conditions • New workers or contractors Signature Date Printed Name • Extended work hours • Daily Safety Topic • Occurrence of near misses or injuries Signature Date Initialing demonstrates that site conditions and hazards have not changed from the original SSP. If changes did occur, make the necessary updates to this JHA and add notes as applicable in Section 9. Day Discussion Topic Initials 2 3 4 5 6 7 8 9 10 11 Page 52 of .58 3 of3 iv\ t J ,;,,,. 1 k.l.J) t Page l o/2 EMERGENCY ACTION PLAN FORM The Job Supervisor/ Client Project Manager (CPM) will ensure that all employees are familiar with the facility emergency and evacuation procedures, assembly/ rally points, alert systems, and signals prior to work commencing. In the event of an emergency situation/ evacuation, the Job Supervisor/ CPM will maintain a roster and be responsible for accounting for all employees. The Job Supervisor/ CPM will ensure that this Emergency Action Plan Form Is completed, communicated to all employees, and posted. •Mou must follow the client's emergency action plan first, and notify your Supervisor immediately. •If incident is life threatening, CALL 911 IMMEDIATELL Y •UI non-emergency medical attention i s needed, call AXIOM Medical number: 877-502-9466. 1 MEG Job Supervisor/ CPM 's Name: 2 MEG Job Supervisor/ CPM's Telephone Number: 3 MEG Job Safety Supervisor (if applicable): 4 MEG Job Safety Supervisor's Telephone Number: 5 Plant's Emergency Telephone Number: 6 Local Hospital/ Clinic Telephone Number: 7 Emergency Ops Radio Channel: 8 Plant's #1 Contact Person's Name: 9 Plant's #1 Contact Person's Telephone Number: 10 Plant's #2 Contact Person's Name: 11 Plant's #2 Contact Person's Telephone Number: 12 Designated Assembly Point Location: 13 Evacuation Routes: 14 Severe Weather Shelter Location: 15 Eye Wash and Safety Shower Location: 16 The First Aid Kit is Located: . 17 The Fire Extinguisher is Located: Page 53 of 58 GP081AS-041316-PP-848 Page2of2 EMERGENCY EVACUATION AND ASSEMBLY MAP 1 Facility Name: 2 Facility Alarm (Circle): YES or NO FIRE: : CHEMICAL/ GAS: : Alarm Tones: SHELTER-IN-PLACE: EVACUATE: : 3 OTHER: . 4 Designated Shelter(s) Description: 5 Designated Assembly Point(s) Description: N W~E s Draw the evacuation and assembllf:maf;! here EMERGENCY ACTION PLAN FORM AND EVACUATION ASSEMBLY MAP REVIEW: Crew Names and Signatures Printed Name: Signature: -Date: Printed Name: Signature: Date: Page 54 of 58 GP0SlAS-041316-PP-848 Page 1 of 1 Daily MEWP Lift Inspection Form All checks must be completed prior to each work shift, before operation of the MEWP lift. This checklist must be used atthe beginning of each shift or following 6 to 8 hours of use. MEWP Lift Model #: Serial Number: Make: Rented or Owned: • Check "Yes" if an item is adequate, operational, and safe. • Check "No" to indicate that a repair or other corrective action is required prior to use. • Check "N/A" to indicate "Not Applicable." Items to be Inspected 1. All MEWP lift components are in working condition (i.e. no loose or missing parts, torn or loose hoses, etc.)-if something can be easily loosened by hand then it is not sufficient. 2. Hydraulic fluid level is sufficient, with the platform fully lowered 3. Hydraulic system pressure (see manufacturer specs) is acceptable. If the pressure is low, determine cause and repair in accordance with accepted procedures as outlined in service manual. 4. Tires and wheel lug nuts (for tightness) 5. Hoses and cables (i.e. worn areas or chafing) 6. Platform rails and safety gate (no damage present) 7. Pivot pins secure 8. Welds are not cracked and structural members are not bent or broken 9. Warning and instructional labels are legible and secure, and load capacity is clearly marked. 10. Manufacturer's Instruction Manual is present inside the bucket 11. Base controls (switches and push buttons) can be properly operated 12. Platform conditions are safe (i.e. not slippery) 13. Fire extinguisher is present, mounted and fully charged, located inside the bucket 14. Headlights, safety strobe light and back-up alarm are functional 15. Workplace is free of hazards (overhead powerlines, obstructions, level surface, high winds, etc.) *Do not operate if winds are 20 mph, unless otherwise specified by manufacturer recommendations. Operator Name & Signature Location Ground Control Name & Signature Location Harness Inspections: Printed Name Signature Printed Name Signature Printed Name Yes No N/A □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ [j □ □ □ □ □ Date Date Date Date Date Signature Page 55 of 58 GPos1As!bTr:fii~1>~-a~s MVl i KU.:'>.t. \ I H Ii l I/. j I I '1 .,, I H '• ; (. 1 "-Page 1 of 1 Extended Hours Safety Audit Project Number: ----------Date: ------Time:--------- When a project is expected to extend past a 14-hour work day, this form must be completed to evaluate the condition of the crew, and the safety of the work environment. Permission to proceed into extended work hours must come from a District Manager (0~) or Regional Vice President (RVP). Technical RVPs can authorize moving forward, if they are in the field or if they are managing the project. 1. Hold test crew meeting Test crew initials: The test leader should look for signs of the following in their crews: • Irritability • -Fatigue • Lack of motivation • Depression • Headaches • Reduced alertness, lack of concentration and • Giddiness memory The test leader should assess the environmental and hazardous concerns: • · Temperature and weather • Lighting • Working from Heights 2. Notify DM or RVP • Hoisting • PPE (i.e. respirators, etc.) • Pollutant concentration in ambient air (SO2, H2S, ect.) The PM must contact either the DM or RVP to discuss the safety issues that may arise due to the extended work period. During this time, they can come to an agreement on how to proceed. Items to discuss include: • Reason for extended hours • Reason for delay • Production limitations • Impending Weather 3. Contact the client . The PM, DM or RVP must discuss with client any identified safety concerns, the client's needs and mutually agree on how to proceed. Discussion should also include the appropriate rest period needed before the next day's work shift can begin. The DM and/or a RVP must be informed on the final decision. Final Outcome: Approver: Page 56 of 58 001 AS-SAFETY-FM-3 GP0BlAS-041316-PP-848 Page 1 of 1 Heat Stress Prevention Form T his form is to be used when the Expected Heat Index is above 91° F, and is to be kept with project documentation. er PM: Ex ected Heat Index: 1. Review the signs of Heat Exhaustion and Heat Stroke 2. If Heat Index is above 91 ° F: • Provide cold water and/or sports drinks to all field staff (avoid caffeinated drinks and energy drinks which can increase core temperature). o Bring no less than one gallon of water per employee • If employee(s) are dehydrated, on blood pressure medication or not acclimated to heat, ensure they are aware of the heightened risk for heat illness • Provide cool head bands/vests/etc. • Have ice available to employees • Implement work shift rotations and breaks, particularly for employees working in direct sunlight. • Provide as much shade at the jobsite as possible, including tarps, tents or other acceptable temporary structures. • PM should interview each field staff periodically to evaluate for signs of heat illness 3. If Heat Index is above 103° F: • Employees must stop for drinks and breaks every hour (about 4 cups/hour) • Employees are not permitted to work alone for more than one hour at a time without a break offering shade and drinks • Employees should wear cool bands and vests if working outside more than one hour at a time • PM should interview each field staff every 2 hours to evaluate for signs of heat illness Faint or dizzy Excessive sweating---- Cool, pale, ---~ 1 • dammy skin .-- HEAT R STROKE, -~ ..Al ----Throbbing headache -----Nosweatfng _ Body temperature l lijc1 . t above103" ~ Red, hot, dry skin Nausea or vomiting Muscle cramps --------May lose Q consciousness nn ◄ AC:, CA CCTV caA C Page 57 of 58 GPOSlAS-041316-PP-848 This is the Last Page of This Document If you have any questions, please contact one of the following individuals by email or phone. Name: Beckie Hawkins Title: District Manager Region: Great Plains Region, Utah Office Email: BeHawkins@montrose-env.com Phone: 801-372-7049 Name: Austin Tramell Title: Field Project Manager Region: Great Plains Region, Utah Office Email: AuTramell@montrose-env.com Phone: 801-645-2353 K ilgore Compan ies 2024 PM , PM,o, PM2 s, and VEOs Compliance Source T est Plan , West Valley P it #10 , Di ll man 5 00 T PH HMA . Plant, Kearn s , Utah Page 58 of 58 GP081AS-041316-PP-848